HomeMy WebLinkAboutAgenda Report - October 17, 1984 (103)All of the submersible pumps installed in City storm.pump
stations since 1976 are Flygt pumps. The first were
installed by a developer in the "temporary" Vine Street
(Sumwest) pump station. At that time the City had no
experience with this type of pump. The developer's engineer
selected Flygt as a high quality unit and one of the few that
had the proper flow and head characteristics for that
application. We have had good experience with these pumps
and have specified them in similar instances. Flygt's
support in the area is excellent. They have trained our
maintenance workers, and provided parts on a timely basis and
allow our people to use their shop and tools in South San
Francisco. \\
The submersible pump industry as a whole has upgraded its
' 7r:
intent to review the technical portion of our specification
._
AWARD - ICDI LAKE Agenda item a -1--D - "Award Lodi Lake Storm Drain Lift Station
SIM MAIN LIFT
Cleanup Pump" was introduced by Staff who explained that this
W. Dave Moore, 2752 Olive Cmirt, West Sacramento,
STATIM CLEANUP
project includes the replacement of the lead pump at the Lodi
PU►+P�„`
Lake Pump Stat ion. n-- work wi l l be done by Ci ty forces.
This contract is for the furnishing of the new pump. This is
questions as were directed by Council.
G'C
part of an ongoing program for which $8,000.00 per year has
STM MIN LIFT
C C .q Xi
been budgeted. At this particular perp s'ation a larger pump
84-154 awarding the contract for "Lodi Lake Storm Punp
PUM
is desired since the discharge rate is not limited by the
appropriated an additional $8,000 from the Capital Outlay
WID. Thus, as indicated in the timm for approval of the
fund to ecaplete the project.
plans and specifications. additional funds are npzded.
Plans and specifications for this project were approved on
September 5. 1984.
The City has received the following four (4) bids for this
project:
Bidder Bid
D.A. Moore Purmp a Equip. Co. $10.359.92
Shape. Inc. $12.704.00
J.B.I. $15.5F?.00
industrial Pump a Supply $16.418.34
It is recannended that the bid be awarded to Shape, Inc., who
is furnishing a Flygt pump rather than D. A. Mbore Perp Co..
iwho
is proposing a pump made by ANI. The technical
specifications were written based on Flygt specifications and
the ANI pump has a imrber of exceptions although they are
relatively minor. It does appear that the pump is a high
quality unit. However. ANI and Moore do not meet the
specifications in the area of maintenance and support. The
specifications clearly call for parts and repair capability
in Northern California. Mbore has been working to establish
this capability for a year an tells us that it will be done
in 1985. We do not feel that a conparmy's expansion plans are
in conformance with the letter. nor the intent of the
specifications.
All of the submersible pumps installed in City storm.pump
stations since 1976 are Flygt pumps. The first were
installed by a developer in the "temporary" Vine Street
(Sumwest) pump station. At that time the City had no
experience with this type of pump. The developer's engineer
selected Flygt as a high quality unit and one of the few that
had the proper flow and head characteristics for that
application. We have had good experience with these pumps
and have specified them in similar instances. Flygt's
support in the area is excellent. They have trained our
maintenance workers, and provided parts on a timely basis and
allow our people to use their shop and tools in South San
Francisco. \\
The submersible pump industry as a whole has upgraded its
product considerably over the last decade. It is Staff's
intent to review the technical portion of our specification
._
and allow more flexibility in design details, however, Staff
feels its requirements for support services are appropriate.
W. Dave Moore, 2752 Olive Cmirt, West Sacramento,
representing D. A. Moore Pump and FquipmPnt Carpany addressed
the Council regarding his company's bid and responded to
questions as were directed by Council.
AWARD - LCDI LAKE
Following additional discussion, Council, on motion of Mayor
STM MIN LIFT
Pro Tempore Ilinchman, Olson second, --jopted Resolution No.
STATICN CLEANUP
84-154 awarding the contract for "Lodi Lake Storm Punp
PUM
Replacement" to Shape, Inc., in the amomamt of $12,704.00, and
appropriated an additional $8,000 from the Capital Outlay
R5. NO. 84-154
fund to ecaplete the project.
0 f
RESOLUTION NO. 84-154
AWARD - CONTRACT FOR LODI LAKE STOR141
PUMP REPLACEMENT
WHEREAS, in answer to notice duly published in
accordance with law and the order of this City Council, sealed
bids were received and publicly opened by the City Clerk of
this City on September 26. 1984 at 11:00 a.m. for the contract
for Lodi Lake Storm Pump Replacement as described in the
specifications therefor^ approved by the City Council September
5. 1984; and
WHEREAS, said bids have been compared, checked, and
tabulated and a report thereof filed with the City Manager as
follows:
BIDDER AMOUNT
D. A. Moore Pumps a Equip. $10,359.92
Shape, Inc. $12,704.00
Industrial Pump Supply $16,418.34
J.B.I. $15,562.00
WHEREAS, D. A. Moore Pumps & Equipment Co. bid of
$10,359.92, which represents the low bid received, did not
meet specifications the City Council determined that it would
award the.contract for Lodi Lake Storm Pump Replacement to the
second low bidder, Shape. Inc., in the amount of $12,704.0'0.
NOW, THEREFORE, BE IT RESOLVED by the City Council of
the City of Lodi that award of contract for Lodi Lake Storm
Pump Replacement be and the same is hereby made to Shape,
Inc., the second low bidder, in the amount of $12,704.00
Dated: October 17, 1984
I hereby certify that Resolution No. 84-154
was passed and adopted by the City Council
of the Cit} of Lodi in a regular meeting held
October 17, 1984 by the following vote:
Ayes: Council Members - Reid, Hinchman, Olson,
Pinkerton, & Snider
Noes: Council Members - None
Absent: Council Members - None
ALICE M. RE IMCHE
City Clerk
84-154
CITY COUNCIL
JOHN R (Rar*) SNIDER. Mavo►
DAVID M. HINCHMAN
Mayor Pro Tempore
E VE LYN M OLSON
JAMES W PINKERTON. It
FRED M REID
F
It
CITY OF LODI
CITY HALL, 221 WEST PINE STREET
POST OFFICE BOX 320
LODI. CALIFORNIA 95241
(209)334-5634
October 18, 1984
Shape, Inc.
P.O. Box 1462
Sacramento, CA 95807
SUBJECT; Lodi Lake Storm Drain Lift Station
Pump and Motor
HENRY A GLAVi$. )r.
City Manager
RE`'`A IPWREIMCHE
'{' t (� Citr Clerk
O { t�. J �AM Z 23
RONALD M STEIN
ALICE X. RErty Ateornt�,
CITY CUBA
CI
The Lodi City Council on October 17, 1984, awarded the bid for the
above equipment to you in the amount of $12,704. Enclosed is
Purchase Order No. 6102 for this equipment.
We have also enclosedfor your information a bid summary showing
the bids received.
Extra sets of plans and specifications can be obtained by writing
or calling this office.
Delivery date shall be fo-tr weeks after receipt of the purchase
order.
Sincerely;
,
.`E. Robison
ssistant City Engineer
Enclosures
0
CITY OF LODI
PUBLIC WORKS DEPARTMENT
TO: City Council
FROM: City Manager
DATE: October 11, 1984
SUBJECT: Lodi Lake Storm Pump Replacement
COUNCIL COMMUNICATION
Approved in F.Y. Budget: 1984
Fund: General Fund
Amount Budgeted: $ 8,000.00
Total Project Estimate: $;6,000.00
Bid Opening Date: Sept. 26, 1984
RECOMMENDED. ACTION: That the City Council award the contract for the above project
to Shape, Inc., in the arrvount of $ 12,704.00, and appropriate an additional $ 8,000.
to complete the project.
BACKGROUND INFORMATION: This project includes the replacement of the lead pump at
the Lodi lake Pump Station. The work will be done by City forces. This contract is
for the furnishing of the new pure. This is part of an ongoi-g program for which
$ 8,000.00 per year has been budgeted. At this particular pump station a larger
pump is desired since the discharge rate is not limited by the WtD. Thus, as indi-
cated 'in the memo for approval of the plans and specifications, additional funds are
needed.
Plans and specifications for .this project were approved on September 5, 1984.
The City has received the following four (4) bids for this project:
BIDDER
LOCATION
Engineer's Estimate
D.A. Moore Pump & Equipment Co. West Sacramento
Shape, Inc. Sacramento
J.B.I. Burlingame
industrial Pump € Supply Clovis
BID
$ 13,800.00
10,359.92
12,704.00
15,562.00
16,418.34
It is recommended that the bid be awarded to Shape, Inc., who. is furnishing a Flygt
pump rather than D.A. Moore Pump Co. who is proposing a pump made by ANI. The
technical specifications were written based on Flygt specifications and the ANI pump
has a number of exceptions although they are relatively minor. It does appear that
the pump is a high quality unit. However, ANI and Moore do not meet the specie ca-
tions in the area of maintenance and support. The specifications clearly call for
parts and repair capability in Northern California. Moore has been working to esta-
blish this capability for a year and tells us that it will be done in 1985. We do
not feel that a company's expansion plans are in conformance with the letter, nor the
intent of the specifications.
All of the submersible pumps installed in City storm pump stations since 1976 are
Flygt pumps. The first were installed by a developer in the "temporary" Vine Street
APPROVED: I FILE NO.
HENRYA. G ES. ty Manager
COUNCIL COMMUNICATION - Lodi Lake S.P. Replacement
October 11, 1984
Page 2
(Sunwest) pump station. At that time :he City had no experience with this type of
PUMP. The developer's engineer selected Flygt as a high quality unit and one of the
few that had the proper flow and head characteristics for that application. We have
had good experience with these pumps and have specified them i.n similar instances.
Fiygt's support in the area is excellent. They have trained our maintenance workers,
and provided parts on a timely basis and allow our people to use their shop and
tools in South San Francisco.
The submersible pump industry as a whole has upgraded its product considerably over
the last decade. It is our intent to review the technical portion of our specifica-
tion and allow more flexibility in design details. However, we feel our requirements
for support se ices are appropriate.
.4
ck Iionsko
P b l i 4 Works Director
cc: Assistant Finance Director
JLR/RCP/cg
r
CITY OF LODI '
PUBLIC WORKS DEPARTMENT ADDENDUM NO I
PROJECT: LODI LAKE STORM DRAIN OUTFALALICE M -r00 2 4 1%4
CITY C,cftK
Notice is he-eby given that the plans & specifications for the above-
mentioned project have been revised as follows:
1. Plan Drawing e'40129
a. Pipe Alternate Table, "full lining" means a fully paved interior
to provide a smooth pipe comparable to concrete pipe.
b. Add Note 3 "Trench backfill shall be compacted to 90% R.C.. to the
surface. Replacement of any oiled surfaces shall be done by the City."
2. Pian Drawing 84D130, Overflow Structure Construction Sequence, Note 1
should read, "..... Set 541' SO starter section."'
3. The bid item for the overflow structure was omitted from the proposal.
Please use the proposal attached to this Addendum. Use of this proposal
shall constitute acknowledgment of receipt of this Addendum.
Ordered by:
ck L. Ronsko
PublicWorks Director
SECTION 3
BID PROPOSAL
LODI LAKE STORM DRAIN OUTFALI
CITY OF LODI, CALIFORNIA
Date:
To the Lodi City Council
Lodi City Hall
221 West Pine Street
Call Box 3006
Lodi, CA 95241-1910
The undersigned declares that the site has been carefully examined,
Information to Bidders, Contract, General Provisions, Special
Provisions and the Plans for the construction of various items
required for the above-named project and submits this schedule of
prices for the items of his bid.
If awarded the Contract, the undersigned agrees to furnish all
Labor, material and equipment necessary to complete said work for
this project, excepting those items supplied by the City of Lodi.,
in strict accordance with the Plans, Information to Bidders,
General Provisions, Special Provisions and Contract form adopted
for the same and 'fie requirements under them of the Engineer, and
will take in full payment therefor the following unit and total
pri.ces, to -wit
3.1
Dccnn2 /11 ero
Perform the work necessary to install storm drain, slide gate, and construct an
overflow structure, all as shown on the plans and specifications for "LODI LAKE
STORM DRAIN OUTFALL."
BID ITEMS
ITEM
S
EST'D.
NO.
DESCRIPTION
UNITTG
Y.
1.
54" storm drain
LF
728
2.
66" storm drain
LF
55
3.
48" Special Manhole
EA
1
4.
Excavation Safety
LS
LS
5.
Outlet Grate
EA
1
6.
48" Slide Gate
EA
1
7.
Overflow Structure
LS
LS
. TOTAL
BASE BID
3.2
occnn,) /i 1 m
UNIT TOTAL
PRICE PRICE
�
S
S
S
Lump Sum
S
S
S
Lump Sum
CITY OF LODI
PUBLIC WORKS DEPARTMENT ADDENDUM NO_2
October 25, 1984
PROJECT: LODI LAKE STORM DRAIN OUTFALL
Notice is hereby given that the plans & specifications for the above—
mentioned project have been revised as follows:
1. Add to Plan Drawing 84D129 Pipe Alternate Table, Items 1 b 2:
54" Spiral Rib Pipe, coated, 0.109 in. thick.
2. Add to Special Provisions, Section 6.604:
"Spiral rib" steel pipe may be substituted for corrugated steel pipe
in accordance with the Pipe Alternate Table shown on the plans and these
Special Provisions.
"Spiral Rib" pipe shall be as manufactured by Pacific Spiral Rib
Pipe, Sacramento, CA. or approved equal. Joints and band couplers
shall comply with the applicable provisions of Section 61 of the Standard
Specifications. Materials and fabrication shall comply with the ap-
plicable provisions of Section 66 of the Standard Specifications.
dared
c L. Ronsko
bli Works Director
0 i
C01
CITY OF LODI
PUBLIC WORKS DEPARTMENT
RECEIPT OF ADDENDUM
NO. 2
10/25/84
PROJECT: LOD1 LAKE STORM DRAIN OUTFALL
Ppceived from the
City
of Lodi ADDENDUM
NO. 2 to the pians
and specifications
for
Lodi Lake Storm Drain
Outfall
Date:
by
NOTE: This acknowledgement must be inclu(k d with the Proposal when
submitted.