AGENDA TITLE: Approve Plans and Specifications and Authorize Advertisement for Bids for Water
Meter Program Phase 3
MEETING DATE: December 5,2012
PREPARED BY: PublicWorks Director
RECOMMENDED ACTION: Approve plans and specifications and authorize advertisement for
bids for Water Meter Program Phase 3.
BACKGROUND INFORMATION: At the May 2, 2007 City Council meeting, the Water Meter Retrofit
Policy was adopted. The primary objectives of the Water Meter
Retrofit Policy were to accelerate the installation of residential water
meters and shorten the time period during which customers would be paying for water on flat rate versus
on usage base.
At the October 20, 2010 City Council meeting, a seven-year construction phasing was approved and the
property owner meter paymentwas capped at $300 per parcel. The first of seven construction projects
was awarded by Council in March 2011 and included the installation of 3,698 meters and the
replacementof 4,220 feet of water main. The second construction projectwas awarded in March 2012
and included the installation of 2,111 meters and the replacement of 26,350 feet (five miles) of water
main. The project area for Phase 3 is presented in Exhibit A and includes the installation of 1,465 meters
and the replacement of 20,230 feet (3.8 miles) of water main. The estimated construction cost of
$4.176 million (including the cost of the water meters and ERTs) is in line with previous estimates.
Construction is expected to begin in April and conclude in November2013.
Plans and specifications for the project are on file in the PublicWorks Department. The planned bid
opening date is February 6, 2013.
FISCAL IMPACT: Water main leak and service repairswill be reduced. No additional costs
will be incurred for reading of the meters as they are automatically read
concurrentwith the reading of the electric meters.
FUNDING AVAILABLE: Funding will be identified at project award.
FWS/pmf
Attachment
cc: Lary Parlin, Deputy PublicWorks Director— Utilities
Tony Valdivia, RMC Water and Environment
APPROVED:
4faz��' -2 a�
F. Wally S6hdelin
Public Works Director
Bartlam, City Manager
K:\WP\PROJECTS\WATER\Meters\Water Meter Program Phase3\CPS&A.doc 11119/2012
Legend
Replacement Pipeline
7 Phase Boundary Set
Phases
Phase 1 (2011)
- Phase 2 (2012)
Phase 3 (2013)
- Phase 4 (2014)
- Phase 5 (2015)
- Phase 6 (2016)
Phase 7 (2017)
..... TIS
,I �, I I� 1�„'` '•- , -_-....... � �i IIS
—t� —1— — 1 1. i ..CO
Tr -11 I; o II
rn r Rd. .... .
14
0 720
Feet
�...... Elm. St 1
I'
1:
AL
1,44 RMC
City of Lodi: Water Meter Program Phase 3
TC
T
f6
,2