HomeMy WebLinkAboutAgenda Report - September 18, 1985 (91)BIDDER AMOU!JT Richard A. Heaps Electrical. Contractor, Inc. $55,396.25 Graffigna Electric $58,204.00 Burnup and Sims of California, Inc. $59,364.00 Lewis and Tibbitts, Inc. $64,471.15 Crutchfield Construction Co., Inc. $66,230.00 C P N Construction Co. $72,004.00 COUNCIL ADOPTED RESOLUTION No. 85-125 AWARDING THE CONTRACT FOR THE INSTALLATION OF ELECTRIC SUBSTRUCTURES - MUTT AVENUE SOUTH OF TOKAY STREET TO RICHARD A. HEAPS ELECTRICAL CONTRACTOR, INC., IN THE AMOUNT OF $55,396.25. z 7 CITY COIL MEETING y0. .. 18, 1985 _ AWARD - CONTRACT FOR INSTALLATION OF ELECTRIC SUBSTRUCTURES - MILLS AVENUE SOUTH OF TOKAY STREET RES. NO. 85-125 City Manager Peterson presented the following bids which had been received for the installation of Electric Substructures — `� ' Mills Avenue South of Tokay Street: BIDDER AMOU!JT Richard A. Heaps Electrical. Contractor, Inc. $55,396.25 Graffigna Electric $58,204.00 Burnup and Sims of California, Inc. $59,364.00 Lewis and Tibbitts, Inc. $64,471.15 Crutchfield Construction Co., Inc. $66,230.00 C P N Construction Co. $72,004.00 COUNCIL ADOPTED RESOLUTION No. 85-125 AWARDING THE CONTRACT FOR THE INSTALLATION OF ELECTRIC SUBSTRUCTURES - MUTT AVENUE SOUTH OF TOKAY STREET TO RICHARD A. HEAPS ELECTRICAL CONTRACTOR, INC., IN THE AMOUNT OF $55,396.25. OUNCIL COMMUNICATTAN SUBJECT: INSTALLATION OF ELECTRIC SUBSTRUCTURES MILLS AVENUE SOUTH OF TOKAY STREET (UD -E85-10) DATE NO. September 11, 1985 On Tuesday, September 10, 1985, bids were received for the installation of electric substructures (vaults & conduits) on Mills Avenue south of Tokay Street, Royal Crest Drive, Stafford Street, Avalon Avenue and Vine Street. The installation of the substructures will enable the Utility Department to reconstruct the underground direct -buried 12-kv distribution system in the area. The existing system, installed in 1968, is rapidly failing due to cable deterioration. As a result of the cable condition, this area has experienced numerous outages, with the outage rate continually increasing. Based on the bids received, it is recommended that the bid be awarded to the lowest bidder Richard A. Heaps Electrical Contractor, Inc., Sacramento in the amount of $55,396.25. Funding for this project was included in the 1985-86 fiscal year budget. lt,C� Henry . Rice Utility Director Attach. c.c. Public Works Director .TO- THE CITY COUNCIL FROM: THE CITY MANAGER'S OFFICE SUBJECT: INSTALLATION OF ELECTRIC SUBSTRUCTURES MILLS AVENUE SOUTH OF TOKAY STREET (UD -E85-10) DATE NO. September 11, 1985 On Tuesday, September 10, 1985, bids were received for the installation of electric substructures (vaults & conduits) on Mills Avenue south of Tokay Street, Royal Crest Drive, Stafford Street, Avalon Avenue and Vine Street. The installation of the substructures will enable the Utility Department to reconstruct the underground direct -buried 12-kv distribution system in the area. The existing system, installed in 1968, is rapidly failing due to cable deterioration. As a result of the cable condition, this area has experienced numerous outages, with the outage rate continually increasing. Based on the bids received, it is recommended that the bid be awarded to the lowest bidder Richard A. Heaps Electrical Contractor, Inc., Sacramento in the amount of $55,396.25. Funding for this project was included in the 1985-86 fiscal year budget. lt,C� Henry . Rice Utility Director Attach. c.c. Public Works Director RESOLUTION NO. 85-125 AWARD - CONTRACT FOR INSTALLATION OF ELECTRIC SUBSTRUCTURES - MILLS AVENUE SOUTH OF TOKAY STREET, LODI WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened by the City Clerk of this City on September 10, 1985 at 11:00 a.m. for the contract for the installation of electric substructures, Mills Avenue south of Tokay Street as described in specifications therefor approved by the City Council on August 21,1985; and WHEREAS, said bids have been compared, checked, and tabulated and a report thereof filed with the City Manager as shown on exhibit "A" attached hereto and thereby made a part hereof. WHEREAS, the City Manager recommends that award be made to the low bidder as follows: Richard A. Heaps Electrical Contractor, Inc., Sacramento, CA in the amount of $55,396.25 NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lodi that award of contract for the installation of electric substructures, Mills Avenue south of Tokay Street, Lodi be and the same is hereby made as heretofore set forth. Dated: September 18, 1985 I hereby certify that Resolution No. 85-125 was passed and adopted by the City Council of tie City of Lodi in a regular meeting held September 18, 1985 by the following vote: Ayes: Council Members - Olson, Pinkerton, Reid, Snider, and Hinchman (Mayor) Noes: Council Members - None Absent: Council Members - None Alice M. Rmche City Clerk BID EVALUATION UD -E85-10 ELECTRIC SUBSTRUCTURES MILLS A:ENUE SOUTH OF TOKAY ST. Richard A. Heaps Electrical Contractor, Inc. Sacramento Graffigna Ele,.tric Lodi Burnup and Sims of California, Inc. Rancho Cordova Lewis & Tibbitts, Inc. Fremont Crutchfield Construction Co., Inc. Stockton C P N Construction Company Concord Exhibit "A" $55,396.25 58,204.00 59,364.00 64,471.15 66,230.00 72,004.00