HomeMy WebLinkAboutAgenda Report - September 18, 1985 (97)TAVES PARK - FINAL
ETR AND PREZONING
ORD. NO. 1363 INTRO.
Notices thereof having been published and affidavits of
publication being on file in the office of the City Clerk, Mayor
Hinchman called for the Public Hearings to consider the Planning
Commission's recndation that the City Council certify as
adequate the Final Environmental Impact Report for Taves Park,
a proposed 23.6 acre residential, institutional and ccauercial
project at the southeast corner of West Kettleman Lane and
Lower Sacramento Road and to consider the Planning Commission's
recommendation that Taves Park, a proposed 23.6 acre
residential institutional, and commercial project be prezoned
R-2, Single -Family Residential; R -C -P, Residential-
Conmercial-Professional; and C -S, Commercial Shopping shaven as
Alternate "B" in the Final Environmental Impact Report for the
proposed project.
The matter was introduced by Ccummiity Development Director
Schroeder who presented diagrams of the subject area and
responded to questions regarding the matter as were posed by the
Council.
Erin Corey, City of Lodi Junior Planner, reviewed the Final
Environmental Impact Report for Taves Park and responded to
questions regarding the document as were posed by the Council.
The following persons spoke in favor of the recommendations
regarding Taves Park:
a) Mr. Fred Baker, Attorney -at -Law, representing Dr. Taves,
317 W. Lodi Avenue, Lodi.
b) Mr. Glen Baumbach, Baumbach-Piazza, 323 W. Elm Street,
Lodi
dI :`ice"
Continued September 18; 1985
Th:re were no persons wishing to speak in opposition to the
matters, and the public portion of the hearing was closed.
On motion of Council Member Olson, Reid second, Council
certified as adequate the Final Environmental Impact Report for
Taves Park and established the following findings:
A. Environmental Impact I
Impact: The project will result in the loss of 23.6
acres of prime agricultural soil. If the project is
approved, this loss cannot be mitigated.
Finding: All of the land in and around the City of Lodi
is designated as -prime agricultural soil.
The City does not have the option of building on
"non -prime" agricultural soils in order to preserve the
prime soils. Every develcpnent built in the City, small or
large, utilizes scene prime agricultural soil. The
residential, camiercial and industrial needs of the City
necessitates scare urbanization of agricultural --land.
The City of Lodi has planned .and constructed its utility
system to serve the area with water, sewer and storm
drainage in anticipation of the area developing. The
existing infrastructure will allow development of the area
without costly expenditures of public funds for the
extension or construction of major new lines.
Overriding Considerations:
a) Before the adoption of the "Greenbelt Initiative" in
August 1981, the parcel in question has been designated for
residential development for many years by the City of Lodi
project site have been undergoing urbanization or will be
in the near future. Rural residential development also
exists to the south of the parcel but is not within the
City limits. Residential and ecffr&--rcial development is
planned for the parcel adjacent to the Taves parcel and the
proposed development will be a logical extension of the
urbanized area.
b) If this project were not approved, it could affect the
long-term, housing supply in Lodi. At this time, there are
about 338 acres of residential -zoned land left for
development in the city limits. However, most of this has
already been planned for development and the buildout is
approximately 3.75 years. Once this supply of housing is
used up there are very few new subdivisions to take their
place. Much of this is a result of the "Greenbelt
Initiative" which has significantly restricted the
possibility of new development. Residential projects often
take 2-3 years from the planning stage to when the homes
are built. Even if the Taves project were approved, it
might be 1987 before any houses are cxxnpleted in this
project. By then the number of existing subdivision lots
will be substantially .-educed.
B. Environmental Impact II
In
pact: Urbanization of subject parcel will affect
adjacent agricultural parcels.
6
Continued September 18, 1985
Finding: The Taves property is adjacent to proposed
urban development on the east and existing rural
residential development to the south. There would be some
modification of agricultural practices on the east parcel
until it is developed. Problems of vandalism and
trespassing can be mitigaced by the construction of a solid
fence or wall along the eastern edge of the Taves parcel.
This mitigation may not be required if The Meadows is
developed before Taves Park. The agricultural land to the
west will require no modification of farming practices, as
it is separated frau the subject parcel by Lower Sacramento
Road which bears a right-of-way of 80 feet. The parcel to
the north is separated by Kettleman Lane which has a
right--of-way of 120 feet and is developed wth comiercial
uses.
C. Environmental Impact III
Impact: The development of the subject parcel will
generate 8,000 vehicle trips per day which will be added to
the surrounding streets.
Finding: Lower Sacramento Road and Kettleman Lane will
be restriped for more lanes and a 4 -Way traffic signal.
(There is currently a 4 -way stop) will be installed at the
intersection of the two streets. Improvements that will be
made to Lower Sacramento Read and Kettleman Lane will
improve the overall traffic flow.
D. Environmental Impact -Iv
Impact: The project will produce additional vehicle
generated air pollution.
Based on air quality projections, the amount of
j,
e-
- -
s
the total For the City of Lodi. This level is not
considered significant.
E. Environmental Impact V
InT
ct: Residential units adjacent to I,ower Sacramento
Road and the streets servicing the commercial uses, will be
subject to noise levels exceeding recomwnded levels.
Finding: To help mitigate excessive noise levels, the
residential units can be designed with noise reduction
features built into the units.
F. Environmental Impact VI `-
?zpact: The development of the Taves parcel will
generate 74 additional school -aged children. This will
affect the Lodi Unified School District's ability to
provide adequate classrocsm space. ?
Finding: The City of Lodi has adopted a School Impaction
Fee which is paid to the school district. The fee is
considered adequate mitigation for the impact of additionalj
students on schools. 1
G. Environmental Impact VII
Impact: The 88 residential units would add 89 tons of J
solid waste per year. The current disposal site is
reaching its upper limits and adding more solid waste could-]
be a problem.
i
7
.r
,
y�,
». :.• -..x 4', n f fir' :NA
g�
si. a`W'
4
Continued September 18, 1985
Finding: The disposal of solid waste will not be a
problem if a new site is found before the current site has
reached its limit. Measures are being taken to extend the
life span of the current disposal site an additional 4-5
years.
H. Alternatives to the project: The EIR discussed several
alternatives to the proposed project. The following are
findings on three of the alternatives:
Alternative A. This alternative is a "no project"
alternative, which would mean that no devel.optrent would be
constructed on the property.
Finding: This alternative would eliminate the
envirormental impacts resulting from the proposed project.
This alternative could affect the future supply of housing
in Lodi due to the relatively small amount of residential
zoned land left for development in the City limits.
Alternative B. This alternative is a redesigned project
reducing the number of residential units, and modifying the
ccmrercial size and configuration of the ccavercial parcels
and changing the type of ccnnercial zoning from C-2 to C -S.
Finding: This alternative allows for a more cohesive
street layout and separates the cc mercial and residential
uses. The number of residences is reduced frcm 88 to 76,
which helps mitigate the traffic impacts and as well as
impacts on the Lodi Unified School District. Alternative B
changes the C-2 zone (General Commercial) to C -S
(Ccemiercial-Shopping) and facilitates the separation of the
co mrcial uses from the residential uses by changing the
street layout and project design. This also helps mitigate
the traffic impacts of the developer's proposal.
A.
2
ik^. R ✓-� ..•5fr � ^�� Y hid^ � � . �.
k
{l( r- `.
Growth -inducing impact: The project will not have a
significant gr_rmh-inducing impact on the City of Todi.
Finding: The passage of Measure A, the "Greenbelt
Initiative", has placed a significant future growth limit
on the City. All new General Plan amendments that require
an annexation must receive voter approval.
M.
A
ct a
r� EX �
k �J4
Alternative C: This alternative would change the �.
counercial uses and professional uses to multi -family
residential uses. The R-2 zone would remain the same.
Finding: The proposed R -C -P zone would allow 26 units =
(2.6 acres at 10 units per acre) as residential garden
apartments (R -Cdr), and the proposed commercial zone would
allow as .many as 580 units (7.25 acres at 80 units per -
acre) as Residential High Density, Caged to the
developer's proposal, daily vehicle trips would be reduced
by 2,880 and school -aged children would be increased by
289. A sound barrier would be needed along Laver
Sacramento Road and Kettleman Lane to insulate the
residences fr_an excessive noise levels. Water consumption
would be higher due to this alternative (84 acre feet per
year) than the present use of a vineyard (56.6 acre feet
per year). However, this difference is not considered
significant. This alternative's 666 residential units
would generate: as much as 675 tons of solid waste per year,
a significant increase when ccnpared to 89 irons per year
the developer's proposal would gi-nerate.
Growth -inducing impact: The project will not have a
significant gr_rmh-inducing impact on the City of Todi.
Finding: The passage of Measure A, the "Greenbelt
Initiative", has placed a significant future growth limit
on the City. All new General Plan amendments that require
an annexation must receive voter approval.
M.
A
ct a
r� EX �
k �J4
Continued September 18, 1985
The motion carried by the following vote:
Ayes: Council Members - Olson, Pinkerton, Reid, and
Hinchman (Mayor)
Noes: Council Members - None
Absent: Council Members - Snider
Abstain: Council Members - None
Council Member Olson then moved for introduction of Ordinance
No. 1363 prezoning Taves Park, a proposed 23.6 acre
Residential Institutional and ComTercial project as R-2,
Single -Family Residential; R -C -P, Residential -Commercial -
Professional; and C -S, Commercial Shopping as shown on
Alternate "B" in the Final Environmental Impact Report.
The motion was seconded by Mayor Pro Tempore Reid and
carried by the following vote:
Ayes: Council Members - Olson, Pinkerton, Reid, and
Hinchman (Mayor)
Noes: Council Members - None
Absent: Council Members - Snider
Abstain: Council members - None
TO: I THE CITY COUNCIL
FROM: THE: CITY MANAGER'S OFFICE
' .)UNCIL COMMUNICATIP'
DATE
September 11, 1985
5UBJECT:;TAVES PARK -FINAL EIR ANU FKLLUwtnb
BACKGROUND: At its meeting of Monday, August 26, 1985 the Planning
Commission recommended that the City Council take the following actions:
1. Certify as adequate the Final Environmental Impact Report for Taves
Park, a proposed 23.6 acre residential, institutional and
commercial project at the southeast corner of West Kettleman Lane
and tower Sacramento Road; and
2. Prezone Taves Park to R-2, Singic-Family Residential, R -C -P,
Residential -Commercial -Professional, and C -S, Commercial Shopping
shown as Alternative "B" in the Final Environmental Impact Report
for the proposed project.
This project is one of five Measure "A" (i.e. Green Belt Initiative)
elections scheduled for November 5, 1985
NO.
CITY COUNCIL
DAViP M. HINCHMAN, Mayor
FRED M. REID
Mayor Pro Tempore
: EVELYN M. OLSON
JAMESW. PINKERTON, Jr.
JOHN, R. (Randy) SNIDER
September 5, 1985
Melvin Taves, DDS
972 East Highway 12
Lodi, CA 95240
Dear Dr. Taves:
CI1Y OF LODI
CITY HALL, 221 WEST PINE STREET
CALL BOX 3006
LODI, CALIFORNIA 95241-1910
(209) 334-5634
RE: Taves Park - Environmental Documentation and Prezoning
EIR 85-2 and Z-85-12
At its meeting of Monday, August 26, 1985, the Lodi City Planning
Commission took the following actions:
THOMAS A. PETERSON
City Manager
ALICE M. REIMCHE
City Clerk
RONALD M. STEIN
City Attorney
1. Recommended that the Taves Park, a proposed 23.6 acre
residential, institutional and commercial project be prezoned to
R-2, Single -Family Residential, R -C -P, Residential -Commercial -
Professional; and C -S, Commercial Shopping shown as Alternate
"B" in the Final Environmental Impact Report for the proposed
project.
2. Recommended that the Lodi City Council certify as adequate, the
Final Environmental Impact Report for Taves Park, a proposed
residential and commercial project located at the southeast
corner of Kettleman Lane (Highway 12) and Lower Sacramento.Road.
The City Council has set public hearings on this item for 7:30 p.m.,
Wednesday, September 18, 1985 in the Council Chambers, 221 West Pine
Street. You or your representative should be present at this hearing
to answer any questions the Council might have.
Sincerely,
LAO 4d
J MES B. SCHR DER
ommunity Development Director
cc: Fred Baker
Baumbach and Piazza
OW I
k|
TAVE.S PROJE
f §
�� . .
5 ITT LIE U AN L A D 5
C—S
t7T-1-T - T77�
TUOLVD82 signal
PROPERTY LINE
C -S Commercial Shopping
R-2 Residential - Single
Family
R -CP -Residential-Commercial
Professional
i
w
a
NVES PROJE
�j
0.
UMMEE
521
LEGAL NOTICE
NOTICE OF PUBLIC HEARING BY THE LODI CITY COUNCIL
OF THE CITY OF LODI TO CONSIDER THE PLANNING COMMISSION'S
REC7QNA2EMATION THAT TAVES PARK, A PROPOSED 23.6 ACRE
RESIDENTIAL, INSTITUTIONAL AND SIAL PRQ7EC'T BE
PREZONED R-2, SINGE -FAMILY RESIDENTIAL; R -C -P
RESIDENTIAI CO IAL-PP.OFFSSIONAL; AND C -S,
CCIAL SHOPPING
NOrPICE IS HEREBY GIVEN THAT on the 18th day of September 1985, at
;:ne hour of 7;30 p.m., or as soon thereafter as the matter may be heard, the
Lodi City Council will conduct a Public Hearing in the Chambers of the Lodi
City Council at 221 West Pine Street, Lodi, California, to consider the
Planning Commission's recommendation that Taves Park, a proposed 23.6 acre
residential, institutional and ccmmercial project be prezoned R-2,
Single -Family Residential; R -C -P Residential-Cc:mercial-Professional; and
C -S, Commercial Shopping shown as Alternate "B" in the final Environmental
Impact report for the proposed project.
Information regarding this item may be obtained in the office of the
City Clerk at 221 West Pine Street, Lodi, California. All interested persons
are invited to present their views either for or against the above proposal.
Written statements may be field with the the City Clerk at any time prior to
the heating scheduled herein and oral statements may be made at said hearing.
If you challenge the subject matter in court you may be limited to
raising only those issues you or scaeone else raised at the Public Hearing
described in this notice or in written correspondence delivered to the City
Clerk, 221 West Pine Street, at or prior to, the Public Hearing.
By Order of the Lodi City Council
Alice M. Re' he
City Clerk
Dated: September 5, 1985
NOTICE OF PUBLIC HEARING
BY THE CITY COUNCIL OF THE CITY OF LODI
TO CONSIDER THE RECONMENDATION OF 2TE LODI PLANNING
COMMUSSION TO THE CITY COUNCIL THAT THE FINAI, ENVIRCNMENTAL
IMPACT REPORT FOR TAVES PARK BE CERTIFIED AS ADEQUATE
NOTICE IS HEREBY GIVEN that on Wednesday, September 18, 1985, at the
hour of 7:30 p.m., or as soon thereafter as the matter may be heard, the Lodi
City Council will conduct a public-hearing in the Council Chambers, City Hall,
221 West Pine Strut, Lodi, California, to consider the reccmTendation of the
Lodi Planning Ccmnission to the City Council that the Final Environmental
Impact Report for Taves Park, a proposed 23.6 acre residential, institutional
and ccmTercial project at the southeast corner of West Kettleman Lane and
Lower Sacramento Road be certified as adequate.
Information regarding this item may be obtained in the office of the
Ccauunity Development djxector at 221 West Pine Street, Lodi, California. All
interested persons are invited to present their views ei::ner for or against the
above proposal. Written statements may be filed with the City Clerk at any
time prior to the hearing scheduled herein and oral statements may be made at
said hearing.
If you challenge the subject matter in court you may be limited to
raising only those issues you or scaneone else raised at the Public Hearing
described in this notice or in written correspondence delivered to the City
Clerk, 221 West Pine Street at, or prior to, the Public Hearing.
By Order of the Lodi City Council
A1cZe&--4.')Rke
City Clerk
Dated: September 5, 1985
• r �
pimplklq `:�l M
NOTICE OF PUBLIC HEARING BY THE LODI CITY COUNCIL
OF THE CITY OF LODI TO CONSIDER THE PLANNING COMMISSION'S
RECON4ENDATION THAT TAVES PARK, A PROPOSED 23.6 ACRE
RESIDENTIAL, INSTITUTIONAL AND COIAERCIAL PROJBCr BE
PREZONED R-2, SINGLE-FAMILY RESIDENTIAL; R -C -P
RESTDE'NTLAL-CCMEWIAL-PROFESSIONAL; AMID C -S,
COMMERCIAL SHOPPING
NOTICE IS HEREBY GIVEN THAT on the 18th day of September 1985, at
the hour of 7;30 p.m., or as soon thereafter as the matter may be heard, the
Lodi City Council will conduct a Public Hearing in the Chambers of the Lodi
City Council at 221 West Pine Street, Lodi, California, to consider the
Planning Commission's recon endadation that Taves Park, a proposed 23.6 acre
residential, institutional and ccnuercial project be prezoned R-2,
Single -Family Residential; R -C -P Residential-Catmercial-Professional; and
C -S, CcmTkercial Shopping shown as Alternate "B" in the final Environmental
Impact report for the pro; )sed project.
Information regarding this item may be obtained in the office of the
City Clerk at 221 West Pine Street, Lodi, California. All interested persons
are invited to present their views either for or against the above proposal.
Written statements may be field with the the City Clerk at any time prior to
the hearing scheduled herein and oral statements may be made at said hearing.
If you challenge the subject matter in court you may be limited to
raising only those issues you or someone else raised at the Public Hearing
described in this notice or in written correspondence delivered to the City
Clerk, 221 West Pine Street, at or prior to, the Public Hearing.
By Order of the Lodi City Council
Alice M. Re' he
City Clerk
Dated: September 5, 1985
LEGAL NOTICE
NOTICE OF PUBLIC HEARING BY THE LODI CITY COUNCIL
OF THE CITY OF LO DI TO CONSIDER THE PLANNING CcmISSION' S
RECU4ENDATION THAT MAGGIO INDUSTRIAL PARK, A PROPOSED
37.6 ACRE INDUSTRIAL PROJECT AT THE N0RTH,0= CORNER
OF SOUTH STOCKTON STREET AND HARNEY LANE BE PREZONED
TO M-2, HEAVY INDUSTRIAL
NOTICE IS HEREBY GIVEN THAT ON the 18th day of September 1985, at
the hour of 7:30 p.m., or as soon thereafter as the matter may be heard, the
Lodi City Council will conduct a Public Hearing in the Chambers of the Lodi
City Council at 221 West Pine Street, Lodi, California, to consider the
Planning Commission's recaurendation that Maggio Industrial Park, a proposed
37.6 acre industrial project at the northwest corner of South Stockton Street
and Harney Lane be prezoned to M-2, Heavy Industrial.
Information regarding this item may be obtained in the office of the
City Clerk at 221 West Pine Street, Lodi, California. All interested persons
are invited to present their views either for or against the above proposal.
Written statements may be filed with the the City Clerk at any time prior to
the hearing scheduled herein and oral statements may be made at said hearing.
If you challenge the subject matter in court you may be limited to
raising only those issues you or someone else raised at the 1hublic Hearing
described in this notice or in written correspondence delivered to the City
Clerk, 221 West Pine Street, at or prior to, the Public Hearing.
By Order of the Lodi City Council
Alice M. Resnc:he
City Clerk
Dated: September 5, 1985
NOTICE OF i RI
BY THE CITY COUNCIL OF i OF •D
TO CONSIDER THE • E•• , iM n • • OF i • t PLANNING
MM4ISSICN TO THE CITY COUNCIL THAT TIM FINAL MUPOMMI,
IMPACT REPORT F• • MAGGIO INDUSTRIAL PARKCERTIFIED
AS ADEQUATE
NOTICE IS HEREBY GIVEN that on Wednesday, September 18, 1985, at the
hour of 7:30 p.m., or as soon thereafter as the matter may be heard, the Lodi
City Council will conduct a public hearing in the Council Chambers, City Hall,
221 West Pine Street, Lodi, California, to consider the reccmnendation of the
Lodi Planning Commission to the City Council that the Final Environmental
Impact Report for Maggio Industrial Park, a proposed 37.6 acre industrial
project at the northwest corner of South Stockton Street and Harney Lane be
certified as adequate.
Information regarding this item may be obtained in the office of the
Ccmmunity Development director at 221 West Pine Street, Lodi, California. All
interested persons are invited to present their views either for or against the
above proposal. Written statements may be filed with the City Clerk at any
time prior to the hearing scheduled herein and oral statements may be made at
said hearing.
If you challenge the subject matter in court you may be limited to
raising only those issues you or scaneone else raised at the Public Hearing
described in this notice or in written correspondence delivered to the City
Clerk, 221 West Pine Street at, or prior to, the Public Hearing.
By, Order of the Lodi City Council
dI. W
Alice M. Reuw§eU
City Clerk
Dated:
3eptn_mber 5, 1985
eo*�
NOTICE OF PUBLIC HEARING•I • 0
OF 1 OF • / TO CONSIDER THE PLANNING 1 i•. •
RECOMMENDATION T/• IE APPROVAL OF 1 REQUEST OF
KRISTEN M'.• 1 II TO PREZONE A 2+ ACRE PARcEL AT TBE•
CORNER • 1 II• • • ' / AND LU -AC STREETTO
NEIGHBORHOOD i•. !IIP • AccomMODATE A CIII AND BREAKFAST
INN 11
NOTICE IS HEREBY GIVEN THAT ON the 18th day of September 1985, at
the hour of 7;30 p.m., or as soon thereafter as the matter may be heard, the
Lodi City Council will conduct a Public Hearing in the Chambers of the Lodi
City Council at 221 West Pine Street, Lodi, California, to consider the
Planning CcarrLission's recanrendati.on that the approval of the request of
Kristen Cranwell to prezone a 2+ acre parcel at the northwest corner of
Turner Road and Lilac Street to C-1, Neighborhood Cormiercial to accormiodate a
Bed and Breakfast Inn and Restaurant.
Information regarding this item may be obtai:ied in the office of the -
City Clerk at 221 West Pine Street, Lodi, California. All interested persons
are invited to present their views either for or against the above proposal.
I'
Written statements may be field with the the City Clerk at any time prior to
the hearing scheduled herein and oral. statements may be made at said hearing.
If you challenge the subject matter in court you may be limited to
raising only those issues you or sareone else raised at the Public Hearing
described in this notice or in written correspondence delivered to the City
Clerk, 221 West Pine Street, at or prior to, the Public Hearing.
By Order of the Lodi City Council
GCL��
Alice M. Reimche
City Clerk
Dated: September 5, 1985
NOTICE OF PUBLIC BEARING
REGAMING THE CEUIFICATION OF THE FILING
OF A NDGATIVE DECLARATION BY THE Ca1MTY DEVELOMM DIRECTOR
AS ADEQUATE ENVIRCt,'Ila NTAL DOCUMENTATION ON THE REQUEST OF
KRISTEN CFafidlL TO PREZCNE A 2+ ACRE PARCEL AT THE NORT51EST
CORNER OF TURNER ROAD AND LILAC STREET
NOTICE IS HEREBY GIVEN that on Wednesday, September 18, 1985, at the
hour of 7:30 -p.m., or as soon thereafter as the matter may be heard, the Lodi
City Council will conduct a public hearing regarding the Lodi Planning
Commission's recomTendation that the Lodi City Council certify the filing of A
Negative Declaration by the Community Development Director as adequate
environmental documentation on the request of Kristen Crcu.;ell to prezone
a 2+ acre parcel at the northwest corner of Turner Road and Lilac Street as
reccmrended by the Lodi Planning Commission.
Information regarding this item may be obtained in the office of the
CcnmmitY Development director at 221 West Pine Street, Lodi, California. All
interested persons are invited to present their views and commentL on the
Negative Declaration. written statements may be filed with the City Clerk at
any time prior to September 18, 1985.
If you challenge the subject matter in court you may be Limited to
raising only those issues you or someone else raised at the Public Hearing
described in this notice or in written correspondence delivered to the City
Clerk, 221 West Pine Street at, or prior to, the Public Hearing.
By Order of the Lodi City Council
-&"Leh—
Alice M. Reiftche
City Clerk
Dated: September 5, 1985
MEMORANDUM, City of Lodi, Community Development Department
TO: CITY COUNCIL
FROM: COMMUNITY DEVELOPMENT DIRECTOR
DATE: SEPTEMBER 6, 1985
SUBJECT: FINDINGS OF APPROVAL FOR TAVES PARK EIR 85-2
A. ENVIRONMENTAL IMPACT I
Impact: The project will result in the loss of 23.6 acres of
prime agricultural soil. If the project is approved, this less
cannot be mitigated.
Finding: All of the land in and around the City of Lodi is
designated as prime agricultural soil.
The City does not have the option of building on "non -prime"
agricultural soils in order to preserve the prime soils. Every
development built in the City, small or large, utilizes some
prime agricultural soil. The residential, commercial and
industrial needs of the City necessitates some urbanization of
agricultural land.
The City of Lodi has planned and constructed its utility system
to serve the area with water, sewer and storm drainage in
anticipation of the area developing. The existing
infrastructure will allow development of the area without costly
expenditures of public funds for the extension or construction
of major new lines.
Overridinq Considerations:
a) Before the adoption of the "Greenbelt Initiative" in August
1981, the parcel in question has been designated for residential
development for many years by the City of Lodi General Plan.
The areas directly to the east of the project site have been
undergoing urbanization or will be in the near future. Rural
residential development also exists to the south of the parcel
but is not within the City limits. Residential and commercial
development is planned for the parcel adjacent to the Taves
parcel and the proposed development will be a logical extension
of the urbanized area.
b) If this project were not approved, it could affect the
long-term, housing supply in Lodi. At this time, there are
about 338 acres of residential -zoned land left for development
-t-
i
MEMORANDUM, City of Lodi, Community Development Department
TO: CITY COUNCIL
FROM: COMMUNITY DEVELOPMENT DIRECTOR
DATE: SEPTEMBER 6, 1985
SUBJECT: FINDINGS OF APPROVAL FOR TAVES PARK EIR 85-2
A. ENVIRONMENTAL IMPACT I
Impact: The project will result in the loss of 23.6 acres of
prime agricultural soil. If the project is approved, this less
cannot be mitigated.
Finding: All of the land in and around the City of Lodi is
designated as prime agricultural soil.
The City does not have the option of building on "non -prime"
agricultural soils in order to preserve the prime soils. Every
development built in the City, small or large, utilizes some
prime agricultural soil. The residential, commercial and
industrial needs of the City necessitates some urbanization of
agricultural land.
The City of Lodi has planned and constructed its utility system
to serve the area with water, sewer and storm drainage in
anticipation of the area developing. The existing
infrastructure will allow development of the area without costly
expenditures of public funds for the extension or construction
of major new lines.
Overridinq Considerations:
a) Before the adoption of the "Greenbelt Initiative" in August
1981, the parcel in question has been designated for residential
development for many years by the City of Lodi General Plan.
The areas directly to the east of the project site have been
undergoing urbanization or will be in the near future. Rural
residential development also exists to the south of the parcel
but is not within the City limits. Residential and commercial
development is planned for the parcel adjacent to the Taves
parcel and the proposed development will be a logical extension
of the urbanized area.
b) If this project were not approved, it could affect the
long-term, housing supply in Lodi. At this time, there are
about 338 acres of residential -zoned land left for development
-t-
11
i
in the city iimits. however, most of this has already been
planned for development and the buildout is approximately 3.75
years. Once this supply of housing is used up there are very
few new subdivisions to take their place. Much of this is a
result of the "Greenbelt Initiative" which has significantly
restricted the possibility of new development. Residential
projects often take 2-3 years from the planning stage to when
the homes are built. Even if the Taves project were approved,
it might be 1987 before any houses are completed in this
project. By then the number of existing subdivision lots will
be substantially reduced.
B. ENVIRONMENTAL IMPACT II
Impact: Urbanization of subject parcels will affect adjacent
agricultural parcels.
Finding: The Taves property is adjacent to proposed urban
development on the east and existing rural residential
development to the south. There would be some modification of
agricultural practices on the east parcel until it is
developed. Problems of vandalism and trespassing can be
mitigated by the construction of a solid fence or wall along the
eastern edge of the Taves parcel. This mitigation may not be
required if The Meadows is developed before Taves Park. The
agricultural land to the west will require no modification of
farming practices, as it is separated from the subject parcel by
Lower Sacramento Road which bears a right-of-way of 80 feet.
The parcel to the north is separated by Kettleman Lane which has
a right-of-way of 120 feet and is developed with commercial uses.
C. ENVIRONMENTAL IMPACT III
Impact: The development of the subject parcel will generate
8,000 vehicle trips per day which will be added to the
surrounding streets.
Finding: Lower Sacramento Road and Kettleman Lane will be
restriped for more lanes and a 4 -way traffic signal. (There is
currently a 4 -way stop) will be installed at the intersection of
the two streets. Improvements that wili be made to Lower
Sacramento Road and Kettleman Lane will improve the overall
traffic flow.
D. ENVIRONMENTAL IMPACT IV
-Impact: The project will produce additional vehicle generated
J air pollution.
Finding: Based on air quality projections, the amount of
additional air pollution will be less than 1/10th of 1% of the
total for the City of Lodi. This level is not considered
significant.
-2-
W
E. ENVIRONMENTAL IMPACT V
Impact: Residential units adjacent to Lower Sacramento Road
and the streets servicing the commercial uses, will be subject
to noise levels exceeding recommended levels.
Finding: To help mitigate excessive noise levels, the
residential units can be designed with noise reduction features
built into the units.
F. ENVIRONMENTAL IMPACT VI
Impact: The development of the Taves parcel will generate 74
additional school -aged children. This will affect the Lodi
Unified School District's ability to provide adequate classroom
space.
Finding: The City of ;_-)di has adopted a School Impaction Fee
which is paid to the s61ool district. The fee is considered
adequate mitigation for the impact of additional students on
schools.
G. ENVIRONMENTAL IMPACT VII
Impact: The 38 residential units would add 89 tons of solid
waste per year. The current disposal site is reaching its upper
limits and adding more solid waste could be a problem.
Finding: The disposal of solid waste will not be a problem if
a new site is found before the current site has reached its
limit. Measures are being taken to extend the life span of the
current disposal site an additional 4-5 years.
H. ALTERNATIVES TO THE PROJECT: The EIR discussed several
alternatives to the proposed project. The following are
findings on three of the alternatives:
Alternative A. This alternative is a "no project" alternative,
which would mean that no development would be constructed on the
property.
Finding: This alternative would eliminate the environmental
impacts resulting from the proposed project. This alternative
could affect the future supply of housing in Lodi due to the
relatively small amount of residential zoned land left for
development in the City Limits.
2. Alternative B: This alternative is a redesigned project
reducing the number of residential units, and modifying the
commercial size and configuration of the commercial parcels and
changing the type of commercial zoning from C-2 to C -S.
-3-
Finding: This alternative allows for a more cohesive street
layout and separates the commercial and residential uses. The
number of residences is reduced from 88 to 76, which helps
mitigate the traffic impacts and as well as impacts on the Lodi
Unified School District. Alternative B changes the C-2 zone
(General Commercial) to C -S (Commercial -Shopping) and
facilitates the separation of the commercial uses from the
residential uses by changing the street layout and project
design. This also helps mitigate the traffic impacts of the
developer's proposal.
Alternative C: This alternative would change the commercial
uses and professional uses to multi -family residential uses.
The R-2 zone would remain the same.
Finding: The proposed R -C -P zone would allow 26 unit -s ( f,
acres at 10 units per acre) as residential garden apartments
(R -GA), and the proposed commercial zone would allow as many as
580 units (7.25 acres at 80 units per acre) as Residential High
Density. Compared to the developer's proposal, daily vehicle
trips would be reduced by 2,880 and school -aged children would
be increased by 289. A sound barrier would be needed along
Lower Sacramento Road and Kettleman Lane to insulate the
residences from excessive noise levels. Water consumption would
be higher due to this alternative (84 acre feet per year) than
the present use of a vineyard (56.6 acre feet per year).
However, this difference is not considered significant. Th is
alternative's 656 resider -tial units would generate as much as
675 tons of solid waste per year, a significant increase when
compared to 89 tons per year the developer's proposal would
generate.
J. GROWTH -INDUCING IMPACT: The project will not have a signifi-
cant growth -inducing impact on the City of Lodi.
Finding: The passage of Measure A, the "Greenbelt
Initiative", has placed a significant future growth limit on the
City. All new General Plan amendments that require an
annexation must receive voter approval.
-4-
0
v
TAVES PARK
FINAL ENVIRONMENTAL IMPACT REPORT
EIR 85-2
AUGUST, 1985
APPLICANT
Melvin Taves, DDS
970 E. Highway 12
Lodi, CA -95240
DEVELOPER
Fred Baker
Attorney at Law
317 W. Lodi Avenue
Lodi, CA 95240
AGENCY PREPARING EIR
Cjty,of Lodi
221 West Pine Street
Lodi, CA 95240
=5:
TABLE OF CONTENTS
'
Page
INTRODUCTION
SUMMARY
'
' PROJECT DESCRIPTION
l
Site Location
l -`
Project Characteristics
l ��
AoorOVa]S Required
2
' ENVIRONMENTAL SETTING, IMPACTS & MITIGATIONS
3 ��
A. Land Use and Aoricultural Land Conversion
3
B. Traffic
5
` C. Soils,, Geology and Drainage
7 �
D. Noise
9 '^
E. Air Quality
10
F. Historical and Cultural Resources
12 '
G. Community Services
12,
UNAVOIDABLE IMPACTS
`
l8
IRREVERSIBLE,ENVIRONMENTAL CHANGES
�
'^
lQ �
�
RELATIONSHIP BETWEEN SHORT-TERM USES OF THE
ENVIRONMENT AND ENHANCEMENT OF LONG-TERM
18
PRODUCTIVITY.
^
CUMULATIVE IMPACTS
19 ' ^
GROWTH -INDUCING I14PACTS
20
ALTERNATIVES
21 '
-
APPENDICES
'
'--''-'--
23 ^
LIST OF RESOURCES
24
COMMENTS
25
RESPONSES TO COMMENTS
34
A. INITIAL STUDY
38
B. TYPICAL SOUND LEVELS
41
2
6
19
,
'
�
'
L/u/ OF EXHIBITS
- ,
.`
^
'
~
EXHIBIT
VICINITY MAP
VlC
I _
' '
EXHIBlT
2 TENTATIVE SUBDIVISION MAP
°~
EXHIBIT
LAND USE MAP
EXHIBIT
4 @-BASIN STORM DRAINAGE AREA
EXHIBIT
5 ALTEDNATIVE B
EXHIBIT
MEASURE A
`
EXHI�IT
7 GENERAL STREET PLAN ~
. .
('-E5-MEADOWS SUBDIVISIONS)
.PAGE
LIST OF TABLES
----
TABLE l
PROPOSED USES
TABLE 2
PROJECT TRIP GENERATION
TABLE 3
LOSS OF FARM LAND IN LDDl
�
'
. '
'
'
2
6
19
EXHIBIT 2
TENTATIVE SUBDIVISION MAP
TAVES PARK
AV77L F AOF N LN. �f7ATE R1 /Zf
/ 1 J t 5 {
Is
I .MIAMI l.IEf.Y OR/YE II
II
a
A}/I'
S iN O
• •
AI I! 13
13 a ~
,� Ir
!I I7 ry
/1 I! ! M
I- Tl/O[V plow/ ST�PffT 2 v
� w
ACRES
UNITS U.P.A.
RESIDENTIAL
10.9
69 5.5
DUPLEX
2.75
28 10
TOTAL
13.8
88
NET DENSITY:
6.3
de
M
M''
M'
M
I/
!/
AI I! 13
13 a ~
,� Ir
!I I7 ry
/1 I! ! M
I- Tl/O[V plow/ ST�PffT 2 v
� w
ACRES
UNITS U.P.A.
RESIDENTIAL
10.9
69 5.5
DUPLEX
2.75
28 10
TOTAL
13.8
88
NET DENSITY:
6.3
Ir
II
s! '
I/
A►
49
I/
!/
�
n
f
n
7r
W
s.
»
740
b
7Iit
A
� •/y/N �
PMflt
st
M'
17
N
I'►
M
AV
AWS
�-
777
0
O
EXHIBIT 5
ALTERNATIVE B
9 E T T L E MAN LAN E (STATE NT. 12)
1
TU0LUMNE
C -S
R -2-
R -CP
C --S
PROPERTY LINE
STREET
Commercial Shopping
Residential - Single
Family
Residential -Commercial
Professional
EXHIBIT 6 MEASURE A
URUINANCt: NU. 1237
AN ORDINANCE AMENDING Till-' LAND USE F:LI•:MliN•r OF 'riw
CITY CENL••RAI, PLAN AS ADOI'TI:U OCTOBER 5, 1955
REMOVING FROM TIIE I.ANU U1;1-' ELEMENT ANY AREA NUT
WITIIIN 'I'll E, LIMITS OF Tllk VITY riff TIN:
DATE OF THE AWVTLUN UI' '!•1111 ORUJNANCI-' AND WILL
REQUIRE A VoTE or Till-,' IV•:OPLE 1'0 AGAIN INCLUDE
THIS AREA IN 7.111: LANA USII ELEMI:N'1'
The people of tho City of Lodi du ordain a:i'fulluw:;:
1. It shall be the policy of the City of Lodi to protect
land in the Croon (tell are.i ill or.lor tit pro:orvr .u,.l pr•,t,•,•t
ayricultural land, pra::;etve Chu neuniv value of Il,u aro,., ps..1..•,•I
wildlife habitat and natural rc::ourcct: and to proton Lh.: !;moll
city character of Lodi.
2. The Green Halt arca dull be designated as the area
between the outer limits of the incorlx,rated city and the outer
limits of the adopted sphere of influence at the adoption of this
ordinance.
3. To affect the policy of the City of Lodi to protect
land ill lire Gtoa•n Ili -11 alva, h,,ii .1•11 ir.01111 .I ,l•'n•1„1en.•nl in 11,..
City of Lodi which lies adjacent to the Crcen holt arc;, shall l,c
perutiilu,l uttly oflot ,I Iin,iilel Iry the Vily (••,:u„•i1 111,0 !--h h.ni
agricultural development will not interfere with thelcontinued
i
productive use of ayricultural land in the Crcun Hull arc•, ul 1.11.11
an adequate buffer or mitigation zone exists to assure continued
productive use of agricull:ural land in the Crunn Ilelt arra.
4. P.t the time of adoption of this ordinance, the Cruen
Belt area shall be removed from the existing Land Use Elunent of
the Cultural 1'I..n or the Cily (.1 Ln,li.
S. :R_-foru land fit tho. Greun Haat area can be ann,-xc,i by
Cite Ci Ly it Lotti, an .licit rt,licit rt.1 Ln Il,t- CiIY':: L.nnl 11::,• 1:1..no.lit
the General Plan must bo matle and approved .by it uta j,.r it y. of 1 h,•
People vot.inq in a oily -wide elpation.
6. Before any diinvxation prutxrual can bol dphr:,varl, Chu
vices, the school district, and exit:tiny roadw.lys.
7. Water, sewer, and electrical facilities sh.,11 not be
expanded or extended until the city Council 111.1kon Lis'! 1111diu-I
that a proposed expansion or extension is consistent with the ryoal::,
policiou Jilt] land u::a• deuiyuaLiosts of the Ga:ner.,l 1'i.g1 and lhi:;
ordinance.
8. The Ciiy of I.eali 111.1y hind elections in cousul,datiLit, will,
other scheduled elections in the City for the purpose of allowing
voters to voice their opinion:: uu an/a•ndna'nl:; In 1h.. (•i t y':. i.., h•I U::•
Elunent oL the General Plan.
9. If any portion of this ordinance is hereafter determined
to be invalid, all remaining portions of this ordinance shall .
remain in force and effect and to this extent the provisions of
this ordinance are superable.
Section 2. This ordinance was brouyht to a vote of -the
voters at a Special initiative l -'lection held in the (,ily of Lo11t
on August 25, 1981 and as a majority of tiro voters voted in its
favor, tho ordinance is a valid and bindin,l ordinance of the City ul
Lodi.
Section 3. - This ordinance shall be considered as aduptell
upon the date that the vote is declared by the leyisiative bo(Jy
(Tuesday, September 1, 1981) and shall tic in rlfpcl 10 d.1ye: alt.•.
that date.
Section 4. - All ordinances and parts of ord-nances in con-
flict herewith are repealed insol;o• a:: :;ucit conflict a..ry e;: i:.i .
Sucl fun 'i. - i'tir:.a.,i.l l„ -r1. 1,• . 401 i UI Lt.,- :.t.att- ,•1
California than ordinance tihail nal by repl••11 e,1 .n .rau•n.h•.1 ,•ar1 q.1
by a vote of Lha people.
State of California
County of San Joaquin,
I, Alice M. Reiencho, City Clark of the City of Lodi, do
hereby certify that ordinance No. 1237 was brou,Iht to a
vote of the voters at a Special Lnitiative la cation held
in t h(: CI Ly of Locli on Atn1n:;1 1.5, 19111 .$loll .,:: .. 111.1 1,,, i l y
OI the vu1.-.:: volod in ite; lavas, the ardivauco i:; a v.,ll.l
and bindir,.J ordinance of the City of Lodi. This ordin.inre
shall be considered ar. ada1le41 up,u, the d.tl,• 111.11 IIW v11tr
City Council muut maku the lindiny that the propound inuvx.rldan iii wee: declared by tIle _Iegi:;L.altvv body (Ttivuday, tioptavnher 1,
1981) and shall be in eflua 10 d:,y:: alter lh.,t alatr.
eontlguoua to exiuting .:ity b•,undatiea and thu projec1.ud d(lnaild from the proposed devulopmanl In the area to be annexed will not 1
ALICE M. REIMCIIE
axCVPJ the nerviru capaeity•of exiatinsl municipal uti)ition all(] ser-
..
`
.. - .. :. �m�w..,+�^.�ytiq•A.•..nww?•�+awc:.,wra::nmx e,. - -. .;rl.yReewe.r�.re
. if3 ui •:�;rsK5 ., ae�::•_?•m - ...-�ive•:r.4Ram1 :e.. • .:
0
4
ip
4
a
EXHIBIT 7
GENERAL STREET PLAN
TAVES - MEADOWS SUBDIVISIONS
1.%lI Via✓wi✓ ea• "I. (ri/Ick wv tivJ)
I=
F1
BACKUP/INTRO (Taves EIR) i
INTRODUCTION
-
This is a draft Environmental Impact Report (EIR) prepared in
compliance with the California Environmental Quality Act (CEQA) of
1970. The report is focused on those issues identified as
potentially significant in the City of Lodi's Initial Study of the
proposed project pursuant to Section 15063 of the State CEQA
Guidelines. The Initial Study is attached as Appendix A.
The project's sponsors, Dr. Melvin Taves, owner of the project site
and Fred Baker, developer, are requesting approval for the
annexation of 23.6 acres for single-family residential units and
commercial development.
The report is intended to enable City of Lodi officials and the
public to evaluate the environmental effects of the proposed
project, to examine measures for mitigating those effects x=
determined to be significant, and to consider alternatives to the f
9
project as proposed. It is not the function of the EIR to
recommend approval or rejection of the project.
F1
BACKUP/INTRO (Taves EIR) i
SUMMARY
PROJECT DESCRIPTION
The project consists of 23.6 acres containing 60 single-family homes, 14
duplexes, and about 6.5 acres of commercial -shopping development.
The subject site is currently zoned GA -40 (General Agriculture -- 40
acres per dwelling unit) by the San Joaquin County general plan
rezoning to R-2, low-density residential; R -CP, residential, commercial,
professional; and C -S, commercial -shopping, will be required. The R-2
zone allows an overall residential density of 7-10 units per acre. The
project will require annexation to the City of Lodi and the approval of
the voters of the City of Lodi under the requirements of Measure "A"
(Greenbelt Initiative).
LOCATION
The project site is located at the southeast corner of Kettleman Lane
(Highway 12) and Lower Sacramento Road. The parcel is designated as San
Joaquin County Assessor's parcel 058-140-02 and 03.
ENVIRONMENTAL IMPACTS
1. Loss of 23.6 acres of prime agricultural soil. Parcel is Class I
soil made up of Hanford sandy loam, well suited for a variety of
agricultural uses. Development will mean loss of agricultural use of
land. Urbanization-wi11 affect adjacent agricultural parcels by
restricting normal spraying and cultivation operations. Vandalism,
trespassing and homeowner's complaints could increase.
2. Urbanization of the subject parcels could affect the agricultural
use of adjacent parcels by possibly requiring modification of spraying
and cultivation practices. Vandalism, trespassing and homeowner's
® complaints could result.
3. Traffic will increase on Lower Sacramento Road and Kettleman Lane.
The project will generate approximately 8,000 vehicle trips per day when
fully developed.
® 4." Air pollution will increase slightly as a result of increased
vehicular traffic. The increase in vehicular related pollutants will be
insignificant in relation to the totals for San Joaquin County. There
will be a temporary increase as a result of construction grading and
BACKUP/SUMMARY (Taves EIR)
I
ALTERNATIVES TO THE PROJECT
1. "N� o project" alternative. Eliminates all impacts by leaving the
site in agricultural -use. This alternative could affect the future
supply of housing and decrease the chance for affordable housing.
2. Alternative project design would reduce the number of residential
units -'and - number of streets in the project. This would help mitigate
traffic flow -in the project. The alternative design would also allow
for the residential project to be more separated from the commercial
project and alleviate some of the noise and traffic problems.
This alternative does not relieve the impact of the loss of agricultural
land or the environmental impacts of the proposed project.
-9 IRREVERSIBLE AND LONG-TERM IMPACTS
Loss of agricultural land is permanent and irreversible once development
occurs.
* These two alternatives were added to the Final EIR and not included in
the Draft EIR.
BACKUP/SUMMARY (Taves EIR)
iv
*3. All residential alternative allowing the commercial -shopping (C -S),
and residential -commercial -professional (R -C -P) uses to be multi -family
residential. The R -C -P zone would allow 26 residential units and the
commercial zone would allow as many as 580 units, increasing the total
number of units to 666. This alternative would reduce the daily
vehicles trips to 5,120 but would increase the number of students to
363, having a substantial impact on the LUSD. This alternative would
alleviate the noise that would have been generated from the commercial
projects but a sound barrier would still be needed along Kettleman Lane
and Lower Sacramento Road as the noise levels along those corridors
exceed CNEL's of 60 dBa. This alternative would use 84 acre-feet of
water per year and generate 33.5 acre feet of wastewater per year,
putting additional loads on the White Slough Treatment Plant. The 666
units would generate as much as 675 tons of solid waste per year.
*4. Alternative 'D' places the project in an alternative site somewhere
in the existing City limits using vacant "infill" property. The problem
with this alternative is there are no large vacant parcels remaining in
the City limits. The City has had a continuous policy of only
developing properties adjacent to developed areas of the City and there
have never been many "infill" properties. The City is, in fact,
extremely compact in area for a city of its type and population.
-9 IRREVERSIBLE AND LONG-TERM IMPACTS
Loss of agricultural land is permanent and irreversible once development
occurs.
* These two alternatives were added to the Final EIR and not included in
the Draft EIR.
BACKUP/SUMMARY (Taves EIR)
iv
CUMULATIVE IMPACTS
I. Loss of agricultural land is cumulative. In the past years,
several hundred acres of lard have been developed with various
residential, commercial and industrial projects. Because the City of
Lodi is entirely surrounded by prime agricultural land, all future
projects will utilize agricultural land.
2. There is a cumulative impact on the LUSD. The LUSD includes much
of the northern San Joaquin County, including the City of Lodi and north
Stockton. It is estimated that there is the potential for an additional
several thousand students in projects currently approved and in some
stage of development. This includes Lodi, north Stockton and the
unincorporated County areas. This would seriously affect the LUSD.
GROWTH -INDUCING IMPACT
If the proposed project is approved by the voters and the City, it could
have growth -inducing impact. If they were to approve this project, that
might indicate some willingness to approve similar development requests
in the future. On the other hand, they could approve this request and
deny all future requests. In any case, they would have the final
determination on any future growth in the City.
In the project area, all the area west of Lower Sacramento Road is
u outside of both the Lodi General Plan area and the Measure A area. This
means that development of this area could not occur as a part of the
City of Lodi.
Yx
BACKUP/SUMMARY (Taves EIR)
PROJECT DESCRIPTION
A. SITE LOCATION
The project site consists of 23.6 acres located to the southwest of the present
Lodi City Limits. The parcel is bordered on the north by Kettleman Lane
(Highway 12), to the west by Lower Sacramento Road, to the east by the
city/county limits, and a planned but yet -to -be constructed residential
project, (The Meadows Subdivision) and to the south by nine single-family
houses and 2 duplexes.
The area west of the site, across Lower Sacramento Road is agricultural land.
To the north of the site is a liquor store and agricultural land. To the east,
the property is currently in agricultural production but is planned for
residential development ("The Meadows") in the near future. On the lower west
side (south) of the project site are eleven residences. The lower east side of
the property is agricultural land currently producing row crops. (See
Exhibit 3.)
The site is currently in agricultural production and there are two homes on the
parcel. A small lot (100' x 150') at the southeast corner of Lower Sacramento
Road and Kettleman Lane, occupied by a gasoline station, abuts the subject
property but is not included in the annexation or project request.
B. PROJECT CHARACTERISTICS
The proposed project, known as "Taves Park" would consist of 88 residential
units (28 duplex units and 60 single-family units) and approximately 6.5 acres
of commercial -retail development. The May 1985 tentative subdivision map
prepared by Baumbach and Piazza, shown in Exhibit 2, would be developed as
shown in Table 1.
W-1
a
a BACKUP/TAVES-EIR - -1-
TABLE 1
PROPOSED USES
LOT NUMBER PROPOSED USE & ZONING
C
BACKUP/TAVES-EIR - -2- f
Lots 1-12 Commercial -Shopping -
C -S Designation;
6
Residential -Commercial -
Professional - R -C -P
Lots 13-20 Duplexes -
R -GA designation.
Minimum lot size - 6,000 sq.ft.
Lots 27-86 Single -Family residences -
R-2 Designaticn.
Minimum lot size - 5,000 sq. ft.
Within the subdivision, five new roads would be constructed by the developer to
provide access to the project. The cost of these roads would be paid for by the
developer.
C
C. APPROVALS REQUIRED
In order to develop the site as proposed, the applicant must receive a variety
of approvals from the City of Lodi. First, since the site is outside the City
limits, the parcel must be annexed. Agriculture has been the predominate use
surrounding the incorporated area. In recent years, urban uses have displaced
some agricultural uses. On August 25, 1981 the voters of the City of Lodi passed
Measure "A", an initiative ordinance to limit future expansion of the City. The
initiative, known as the "Greenbelt" initiative, amended the City's General Pian
by removing the Planned Urban Growth Area from the Land Use Element of the General
Plan. The Urban Growth area now includes only those areas that were within the
City limits at the time of passage of the initiative. The ordinance now requires
that any addition to the Urban Growth area, i.e. annexations, requires an
amendment to the Land Use Element of the General Plan. These annexation -related
amendments to the General Plan require approval by the voters. (See Exhibit 6)
The project is currently designated in the San Joaquin County General Plan as
GA -40, General Agriculture -- 40 acres minimum parcel size. Rezoning will be
necessary as well as a General Plan Amendment upon approval by the voters).
Finally, the tentative subdivision map must be approved. This EIR must be
certified by the City prior to granting any of these approvals.
C
BACKUP/TAVES-EIR - -2- f
3
ENVIRONMENTAL SETTING, IMPACTS AND MITIGATIONS
A. LAND USE AND AGRICULTURAL LAND CONVERSION
The 23.6 acre site is located to the southwest of the Lodi City Limits. The
site consists of agricultural land currently in grape production. The vineyard is
about 80 years old and the grapes are Tokay, Carignane and Zinfandel. Soil on the
site is .Hanford sandy loam, considered to be prime agricultural soil. The two
residences on the site are currently occupied and are the only buildings occupying
the site.
The project site currently has a San Joaquin County zoning designation of GA -40,
General Agriculture -- 40 acres minimum parcel size.
In order to develop the site as pr000sed, and to access city utilities, the parcel
will must be first annexed, which requires approval by the voters of the City of
Lodi.
Impacts
The development of Taves Park will result in the loss of 23.6 acres of prime
agricultural land. Development of the site with residential and commercial uses
will terminate further use of the property for agricultural purposes. The
existing vineyard and houses will be removed and replaced with streets, houses and
4 other urban improvements.
The adjacent agricultural parcels may also be affected by the urbanization of the
parcel site. The presence of a residential development may require modification
of normal farming practices of adjacent agricultural lands. The use of, and
particularly the aerial application of, certain controlled pesticides and
herbicides may be restricted 'on areas adjacent to residential developments.
Cultivation and harvesting operations may result in complaints from urban
residents concerning noise and dust. Agricultural. operations adjacent to
urbanized areas may also be subject to an increased amount of trespassing and
vandalism, particularly from the increase of school-age children.
The adjacent agricultural land (to the west) is separated by Lowp.- Sacramento
Road, a 60 -foot wide street. This should be an adequate buffer for residences
against most agricultural operations. The agricultural land to the east is
planned for residential and office development. The agricultural land to the
north is separated from the project site by Highway 12 (100 foot right-of-way,
110 foor right-of-way in future) and is partially developed. No land use
conflict is anticipated on the south side of the project, since it is
residential.
Muir Way, indicated on the Tentative Map (Exhibit 2) has an entrance median. The
BACKUP/TAVES-EIR - -3-
i
City of Lodi's policy is not to accept the responsibility for maintenance of such
a median. To insure <dequate maintenance, a homeowner's association must be
formed to accept maintenance responsibilities. Also, Kettleman Lane (Highway 12)
has a 20' right-of-way fo- future street widening. Fifteen feet will most likely
be deeded to the subdivision by the City for parking and landscaping. This must
be maintained by the subdivision.
Mitigations
If the Taves Park project is approved and constructed, the 23.6 acres of prime
agricultural land will be removed from further use. There is no practical way
to mitigate this loss. Once cleared and developed, it is unlikely the land
will ever be returned to agricultural u-3.
To the north and west of the project site, Kettleman Lane and Lower Sacramento
Road provide an adequate buffer to protect the adjacent agricultural uses. If "The
Meadows" project to the east does not develop prior to the Taves property, a
solid fence to serve as a barrier separating the two will be required on the east
and on the south property line.
A wall or fence separating the two parcels should help mitigate noise,
trespassing and nuisance problems. However, intrusions of pesticides and
herbicides are more difficult to mitigate. Pesticides, herbicides or other
chemicals are controlled by state and federal regulations.
All restricted chemicals, those with the potential to cause health or
environmental problems, require a San Joaquin County Agricultural Department
permit for use. The Agricultural Department determines the suitability of the
chemical based on the location of the field, the types of crops in and around the
field and the land uses in the area.
According to the San Joaquin County Agricultural Department, there are no definite
distances required between the fields being treated and adjacent residences.
Permits for application of restricted chemicals are issued based on the particular
characteristics and restrictions of the chemical and the judgement of the
agricultural commissioner. The key factor in the safe use of any chemical is
proper application. This includes using the proper method of application, using
the correct equipment, checking for favorable weather conditions and using proper
care.
In situations where a particular chemical or application method is felt to be
unsuitable, there is usually an acceptable alternative. The presence of homes
would not automatically mean than: a farmer could nct use chemicals. It would only
mean that he would have to take particular care n their application and in
certain cases might have to use an alternate chemical or method of application.
Although there would be increased traffic adjacer.' to the agricultural land, this
has not adversely affected grape production in other- areas of Lodi.
Although it would not mitigate the above impacts, future residents of the project
should be put on notice of the existerce of adjacent agricultural activities.
This can be accomplished by requiring covenants, conditions and restrictions
(CC&R's) with this information in the deeds.
BACKUP/TAVES-EIR - -4-
B. TRAFFIC
The project site is located on the southeast corner of Kettleman Lane
12) and Lower Sacramento Road.
(Highway
The project's single-family residences would have access from Kettleman Lane and
also from Lower Sacramento Road (east) via Muir Way and Tuolumne Street. Lots 1-6
of the commercial -retail parcels will have direct access to Kettleman Lane and Lot
12 will have direct access to Lower Sacramento Road. Lots.6 through 12 and 13-86
will have access to both Kettleman Lane and Lower Sacramento Road via Muir Way and
Tuolumne Street.
Local access to/from the site is available on Kettleman Lane and Lower Sacramento
Road. Kettleman Lane (Highway 12) is a major artery extending west to Rio Vista
and east to Highway 88 into the Sierra foothills. It also carries traffic between
Interstate 5 and Highway 99. Lower Sacramento Road is an important north -south
traffic carrier along the westerly edge of Lodi, carrying traffic between
Stockton, Lodi and:North county areas. Both north and south of Kett'. -man Lane,
Lower Sacramento is a two-lane, rural road. The intersection of Kettleman 'Lane
and Lower Sacramento Road is controlled by a four-way stop.
Regional access would be provided at the intersections of Kettleman Lane and
Interstate 5 to the west, and Kettleman Lane and Highway 99 to the `asc as well as
as well as Lower Sacramento Road to the south.
Traffic flow at Lower Sacramento Road and Kettleman Lane is approximately 9,000
vehicle trips per day (vtd). The traffic flow at Kettleman Lane west of Ham Lane
is about 1,2,950. There aye about 6,800 daily vehicle trips north of Harney Lane
on Lower Sacramento Road.
Impacts
Daily and peak -hour trip generation have been calculated for the project based on
the research conducted by the Institute of Traffic Engineers (ITE). As shown in
Table 2, the project would generate about 8,007 vehicle trips per day. Eight
hundred thirty one of these would occur during the PM peak hour. (Typically
the heaviest hour of traffic flow is within the 4PM-6PM period). It is
recognized that traffic to/from the projects retail commercial component would
not represent all new travel on the street network. The neighborhood
commercial area could serve the typical day-to-day shopping needs of project
residents as well as other residents in the area. Because these trips are now
occurring on the street network (to/from existing retail areas), the project
® would merely divert a portion of these trips. Although it would be tenuous to
identify a specific diversion factor, it is estimated that 50% of the
neighborhood commercial traffic would be diverted from existing shopping trips.
The distribution of project traffic would reflect the various travel purposes
associated with the pro.4ect components. The residential developments travel would
® include commute trips, shopping trips, personal business trips and trips to/from.
schools and recreational facilities. The most recent census statistics indicate
® BACKUP/TAVES-EIR. -5-
14
that over 50% of
Lodi residents work in the Lodi area. It is2
estimated that
over 90% of other
residential trips are within the
Lodi area.
The project's
commercial -shopping
component would probably generate new trips from
4 residential areas
within 1/2 - 3/4 mile of the site.
TABLE 2
PROJECT TRIP GENERATIONS
PM PEAK
DAILY DAILY
P.M.
HOUR
TRIP RATE TRIPS
HOUR %
TRIPS -
60 Single-
10/unit 600
1.0
60*
family units
s 28 Duplex
6.1/unit 170.8
.7
19.6*
units
f
91,600 sq. ft
79/100 sq.ft. 7,236.0
8.2
751.12*
I Commercial -retail
GROSS TOTALS
8,007
831
The project would focus traffic at three locations: The Kettleman Lane/Lower
Sacramento Road intersection, the Lower Sacramento frontage near Kettleman
Lane, and the Kettleman Lane frontage near Lower Sacramento Road. At each
location, turning movements would result in an increased potential for vehicle
conflicts and delay.
Mitigation
The primary effects of the project traffic would be increased turning movements
and potential vehicle conflicts at intersections and retail commercial
driveways. As a way to mitigate potential traffic congestion on Kettleman
Lane, four lanes would be planned for the Highway. One lane would be
eastbound, two lanes westbound and one lane would be reserved for center lane
turns. Currently there is a 4 -way flash signal at Kettleman lane and Lower
Sacramento Road. A study will be undertaken to determine when a four-way
signal will be needed.
Lower Sacramento Rod would be improved to conform to Lower Sacramento Road
north of Vine Street. No new lanes would be added but curb, gutter and
* These numbers differ from original numbers in the Draft EIR, and were
changed to correct the error.
BACKUP/TAVES-EIR
sidewalk would be put in by the developer. The City would be responsible for
the pavement. If a signal is needed at the intersection of Lower Sacramento
Road and kettleman Lane, it would be paid for by the City at a cost of about
$120,000.
C. SOILS, GEOLOGY, AND DRAINAGE
The entire site is underlain by Hanford sandy loam soil. The surface layer
contains grayish -brown, soft, granular material that grades downward to light
grayish -brown, massive soft, sandy loam. The soil is a floodplain deposit
developed on moderately coarse-grained alluvium of predominantly granitic
origin. Hanford sandy loam is prime agricultural soil. It has a Class I
capability rating (assigned by the Soil Conservation Service) indicating few or
no limitations for agricultural purposes. The Storie Index for Hanford sandy
loam is 95 (of a possible 100 points) indicating it is particularly well suited
to general intensive farming. It is generally used in the production - of
vineyards, orchards and other perennial crops. Hanford sandy loam is one of
the most highly desired soils in the country.
Hanford sandy loam is also rated good for construction purposes, having a
bearing capacity of about 2,000 pounds per square foot, and no expansive
characteristics. It will support most structural building loads.
The soil in the project area is derived from the Modesto Formation, a young
alluvial deposit that is part of 8,000 to 10,000 feet of lake and river
sediments filling the Great Valley. Underlying these sediments are about
60,000 feet of relatively undeformed marine sedimentary rock. Although no
faults appear on the surface in the vicinity of Lodi, the structure of the
bedrock indicates that ancient faults probably affected the Great Valley.
The nearest potentially active faults are in the Rio Vista -Montezuma area, 22
to 32 miles west of Lodi. The Stockton Fault (about 14 miles south) and the
Isleton-Ryde Fault Zone (about 14 miles west) are older, buried faults
generally considered inactive. The nearest historically active faults, the
most probable source of strong groundmotion, are in the San Francisco Bay Area
40 of the Coast Ranges. These faults include the San Andreas (about 70 miles
southwest), the Hayward (about 55 miles southwest), the Calaveras (about 45
miles southwest), the Livermore (about 40 miles southwest), and the Antioch
(about 30 miles west southwest). The Midland Fault Zone (about 20 miles west)
is buried and considered mostly inactive although a Richter Magnitude 4+
earthquake was epicentered in the zone within this century. Lodi is in seismic
0 Zone 3, as defined by the 1978 Uniform Building Code, which requires the
strictest design factors to resist these lateral forces.
0 BACKUP/TAVES-EIR - -7-
The roject vicinity is virtually flat at about 40 feet above mean sea level
(msl�. The site slopes very gently (about three feet per mile) to the
southwest with no natural drainage channels crossing it. The property is
outside the 100 -year floodplain of the Mokelumne River.
The City operates a system of interconnecting storm drainage basins to provide
temporary storage for peak storm runoff. The runoff is stored until the water
can be pumped in the W.I.D. Canal or the Mokelumne River at controlled rates
and locations. The Taves Park project would use the G -Basin which will service
southwestern Lodi. Basin -parks serve both a storm drainage function and a
recreational function. At this time G -Basin serves only Whispering Oaks and
The Meadows subdivisions. Eventually it will be developed as a park and
service the area shown in Exhibit 4.
ii
Impacts
Development of Taves Park would result in the loss of 23.6 acres of prime
agricultural land. The property is currently in grape production, but the
Hanford sandy loam soil is also well suited for row crops and orchards.
Development of the site would preclude further agricultural use.
Urbanization of the project site could also affect the continued agricultural
use of adjacent parcels. The presence of a residential development may require
modification of normal farming practices on adjacent agricultural lands. The
use of certain controlled pesticides and herbicides may be restricted on areas
adjacent to residential developments. Cultivation and harvesting operations
may result in complaints from urban residents concerning noise and dust.
Development of the Taves Park site would increase the erosion potential on the
site during the construction period. Erosion hazard is slight and could be
kept low with a minimum of dust control/wind erosion control measures, such as
watering the site during the grading period of construction.
In the event of an earthquake, people and structures on the site would be
exposed to strong groundmotion on one of the faults in the nearby Coast Ranges.
During such an event, windows might be broken, plaster cracked and unstable
objects overturned. Trees, poles and other tall objects would be disturbed.
Adherence to the recommended" lateral force requirements of the "Structural
Engineers Asso,;iation of California (embodied in the Uniform Building Code)
would greatly reduce the likelihood of damage or injury due to seismically
induced groundshaking.
Development of the Taves Park project site would create impermeable surfaces in
the form of roads, walks, patios and structures. These surfaces would
effectively prevent storm water from percolating into the ground and would
generate higher runoff values than currently exist.
The City storm drainage lines and facilities have been designed to accommodate
this increased runoff from the project area.
BACKUP/TAVES-EIR -, -8- 0
C
Mitigation
® If Taves Park is approved and constructed, 23.6 acres of prime agricultural
soil will be covered removing it from future agricultural purposes. There is
no practical way to mitigate the loss of this resource. Once cleared and
developed with streets, houses and buildings, it is unlikely that the land will
ever return to agricultural use.
® Erosion during the period of construction can be kept to a minimum by doing as
much of the excavation as possible during the dry season. Maintaining
undeveloped areas in groundcover and revegetating developed areas as quickly as
possible would also reduce erosion potential. It is unlikely that a formal
erosion/sedimentation control plan would be necessary at this site.
D. NOISE
The proposed project would be subject to the standards contained in Title 25 of
® the California Administrative Code which states that residences located in
areas of Community Equivalent Noise Levels (CNEL) of 60 dBa or greater are
required to have an acoustical analysis showing that the. structure has been
designed to limit noise to the prescribed allowable levels.
Local guidelines would also apply. Areas exposed to less than day night
® average noise levels (Ldn) of 60 dBa are considered acceptable for residential
development. Areas exposed to Ldn 60-65 dBa are conditionally acceptable if
minor sound reduction measures are incorporated into the project design.
Further details on noise within San Joaquin County appear in the County Noise
Element. However, it should be noted that this document is about 8 years old
and some of its contents may be out of date.
A City of Lodi noise contour map indicates that Ldn noise levels reach 65-75
dBa at the perimeter of the site along Lower Sacramento Road and Kettleman
Lane.
®
Impacts
The project would result in significant shorn -term noise impacts due to
construction activities. Peak noise levels generated during the noisiest
construction operations, those involving earthmoving and grading, would range
from about 80-35 dBa at 50 -foot distances and about 74-79 dBa at distances of
100 feet. This could cau,-e some inconvenience for those residences south of
the site. Closing the windows would help mitigate this problem.
Project operation of the commercial -retail parcels could increase noise levels
for the residential parcels. There :s no buffer between the commercial -
shopping uses and the residential uses, making the residential uses susceptible
to traffic and freight- noise generated by the commercial uses.
Project operation would increase traffic volumes in the vicinity of the site.
It is generally agreed that perceptible increases in traffic noise occur when
BACKUP/TAVES-EIR - -9-
traffic volumes double. Based upon the traffic volumes predicted on Page 6 of
this report, it is expected that increases in traffic noise on adjacent streets
due to project generated traffic would not be perceptible. However, it should
be noted that in combination with traffic increases from other sources, audible`
impacts could occur.
Mitigation 4
Because the noise levels on the portions of the site adjacent to Kettleman Lane _
and Lower Sacramento exceed CNEL 60 dBa, Title 25 of the California
Administration Code would require that a noise analysis be performed to show
that the proposed buildings have been designed to limit intruding noise.
Measures to mitigate excess noise could include, but would not necessarily be
limited to, the following:
o Sound reducing wall behind commercial parcels, prohibiting
vehicular access onto Mono Creek Drive and reducing noise for the
residences.
o Minimize number and size of windows facing
commercial parcels.
o Avoid placing bedrooms facing commercial parcels.
E. AIR QUALITY
The proposed project is located in the northern portion of San Joaquin County
which is the northernmost county in the San Joaquin Valley Air Basin. The
climate in the project area is characterized b hot dr summers and cool wet
p J Y y
winters. Mean annual rainfall is about nine inches which falls mostly during
storms between October and April. Average winter maximum temperatures are in
high 50s; average summer maximum temperatures are in the 90's.
t ;
The most serious air pollution problem in this area is due to elevated
concentrations of ozone, which have deleterious effects on human health and
crop production. The problem occurs largely from May to October when intense
heat and sunlight promote the formation of ozone from chemical reactions in the
atmosphere involving reactive organic gases (ROG) and oxides of nitrogen (NO }.
During this pf-riod temperatures frequently. exceed 100°F (the average daxily
maximum in July is 95°F) and prevailing west and northwest winds may bring
pollutants from the more heavily populated Bay Area into San Joaquin County.
Ozone concentrations exceeding the federal standard of .12 parts per million
have occurred under these conditions.
It is generally assumed that pollutants in the project area are transported to
the southeast; air quality generally worsens to the south in the San Joaquin
Valley. Winds at the project site are influenced by marine air which flows
through the coastal hills and valleys into the San Joaquin Valley; winds are
strongest in the afternoon and evening.
BACKUP/TAVES-EIR - -10-
A second air quality problem in San Joaquin County occurs from October through
January when strong _temperature inversions trap pollutants near the earth's
!► surface. At such times build-ups of carbon. monoxide (CO) may violate the
Federal eight-hour average 'CO standard of nine parts per million. Violations
generally occur in the evening due to the combination of emissions from heavy
vehicular traffic and stagnant atmospheric conditions. A third air quality
problem is violation of state and federal air quality standards for total
suspended particulates (TSP). This situation exists throughout the Central
Valley. The major sources of TSP are resuspended dust from spring winds and
agricultural operations including burning.
San Joaquin County's air quality violates air quality standards for ozone, CO,
and TSP. The 1977 Amendments to the Federal Clean Air Act require
non -attainment areas (areas which will not be in compliance with National
Ambient Air Quality Standards (NAAQS) by 1982, to prepare air quality plans
(called nonattainment area plans or NAP), designed to bring the areas into
compliance by the end of 1987. The San Joaquin County Board of Supervisors was
designated the lead planning agency for ozone and CO, while the California
State Air Resources Board was the lead agency for TSP planning.
.0 The Air Quality Management Plan for San Joaquin County includes the following
strategies to attain compliance with the ozone and CO air quality standards:
reducing emissions from on -road motor vehicles; a Transportation Control Plan
to encourage less -polluting forms of transportation; emissions controls on
stationary sources such as industry, and businesses; and control of many other
area sources such as off-road vehicles, agricultural emissions and
miscellaneous combustion processes.
Construction activities would generate pollutants in the project vicinity.
Trucks and other motorized construction equipment would release exhaust during
construction hours. The quantities involved would not be lik?ly to cause air
quality violations in the immediate vicinity of the project, nor would they be
likely to produce measurable increases in pollutant concentrations in
surrounding areas. Earth moving and grading operations would generate
suspended particulates through the movement of earth and the passage of wind
over exposed earth surfaces. Such activities would occur over the entire
period. of community build -out. The resulting particulates would increase
soiling downwi„d, and could aggravate individuals with respiratory problems and
annoy nearby residents. Violations of the particulate air quality standard
could occur ii. the immediate vicinity of the project; data and models with
which to quantify these impacts are not available. It should be noted,
however, that because of the agricultural land uses in the vicinity of the
project site, it is likely that amhient particulate concentrations are already
relatively high.
BACKUP%TAVES-EIR -
-11-
Mitigation
The following steps may be taken to reduce dust emissions during construction:
0.
o watering exposed surfaces (complete coverage twice daily can reduce
emissions by 50%)
o use of tarpaulins on loaded trucks.
o minimization of the period during which soils are exposed.
Since motor vehicle emission rates are regulated by state and federal age-1cies,
the 'available mitigation measures are restricted to reducing traffic volumes
and congestion. Measures to reduce VMT or improve flow are identified in the
transportation section of this report.
F. HISTORICAL AND CULTURAL RESOURCES
There are no historic sites or buildings on the subject property as designated
by any Federal, State or local agencies. The nearest recorded landmarks are in
the community of Woodbridge, 21 miles to the north, and tho Lodi Arch, 21 miles
to the northwest.
It is doubtful that there are any archeoiugical sites on the property.
S
Although there are no recorded archeological surveys of the site, known Indian
sites in the Lodi area are usually located along the banks of the Mokelumne
River, 2 miles to the north.
The property has been extensively cultivated for many years. There is no
record of any items of antiqui;:! carer being unearthed on the site.
+�
Additionally, the extensive diggi,;g �r.d pl.owing to cultivate the vineyards and
t:.e trenching to install rr i goi i..,n 'lines woul d have destroyed any
archeological naterial.
Mitigation
If, during the construction, some article of possible archeological interest
should be unearthed, work willbe immediately halted and a qualified
archeologist will be summoned to examine the findings.
i
G. COMMUNITY SERVICES
POLICE
•
The Lodi Police Department serves the area within Lodi City limits which is
divided into seven patrol areas. The Department has 56 sworn officers, 40
^i
BACKUP/TAVES-EIR - -12-
>�t
patrol officers and 14 patrol cars. There is one central dispatch station.
The average response time for the City is 2.9 minutes.
Is ;
The project site is not currently patrolled, by the Lodi Police Department.
Calls to areas outside the Lodi City limits are directed to the San 'Joaquin
County Sheriff.
0 Impacts
The development of the Taves Park project will mean the end of the present
patrol arrangement between the Lodi Police -and San Joaquin Sheriff. The Lodi
Police will provide police service to the development if it is within city
limit:.. No adverse impact to police services as a result of this project has
3 been identified by the police department.
Mitigation
None required.
FIRE
The City of Lodi will provide fire protection to the project area. The Lodi
Fire Department provides service within City limits, an area of approximately
9.3 square miles with a service population of 40,000. The Department has 48
firefighters, four 1500 -gallon pumpers, one elevated platform truck, one
ladder truck and one equipment truck. This equipment is distributed between
three stations. The station closest to the site is Fire Station III at Ham and
Arundel. Emergency response time to the project is estimated to be 3 to 4
minutes. The City has a Class III TSO rating.
Impacts
The Fire Department has indicated that service to the project site will not be
a problem unless there is insufficient water pressure.
Mitigation
The west side of Lodi developed more recently. As a result the existing
infrastructure is newer and should provide sufficient water pressure to meet
the needs of the project.
SCHOOLS
0 The Lodi Unified School District (LUSD) serves the City of Lodi and nearly all
of northern San Joaquin County, including portions of North Stockton. The
School District has a student population of 17,000, which is estimated to be
_ BACKUP/TAVES-EIR - -13-
growing by 4 to 7 percent per year. i
Inadequate classroom space, is a common problem with the LUSD and students are '
bussed throughout the District. LUSD has taken measures to minimize the
problem. Lodi High School is.on extended hours to handle the student overload.
A statement of impaction has been filed with the State of California and in
addition a tax of $200 per bedroom on new construction is in effect in Lodi.
Impacts
The School District estimates that one student is added by each new
single-family home, and by every two multiple -family units. Therefore, the
Taves Park project can expect to add 74 students to the Lodi School District. _.
Vinewood School, Senior Elementary and Tokay High School would be the schools
most affected.
Mitigation
Fees of $200 per bedroom on new construction are paid to the School District to
help offset the cost of new schools. The District does anticipate the
-potential need for an elementary school to serve students from the area south
and west of Ham Lane and Kettleman Lane. The District is also currently
negotiating a site for a new high school in North Stockton which will help
relieve the load on the Lodi High Schools.
0
WATER
The City of Lodi provides water to the area from a series of 18 wells drawing
on 150 -500 -foot deep aquifers. The entire system has a capacity of 42 million
gallons per day (mgd). Current residential water use is not known, as water is
not metered. New wells are drilled using water utility revenues as additional
areas are developed.
The developer is responsible for extension of all water mains. Residential
water use is not metered; commercial and industrial use is metered and priced
at a declining rate. The City of Lodi has an ongoing water monitoring and
testing program for all its City well sites. The program is designed to alert 0
the City to the presence of any chemicals, organisms or other potentially
harmful materials that may be present in the water system.
Of particular concern has been the possible presence of the chemical DBCP, a
chemical product that was used by farmers to control nematodes. Although the
product has been banned for a number of years, traces of the chemical are still 0
present in the soil and underlying water tables. Tract levels have been
detected in some of the City's wells however, the levels are below the State's
"Action Level" of 1 p.p.b. (parts per billion). If the DBCP level did exceed 1
p.p.b., the City would either reduce or cease pumping from the problem well in
accordance with State regulations.
BACKUP/TAVES-EIR -14-
M177 -71F.
,. �.
Impacts
0 The City estimates that approximately 3.1 acre feet (AC) of water per year are
required for each acre of single-family development and 4.2 acre feet for each
acre of multi -family development. Given this trend, the project's residential
water is estimated consumption to be about 43.7 acre feet per year or 230
gallons per unit per day.
Commercial development of the north edge of the site will have minimum water
needs. The retail shopping area and commercial -professional project envisioned
(91,600 square feet) should use less than 1/10 of an acre foot per year.
The total water consumption for the Taves Park project will be approximately
43.8 acre foot per year. This level of water consumption will not
significantly affect the City's current capacity. Water use will be heavier if
the property is developed as residential than if it remains in agricultural
use. The California Department of Water Resources provides the following
estimates for various agricultural crops:
Alfalfa 3.4 AC
Deciduous Orchards 3.0 AC
Vineyards 2.4 AC
Truck Gardening 1.8 AC
Barley 0.0 AC
(An acre-foot of water is the amount of water needed to cover one acre of land
with one foot of water, or 326,000 gallons.)
The Taves Park project is estimated to use 43.8 AC per year. Consumption can
be substantially reduced through water conservation and cut by as much as half
by metering the residential supply charging customers by amount used rather
than a flat rate.
Mitigation
None required.
WASTEWATER.
The City of Lodi Sanitary System handles wastewater within City limits, serving
35,000 residential and commercial customers. The City's White Slough Treatment
Plant provides primary and secondary treatment and has a capacity of 5.8 mgd.
Current residential wastewater flow is not known but it is es imated that 40%
of residential water consumption is carried away as wastewater. The developer
pays for installation of all connecting lines and a connection fee (r-eatment
plant buy -in charge) for each unit developed.
BACKUP/TAVES-EIR - -15-
The franchise operator estimates an average of 39 lbs. of solid waste is
generated per residential unit per week. Therefore the 88 proposed units would
create approximately 89 tons of refuse a year. A new landfill yet to be
determined, should be in use by the time this project is completed. The
sanitary service is a mandatory service that operates on a user fee basis. The
Taves Park development would require additional manpower and service equipment.
Sanitary City considers this is part of a normal growth pattern and the cost of
capital improvements would be repaid by user fees.
Mitigation
None required.
ELECTRICITY
The City of Lodi owns and operates the local electrical distribution system.
It is a member of the Northern California Power Agency from which it receives
power, and also buys power from a number of other sources.
BACKUP/TAVES-EIR -. -16-
Impacts
Assuming about 40%
of water consumption is carried away as wastewater, thele
Taves Park project
can be expected to generate 17.5 AC of wastewater. The
treatment plant has
the capacity to absorb the flow but is currently at 75% of
total capacity. At
current growth rates, expansion of the plant will be needed
by 1990-1r,32.
Mitigation
=�
None required.
}'
SOLID WASTE
r'
Solid waste disposal
is provided in the project area by Sanitary City Disposal,.
a private r.anchise
collector. Sanitary City Disposal services the area within
Lodi City limits and
has more than 14,000 customers. Collection is made by
truck on a weekly
basis for residential customers and more frequently for
commercial clients.
Refuse is taken to a transfer station in Lodi where
approximately 25% is reclaimed. The remainder is trucked to Harney Lane
disposal site, a Class II -2 landfill. Harney Lane Landfill has nearly reached
capacity and is scheduled
to close in 1986. Temporary measures are being taken
to extend the 9ife
of the Harney Lane site by utilizing fill dirt from an
adjoining site.
Impacts
-
The franchise operator estimates an average of 39 lbs. of solid waste is
generated per residential unit per week. Therefore the 88 proposed units would
create approximately 89 tons of refuse a year. A new landfill yet to be
determined, should be in use by the time this project is completed. The
sanitary service is a mandatory service that operates on a user fee basis. The
Taves Park development would require additional manpower and service equipment.
Sanitary City considers this is part of a normal growth pattern and the cost of
capital improvements would be repaid by user fees.
Mitigation
None required.
ELECTRICITY
The City of Lodi owns and operates the local electrical distribution system.
It is a member of the Northern California Power Agency from which it receives
power, and also buys power from a number of other sources.
BACKUP/TAVES-EIR -. -16-
f
Impact
The proposed project will have no impact on electrical service and is readily
served.
Mitigation
F
None required.
GAS
E
Pacific Gas and Electric Company will provide service. ti
a
TELEPHONE
Pacific Bell will provide local service
TELEVISION CABLE
King Video Cable will provide service.
i
UNAVOIDABLE IMPACTS
The loss of prime agricultural land would be an unavoidable impact. Once the
land is developed with homes, streets and stores there is little likelihood
that it would ever be used for agricultural purposes.
IRREVERSIBLE ENVIRONMENTAL CHANGES
The loss of agricultural land is also considered to be an irreversible change.
It is unlikely that the land, once developed, would ever be used again for
agricultural purposes.
f.,
RELATIONSHIP BETWEEN SHORT-TERM USES OF THE ENVIRONMENT �
AND ENHANCEMENT OF LONG-TERM PRODUCTIVITY
t
Development of the site would have a long-term effect of depleting the supply F"
of prime. agricultural land in the Lodi area. This is both a project -specific
and cumulative impact.- :_
AGRICULTURAL LAND
The proposed project will contribute to a cumulative loss of prime agriculture
land that has occurred in the past several years. Table 3 shows the the
projects that did, or will, contribute to this loss.
PROJECT
TABLE 3
LOSS OF FARM LAND IN LODI
APPROXIMATE ACRES
Lakesh_:re Village
98
Acres
The Meadows
92
Acres
Kennedy Ranch
88
Acres
Tandy -Johnson Ranch
58
Acres
Noma Ranch
20
Acres
Woodlake North
35
Acres
Sunwest IV
55
Acres
TOTAL ACREAGE 446 Acres
STATUS
Under Construction
Under Construction
Under Construction
Under Construction
Under Construction
Under Construction
Approved
All land in and around the City of Lodi is designated as prime agricultural
land. Thus every development must utilize agricultural land. Most future
residential, commercial and industrial development will require the
urbanization of agricultural land.
SCHOOLS
The other significant cumulative impact is the impact on the LUSD. LUSD
estimates place the number of new students generated by developments in Lodi
and North Stockton at several thousand students in the next few years. These
students place a strain on the District's ability to provide classroom space,
particularly in light of the fiscal problems facing schools. Currently,
developers both in Lodi and in Stockton have been working with the LUSu to
provide funds for additional classroom space. This will help alleviate some of
the short-term problems facing the schools.
BACKUP/TAVES-EIR - -19-
The development of Taves Park would introduce new urban uses to the southwest
corner of Lodi. These new uses may accelerate the rate at which the
surrounding area is developed.
.The installation of various public utilities, particularly storm drainage,
could allow additional development of the area. The construction of th.?
G -south storm drainage basin would provide storm drainage for the area from
Vine Street south to Harney Lane. This would remove a major roadblock to
development of this.area.
It must be noted, however, that the "Greenbelt" initiative will determine
whether any further development will take place in this area. Currently, all
the land outside of the existing City limits must have voter approval prior to
annexation and development.
BACKUP/TAVES-EIR -
-20-
A. NO -PROJECT ALTERNATIVE
Under this alternative the proposed project would not be approved by the City
and therefore would not be built. This would enable the land to continue to be
used for agricultural purposes and would eliminate the other adverse impacts
that.might result from the project.
While this alternative would eliminate the environmental impacts, it could have
an adverse affect on the current future provision of housing in Lodi. At this
time, there are about 356 acres of residential -zoned land left within the City
limits. However, most of this has been planned for development and the
buildout of remaining residential land is about 3.75 years.
4) While a 3+ year supply of lots may seem like a substantial amount, it must be
remembered that large subdivision projects take 2-3 years from the planning
stage to when actual houses are built. Even if the Taves project were
approved, it might be 1987 before any houses are completed in this project. By
then the number of existing subdivision lots will have been reduced
substantially.
By continually adding new subdivisions as existing subdivisions are built out,
the City would maintain a steady supply of available lots. This tends to
create a more stable housing environment, with both builders and buyers assured
of a future supply, This, in turn, would tend to help moderate housing prices
by balancing supply with demand, thereby creating more affordable housing.
j ® Maintaining an adequate number of new subdivision also allows the homebuyer a.
better selection of houses to choose from. The increased selection would mean
that the buyer would have a better opportunity to select the price range,
locate, housing style, etc. to suit their need.
B. ALTERNATIVE PROJECT DESIGN
Another alternative to the proposed project would be to redesign the site plan
to allow for a more cohesive street layout and commercial and residential mix.
(See Exhibit 5). This alternative would separate the commercial from the
residential by a sound -reducing wall behind residences on Tuolumne Street.
Kings River Drive and Kaweah Drive would also eventually tie into a future
connector street to Lower Sacramento Road and Mills Avenue, if the property
south of Taves is ever developed. This would add another access to the
subdivision on the southern end. (See Exhibit 7)
This alternative would reduce the number of residences from 88 to 76. Fewer
residences and improved street design would help mitigate traffic impacts.
The impact on schools would be reduced by 13 students. Alternative B allows
for a commercial -shopping zone, and a residential -commercial -professional
BACKUP/TAVES-EIR - -21-
(R -C -P) zone, but would be separated from the residential development by the
street design and the orientation of the commercial parcels. 0
This alternative would not reduce the impact of the loss of agricultural land.
Regardless of the design of the project, the land would still be removed from
agricultural use.
C.
ALL RESIDENTIAL USE ALTERNATIVE*
0
This alternative would change the commercial -shopping uses and
Residential -Commercial -Professional (R -C -P) uses to multi -family residential
uses. The R -C -P zone would allow 26 residential units as Res -idential -Garden _
Apartments (R -GA) and the commercial zone could allow as many as 580 units as
Residential -High Density.
The impacts of this alternative are as follows:
1. The number of vehicle trips would be reduced by 5,120 v.t./day, The 26
R -GA units would generate 140 v.t./day and the 580 high-density units
would generate 2,146 v.t./day.
2. The student population would also be affected. The 666 units in
the
Alternative C would generate approximately 363 students, while
developer's proposed 88 units would generate approxiately 74 students.
i
D. INFILL ALTERNATIVE
Alternative D would utilize a vacant "infill" property located somewhere in the
This
existing City limits as an alternative site for this project. would
eliminate the development of the Taves property and place the project in a
location that presumably is already impacted.
The problem with this alternative is that the City of Lodi does not have any
large "infill" properties remaining. Because the City has had a continuous
policy of only developing properties that are adjacent to developed areas of
The
the City, there have never been many "infill" properties in the City.
for City of its type and
City is, in fact, extremely compact in area a
population.
In recent years, Homestead Manor, Turner Road Estates, Rivergate Mokelumne,
"infill"
Sanguinetti Park and Mokelumne Village, have been approved on
properties. These subdivisions are all under construction with various types
all the large vacant
of development. These developments have utilized
properties that existed within the developed parts of Lodi.
Of the remaining parcels, most'are too small for a residential subdivision.
They range in size from individual single-family lots to parcels of one or two
individuals who
acres. Many of the large parcels are owned by church groups or
to sell their property. In any case, there are no properties that
0
do not want
would be suitable for a large subdivision development.
*Alternatives C and D were not included in the Draft EIR
BACKUP/TAVES-EIR - -22- to
rx.
.
FOOTNOTES
'k
Malcomb Nicely, San Joaquin County Engineering Dept.,
Conversation, June 1985.
- J
2'
City of Lodi, Data Bank, A Satistical Profile, 1985, p. 12.
.R
3'
Institute of Traffic Engineers, Trip Generation, 1979.
4'
Richard Prima, Chief Civil Engineer, City of Lodi,
Conversation, June 1985.=:
5'
City of Lodi, Batch Environmental Impact Report, 1984.
6'
EIP Corporation, Woodlake North Environmental Impact Report,,
1984.
-
7'
Fran Forkas, Water & Waste Water Superintendent, Conversation,
May 1985.
8'
Lou Thanas, Deputy Director, San Joaquin County Planning
Department, Conversation, June 17, 1985
.:
■rr
7
a LIST OF RESOURCES
Dr. Melvin Taves, owner, Taves Park.
San Joaquin County General Plan Map to 1995, April, 1983.
City of Lodi, Sunwest IV Final Environmental Impact Report, June 1983.
City of Lodi, Woodlake North Final Environmental 'Anpact Report, June
3
1984.
Marvin Davis, Civil Engineer Assistant, City of Lodi.
Glenn Robison, Assistant City Engineer, City of Lodi.
Rich Prima, Chief Civil Engineer, City of Lodi.
Fran Forkas, Water and Wastewater Superintendent, City of Lodi.
City of Lodi, Noise Contour Map, 1978.
Lou Thanas, Deputy Director, San Joaquin County Planning Department,
June 17, 1985.
Jackie Masterson, City of Lodi Police Department.
Don Hawkinson, City of Lodi Fire Department.
Institute of Transportation Engineers, Trip Generation, 1979.
Malcomb Nicely, Trafic Engineer, San Joaquin County.
City of Lodi, Batch Environmental Impact Report, 1984.
BACKUP/BIBLIO- TAVES EIR DRAFT
-24-
m
COMMENTS
-25-
At]
1860 EAST HAZELTON AVENUE
STOCKTON, CALIFORNIA 95205
TELEPHONE (209) 944-2233
SAN' 1CAOUIN- COUNTY COUNCIL OF-.GOY.ERNMENTS
July 2, 1985
City of Lodi
Planning Department
221 West Pine Street
Lodi, CA 95240
Gentlemena
This is in response to the Draft Environmental Impact Report for
Taves Park. As the regional transportation planning agency for
San Joaquin County, the Council of Governments offers the
following comments:
It is recommended that the EIR address specific mitigation mea-
sures designed to facilitate the flow of traffic on the existing
roadway network. For example, while the draft EIR identifies the
possible need for a traffic signal at Lower Sacramento and Route
12, it should also address the issue of when the need for that
improvement would arise, what the approximate cost would be, and
who would pay for that improvement.
COG staff is concerned that to encourage additional ingress/
egress on Kettleman Lane encourages traffic congestion and safety
problems on a state highway with future traffic projections of
28,000 (year 2000).
As a mitigation measure, Page IV proposes "limiting access to
Kettleman Lane" However, due to the lack of any alternative
north/south access points within this development, it appears
that the impact of this measure would be to divert traffic onto
Tuolumne Street to make a turn onto Lower Sacramento Road
possibly necessitating -.a traffic signal.
In connection with the above comment, the Regional Transportation
Plan prepared by this offices identifies Lower Sacramento Road as
a roadway with capacity concerns serving a median of 15,000 cars.
The EIR needs to address the impact that this proposed develop
ment would hzive on Lower Sacramento Road with and without limited
access to Kettleman Lane.
With regard to pages 9 and 10, the number of trips generated by
the new development is estimated. These trips needs to be
assigned to the roadway network before the im act of—t la-.-,
development can be adequately addressed.->,,:.,;:. ;
}
f
• COUNTY OF SAN JOAQUIN • CITIES OF STOCKTON, LODI, TRACY,
-26
c -r
<=T y
ANTE ESCXLC RIPON •'
ATC:PM:gmw
ANDREW T. CHESLEY
Transportation
Planner
-2%-
f
r r
Cr7(
.. Drn'.e4 ..»�
r�
City of Lodi
Page Two
t
July 2, 1985
The draft EIR does not adequately address the
growth inducing
impact of this development. For example, this
development may
f
bring added pressure on the City of Lodi to
extend Century
Boulevard out to Lower Sacramento Road before
the City had
originally intended.
Page 20 refers to a VMT reducti-on scheme in the
"transportation
a
section". However, no section or VMT reduction scheme exists.
If you have any' questions, please do not hesitate to give me or
Patricia Mickelson of my staff a call.
Very truly yours,
ATC:PM:gmw
ANDREW T. CHESLEY
Transportation
Planner
-2%-
f
r r
Cr7(
.. Drn'.e4 ..»�
0 0 M i= -A W"Y
PACIFIC GUAs AND ELECTRIC
.0 IrD(r
4040 WEST LANE - P. O. BOX 930 - STOCKTON. CALIFORNIA 95201 - (209) 466.2261
August 2, 1985
File: 606
Review of Draft EIR
Taves Park EIR 85-2
City of Lodi
221 W. Pine Street
Lodi, CA 95240
0 Gentlemen:
We have completed our review of the Draft Environmental Impact
Report for the Taves Park Project, Lodi.
PGandE has no comments on the Draft EIR. However, we would like,
to take this opportunity to inform the parties involved that
should this development require relocation or undergrounding of
our facilities, whether presently located within the development
or within adjacent streets, said facilities will be relocated at
the developer's expense.
Thank you for the opportunity to review this project. If you
have any questions, please call Mr. Michael San Julian at
942-1553.
Sincerely,
S. V. KoV
Division Land Supervisor
MSan Juliar.:mc
cc: Dr. Melvin Taves
970 E. Highway 12
Lodi, CA 95240
AU I IS
DE` t RT
-28-
PACIFIC CTAS AND ELECTRIC COMPANY
�(GtM�°.a -+— 12 WEST PINE STREET LODI, cALIFORNIA 95240 (209) 369-3538
DAVID J. SWEITZER -
MANAGER - LOW r
X4
August 6, 1985
City of Lodi
Planning Department
Re: Taves Park Project
970 E. Highway 12, Lodi, CA.
Upon receiving the Environmental Impact Report for Taves Park located at
970 E. Highway 12, Lodi, CA., Pacific Gas and Electric Company researched
the impact this annexation would present. if this projec-, was accepted
into the City of Lodi.
PGandE presently has two electric line extensions serving this parcel
of land. These two line extensions serve two residences, one agriculwral
shop and two, three phase agricultural wells.
PGandE also has Natural Gas service serving the two residences on this
parcel of land.
If this project was annexed into the City of Lodi, PGandE would request
fair and just compensation for the value of the capital equipment purchased
or removed, severance costs, and the loss of the existing five customers
presently; being served at this time.
If you have any questions -regarding this matter, please call me at (209)
369-3538.
Sincerely,
/eJ_.?z.�eitzer
F
j AUS 07 �5 �
-29-
lod! unified achool diottlet
FACILITIES PLANNING, 815 W. LOCKEFORD ST., LODI, CA. 95240 (209) 369-7411- 466.0353
May 30, 1985
City of Lodi
Community Development Department
221 West Pine Street
Lodi, California 95240
Attention: Erin Corey
Re: Taves Park Annexation/Development
Notice of Preparation
Dear Erin:
Thank you for providing us with the notice of preparation on the
aforementioned development.
Under present attendance area definitions, the subject development
is in the Henderson rural attendance area (with students attending
Vinewood School; Senior E1; and Tokay High School). As you know,
the District continues to experience overcrowding in nearly all of
its schools.
In lieu of dedication of a site in the Lobaugh Meadows subdivision,
the District has ammended its development fee agreement with those
developers to permit the payment of fees only. Although the District
has not formally requested the reservation of an elementary school
site in the Lobaugh Meadows subdivision, the District does anticipate
a potential future need for an elementary school site to serve students
froru the area south and west of Ham and Kettleman Lanes..
If additional information is required, please do not hesitate to con-
tact me.
Si�rely,
Mary'J�an Starr, AICP
Facili y Planner
MJS:ms
-30-
lodi unified
FACILITIES PLANNING, 815 W. LOCKEFORD ST.. LODI, CA. 95240 (209) 381 -7411 -466 -OM
August 5, 1985
City of Lodi
Community Development Department
221 West Pine Street
Lodi, California 95240
Attention: Dave Morimoto
Re Taves Park - Draft EIR 85-2
Dear Mr. Morimoto:
Thank you for referring the aforementioned EIR to Lodi Unified School
District. The following comments are submitted for your consideration.
i
Page iv - Development fees (bedroom fees) provide only partial mitigation
to the problem of overcrowding in area schools. Page 24 - Lodi and Tokay
High Schools are both on extended day. A statement of impaction is filed
annually with the Cities of Lodi and Stockton and San Joaquin County with
a fee of $200 per bedroom currently in effect in Lodi.
Page 25 - The fees paid pursuant to Government Code Section 65970-65981
(SB201-1977) may be used for interim housing only. If the developer
enters into a voluntary agreement with the District, the fees may be t_
used for interim or permanent housing. A developer may also dedicate
land in -lieu of a fee payment. The District is actively pursuing new
school construction through the State Leroy.F. Greene Lease Purchase
Program; however, funds are not made available until the overcrowding
exists. The new high school will help relieve overcrowding both at. �
Lodi and Tokay High Schools. The developer of this project has contacted
the District regarding a voluntary Development Fee Agreement.
If additional information is needed, please do not hesitate to contact
me.
Sincerely,
Mar Joa/n 4r�r'�'.w6p"Etc
.Fa i 1 i ty Planner -/ ?hs
cc: Fred Baker
MJS:ms
Business, Transportation and Housing Agency
To State Clearinghouse Date July 29, 1985
Office of Planning & Research
1400 Tenth Street Me = SJ -12 -P.M. 15.2±
Sacramento, CA 95814 Taves I'ark
SCH #85061.817
Attention: Erin Corey
From DEPARTMENT OF TRANSPORTATION
Mr. Preston W. Kelley, District 10 Director
Subject:
We have reviewed the Draft EIR on Taves Park subdivision
and have the following comments:
1. A detailed traffic circulation study with an impact
analysis and proposed riitigations for this project should be
included in the EIR.
2. The developer should consider widening the south side
of State Route 12 to provide a continuous left turn lane and
two eastbound lanes similar to the area east of this project.
Mitigation measures should be proposed in the form of funding
and responsibility.
3. Any new proposed access or work within State right
of way will require an encroachment permit from Caltrans.
4. All drainage from the proposed project should be
directed away from the State highway right of way.
Caltrans would be willing to meet and discuss any plans
for anticipated needs for improvements to the existing highway
corridor through your community.
If you have any questions in regard to your comments, please
call or write Sharon Stewart, Caltrans District 10, P.O. Box 2048
Stockton, CA, 95201; telephone (209) 948-7875. '
RESPONSES TO COMMENTS
RESPONSE TO SAN JOAQUIN COUNTY COUNCIL OF GOVERNMENTS COMMENTS
Lower Sacramento Read at Highway 12 - Existing traffic volumes at this
intersection already considerably
exceed the minimum Cal Trans volume
warrants. There were 11 accidents at this intersection in 1984. If this
intersection was within the City Limits, the City would have studied the
intersection biennually. Given its volume and accident history it would have
placed at the top of the City signal priority list. City policy has been to
fund traffic signals from the various street funds - Gas Tax, Transportation
Development Act or Federal Aid -Urban. Signals at intersections where other
agencies are responsible for a share, such as this case in which both Cal -
Trans and San Joaquin County are involved, would require a special agreement.
In any event, design and construction contract administration would be by Cal
Trans. The approximate cost is $120,000.
The annexation of this land and development of the Taves project will
undoubtedly hasten the installation of this already -needed signal.
Highway 12 Capacity/Access - Future traffic projections for Highway
12/Kettleman Lane include traffic generated
by adjacent development. A daily volume of
28,000 it not unreasonable for a four lane facility with turn lanes. When
improved on both sides, as it is in Lodi, Highway 12 has sufficient width for
6 lanes plus a turn lane.
Driveway access to Highway 12 is controlled by Cal Trans. The City would
propose to allow one driveway west of Muir Way for right turns only (both
entering and leaving) and one major driveway east of Muir Way. Other
driveways for the commercial property would be on Muir Way. This spread of
access points should keep the conflicting volumes down to a level less than
that needing signalization.
Lower Sacramento Road Capacity/Access - The fully developed width of Lower
Sacramento Road is similar to that
of Highway 12. The City does not
anticipate capacity problems with this street.
Major access from Taves Park would be on Tuolumne Street although under
Alternative B, a right turn only driveway could be allowed on the commercial
parcel.
Trip Assignment - Peak hour volumes have been assigned as shown on
Exhibit A. These volumes have been used in the
-34-
r]
preceding analyses. Note that all Taves Park volumes
are shown entering or leaving at the two new -streets. Additional access
points - driveways on Highway 12 and Lower Sacramento Road - will reduce the
volumes at these intersecting streets. --
Century Boulevard - The Taves Park project does not front. Century
Boulevard - it is separated by two, twenty -acre
parcels. (See Land Use Map). The G -Basin site has
been annexed and the City will build the WID crossing on Century Boulevard
this winter. The Meadows and Whispering Oaks projects fronting Century
Boulevard are active. Within a year or two the north half of Century
Boulevard will be completed from the WID Canal to the west end on The
Meadows. Ordinarily, the. City would not extend a street until the adjacent =
property develops. Pressure to extend Century Boulevard to Lower Sacramento I
Road would tend to come from the Whispering Oaks/Tokay Nigh School area. If
the City elected to make the extension, approximately 450 feet of.
right-of-way and street construction would be needed to connect to the City's
G -Basin site. Street work at the basin is already City responsibility. The
extension presently is scheduled for construction with adjacent development
and/or development of the basin. (See Exhibit 7)
-36-
4CITY OF D
PUBLIC WORKS DEPARTMENT
TAGS FrOjeCT'
L /5>-rl & PtVS V1ZDJe,(,Tr
TgA�P(l LoNorrlok)
va
-35-
RESPONSE TO CAL TRANS COMMENTS
1. Traffic projections have been revised and are included in the text.
Mitigation measures are discussed in responses to other comments.
2. Widening the south side of Kettleman Lane (Highway 12) will be done as
part of the developer's normal subdivision off -site_ improvements. The
developer's responsibility includes the installation of underground
utilities, curb, gutter and sidewalk, and street paving to the edge of
the existing pavement. Street restriping is usually the responsibility
of the agency responsible for the street. In the case of Highway 12,
this is Cal Trans.
3. The City and the developer's engineer, are well aware of Cal Trans'
Encroachment Permit requirements. This will he handled as part of
normal subdivision processing.
4. Drainage facilities will be part of the improvements mentioned in Item 2
above. The project will also provide for proper drainage for the
highway, thus eliminating Cal Tran's weed filled ditches.
Cal Trans also drains the intersection of Lower Sacramento Road and
Highway 12 into the City's Industrial Waste line. This connection can
be eliminated with the construction of this project
APPENDIX Ar
INITIAL STUDY-
Environmental Assessment
INITI.r1L STUDY
1. PROJECT TITLE TAVES PARK
2. LOCATION southeast corner of Lower Sacramento Road & Kettleman Lane (Highway 12)
3. PROJECT DESCRIPTION 23.6 ± acres -planned. -development to include commercial shopping
uses and low and medium density residential uses.
4. General Plan Designation (A) Existing (city), (B) Proposed (A) GA, general
agricultural (San Joaquin County); (B) none.
5. Site description and surrounding land use Agricultural use. Bordered by
agricultural uses and a residential planned development use to the east.
6. Zoning (A) Existing, (B) Proposed (A) GA, general agriculture*(San Joaquin
County; (B) Planned development mixed commercial and residential
planned developmen
Will the Project Pave a Significant Effect
Through Any of the Following Impacts? Yes
No Maybe
7. a. Substantial alteration of natural topography, soil
orsubsoil features ......................... ....... X
b. Substantially degrade surface or groundwater quality..
X
c. Substantially deplete surface or groundwater
resources.............................................
X
d. Substantially interfere with groundwater flow
orrecharge....... .................................
X -
e. Cause a significant affect related to flood, erosion
orsiltation ..........................................
X
f. Substantial interference with the habitat of any
species of fish, wildlife or plant ....................
X
g. Violate ambient air quality standards or create
X
substantial air emissions or objectionable odors......
h. Substantially increase ambient noise or glare
levet for adjoining areas .............................
X
i. Substantial reduction of existing cropland............ X
j. Expose individuals or property to geologic, public
X
health, traffic, flood, seismic or other hazards......
-39-
Adverse impacts of project and their magnitude:Loss of agricultliral land,
increased demand on services and schools increased traffic,
and noise from surrounding streets.
Mitigation Measures to Reduce Adverse Impacts Identified by Initial Study:
To be identified in EIR
RECOMMENDATION
Negative Declaration X EIR Conditional Negative
Declaration
JAMES B. SCHROEDER
Environmental Review Officer
By-� J _ Date May 8, 1985
Firs/,_R�
If
f,
-40-
Yes No Maybe
k.
Have a substantial, demonstrable, negative aesthetic
effect...............................................
1.
Result in the r;isruption or alteration of an
archeological, historical or paleontological site....
X
m.
Cause or allow substantial increase in consumption in
X
any natural resources.. ............... ..........
n.
Results in the use or waste of substantial amounts of
X
fuel or energy..... ... ................:..........
o.
Necessitate major extensions of water, sewer, storm
X
drain, electrical -lines or public roads ..............
p.
Substantially increase demand for or utilization of
public serv;ces such as schools or fire or police
X
protection...........................................
q.
Substantially change transportation patterns related
to existing traffic load, street capacity, parking
X
availability or traffic safety .......................
r.
Induce substantial growth, concentration or displace-
mentof population ...................................
X
s.
Result in an alteration or conflict with existing or
plannedland uses ...................................
X
t.
Conflict with adopted plans, goals or policies of
the City of Lodi ....................................
X
Adverse impacts of project and their magnitude:Loss of agricultliral land,
increased demand on services and schools increased traffic,
and noise from surrounding streets.
Mitigation Measures to Reduce Adverse Impacts Identified by Initial Study:
To be identified in EIR
RECOMMENDATION
Negative Declaration X EIR Conditional Negative
Declaration
JAMES B. SCHROEDER
Environmental Review Officer
By-� J _ Date May 8, 1985
Firs/,_R�
If
f,
-40-
A -WEIGHTED SOUND PRESSURE LEVEL. IN DEDCIBLES
CIVIL DEFENSE SIREN (1001
JET TAKEOF (200')
RIVETING MACHINE
DIESEL BUS (15')
90
SAY AREA RAPID TRANSIT
TRAIN PASSBY (10')
so
PNEUMATIC DRILL (50')
170
SF MUNI LIGHT RAIL VEHICLE (351
FREIGHT CARS (1001
VACUUM CLEANER (10')
60
s
SPEECH Cl')
AUTO TRAFFIC INEAR FREEWAY
50
LARGE TRANSFORMER (2001
AVERAGE RESIDENCE
40
SOFT WHISPER (S')
THRESHOLD OF PAIN
ROCK MUSIC BAND
PILEDRIVER (50')
AMBULANCL' SIREN (100')
BOILER ROOM
PRINTING PRESS PLANT
GARBAGE DISPOSAL IN HOME (31
INSIDE SPORTS CAR (50 MPH)
DATA PROCESSING CENTER
DEPARTMENT STORE
PRIVATE BUSINESS OFFICE
LIQHT TRAFFIC (100')
TYPICAL MINIMUM NIGHTTIME
LEVELS -RESIDENTIAL AREAS
RUSTLING LEAVES RECORDING STUDIO
10
THRESHOLD OF FEARING MOSQUITO (31
0
(100') -DISTANCE IN FEET BETWEEN SOURCE AND LISTENER
TYPICAL. SOUND LEVELS
MEASURED IN THE ENVIRONMEENT AND INDUSTRY
-42-