HomeMy WebLinkAboutAgenda Report - November 21, 2012 C-11AGENDA ITEM
CITY OF LODI
,. COUNCIL COMMUNICATION
AGENDA TITLE: Adopt Resolution Authorizing the City Managerto Execute Contract with Diede
Construction, Inc., of Woodbridge for Directional Boring and Conduit Installation ($300,000)
MEETING DATE: November21,2012
PREPARED BY: Electric Utility Director
RECOMMENDED ACTION: Adopt a resolution authorizing the City Managerto execute contractwith
Diede Construction, Inc., of Woodbridge, for directional boring and conduit
installation in an amount not to exceed $300,000.
BACKGROUND INFORMATION: The City of Lodi Electric Utility Department (EUD) maintains approximately
123 miles of overhead power lines and 12 miles of underground cable in
order to supply electric power to its
customers. As part of routine maintenance and upgrades to the electric system, underground cable needs
replacement. When replacing underground cable, EUD crews first attempt to pull in new conductorvia plastic
conduit that was buried when the system was first installed. Oftentimes it is crushed and unusable due to aging,
ground movement, or tree root intrusion. When that is the case, new conduit must be installed for the replacement
cable. This is done by either trenching or directional boring. EUD staff recommends directional boring to mitigate
time delays, inconvenience to the public and costly repairs to sidewalks, street and landscaping.
The proposed directional boring agreement covers the period of November22, 2012 to June 30, 2013 with the
option for up to three additional one-year extensions covering fiscal years 2013/14, 2014/15 and 2015/16.
The EUD advertised bid documents on October 26, 27, 2012. Four respective contractors requested bid
documents. On NovemberT 2012, bidswere opened with the resultsshown on ExhibitA.
Staff reviewed the proposals and deemed Diede Construction bid the lowest and compliant with the approved
specifications.
FISCAL IMPACT: Procurement cost not to exceed $300,000.
FUNDING: Included in FY2012/13 Budget Account No. 161650.1820
Jordan Ayers
DeputyCity Manager/Internal Service Director
EI e A. 4irkley
ectric Utility Director
PREPARED BY: Kevin Riedinger, Electric Operations Superintendent
EAK/KR/Ist
APPROVED: DTA ��
Konradt Bartlarr, City Manager
Directional Boring and Conduit Installation
Bid Tabulation
Received 11/07/2012
EXHIBIT A
Directional Boring and Conduit Installation
Bid Tab
Diedi
Deleo
Golden
Irish
Item
Description
Unit
Est'd Qty.
Unit Price
Unit Price
Unit Price
Unit Price
1
One (1) each 6" Schedule 40 PVC Bore Guard or Certacom
LF
$0.00
$44.00
$70.25
$56.75
$95.86
One (1) each 5" Schedule 40 PVC Bore Guard or Certacom
LF
$0.00
$43.00
$68.60
$52.65
$94.36
One (1) each 4" Schedule 40 PVC Bore Guard or Certacom
LF
$0.00
$36.00
$44.75
$48.75
$92.86
One (1) each 3" Schedule 40 PVC Bore Guard or Certacom
LF
$0.00
$30.00
$44.65
$45.00
$92.36
Two (2) 3" Schedule 40 PVC Bore Guard or Certacom
LF
$0.00
$37.00
$52.45
$50.75
$95.36
One (1) each 2" HDPE
LF
$0.00
$23.00
$35.15
$42.75
$91.36
Two (2) 2" HDPE
LF
$0.00
$25.00
$36.00
$46.00
$93.36
Three (3) 2" HDPE
LF
$0.00
$30.00
$36.90
$49.00
$95.36
One (1) W HDPE
LF
$0.00
$22.00
$35.00
$42.00
$89.36
Two (2) W HDPE
LF
$0.00
$23.00
$35.00
$45.00
$89.36
2
Excavate, Trench, Backfill, and Compact all Excavations
LF
$0.00
$50.00
$65.00
$84.00
$42.50
3
Asphalt Removal and Replacement as required above need for standard boring work
SF
$0.00
$35.00
$32.00
$28.75
$32.00
4
Concrete Removal and Replacement as required above need for standard boring work
SF
$0.00
$35.00
$27.00
$34.75
$42.24
5
Curb and Gutter Removal and Replacement
SF
$0.00
$32.00
$42.00
$56.50
$42.00
6
Dispose of all excess material for each project
EA
$0.00
$250.00
$250.00
$650.00
$500.00
7
Construction notification for each project
EA
$0.00
$81.00
$250.00
$725.00
$500.00
8
Excavation Safety for each project
EA
$0.00
$312.00
$250.00
$375.00
$500.00
ill 1 7XM1411ZI = 0 007 1 Iii WKIii11000 h�►111�'�I E6'jW XlWV1 11WW!
CITY OF LOBI, CALIFORNIA
THIS CONTRACT made by and
referred to as the "City," and _
to as the "Contractor."
WITNESSETH:
111111111111 1
between the CITY OF LOBI, State of California, herein
, herein referred
That the parties hereto have mutually covenanted and agreed, and by these presents do
covenant and agree with each other, as follows:
The complete Contract consists of the following documents which are incorporated
herein by this reference, to -wit:
Notice Inviting Bids
Information to Bidders
General Provisions
Special Provisions
Bid Proposal
Contract
Contract Bonds
Plans
The Latest Edition of
Standard Specifications,
State of California,
Business and Transportation Agency,
Department of Transportation
All of the above documents, sometimes hereinafter referred to as the "Contract
Documents," are intended to cooperate so that any work called for in one and not
mentioned in the other is to be executed the same as if mentioned in all said
documents.
ARTICLE I - That for and in consideration of the payments and agreements hereinafter
mentioned, to be made and performed by the City and under the condition expressed in
the two bonds bearing even date with these presents and hereunto annexed, the
Contractor agrees with the City, at Contractor's cost and expense, to do all the work and
furnish all the materials except such as are mentioned in the specifications to be
furnished by the City, necessary to construct and complete in a good workmanlike and
substantial manner and to the satisfaction of the City the proposed improvements as
shown and described in the Contract Documents which are hereby made a part of the
Contract.
ARTICLE II - The City hereby promises and agrees with the Contractor to employ, and
does hereby employ, the Contractor to provide all materials and services not supplied by
the City and to do the work according to the terms and conditions for the price herein,
and hereby contracts to pay the same as set forth in Section 5-600, "Measurement,
Acceptance and Payment," of the General Provisions, in the manner and upon the
conditions above set forth; and the said parties for themselves, their heirs, executors,
administrators, successors and assigns, do hereby agree to the full performance of the
covenants herein contained.
Directional Boring & Conduit Install Sec 4.doc
4.1 11/08/12
ARTICLE III - The Contractor agrees to conform to the provisions of Chapter 1, Parti,
Division 2 of the Labor Code. The Contractor and any Subcontractor will pay the
general prevailing wage rate and other employer payments for health and welfare,
pension, vacation, travel time, and subsistence pay, apprenticeship or other training
programs. The responsibility for compliance with these Labor Code requirements is on
the prime contractor.
ARTICLE IV - And the Contractor agrees to receive and accept the following prices as
full compensation for furnishing all materials and for doing all the work contemplated
and embraced in this agreement; also for all loss or damage arising out of the nature of
the work aforesaid or from the action of the elements, or from any unforeseen difficulties
or obstructions which may arise or be encountered in the prosecution of the work until
its acceptance by the City, and for all risks of every description connected with the work;
also for all expenses incurred by or in consequence of the suspension or discontinuance
of work and for well and faithfully completing the work, and the whole thereof, in the
manner and according to the Plans and Contract Documents and the requirements of
the Engineer underthem, to -wit:
multiplePerform the work necessary for directional boring, installing conduit, and other
incidental and related work for projects
exceed 00 000 all as shown on the plans and specifications for the above
project.
UNIT PRICE ITEMS
ITEM
NO. DESCRIPTION UNIT UNIT PRICE
Bore and install conduit
as follows:
One (1) each 6"
Schedule 40 PVC Bore
Guard or Certacom LF $ 44.00
One (1) each 5"
Schedule 40 PVC Bore
Guard or Certacom LF $ 43.00
One (1) each 4"
Schedule 40 PVC Bore
Guard or Certacom LF $ 36.00
One (1) each 3"
Schedule 40 PVC Bore
Guard or Certacom LF $ 30.00
Directional Boring & Conduit Install Sec 4.doc
4.2 11/08/12
ITEM
NO.
DESCRIPTION
UNIT
UNIT PRICE
Two (2) 3" Schedule 40
PVC Bore Guard or
Certacom
LF
$ 37.00
One (1) each 2" HDPE
LF
$ 23.00
Two (2) 2" HDPE
LF
$ 25.00
Three (3) 2" HDPE
LF
$ 30.00
One (1) W HDPE
LF
$ 22.00
Two (2) %" HDPE
LF
$ 2 3-0 0
2.
Excavate, Trench,
Backfill, and Compact all
Excavations
LF
$ 50.00
3.
Asphalt Removal and
Replacement as required
above need for standard
boring work
SF
$35.00
4.
Concrete Removal and
Replacement as required
above need for standard
boring work
SIF
$ 35.00
5.
Curb and Gutter
Removal and
Replacement
SF
32.00
6.
Dispose of all excess
material for each project
EA
$ 250.00
Directional Boring & Conduit Install Sec 4.doc
4.3
11/08/12
ITEM
NO.
7.
8.
Construction notification
for each project
Excavation Safety for
each project
UNIT UNIT PRICE
EA $ 81.00
EA $ 312.00
ARTICLE V - By my signature hereunder, as Contractor, I certify that I am aware of the
provisions of Section 3700 of the Labor Code, which requires every employer to be
insured against liability for workers' compensation or to undertake self-insurance in
accordance with the provisions of that code, and I will comply with such provisions
before commencing the performance of the work of this contract.
ARTICLE VI - It is further expressly agreed by and between the parties hereto that,
should there be any conflict between the terms of this instrument and the Bid Proposal
of the Contractor, then this instrument shall control and nothing herein shall be
considered as an acceptance of the said terms of said proposal conflicting herewith.
ARTICLE VII - The City is to furnish the necessary rights-of-way and easements and to
establish lines and grades for the work as specified under the Special Provisions. All
labor or materials not mentioned specifically as being done by the City will be supplied
by the Contractor to accomplish the work as outlined in the specifications.
ARTICLE VIII - The Contractor agrees to commence work pursuant to this contract
within 30 calendar days and to diligently prosecute to completion within 60 WORKING
DAYS for each project submitted within the one-year term of this contract.
ARTICLE IX — This agreement may be extended for three (3) additional one-year terms
at the City's option on the same terms and conditions as set forth herein. City shall
exercise its option in writing 30 days before the expiration of this agreement.
WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE TIME
OF COMPLETION FOR THIS CONTRACT IS REASONABLE AND THE
CONTRACTOR AGREES TO PAY THE CITY LIQUIDATED DAMAGES AS SET
FORTH IN SECTION 6.5 OF THE SPECIAL PROVISIONS. CONTRACTOR AGREES
THAT THIS AMOUNT MAY BE DEDUCTED FROM THE AMOUNT DUE THE
CONTRACTOR UNDER THE CONTRACT.
Directional Boring & Conduit Install Sec 4.doc
4.4 11/08/12
IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands
the year and date written below.
CONTRACTOR: CITY OF LODI
By:
Konradt Bartlam
City Manager
By: Date:
Title
(CORPORATE SEAL)
Attest:
Randi Johl
City Clerk
Approved As To Form
D. Stephen Schwabauer, City Attorney
Janice D. Magdich, Deputy City Attorney
`(T�
Directional Boring & Conduit Install Sec 4.doc
4.5 „/os/, 2
RESOLUTION NO 2012-183
A RESOLUTION OF THE LODI CITY COUNCIL
AWARDING CONTRACTANDAUTHORIZINGTHE CITY
MANAGERTO EXECUTE CONTRACT FOR DIRECTIONAL
BORINGAND CONDUIT INSTALLATION
WHEREAS, in answer to notice duly published in accordance with law and the
order of this City Council, sealed bids were received and publicly opened on November
7, 2012, at 11:00 a.m., for directional boring and conduit installation, described in the
specifications thereof, approved by the City Council on October 3; 2012; and
WHEREAS, said bids have been compared, checked, and tabulated and a report
thereof filed with the City Manager as shown in Exhibit A; and
WHEREAS, staff recommends awarding the contract for directional boring and
conduit installation to the low bidder and local vendor, Diede Construction, Inc., of
Woodbridge, in the amount not to exceed $300,000.
NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby
authorize the award of the contract for directional boring and conduit installation to Diede
Construction, Inc., of Woodbridge, in the amount not to exceed $300,000; and
BE IT FURTHER RESOLVED that the City Manager is hereby authorized to
execute the contract on behalf of the City.
Dated: November 21, 2012
------------------------------------------------------------------
------------------------------------------------------------------
hereby certify that Resolution No. 2012-183 was passed and adopted by the
City Council of the City of Lodi in a regular meeting held November 21, 2012, by the
following vote:
AYES: COUNCIL MEMBERS — Hansen, Johnson, Katzakian, Nakanishi,
and Mayor Mounce
NOES: COUNCIL MEMBERS — None
ABSENT: COUNCIL MEMBERS — None
ABSTAIN: COUNCIL MEMBERS — None
JOHL
City Clerk
2012-183
Directional Boring and Conduit Installation
Bid Tabulation
Received 11/07/2012
■ n
Directional Boring and Conduit Installation
Bid Tab
Diedi
Deleo
Golden
Irish
Item
Description
Unit
Esfd Qty.
Unit Price
Unit Price
Unit Price
Unit Price
1
One (1) each 6" Schedule 40 PVC Bore Guard or Certacom
LF
$0.00
$44.00
$70.25
$56.75
$95.86
One (1) each 5" Schedule 40 PVC Bore Guard or Certacom
LF
$0.00
$43.00
$68.60
$52.65
$94.36
One (1) each 4" Schedule 40 PVC Bore Guard or Certacom
LF
$0.00
$36.00 1
$44.75
$48.75
$92.86
One (1) each 3" Schedule 40 PVC Bore Guard or Certacom
LF
$0.00
$30.00
$44.65
$45.00
$92.36
Two (2) 3" Schedule 40 PVC Bore Guard or Certacom
LF
$0.00
$37.00
$52.45
$50.75
$95.36
One (1) each 2" HDPE
LF
$0.00
$23.00
$35.15
$42.75
$91.36
Two (2) 2" HDPE
LF
$0.00
$25.00
$36.00
$46.00
$93.36
Three (3) 2" HDPE
LF
$0.00
$30.00
$36.90
$49.00
$95.36
One (1) Y4" HDPE
LF
$0.00
$22.00
$35.00
$42.00
$89.36
Two (2)'/." HDPE
LF
$0.00
$23.00
1 $35.00
$45.00
$89.36
2
Excavate, Trench, Backfill, and Compact all Excavations
LF
$0.00
$50.00
$65.00
$84.00
1 $42.50
3
Asphalt Removal and Replacement as required above need for standard boring work
SF
$0.00
$35.00
$32.00
$28.75
$32.00
4
Concrete Removal and Replacement as required above need for standard boring work SF
$0.00
$35.00
$27.00
$34.75
$42.24
5
Curb and Gutter Removal and Replacement
$0.00
$32.00
$42.00
$56.50
$42.00
6
Dis ose of all excess material for each project
$0.00
$250.00
$250.00
$650.00
$500.00
7
Construction notification for each project
:EA
$0.00
$81.00
$250.00
$725.00
$500.00
8
Excavation Safet for each roject
$0.001
$312.00
1 $250.00
1 $375.00
$500.00
■ n