Loading...
HomeMy WebLinkAboutAgenda Report - November 20, 1985 (93)Council Member Pinkerton then moved for approval of Alternate 1 - whereby the City of Lodi will participate in the intersection modifications required at Cherokee Lane and the proposed extension of Century Boulevard at a 50% - 50% split of actual reconstruction costs or $72,000 each. Further, it was agreed that the engineering will be done by the developer's engineer and that these costs will be split equally between the City and the developer and that the developer's contractor will perform the construction and that the City will pay or credit the developer for the City's portion. The motion was seconded by Mayor Hindmian andcarried by unanimous vote. i CITY COUNCIL' MSEtIW, r { i N0YENBER 20, 1985 Fallowing discussion Council Member Snider moved to approve Alternate No. 3 whereby the Developer pays for actual costs of reconstruction of area on the west side equivalent to one half of arterial street (32 feet of City, paving) . participation - $103,000; Developer Participation - $41,000. The motion was seconded by Council Member Reid, but failed to pass by the following vote: Ayes: Council Members - Reid and Snider Noes: Council Members - Olson and Pinkerton and Hinchman (Mayor) Absent: Council Members - None Abstain: Council Members - None Council Member Pinkerton then moved for approval of Alternate 1 - whereby the City of Lodi will participate in the intersection modifications required at Cherokee Lane and the proposed extension of Century Boulevard at a 50% - 50% split of actual reconstruction costs or $72,000 each. Further, it was agreed that the engineering will be done by the developer's engineer and that these costs will be split equally between the City and the developer and that the developer's contractor will perform the construction and that the City will pay or credit the developer for the City's portion. The motion was seconded by Mayor Hindmian andcarried by unanimous vote.