HomeMy WebLinkAboutAgenda Report - November 18, 1981 (26)(CITY OF LODI
,DPUBLIC WORKS DEPARTMENT
TO: City
FROM: City Manager
DATE: November 6, 1981
0
COUNCIL COMMUNICATION
SUBJECT: Operations and Maintenance Agreement for Spur Track Crossing
1618-0.65-C at Wickes Forest industries
RECOMMENDED ACTION: That the City Council approve the attached agreement
T" -
for Operations and Maintenance of Spur Track Crossing at Wickes Forest
Industries."
BACKGROUND INFORMATION: The City of Lodi applied to the PUC for permission
to build a portion ULodi Avenue across ai. existing spur track serving
Wickes Forest Industries. The spur track is owner! by Robert L. Griffin and
operated by Central California Traction Company.
The PUC has granted authority to the City of Lodi to build the street. The
commission has also ordered the City of Lodi to provide an agreement between
the parties involved, stating that the above mentioned crossing shall be
reconstructed, operated and maintained according to the general orders
referenced in their decision 193683 (attached).
The agreement specified that Mr. Robert L. Griffin, owner of the spur track,
will assume all responsibility for maintenance of said spur track.
The City has met the conditions ordered and provides the above mentioned
agreement as equ ted. It is recommended that the agreement be approved..
J ck . Ronsko
`ubli Works Director
At ment
JLR:ML:dw.w
APPROVED:
HENRY A. UL VES. City. Manager
FILE NO.
_ T,,SD
Decision No. 430,93 MAi 191981
BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CADIFCRNIA
APPLICATICd " .._> '.:,a �,v.,�a.S ....�'.,3 .. n .1 ..✓, -. ,. i -
CORPC RATION , TO CONSTRUCT A CITY STREET ACRO SS j Application i4o. 601 -OU
A SPIV TRACK CF ROOT L. GRIFFIN AT THE (Filed Deccmbcr 26, 19S0;
EXTENSION OF LODI AVENUE, EAST OF CLUFF AVENUE
0 P I N I O N
The City of Lodi requests authority to construct Lodi
Avenue at grade across Central California Traction Company's spur
track in the City of Lodi, San Joaquin County.
The City of Lodi is the lead a gen cy for. this project
pursuant to the Cali fora a ]Environmental Quality Act of 1970 (CEQA) s
as amended,. Public Resources Code, Section 21000'et seq. After
preparation and review of an Initial Study, the City of Lodi issued a
Negative Declaration and approved the project. On December 12, 1980s
a Notice of Determination was filed with the San Joaquin County Clete
utich found that: "The project will not have a significant effect on
the environment."
The Commission is a responsible agency for this project
under CEQ,A and has independently evaluated and assessed the lead
agency's Lnitial Study and legative Declaration. The site of the
proposed project has been inspected by the. Commission staffs
The project will extend Lodi Avenue eastward from Cluff
Avenue across a spur track of the Central California Traction Company
that serves Wickes Forest Industries. This will provide additional
access, improve traffic circulation and increase convenience for
existing and projected industrial development in the area.
Notice of the application was published in the Commis'sion's
Daily Calendar on January 5, 1981. No protests have been received.
public hearing is not necessary.
-s f
EXHIBIT 'A"
A.60160 T/SI)
Findings of Fact
1. Applicant requests authority pursuant to Sections 1201-1205
of the Public Col-� Iodi A7,yaxnv2 7%+, aacroS7,
Central Cali
San Joaquin County.
2. The proposed spur track crossing is required to provide'.,
access and improve traffic circulation patterns in the area.
".3. Public convenience and necessity require construction of the
proposed spur track crossing.
4. Public safety requires that protection at the crossing be
two Standard No. I -R crossing signs (General Order 75-C) and that
traffic on the roadway be protected by a member of the train crew
acting as flagman.
5. The City of Lodi is the lead agency for!,this project
pursuant to the California Environmental Quality Act of 1970% as
amended.
6. The Commission is a responsible agency for this project and
has independently evaluated and assessed the lead agency's Initial
Study and Negative Declaration.
2. This project will have no significant impact on the
environment.
Conclusion of Law
The application should be granted as set forth in the
following order.
ORDER
IT IS ORDERED that:
1. The City of Lodi is authorized to construct Lodi Avenue at
grade across Central California Traction Company's spur track in the.
City of Lodi, San Joaquin County, at the location and substantially
as shown by the plans attached to the application, to be identified
as Crossing No. 61B -0.65-C.
-2-
l
77
2. Construction of the crossing shall be equal or superior
to Standard No. 1 of General Order 72-B.-
3. Clearances sha)1 conform to General Order:.26=--D. Walkways
shall conform to General Order-*—I'T r
4. Protection at the crossing shall be two Standard No. 1-R
crossing signs (General Orde1. j-C�'.
5. _No:oh-iiI1-vehi,oIe shall operate over the crossing unless
it is first brought to a -stop .and traffic on the roadway protected by
a member of the train crew, or other competent employee of the rail-
road, acting as a -flagman.- The flagman shall place a n"ir.imum of - two
fusees on each side of the track prior.to entry of the on -rail vehicle
into the crossing.
6. Written instructions shall be issued by the railroad to
trainmen, operating over the crossing, to comply with the flagging
instructions. A copy of the instructions shall be filed with the
Coml'- csion within thirty days after installation of the spur. track
crossing. Suitable sighs shall be installed on both sides of Lodi
Avenue, calling the attention of trainmen to the flagging instructions.
7. Construction expense of the crossing and installation cost
of the crossing signs shall be borne by applicant.
B. Maintenance of the crossing shall conform to General Order
72-B. Maintenance cost of the crossing signs shall be borne by
applicant.
9. Construction -plans of the crossing approved by Central
California Traction Company, together with a copy of the agreement
entered into between the parties involved shall be filed with the
„Commission prior to commencing construction.
10. Within thirty days after completion pursuant to this order,
applicant shall so advise the Commission in writing.
-3-
**A.60160 T/:
This authorization shall expire if not exercised within €-
two years unless time be extended, or it the above conditions are not
i
complied with. Authorization may be revoked or modified if public Con-
venience, necessity, or safety so require.
The effective date of this order shall be thirty days
after the date hereof. MAY 191981
Dated , at San Francisco,
California.
f
F
•1 •t
VVIN: F PIA SON p
{••I�uh•rt
1) C-11A\•I:.LLE
Alt rut; C A1_\•u
FIi1St.t1.1.1 C. CVrW
tucusuls�{urKcs -
ME