HomeMy WebLinkAboutAgenda Report - December 16, 1987 (52)CITY CGI NCii MEETING
DECEMBER 15, 1987
AWARD CONTRACT FOR
STANDBY GENERATOR
P.EPLACEMENT AT
PUBLIC SAFETY
BUILDING, 230
WEST ELM STREET
"L
RES. NO. 87-172 The City Council adopted Resolution No. 87-1:72 awarding the
contract for the Standby Generator Replacement at Public
CC -12(d) Safety Building, 230 West Elm Street, Lodi, to Collins
Electrical Company and authorized the City Manager to enter
into a lease -purchase agreement for the project and
transfer funds between appropriate accounts.
This project includes the removal of the existing 1941
gasoline engine and generator assembly (including asbestos
insulation), the installation of a new diesel powered
engine, generator with controls, and wiring to the
building's transfer electrical switching gear.
Plans and specifications for this project were approved on
November 4, 1987.
The City received the following bid for this project:
BIDDER LOCATION BID
Estimate $59,000
Collins Electrical Co. Stockton $81,888
City engineering staff met with Collins Elect,ical Co.,
McLaughlin Co. (asbestos removal subcontractor), Valley
Mechanical (plumbing subcontractor), and Engine Power Co.
(generator supplier). The project was reviewedand a
number of items were clarified. The result is a change
order that will reduce the project cost by $3,015 and will
be signed after the contract is awarded. Based on 'these
discussions and the fact that the `estimate did not. allow,
for asbestos removal, it is recommended the project be
awarded.
As an alternative to a standard contract, the .generator
supplier offered a lease -purchase agreement. Collins'
Electrical will still be the prime contractor and they.have
no problem with the arrangement. The Finance Director has
reviewed the terms of the agreement (5 years @ 7.5%) and
feels it would be appropriate for the City to take
advantage of their offer.
Council was apprised that, in order to comply with
auditors' requests, the lease payments should be made out
of the Operating Budget. Sufficient funds to make the
lease payments must be provided in the Operating Budget for
the remainder of 1987•-88.
CITY OF LODI
COUNCIL C01NIMUNICATION
•
PUBLIC WORKS DEPARTMENT
Project Data
T0: City Council Originally Budgeted: 1987
Budgeted Fund: General Fund
FROM: City Manager Amount Budgeted: $61,000
Total Project Estimate: $85,000
MEETING DATE: December 2, 1987 Bid Opening Date: 11/25/87
AGENDA TITLE: Award Contract for Standby Generator Replacement at Public
Safety Building, 230 W. Elm Street
RECOMMENDED ACTION: None.
BACKGROUND INFORMATION: This project includes the removal of the existing
1941 gasoline engine and generator assembly, the installation of a new diesel
powered engine, generator with controls and wiring to the building's transfer
electrical switching gear.
Plans and specifications for this project were approved on November 4, 1987.
The City received the following bid for this project:
BIDDER LOCATION BID
Engineer's Estimate $59,000
Collins Electrical Co. Stockton $81,888
Since only one bid was received and it substantially exceeds the estimate and
budgeted amounts, staff wishes to review the bid with Collins Electrical. A
recommendation will be made at the December 16 Council meeting.
Jac L. Ronsko
Publ c Works Director
JLR/RCP/ma
cc: Purchasing Officer
Assistant Electric Utility Director
APPROVED: FILE N4_
THOMAS A. PETERSON, C_—J
ity Manager
CGENERA2/TXTW.02M
November 25, 1987
City Council
Standby Generator
December i5, i987
Page 22
To comply with auditors' requests, the lease payments should be made out of
the Operating Budget. Sufficient funds to make the lease payments must be
provided in t Operating Budget for the remainder of 1987-88.
eacL.onsko
rks Director
a
cc: Finance Director
Purchasing Officer
Assistant Electric Utility Director
CGENERA3/TXTW.02M
RESOLUTION NO. 87-172
AWARD - CONTRACT FOR STANDBY GENERATOR REPLACEMENT
AT PUBLIC SAFETY BUILDING, 230 W. ELM STREET
WHEREAS, in answer to notice duly published in accordance with
law and the order of this City Council, sealed bids were received and
publicly opened by the City Clerk of this City on November 25, 1987 at
11:00 a.m. for the contract for the Standby Generator Replacement at
the Public Safety Building, 230 W. Elm Street, described in the
specifications therefor approved by the City Council November 4, 1987;
and
WHEREAS, said bids have been compared, checked and tabulated and
a report thereof filed with the City Manager as follows:
Bidder Location Amount
W.
Collins Electrical Co. Stockton $81,888
WHEREAS, the City engineering staff met with Collins Electrical
Co., and two of Collins Company's subcontractors and reviewed the
project and a number of items were clarified, resulting in a change
order that will reduce the project cost by $3,015 and will be signed
after the contract is awarded, and based on these discussions and the
fact that the estimate did not allow for asbestos removal, it was
recommended that the. project be awarded; and
WHEREAS, as an alternative to a standard contract, the generator
supplier offered a lease purchase agreement, although Collins
Electrical Co. will continue to be the prime contractor, and does agree
to the arrangement; and
WHEREAS, the City Finance Director has reviewed the terms of the
1
agreement (5 years @ 7.5%) and finds them to be appropriate; and
WHEREAS, the City Manager recommends that award for the contract
;
which contract shall be a leaseurchase agreement, for Standby
p 9 y
Generator Replacement at Public Safety Building, 230 W. Elm Street, be
,
made to the only bidder, Collins Electrical Co.;
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
r
Lodi that award of contract which shall be a lease purchase agreement
=
for Standby Generator Replacement at Public Safety Building, 230 W. Elm.`'L=`
Street, be and the same is hereby made to Collins Electrical Co., the
only bidder, in the amount of $81,888.
x_
Dated: December 16, 1987
I hereby certify that Resolution No. 87-172 was passed and
adopted by the City Council of the City of Lodi in a regular
meeting held December 16, 1987 by the following vote:
Ayes: Council Members - Pinkerton, Reid, Snider and
Olson (Mayor)
Noes: Council Members - None
Absent: Council Members - Hinchman
Alice M. Reimche
City Clerk
87-172
RES87172/TXTA.OIV
#e CITY OF LODI
COUNCIL COMMUNICATION
PUBLIC WORKS DEPARTMENT
RECOMMENDED ACTION: That the City Council award the contract for the above
project to Collins Electrical Company and authorize the City Manager to enter
into a lease -purchase agreement for the project and transfer funds between
appropriate accounts.
BACKGROUND INFORMATION: This project includes the removal of the existing
1941 gasoline engine and generator assembly (including asbestos insulation),
the installation of a new diesel powered engine, generator with controls and
wiring to the building's transfer electrical switching gear.
Plans and specifications for this project were approved on November 4, 1987.
The City received the following bid for this project:
BIDDER LOCATION BID
Estimate $59,000
Collins Electrical Co. Stockton $81,888
City engineering staff met with Collins Electrical Co., McLaughlin Co.
(asbestos removal subcontractor), Valley Mechanical (plumbing subcontractor),
and Engine Power Co. (generator supplier). The project was reviewed and a
number of items were clarified. The result is a change order that will
reduce the project cost by $3,015 and will be signed after the contract is
awarded. Based on these discussions and the fact that the estimate did not
allow for asbestos removal, it is recommended the project be awarded.
As an alternative to a standard contract, the generator supplier offered a
lease -purchase agreement. Collins Electrical will still be the prime
contractor and they have no problem with the arrangement. The Finance
Director has reviewed the terms of the agreement (5 years @ 7.5%) and feels
it would be appropriate for the City to take advantage of their offer.
APPROVED: --M _. � - — � FILE N0.
CGENERA3/TXTW.02M December 8, 1987
Project Data
TO:
City Council
Originally B- uUg_ete3.
1987
Budgeted Fund: Gcneral Fund
FROM:
City Manager
Amount Budgeted:
$61,000
Total Project Estimate:
$82,OC3
MEETING DATE:
December 16, 1987
Bid Opening Date:
11/25/87
AGENDA TITLE:
Award Contract for Standby
Generator Replacement at
Public
Safety Building, 230 W. Elm
Street
RECOMMENDED ACTION: That the City Council award the contract for the above
project to Collins Electrical Company and authorize the City Manager to enter
into a lease -purchase agreement for the project and transfer funds between
appropriate accounts.
BACKGROUND INFORMATION: This project includes the removal of the existing
1941 gasoline engine and generator assembly (including asbestos insulation),
the installation of a new diesel powered engine, generator with controls and
wiring to the building's transfer electrical switching gear.
Plans and specifications for this project were approved on November 4, 1987.
The City received the following bid for this project:
BIDDER LOCATION BID
Estimate $59,000
Collins Electrical Co. Stockton $81,888
City engineering staff met with Collins Electrical Co., McLaughlin Co.
(asbestos removal subcontractor), Valley Mechanical (plumbing subcontractor),
and Engine Power Co. (generator supplier). The project was reviewed and a
number of items were clarified. The result is a change order that will
reduce the project cost by $3,015 and will be signed after the contract is
awarded. Based on these discussions and the fact that the estimate did not
allow for asbestos removal, it is recommended the project be awarded.
As an alternative to a standard contract, the generator supplier offered a
lease -purchase agreement. Collins Electrical will still be the prime
contractor and they have no problem with the arrangement. The Finance
Director has reviewed the terms of the agreement (5 years @ 7.5%) and feels
it would be appropriate for the City to take advantage of their offer.
APPROVED: --M _. � - — � FILE N0.