HomeMy WebLinkAboutAgenda Report - November 20, 1985 (93)Council Member Pinkerton then moved for approval of
Alternate 1 - whereby the City of Lodi will participate in
the intersection modifications required at Cherokee Lane
and the proposed extension of Century Boulevard at a 50% -
50% split of actual reconstruction costs or $72,000 each.
Further, it was agreed that the engineering will be done by
the developer's engineer and that these costs will be split
equally between the City and the developer and that the
developer's contractor will perform the construction and
that the City will pay or credit the developer for the
City's portion. The motion was seconded by Mayor Hindmian
andcarried by unanimous vote.
i
CITY COUNCIL' MSEtIW,
r { i
N0YENBER 20, 1985
Fallowing discussion Council Member Snider moved to approve
Alternate No. 3 whereby the Developer pays for actual costs
of reconstruction of area on the west side equivalent to
one half of arterial street (32 feet of City,
paving) .
participation - $103,000; Developer Participation -
$41,000. The motion was seconded by Council Member Reid,
but failed to pass by the following vote:
Ayes: Council Members - Reid and Snider
Noes: Council Members - Olson and Pinkerton
and Hinchman (Mayor)
Absent: Council Members - None
Abstain: Council Members - None
Council Member Pinkerton then moved for approval of
Alternate 1 - whereby the City of Lodi will participate in
the intersection modifications required at Cherokee Lane
and the proposed extension of Century Boulevard at a 50% -
50% split of actual reconstruction costs or $72,000 each.
Further, it was agreed that the engineering will be done by
the developer's engineer and that these costs will be split
equally between the City and the developer and that the
developer's contractor will perform the construction and
that the City will pay or credit the developer for the
City's portion. The motion was seconded by Mayor Hindmian
andcarried by unanimous vote.