HomeMy WebLinkAboutAgenda Report - November 4, 1981 (45)REVIEW OF
KENNEDY RANCH
DRAINAGE
PROPOSA 1,
CITY COUNCIL MEETING
Agenda item "h" "Review of Kennedy Ranch Drainage.'_
Proposal" was introduced by City Manager Giave s.
Diagrams were presented for Council's perusal.
The staff indicated that they had received a submittal
from the Kennedy Ranch developers which appeared
to satisfy the previous request of the City Council
made on August 19. 1981 asking the developers to
come back with a plan that included the ultimate
basin concept. The development concept presented
by staff was as follows:
A basin park would be located in
the southwesterly portion of the develop-
ment and designed to be part of the City's
W... d.zv cuucruct all master
drain lines from the park basin to the City's
existing system at Elm and Lower Sacramento
and all north -south master drain lines
necessary to serve future development.
The proposed master drainage facilities
constructed by the developer (basin,
structures and master plan lines) will
be credited against the developer's re-
quired master drainage fees.
The dollars required for these master
drainage facilities over and above the
drainage fees will be fronted by the
developer and an agreement will be entered
into such that there will be a payback as
other properties in the E drainage area
develop.
Staff pointed out that the drainage fees
for this development would be approximately
$300.000 and the master drainage facilities