HomeMy WebLinkAboutAgenda Report - October 2, 1985 (61)AWARD - PURCHASE OF SINGLE-PHASE AND THREE-PHASE PA[)MOUNT TRANSFORMERS RES. NO. 85-135 Council was apprised that on Tuesday, September 17, 1985, bids were received for five 37.5 KVA, ten 50 KVA, and % twenty-five 75 KVA single-phase and three 75 KVA, five 150 KVA, five 225 KVA and two 300 KVA three-phase padnount trans formers . A recap of the bids received was presented for Council's �{ perusal. I Based on design data supplied by the bidders, the life -cycle cost of transformer losses has been evaluated. Based on mini -ran total life -cycle cost of tl-ie transformers, it was recommended that the bid be awarded to the lowest bidder in each category as follows: RTE Corporation Five 37.5 KVA single-phase transformers $5,156.90 Maydwell & Hartzell, Inc. Ten 50 KVA, twenty-five 75 KVA single-phase and Two 75 KVA three-phase transformers $51,453.46 Westinghouse Electric Supply Co. One 75 KVA, five 150 KVA, five 225 KVA and two 300 KVA three-phase transformers $59,082.84 COUNCIL ADOPTED RESOLUTION NO. 85-135 AWARDING THE BID FOR SSE -PHASE AND THREE-PHASE PADMOUNT TRANSFORMERS PURSUANT TO ME RECOMYM 7DATION HERETOFORE SET FORTH. sa Mt 4 ZD .iWnrw.x (. Svsv{ tr .y h `i.3vs N TO: THE CITY COUNCIL FROM: THE CITY MANAGER'S OFFICE OUNCIL C0111MUNICAT DATE NO. September 20, 1985 PURCHASE OF SINGLE-PHASE AND THREE-PHASE PADMOUNT TRANSFORMERS (UD -E85-7) On Tuesday, September 17, 1985, bids were received for five 37.5 KVA, ten 50 KVA and twenty-five 75 KVA single-phase and three 75 KVA, five 150 KVA, five 225 KVA and two 300 KVA three-phase padmount transformers. The transformers will be used to serve: Burgundy Village Park West 4, 5, 6 & 7 Tandy Ranch Whispering Oaks #2 Noma Ranch Apartments Turner Road Apartments #2 Park West Condo LakeEhore Professional Bldg. 730 South Beckman Road Needham School Avenue Place Iris Dr. Professional Bldgs. MCP Investment Well #21 Geweke Motel Ham & Lodi Office Complex Longs Drug Store LDS Church Ashley Place and to replenish the inventory of backup units. Based on design data supplied by the bidders, the life -cycle cost of trans- former losses has been evaluated. Column "B" is the dollar value associated to with these losses. Based on minimum total life -cycle cost of rhe transformers, it is recommended that the bid be awarded to the lowest bidder in each category, as follows: RTE Corporation, Portland, OR. Five 37.5 KVA single-phase transformers $ 5,156.90 Maydwell & Hartzell, Inc., Brisbane, CA Ten 50 KVA, twenty-five 75 KVA single-phase and Two 75 KVA three-phase transformers 51,453.46 Westinghouse Electric Supple Co., Concord, CA One 75 KVA, five 150 KVA, five 225 KVA and two 300 KVA three-phase transformers 59,082.84 The total amount of the award is: $115,693.20 Sufficient funds are available in the Electric Department's operating fund for this acquisition. Henry Rice Utility Director Attach. ewe ; °,R',@'a*e, hNKb^s•,^37�. r"'�.`M;J?` ,: ^t.!7} :s.,'ei'A?Ea.!!?!MR� m.! !Rrt-s +'.m.:'Y"77 1-•^_^.riir;m .a).T, tt rm BID EVALUATION SINGLE-PHASE AND THREE-PHASE PADMOUNT TRANSFOMERS ` UD -E85-7 Item #1 Item #2 Five 37.5 KVA Single -Phase Ten 50 KVA Single -Phase "An "Bn "A" + "Bn Est. ..A.. .B., "A" + "B" Est. Price Cost of Life -Cycle Delivery Price Cost of Life -Cycle Delivery Supplier With Tax Losses Cost (Weeks) With Tax Losses Cost Weeks Westinghouse Electric Supply Co. Concord, CA $5,527.90 $3,188.00 $8,715.90 12-14 $11,649.40 $7,241.00 $18,890.40 12-14 Maydwell 6 Hartzell, Inc.* Brisbane, CA 41420.20 4,062.00 8,482.20 12-14 10,843.80 7,563.50 18,407.30 6-8 RTE Corporation Portland, OR 5,156.90 2,925.50 8,082.40 13 11,246.60 7,460.00 18,706.60 13 Square D Company Hayward, CA No Bid No Bid General Electric Supply Co. Emeryville, CA 5,655.10 3,119.75 8,774.85 12-14 12,582.20 7,157.50 19,739.70 12-14 * Howard Transformer ewe ; °,R',@'a*e, hNKb^s•,^37�. r"'�.`M;J?` ,: ^t.!7} :s.,'ei'A?Ea.!!?!MR� m.! !Rrt-s +'.m.:'Y"77 1-•^_^.riir;m .a).T, tt rm .......... ...... ON Howard Transformer Page 2 BID EVALUATION SINGLE-PHASE AND THREE-PHASE PADMOUNT TRANSFORMERS tt UD -E85-7 Item #3 Item #4 Twenty-five 75 KVA Single -Phase Two 75 KVA Inree-Phase (208 Volt) "A!" "B" "A" + "B" Est. "A" "B" "A" + "B" Est. Price Cost of Life -Cycle Delivery Price Cost of Life -Cycle Delivery Supplier With Tax Losses Cost (Weeks) With Tax Losses Cost (Weeks) Westinghouse Electric Supply Co. Concord, CA $33,920.00 $26,703.75 $60,623.75 14-16 $7,057.46 $2,361.90 9,419.36 23-25 Maydwell & Hartzell, Inc.* Brisbane, CA 34,105.50 25,570.06 59,675.50 6-8 6,504.16 2,520.00 9,024.16 16-18 RTE Corporation Portland, OR 38,981.50 26,238.75 65,220.25 13 7,305.52 2,790.90 10,096.42 21 Square D Company Hayward, CA No Bid 8,274.,*, 2,901.50 11,175.86 18 Ceneral Electric Supply Co. Emeryville, CA 37,789.00 25,083.75 62,872.75 12-14 8,787.40 2,735.00 11,522.40 14-16 Howard Transformer Page 2 Suolier Westinghouse Electric Supply Co. Concord, CA Maydvell 6 Hartzell, Inc.* Brisbane, CA RTE Corporation Portland, OR Square D Company Hayward, CA General Electric Supply Co. Emeryville, Cel * Howard Transformer BID EVALUATION SINGLE-PHASE AND THREE-PHASE PADMOUNP TRANSFORMERS UD -E85-7 Item #5 Two 150 KVA_Three-Phase (208 Volt "A" „B" "d., + "B. Est. Price Cost of Life -Cycle Delivery With Tax Losses Cost (Weeks) _ $ 8,072,96 $4,199.10 $12,262.06 23-25 9,639.84 3,779.40 13,419.04 16-18 8,443.96 4,584.70 13,028.66 21 9,845.28 4,734.50 14,579.78 18 10,627.56 3,972.50 14,600.06 14-16 Item #E. Five 225 KVA Three -Phase (208 Volt "A" "B" "A" + "B" Est. Price Cost of Life -Cycle Delivery With Tax Losses Cost Week,;) $24,035.50 $14,671.75 $38,707.25 23-25 22,911.90 16,229.75 39,141.65 16-18 25, 3:3.40 14,791.25 40,114.65 21 29,595.20 15,053.00 44,648.20 18 27,6b1.90 15,305.00 42,986.90 14-16 Page 3 Sunnliet Westinghouse Electric Supply Co. Concord, CA Ma7dwell 6 Hartzell, Inc.* Brisbane, CA RTE Corporation Portland, OR Square D Company Hayward, CA General Electric Supply Co. Emeryville, CA * Howard Transformer BID EVALUATION SINGLE-PHASE AND TIMEE-PHASE PADMOUNI TRANSPORMEF S UD -E85-7 Item #8 Three 150 KVA Three -Phase (480 Volt "A" Item #7 "A" + "B" Est. Oue 75 KVA Three -Phase (480 Volt) Life -Cycle "A" "B" "A" + "B" Est. Price Cost of Life -Cycle Delivery With Tax Losses Cost Weeks 16-18 $3,527.18 $1,150.95 $4,678,63 23-25 3,901.86 1,065.00 4,956.86 16-18 3,742.86 1,403.10 5,145.96 21 4,22,.40 1,388.65 5,618.05 18 4,630.08 1,254.00 5,884.08 14-16 Item #8 Three 150 KVA Three -Phase (480 Volt "A" "B" "A" + "B" Est. Price Cost of Life -Cycle Delivery With Tax Losses _ Cost Weeks $11y956.80 $6,115.65 $18,072,45 23-25 13,495.92 5,718.15 19,214.07 16-18 12,805.86 6,817.50 19,623.36 21 14,818.80 6,705.9C 21,524.70 18 16,100.34 5,911.35 22,011.69 14-16 Page 4 BID EVALUATION SINGLE-PHASE AND THREE-PHASE PAD`OUNf TRANSFCRMERS UD -E85-7 Item $9 Two 300 KVA Three -Phase (480 Volt) "Au nBu uAn + uBu Est. Price Cost of Life -Cycle Deliv_ry Supplier With Tax Losses Cost(Weeks) Westinghouse Electric Supply Co. Concord, CA $11,490.40 $6,558.20 $18,048.60 23-25 Maydwell 6 Hartzell, Inc.* Brisbane, CA 13,163.08 6,320.20 19,483.28 16-18 RTE Corporation Portland, OR 10,911.64 7,913.70 18,825.34 21 Square D Company Hayward, CA 13,328.44 7,243.90 20,572.34 18 General Electric Supply Co. Emeryville, CA 14,030.16 6,309.00 20,339.16 14-16 * Howard Transformer "All nBn uAn + uBn Est. Price Cost of Life -Cycle Delivery With Tax Losses Cost weeks 'age 5 :,-0I TNCIL COMMUNICAT11 N TO: THE CITY COUNCIL DATE NO. FROM: THE CITY MANAGER'S OFFICE September 20, 1985 SUBJECT: PURCHASE OF SINGLE-PHASE AND THREE-PHASE PADMOUNT TRANSFORMERS (UD -E85-7) On Tuesday, September 17, 1985, bids were received for five 37.5 KVA, ten 50 KVA and twenty-five, 7.5 KVA single-phase and three 75 KVA, five 150 KVA, five 225 KVA and two 300 KVA three-phase padmount transformers. The transformers will be used to serve: Burgundy Village Park West 4, 5, 6 & 7 Tandy Ranch Whispering Oaks #2 Noma Ranch Apartments Turner Road Apartments #2 Park West Condo Lakeshore Professional Bldg. 730 South Beckman Road Needham School Avenue Place Iris Dr. Professional Bldgs. MCP Investment Well #21 Geweke Motel Ham & Lodi Office Complex Longs Drug Store LDS Church Ashley Place and to replenish the inventory of backup units. Based on design data supplied by the bidders, the life -cycle cost of trans- former losses has been evaluated. Column "B" is the dollar value associated with these losses. Based on minimum total life -cycle cost of the transformers, it is recommended that the bid be awarded to the lowest bidder in each category, as follows: RTE Corporation, Portland, OR. Five 37.5 KVA single-phase transformers Maydwell & Hartzell, Inc., Brisbane, CA Ten 50 KVA, twenty-five 75 KVA single-phase and Two 75 KVA three-phase transformers Westinghouse Electric Supply Co., Concord, CA One 75 KVA, five 150 KVA, five 225 KVA and two 300 KVA three-phase transformers The total amount of the award is: $ 5,156.90 51,453.46 59,082.84 $115,693.20 Sufficient funds are available in the Electric Department's operating fund for this acquisition. Henry Rice Utility Director Attach. ki RESOLUTION NO. 85-135 AWARD - BID FOR SINGLE PHASE AND THREE PHASE PADMOUNT TRANSFORMERS. WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened by the City Clerk of this City on September 17, 1985 at 11:00 a.m. for the contract .for Single Phase and Three Phass Padmount Transformers as described in the specifications therefor approved by the City Council August 21, 1985 and WHEREAS, said bids have been compared, checked, and tabulated and a report thereof filed with the City Manager as follows: Bidder Amount Square D Company $80,091.48 Westinghouse Supply $117,238.12 Maydwell & Hartzell $118,986.06 General Electric $127,200.74 R.T.E. Corp. $123,918.24 WHEREAS, the City Manager recommends that award be made as follows: R.T.E. Corporation 5 - 37.5 KVA Single prase transformers - $ 5,156.90 Maydwell & Hartzel 10 - 50 KVA, 25 -75 KVA single phase and 2 - 75 KVA three phase transformers - $51,53.46 Westinghouse 1 - 75 KVA, 5 - 150 KVA, 5 - 225 KVA and 2 - 300 KVA Three phase padmount tranformers - $59,082.84 NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lodi that award of contract for Single Phase and Three Phase Padmount Transformers be and the same is hereby made to the low bidders as shown on Exhibit "A" attached hereto and thereby made a part hereof. Dated: October 2, 1985 I hereby certify that Resolution No. 85-135 was passed and adopted by the City Council of the City of Lodi in a regular meeting held October 2, 1985 by the following vote: Ayes: Council Members - Reid, Olson, Snider V and Pinkerton_` Noes: Council Members - None Absent: Council Members - Hinc.hman (Mayor) Alice M. Reimche City Clerk 85-135 Supplier Westinghouse Electric Supply Co. Concord, CA Maydwell 6 Hartzell, Ino.* Brisbane, CA RTE Corporation Portland, OR Square D Company Hayward, CA General Electric Supply.Co. Emeryville, CA * Howard Transformer BID EVALUATION SINGLE-PHASE AND THREE-PHASE PADMOUNT TRANSFORMERS UD -E85-7 Item NF1 Five 37.5 KVA Sinstle-Phase "An ngn "Au + "B" Est. Price Cost of Life -Cycle Delivery With Tax Losses Cost Weeks $5,527.90 $3,188.00 $8,715.90 12-14 4,420.20 4,062.00 8,482.20 12-14 5,156.90 2,925.50 8,082.40 13 No Bid 10,843.80 7,563.50 18,407.30 5,655.10 3,119.75 8,774.85 12-14 Page 1 11 Item #2 Ten 50 KVA Single -Phase "An "Bn "Aa + uBn Est. Price Cost of Life -Cycle Delivery With Tax Losses Cost Weeks $11,649.40 $7,241.00 $18,890.40 12-14 10,843.80 7,563.50 18,407.30 6-8 11,246.60 7,460.00 18,706.60 13 No Bid 12,582.20 7,157.50 19,739.70 12-14 Page 1 11 Supplier Westinghouse Electric Supply Co. Concord, CA Maydwell & Hartzell, Inc.* Brisbane, CA RTE Corporation Portland, OR Square D Company Hayward, CA General Electric Supply Co. Emeryville, CA * Howard Transformer BID EVALUATION SINGLE-PHASE AND THREE. -PHASE PADMOUNP TRANSFORMERS UD -E85-7 Item #3 Twenty-five 75 KVA Single -Phase A.. .B.. "A" + nBn Est. Price Cost of Life -Cycle Delivery With Tax Losses Cost Weeks $33,920,00 $26,703.75 $60,623.75 14-16 34,105.50 25,570.00 59,675.50 6-8 38,981.50 26,238.75 65,220.25 13 No Bid 37,789.00 25,083.75 62,872.75 12-14 Item #4 Two 75 KVA Three -Phase (208 Volt ..A.. I,B„ .,A" + „Bn Est. Price Cost of Life -Cycle Delivery With Tax Losses Cost Weeka $7,057.48 $2,361.90 $ 9,419.38 23-25 6,504.16 2,520.00 9,024,16 16-18 7,305.52 2,790.90 10,096.42 21 8,274.36 2,901.50 11,175.86 18 8,787.40 2,735.00 11,522.40 14-16 Page 2 DI Supplier W"tinghouse Electric Supply Co. Concord, CA Maydwell 6 Hartzell, Inc.* Brisbane, CA RTE Corporation Portland, OR Square D Company Hayward, CA General Electric Supply Co. Emeryville, CA * Howard Transformer BID EVALUATION SINGLE-PHASE AND THREE-PHASE PADMOUNT TRANSFORMERS UD -E85-7 Item #5 Two 150 KVA Three -Phase (208 Volt Item #6 Five 225 KVA Three -Phase (208 Volt "A" uBn „A" + uBn Est. Price Cost of Life -Cycle Delivery With Tax Losses Coat Weeks $ 8,072.96 $4,189.10 $12,262.06 23-25 9,639.84 3,779.40 13,419.04 16-18 8,443.96 4,584.70 13,028.66 21 9,845.2.8 4,734.50 14,579.78 18 10,627.56 3,972.50 14,600.06 14-16 Item #6 Five 225 KVA Three -Phase (208 Volt "A" "B" "A" + "B" Est. Price Cost of Life -Cycle Delivery With Tax Losses Cost(Weeks) $24,035.50 $14,671,75 $38,707.25 23-25 22,911.90 16,229.75 39,141.65 16-18 25,323.40 14,791.25 40,114.65 21 29,595.20 15,053.00 44,648.20 18 27,681.90 15,305.00 42,986.90 14-16 Page 3 C * Howard Transformer Page 4 i BID EVALUATION SINGLE-PHASE AND THREE-PHASE PA.DMOUNT TRANSFORMERS UD -E85-7 Item #7 Item #8 One; 75 KVA Three -Phase (480 Volt) Three 1!0 KVA Three -Phase (480 Volt) "A" "Be' "All + "Bee Est. "A" "Be' "All + "B" Est. Price Cost of Life -Cycle Delivery Price Cost of Life -Cycle Delivery Supplier With Tax Losses Cost (Weeks) With Tax Losses Cost Weeks r Westinghouse Electric Supply Co. Concord, CA $3,527.18 $1,150.95 $4,678.63 23-25 $11,956.80 $6,115.65 $18,072.45 23-25 Maydwell 6 Hartzell, Inc.* Brisbane, CA 3,901.8E 1,065.00 4,966.86 16-18 13,495.92 5,718.15 19,214.07 16-18 RTE Corporation Portland, OR 3,742.86 1,403.10 5,145.96 21 12,805.86 6,817.50 19,623.36 21 Square D Company Hayward, CA 4,229.40 1,388.65 5,618.05 18 14,818.80 6,705.90 21,524.70 18 General Electric Supply Co. Emeryville, CA 4,630.08 1,254.00 5,884.08 14-16 16,100.34 5,911.35 22,011.69 14-16 * Howard Transformer Page 4 i BID EVALUATION SI14CLE-PHASE AND THREE-PHASE PADMOUNf TRANSFORMS UD -E85-7 Item 49 Two 300 KVA Three -Phase (480 Volt) "A" "B" "A" + "B" Est. Price Cost of Life -Cycle Delivery Supplier With Tax Losses Cost Weeks Westinghouse Electri,; Supply Co. Concord, CA $11,490.40 $6,558.20 $18,048.60 23-25 Maydwell 6 Hartzell, Inc.* Brisbane, CA 13,163.08 6,320.20 19,483.28 16-18 RTE Corporation Portland, OR 10,911.64 7,913.70 18,825.34 21 Square D Company Hayward, CA 13,328.44 7,243.90 20,572.34 18 General Electric Supply Co. Emeryville, CA 14,030.16 6,309.00 20,339.16 14-16 * Howard Transformer "An "Bu "An + uBn Est. Price Cost of Life -Cycle Delivery With Tax Losses Cost Weeks Page 5