APPROVED Council approved the following plans and specifications and
authorized advertising for bids:
CC -2O
CC -47 A; White Slough Water Pollution Control Facility Aeration
System Diffuser Retrofit
E; Underground fuel tanks
CITE L �..ALM*.
c COMMUNICATION'
PUBLIC WORKS DEPARTMENT
Project Data
Originally Budgeted: 19B7/88
Budgeted Fund: Wastewater Capital
Outlay (17.2)
TO: City Council Amount Budgeted: 5175,000
Total Project Estimate: x,154,700
FROM: City Manager Project Estimate (this contract):
$60,^u00
MEETING DATE: September 16, 1987 Bid Opening Date: 20/14/87
AGENDA TITLE: Approve Pians and Specification: for White Slough mater
Pollution Control Facility Aeration System Diffuser Retrofit
and Authorize Advertising for Bids
RECOMMENDED ACTION: That the City Council approve the plans and specifica-
tion�or the above project and authorize advertising for bids.
BACKGROUND INFORMATION Thisprojectincludes the removal -of old and the
installation of nzw aeration diffusers at the White Slough Treatment
Facility. The diffusers have been purchased by the City of Lodi and will be
furnished to the contractor for installation.
A breakdown of the total aeration project costs is as follows:
Diffusers purchased by City $82,300
Installation by formai contract 60,000
Engineering and inspection 121400
TOTAL $154,700
'Jack L. Ronsko ;
Public 'corks Director
JLR/ma:
cc: Purchasing Officer
h
Water/Wastewater Superintendent
E
APPROVED: ��� � ��
FiLE NO.
MA.S A. TER N. Cil Manager
CWSWPCF4/TXTW.02M September 9, 1987
CITE OF LODI Col T
PUBLIC 10/RKS DEP ^ RTPAENT
RECOMMENDEC ACTION: That the City Council approve the plans and specifica-
tions for four underground double-wall fuel tanks and authorize advertising
for bids.
BACKGROUND INFORMATION: Viese tanks are part of the overall State
undergroun.d..fuel tank, upddting project to replace single-wall tanks.with
double-wall continuous monitored tanks.
The location, size, and type of these four tanks is shown below:
Municipal Service Ceviter
Municipal Service Center
Public Safety Building
Public Safety Building
10,000 gallons Unleaded
5,000 gallons Diesel
12,000 gallons Unleaded
5,000 gallons Diesel
A breakdown of the estimated total cost of replacing these four tanks is as
follows:
Double -Wall Fuel Tanks $38,000
Installation by formal contract 40,000
TOTAL $78,000
Jac L. Ronsko
Publ c Works Director
JLR/RW/ma s
cc: Purchasing Officer
Building & Equipment Maintenance Supt.
APPROVED: _ FILE NO.
ISM S1�A FETER S 0 N, Cit I Mana er
CTANK2/TXTW.02M September 9, 1987
PROJECT DATA
TO:
City Council
Originally Budgeted:
1986-87
Budgeted Fund: 121-350.58-519
T0:
City Council
Amount Budgeted:
$80,500
Total Project Estimate:
$78,000
FROM:
City Manager
Project Estimate (this contract):
$38,000
MEETING DATE:
September 16,
1987 Bid Opening Date:
10/7/87
AGENDA TITLE:
Approve Plans
and Specifications for Underground Fuel
Tanks
and Authorize
Advertising for Bids
RECOMMENDEC ACTION: That the City Council approve the plans and specifica-
tions for four underground double-wall fuel tanks and authorize advertising
for bids.
BACKGROUND INFORMATION: Viese tanks are part of the overall State
undergroun.d..fuel tank, upddting project to replace single-wall tanks.with
double-wall continuous monitored tanks.
The location, size, and type of these four tanks is shown below:
Municipal Service Ceviter
Municipal Service Center
Public Safety Building
Public Safety Building
10,000 gallons Unleaded
5,000 gallons Diesel
12,000 gallons Unleaded
5,000 gallons Diesel
A breakdown of the estimated total cost of replacing these four tanks is as
follows:
Double -Wall Fuel Tanks $38,000
Installation by formal contract 40,000
TOTAL $78,000
Jac L. Ronsko
Publ c Works Director
JLR/RW/ma s
cc: Purchasing Officer
Building & Equipment Maintenance Supt.
APPROVED: _ FILE NO.
ISM S1�A FETER S 0 N, Cit I Mana er
CTANK2/TXTW.02M September 9, 1987
'O NCIL COMMUNICATIP-N
TO. THE CITY COUNCIL DATE Meeting of ' NO.
FROM: THE CITY MANAGEWS OFFICE September 16, 1987
SUBJECT. INSTALLATZOtz OF ELECTRIC SLTUSTRUCTURES - (E TL -s7-13)
LOWER SACRAMENTO ROAD RUTLEDGE DRIVE AND TURNER ROAD
RECOMMENDED ACTION: That the City Council approve the plans and specifications
for the installation of electric substructures (vaults and conduits) Gn Lower
Sacramento Road (160 ft.), Rutledge Drive (720 ft.) and Turner Road (440 ft.),
all in the Town and Country area, and authorize advertisement for bids thereon.
The bid opening date has been set for October 6, 1987.
BACKGROUND INFORMATION: The installation of the substructures will enable
the Electric Utility Department to reconstruct the underground direct -buried
12-kv e'.istribution system in the area. The existing system, installed in
1968-69, is rapidly failing due to cable deterioration. This project wi_il
complete the reconstruction in the area.
Funding was included in the 1987-88 fiscal year budget. The estimated cost of
this portion of the reconstruction project is $23,000.
Henry J. Ri
Electric Utility Director
cc: Public Works Director
Assist. Electric Utility Director
Electrical Engineer
Purchasing Officer