Loading...
HomeMy WebLinkAboutAgenda Report - December 16, 1987 (45)DATER MASTER PLAN PROJECT APPROVED CC -6 CC -88 CC -183(a) CITY COUNCIL MEETING rLCrMBER 16, 1987 City Council approved the preparation of a new dater Master Plan by Psomas & Associates and appropriated an additional $15,000 frcm the beater Capital Outlay Res,,rve. Council was informed that 1981/88 Capi,al Improvement Program includes $40,000 for an updated Water "aster Plan. The last plan was completed 10 years ago. The plan is outdated in many respects, including its assumptions as to well locations and capacities and projected land use and population density. In order to properly develop a plan for expansion of the water system to coincide with the adoption of the new General Plan, work should be started now. The budgeted amount was based on e rough guess made a year ago and did not include sufficient funds for the analysis of future water supply. The total project includes: Psomas Engineering $38,200 - City Engineering - This is an c:30mate.of the time to be charged by City engineering staff in working with the consultant, data data collection, and review. 3,000 - Computer Model - A main frame computer model of the water system was developed as part of the previous Master Plan. It is now available on a microcomputer. This would allow City staff and the consultant much quicker access and allow future updating and runs to be made by City engineers. The concept including a microcomputer was reviewed and approved by the City Managument Information Systems (MIS) Committee during the last budget process. 9,000 - Contingencies (10p) 4,800 $55,000 The work will be coordinated with separate studies on UBCP contamination. I CITY OF LODI COUNCIL. COMMUNICATION PUBLIC WORKS DEPARTMENT TO: City Council FROM: City tdanage, MEETING DATE: December 16, 1987 AGENDA TITLE: Approve Water Master Plan Project RECOMMENDED ACTION: That the City Council approve the preparation of a new Water Master Plan by Psomas a Associates and appropriate an additional $15,000 from the mater Capital Outlay Reserve. BACKGROUND INFORMATION: The 1987/88 Capital Improvement Program includes $40,000 for an updated Water Master Plan. The last plan was completed 10 years ago. The plan is outdated in many respects, including its assumptions as to well locations anu capacities and projected land use and population density. In order to properly develop a plan, for expansion of the water system to coincide with the adoption: of the new General Plan, work should be started now. The budgeted amount was based on a rough guess made a year ago and did not include sufficient funds for the analysis -of _future waster supple., ..Th.e.total_ project includes: Psomas Engineering (see attached scope of work) " City Engineering - This is an estimate of the time to be charged Ly City engineering staff in working with the consultant, data data collection,, and review. " Computer Model - A ;vain frame computer model of the water system was developed as part of the previous Master Plan. It is now available on a microcomputer. This would allow City staff and the consultant much quicker access and allow future updating and runs to be made by City engineers. The concept including a microcomputer was reviewed and approved by the City Management Information Systems (MIS) Conimittee during the last budget process. Contingencies (10%) $38,200 3,000 91000 4,800 $55,000 The work will be coordinated with separate studies on DBCP contamination. Qac L. Ronsko cc: Water/Wastewater Superintendent P is Works Director Finance Director APPROVED: _ FILE NO. TWRA-S A. PLfERSON. City Manager CWATERMA/TXTW.02M December 4, 1987 LODI WATER MASTER PLAN - 1987 SCOPE OF WORK Estimated r__.. e- 1- 1. Review, evaluate, and incorporate existing Master Plan 800 and related reports and studies. 2. Review, evaluate, and incorporate existing distribution 1,700 system operation control methodology. 3. Review, evaluate, and incorporate current well supply and 900 distribution facilities data. 4. Review, evaluate, and incorporate existing supply and demand 600 data. S. Utilize current General Plan information for land use 500 planning, population, and growth trends. 6. Review and evaluate existing demand data and incorporate 400 basic design factors to project future water demands. 7. Review, evaluate, and incorporate design criteria for supply 300 and distribution facilities. 8. Review available information on local and area -wide ground- 3,500 water conditions including existing and projected quantity (drawdown) and quality. All sources of information will be referenced. 9. Identify and evaluate long-range supply options. 5,000 10. Identify treatment requirements for WZD surface supply. 1,200 11. Evaluate near and long term impacts of "EBMUD Decision." 7,500 Evaluation will include input from a water rights attorney. 12. Use computer network analyses to evaluate optimum well 6,000 supply and distribution system configuration. Does not include purchase of FAAST computer program, if required. 13. Delineate well supply and distribution system needs for 2,000 present and future. 14. Recommend operation and control procedure to best utilize 1,800 existing SCADA system. 15. Prepare a final report setting forth a master plan for the 6.000 expansion of the water system. $38,200 HLW.jer:5.5