HomeMy WebLinkAboutAgenda Report - December 2, 1987 (71)AWARD CONTRACT FOR STORM DRAIN PUMP STATION ABANDON- MENTS, LOWER SACRAMENTO ROAD, 150' SOUTH OF LODI AVENUE TO LODI AVENUE RES. NO. 87-160 CC -12(a) NIG t'%�E-P /S 19.81 .. .. Council adopted Resolution No. 87-160 awarding the contract for Storm Drain Pump Station Abandonments, Lower Sacramento Road, 150' south of Lodi Avenue to Lodi Avenue LO Crutchfield Construction in the amount of $10.532.00. This project consists of abandoning two storm water pump stations. These stations handled storm water at the intersection of Lower Sacramento Road and Lodi Avenue prior to developing the area. With minor changes to the existing piping in the street, the pump stations will no longer be required. One station belongs to the City and one to the County. The County will reimburse the City for their portion of the work. The project estimate does not include the County's portion, which is $5,500.00. Plans and specifications were approved for this project on November 4, 1987. The City received the following 7 bids for this project: BIDDER LOCATION BID Engineer's Estimate $ 8,480.00 Crutchfield Constr. Stockton $10,532.00 Ric's Excavators Dutch Flat $14,445.00 Ridge Underground Const. Citrus Heights $15,916.00 Transitional Srvs, Inc. Walnut Grove $16,200.00 Ford Constrvction Co. Lodi $18,632.00 Osborn General Eng. & Construction Chicago Park $19,600.00 Claude C. Wood Co. Lodi $26,358.00 An error in the pipe quantity was found in the Engineer's Estimate. This is why the amount. budgeted is too low.. The Engineer's Estimate above reflects the correct quantity with the original unit price. Also, due to a last. minute change in the design, the estimated amount for the pump station abandonment was too low. It was decided to completely remove the San Joaquin Co. pump pit since it is located in the area of a future curb return and would likely interfere with a future traffic signal foundation. ------------- CONTINUED DECEMBER 2, 1987 Based on the range of the bids received and that Crutchfield Construction Co. has a good reputation in Lodi, Staff recommended the project be awarded to Crutchfield Construction Co. The additional City cosi will be charged to the miscellaneous storm drain account. San Joaquin County Public Works has given verbal approval to proceed. City will hold off on signing the contract pending written confirmation. pr 1 by 4: G _ LO D t1 it PUBLIC WORKS DEPARTMENT P TO: FROM: MEETING DATE: AGENDA TITLE: City Council City Manager December 2, 1987 Project Data Originally Bu geted: 1986/87 Budgeted Fund: General Fund Amount Budgeted: $3,500 Total Project Estimate: $7,000 (City Portion) Bid Opening Date: 11/25/87 Award Contract for Storm Drain and Pump Station Abandonments, Lower Sacramento Road, 150' South of Lodi Avenue to Lodi Avenue RECOMMENDED ACTION: That the City Council award the contract for the above project to Crutchfield Construction Co. Inc. in the amount of $10,532.00 subject to receiving written confirmation from San Joaquin County. BACKGROUND INFORMATION: This project consists of abandoning two storm water pump stations. These stations handled storm water at the intersection of Lower Sacramento Road and Lodi Avenue prior to developing the area. With minor changes to the existing piping in the street, the pump stations will no longer be required. One station belongs to the City and one to the County. The County will reimburse the City for their portion of the work. The project estimate does not include the County's portion, which is $5,500.00. Plans and specifications for this project were approved on November 4, 1987. The City received the following 7 bids for this project: BIDDER LOCATION Engineer's Estimate $ 8,480.00 Crutchfield Construction Stockton. $10,532.00 Ric's Excavators Dutch Flat $14,445.00 Ridge Underground Construction Citrus Heights $15,916.00 Transitional Services, Inc. Walnut Grove $16,200.00 Ford Construction. Co. Lodi $18,632.00 Osborn General Engineering & Construction Chicago Park $191-600.00 Claude C. Wood Co. Lodi $26,358.00 An error in the pipe quantity was found in the Engineer's Estimate. This is why the amount budgeted is too low. The Engineer's Estimate above reflects the correct quantity with the original unit price. Also, due to a last minute change in the design, the estimated amount for the pump station abandonment was too low. It was decided to completely remove the San Joaquin Co. pump pit since it is located in the area of a future curb return and would likely interfere with a future traffic signal foundation. APPROVED: CSTORM2/TXTW.02M November 30, 1987 'u4ty Council . December 2, 1987 Page 2 Based on the range of the bids received and that Crutchfield Construction Co. has a good reputation in Lodi, it is reconanerded the project be awarded. The additional City cost will be charged to the miscellaneous storm drain account. San Joaquin County Public Works has given verbal approval to proceed. We will hold off on signing the contract pending written confirmation. Jac L. Ronsko Publ c Works Director JLR/ L/cag cc: Purchasing Officer Street Superintendent San Joaquin County Public Works, Manuel Solario CSTORM2/TXTW.02M ?'t SOLUTION NO. 87-160 AWARD - CONTRACT FOR STORM DRAIN PUMP STATION ABANDONMENTS, LOWER SACRAMENTO ROAD, 150' SOUTH OF LODI AVENUE TO LODI AVENUE WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, seaied bids were received and publicly opened by the City Clerk of this City on November 25, 1987 at 11:00 a.m. for the contract for Storm Drain Pump Station Abandonments, Lower Sacramento Road, 150' South of Lodi Avenue to Lodi Avenue, described in the specifications therefore approved by the City Council November 4, 1987; and WHEREAS, said bids have been compared, checked, and tabulated and a report thereof filed with the City Manager as follows: Bidder Amount Crutchfield Construction Stockton $10,532.00 Ric's Excavators Dutch Flat $14,445.00 Ridge Underground Construction Citrus Heights $15,916.00 Transitional Services, Inc. Vilnut Grove $16,200.00 Ford Construction Co. Lodi $18,632.00 Osborn General Engineering & Construction Chicago Park $19,600.00 Claude C. Wood Co. Lodi $26,358.00 WHEREAS, the City Manager recommends that award for the contract for Storm Drain Pump Station Abandonments, Lower Sacramento Road, 150' South of Lodi Avenue to Lodi Avenue, be made to the low bidder, Crutchfield Construction. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lodi that award of contract for Storm Drain Pump Statior, Abandonments, Lower Sacramento Road, 150' South of Lodi Avenue to Lodi Avenue, be and the same is hereby made to Crutchfield Construction, the low bidder, in the amount of $10,532.00. Dated: December 2, 1987 I hereby certify that Resolution No. 87-160 was passed and adopted by the City Council of the City of Lodi in a regular meeting held December 2, 1987 by the following vote: Ayes: Council Members - Hinchman, Pinkerton, Reid, Snider and Olson (Mayor) Noes: Council Members - None Absent: Council Members - None �m Alice M. Reimche City Clerk 87-160 t