HomeMy WebLinkAboutAgenda Report - December 17, 1986 (98)SUBDIVISION
IMPROVEMERr
AGRFEM7P ADDENDU4
FOR JOHNSON RANCH
UNIT NO. 1 APPROVED City Council approved the Subdivision I-nprovement Agreenent
Addendum for Johnson Ranch Unit No. 1 and authorized the
CC -46 City Manager and City Clerk to execute it on behalf of the
City.
Council was apprised that the City Council authorized the
City to pay for 50% of the cost of 'reconstruction of the
Cherokee Lane/Century Boulevard intersection at its meeting
of November 20, 1985. This addend= covers that
installation based on actual construction costs.
if
_
5 j
i
TO:
CITY OF LODI
PUBLIC WORKS DEPARTMENT
City Council
FROM: City Manager
MEETING DATE: December 17, 1986
COUNCIL COMMUNICATION
4;
AGENDA TITLE: Approve Subdivision Improvement Agreement Addendum for
Johnson Ranch Unit No. 1, Covering the Work at the
Intersection of Cherokee Lane and Century Boulevard
r,
RECOMMENDED ACTION: That the City Council approve the Subdivision
Improvement Agreement Addendum for Johnson Ranch unit No. 1 and authorize the
City Manager and City Clerk to execute it on behalf of the City.
BACKGROUND INFORMATION: The City Council authorized the City to pay for
661 of the cost o reconstruction of the Cherokee Lane/Century Boulevard
intersection at its meeting of November 20, 1985. This addendum covers that
installation based on actual construction costs.
ck L. Ronsko
ublic Works Director
y _
JLR/GER/ma
Attachment
SUBDIVISION IMPROVEMENT AGREEMENT ADDENDUM
JOHNSON RANCH NO. 1
Tract No. 2033
THIS AGREEMENT entered into as of this , 1986 between the
City of Lodi, hereinafter referred to as City-,ff and Verner Construction
Company, hereinafter referred to as "Subdivider."
WITNESSETH•
WHEREAS, the parties have entered into a subdivision agreement dated
Ma,y 6 1986, which agreement covers the responsibilities of City and of
Subdivider for the development of Johnson Ranch, Unit No. 1;
WHEREAS, the City is responsible for the median in Century Boulevard and
50% of the intersection modifications at Cherokee Lane and Century Boulevard;
WHEREAS, Subdivider has provided City with a firm figure from Subdivider's
contractor for doing said work; and
WHEREAS, it is in Subdivider's and City's best interest to do the work at
the time the subdivision construction is done.
NOW THEREFORE, it is agreed between the parties hereto as follows:
1. That this document is considered an addendum to the original
subdivision agreement between the two parties;
2. That Subdivider will see that the work shown on the development plans
for the subdivision shall be completed at the same time and in the
same manner as work in the subdivision;
3. The work is as follows:
Item
No. Description and Quantity Total
1. Traffic Island Removal Lump Sum $ 7,500.00
2. Curb Removal 240 LF @ $4.00 960.00
3. Pavement Removal in Median 6,800 SF @ $0.80 5,440.00
4. Pavement Removal in Intersection 12,800 SF @ 1.50 19,200.00
5. 12" Corrugated Metal Pipe 20 LF @ $25.00 50000
6. Catch Basin 1 EA @ $700.00 700.00
7. 6" Vertical Curb & Gutter 153 LF @ $9.00 1,377.00
8. 6" Vertical Curb (Extruded) 292 LF @ $4.50 1,314.00
9. 6" Vertical Curb & Gutter (Median type) 118 LF @ $9.00 1,062.00
10. 6" Asphalt Concrete Curb 30 LF @'$5.00 150.00
11. Soil Sterilant & 1" Asphalt Concrete Cap 1,600 SF @ $0.50 800.00
12. 0.30' Asphalt Concrete on Existing Road Base 15,200 SF @ $2.10 31,920.00
13. 0.30' Asphalt Concrete on 0.55' Aggregate Base 240 SF @ $1.60 384.00
-1-
14. Street Sign Post 1 EA @ $100
100.00
15.` Engineering'Lump Sum
1,500.00
16. Staking - Surveying Lump Sum
1,500.00
TOTAL BID
$74,407.00
City's portion of intersection (50%)
$37,203.50
Century Boulevard Median Lump Sum
$ 51900.00
Net amount to be paid by City to Subdivider
$43,103,50
4. Based on the above prices, City agrees to reimburse Subdivider in the
normal fashion for contract work, i.e., to pay monthly
for work
accomplished, withholding 10% until acceptance of the work by the City
Council, at which time payment in full will be made to
the Subdivider.
S. All payments made to Subdivider shall be mailed to:
Verner Construction Company
2707 E. Fremont St. Ste. 17
Stockton, CA 95205
IN WITNESS WHEREOF, the parties have caused this Agreement
to be executed
on date -first above written.
CITY OF LODI, a municipal Corporation
\ll+rr,
By:
Thomas A. Peterson
City Manager
' .`O !
.
Attest:
Alice M. Reimche
City Clerk
-2-