HomeMy WebLinkAboutAgenda Report - November 20, 1985 (92)PUBLIC HEARINGS
APPEAL OF
PON THOMAS RE
PLANNING
FISSION
CONDITIONAL
Appy,nvAT
, OF
,�LVISED
NATIVE MAP OF
THE JOHNSON- to law, an
TAI,IDy v been pub
lish� according
SUBDIVISION NoticE thereof having
t
W -k C
M
1
7r �y
Ai
xr�
affidavit of which publication is on file in the office of
the City Clerk, Mayor Hinchman called for the continued
Public Hearing to consider the appeal of Mr. Ronald B.
Thomas, c/o R. Thomas Development Company, P. 0. Box B-28,
Lodi, California, of the Planning Conni.ssion's conditional �
approval of the Revised Tentative 14ap of the Johnson -
Tandy Subdivision dated June 1985.
At the November 6, 1985 Council meeting, Council requested
the staff to formalize possible alternates for city
participation in this complex intersection which involves a
freeway on-ramp and the intersection of two major city
streets. Based on estimates provided by Thamas Developanent
Cern any's engineer, the following alternates and estimated
cost of City and developer participation were presented for
-Council's consideration:
Alternate No. 1 - 50% 50% split of actual reconstruction
costs:
City Participation - $72,000
Developer Participation - $72,000
Alternate No. 2 - Developer pays for equivalent
to one half of new arterial street (32 feet of
paving). Cost is based on all new construction.
City Participation - $109,000
Developer Participation - $35,000
Alternate No. 3 - Developer pays for actual costs of
reconstruction of area on west side equivalent to one half
of arterial street 1.32 feet of paving)
City Participation - $103,000
Developer Participation - $41,000
Alternate No. 4 - Developer pays for equivalent of one half
of street. Center line to be located in center of left -
turn pocket.
City Participation - $91,000
Developer Participation - $53,OOG
Staff recommended that the engineering be done by the
developer's engineer and that these costs be split equally
between the City and the developer.
Diagrams of the subject area were presented for Council's
perusal, and Staff responded to questions as were posed by
Council.
Mr. Ronald B. Thomas, c/o R. Thcmas Development Ccurany,
P. Q. Box B-28, Lodi, spoke on behalf of his appeal.
There being no other persons wishing to speak on the matter
the public portion of the hearing was closed.-
TO: City Council
FROM: City Manager
COUNCIL COINIMUNICATI-ON
DATE: November 13, 1985
SUBJECT: Thomas Development Company's Appeal
Planning Commission's Approval - Johnson -Tandy Subdivision
RECOMMENDED ACTION: That the City Council review the staff report and alter-
nates and determine the appropriate participation by the City of Lodi.
BACKGROUND INFORMATION: At the last Council meeting of November 6, 1985, the
city Council heard the appeal of the Thomas Development Company which requested
the City of Lodi to participate in the intersection modifications required at
Cherokee Lane and the proposed extension of Century Blvd.
The City Council requested the staff to formalize possible alternates for City
partic;pation in this complex intersection which involves a freeway on-ramp
and the intersection of two major City streets. Based on the attached estimate
provided by Thomas Development Company's engineer, we have listed below four
alternates and the estimated cost of City and develcper participation:
Alternate No. 1 - 50% - 50% split of actual reconstruction costs.
City Participation
$72,000
Developer Participation
$72,000
Alternate No. 2 - Developer pays for equivalent to one half of new arterial
street 32 feet of paving). Cost is based on all new construction.
City Participation Developer Participation
$109,000 $35,000
Alternate No. 3 - Developer pays for actual costs of reconstruction of area on
west side equivalent to one half of arterial street (32 feet of paving).
City Participation Developer Participation
f $103,000 $41,000
Alternate Wo. 4 - Developer pays for equivalent of one half of street. Center
line to be located in center of left -turn pocket.
City Participation Developer Participation
$91,000 $53,000
APPROVED: %) _,- FILE NO.
THOMAS A. PETERSON, City Manager
City Council
November 13, 1985
Page 2
5
it is recommended that the engineering be done by developer's engineer and that
these costs be split equally between City and developer.
It is also recommended that the developer's contractor perform the construction
and the City y or credit the developer for the City's portion.
U { _
Jac L. Ronsko
Pub is Works Director
JLRIeeh
Attachment
V 0 (o j D n2. (. 323 West Elm Street
Lodi, Catitornle 95240
BAUMBACH & PIAZZA, INC. Phone (209) 368-6618
OCTOBER 28, 1985
JOB NO. 8540 GIB
PRELIMINARY ESTIMATE FOR CENTURY BOULEVARD & CHEROKEE LANE INTERSECTION
I Item
Roadway Excavation (Exist.
pavement -etc.)
i Compact Original Ground
Aggregate Base,Cl. II (0.67')
Asphalt Concrete,Type "B" (0.33')
Import Borrow
Curb & Gutter
Valley Gutter
6" Extruded Curb
Revise Existing Drainage Lines
j Relocate Existing Street Lights
Relocate and Revise Existing Chain
j Link Fence
New Directional Signing
Quantity
2,300 C. Y.
42,500 S. F.
42,500 S. F.
42,500 S. F.
3,000 C. Y.
470 L. F.
400 L. F.
360 L. F.
2 Each
220 L. F.
SUB -TOTAL.
Unit
$ 10.00
0.15
0.65 f2/r
1.00 SYah
5.00
10.00
8.00
4.00
Lump Sure
1000.00
10.00
Lump Sum
Total
$ 23,000.00
6,375.00
27,625.00
42,500.00
15,000.00
4,700.00
3,200.00
1,440.00
6,000.00
2,000.00
2,200.00
3,000.00
Contingencies @ 5%
TOTAL
Note:l)This estimate does not include curb, gutter and sidewalk along developers
property line.
2)Future signalization costs are not included.
$137,040.0
$144,000.0(
CITY COUMCIL
DAVID M. HINCHMAN, Mayor
FRED M. REID
Mayor Pro Tempore
EVELYN M. OLSON
JAMES W. PINKERTON. Jr.
JOHN R. (Randyl SNIDER
CI'T'Y OF LODI
CITY HALL, 221 WEST PINE.STREET
CALL BOX 3006
LODI, CALIFORNIA 95241-1910
(209)334-5634
November 22, 1985
Mr. Ronald B. Thomas
c/o R. Thomas Development CcaTpany
P. O. Box B-28
Lodi, California 95240
Dear Mr. Thcmas:
THOMAS A. PETERSON
City Manager
ALICE M. REIMCHE
City Clerk
RONALD M. STEIN
City Attorney
This letter will confirm that the Lodi City Council following public
hearings considering your appeal of the Planning Commission's
conditional approval of the Revised Tentative Map of the Jolmson-
Tandy Subdivision dated June 1985 determined that the City of Lodi
will participate in the intersection modifications required at
Cherokee Lane and the proposed extension of Century Boulevard at a 50%
- 50% split of actual reconstruction costs.
Further, Council determined that the engineering will be done by the
developer's engineer and that these costs will be split equally between
the City and the developer and that the developer's contractor will
perform the construction and that the City will pay or credit the
developer for the City's portion.
Should you have any questions regarding this action, please do not
hesitate to call this office.
Very truly yours,
ALICE M. REIMCrM
City Clerk