Loading...
HomeMy WebLinkAboutAgenda Report - September 16, 1987 (66)VARIOUS PLANS AND SPECIFICATIONS APPROVED Council approved the following plans and specifications and authorized advertising for bids: CC -2O CC -47 A; White Slough Water Pollution Control Facility Aeration System Diffuser Retrofit E; Underground fuel tanks CITE L �..ALM*. c COMMUNICATION' PUBLIC WORKS DEPARTMENT Project Data Originally Budgeted: 19B7/88 Budgeted Fund: Wastewater Capital Outlay (17.2) TO: City Council Amount Budgeted: 5175,000 Total Project Estimate: x,154,700 FROM: City Manager Project Estimate (this contract): $60,^u00 MEETING DATE: September 16, 1987 Bid Opening Date: 20/14/87 AGENDA TITLE: Approve Pians and Specification: for White Slough mater Pollution Control Facility Aeration System Diffuser Retrofit and Authorize Advertising for Bids RECOMMENDED ACTION: That the City Council approve the plans and specifica- tion�or the above project and authorize advertising for bids. BACKGROUND INFORMATION Thisprojectincludes the removal -of old and the installation of nzw aeration diffusers at the White Slough Treatment Facility. The diffusers have been purchased by the City of Lodi and will be furnished to the contractor for installation. A breakdown of the total aeration project costs is as follows: Diffusers purchased by City $82,300 Installation by formai contract 60,000 Engineering and inspection 121400 TOTAL $154,700 'Jack L. Ronsko ; Public 'corks Director JLR/ma: cc: Purchasing Officer h Water/Wastewater Superintendent E APPROVED: ��� � �� FiLE NO. MA.S A. TER N. Cil Manager CWSWPCF4/TXTW.02M September 9, 1987 CITE OF LODI Col T PUBLIC 10/RKS DEP ^ RTPAENT RECOMMENDEC ACTION: That the City Council approve the plans and specifica- tions for four underground double-wall fuel tanks and authorize advertising for bids. BACKGROUND INFORMATION: Viese tanks are part of the overall State undergroun.d..fuel tank, upddting project to replace single-wall tanks.with double-wall continuous monitored tanks. The location, size, and type of these four tanks is shown below: Municipal Service Ceviter Municipal Service Center Public Safety Building Public Safety Building 10,000 gallons Unleaded 5,000 gallons Diesel 12,000 gallons Unleaded 5,000 gallons Diesel A breakdown of the estimated total cost of replacing these four tanks is as follows: Double -Wall Fuel Tanks $38,000 Installation by formal contract 40,000 TOTAL $78,000 Jac L. Ronsko Publ c Works Director JLR/RW/ma s cc: Purchasing Officer Building & Equipment Maintenance Supt. APPROVED: _ FILE NO. ISM S1�A FETER S 0 N, Cit I Mana er CTANK2/TXTW.02M September 9, 1987 PROJECT DATA TO: City Council Originally Budgeted: 1986-87 Budgeted Fund: 121-350.58-519 T0: City Council Amount Budgeted: $80,500 Total Project Estimate: $78,000 FROM: City Manager Project Estimate (this contract): $38,000 MEETING DATE: September 16, 1987 Bid Opening Date: 10/7/87 AGENDA TITLE: Approve Plans and Specifications for Underground Fuel Tanks and Authorize Advertising for Bids RECOMMENDEC ACTION: That the City Council approve the plans and specifica- tions for four underground double-wall fuel tanks and authorize advertising for bids. BACKGROUND INFORMATION: Viese tanks are part of the overall State undergroun.d..fuel tank, upddting project to replace single-wall tanks.with double-wall continuous monitored tanks. The location, size, and type of these four tanks is shown below: Municipal Service Ceviter Municipal Service Center Public Safety Building Public Safety Building 10,000 gallons Unleaded 5,000 gallons Diesel 12,000 gallons Unleaded 5,000 gallons Diesel A breakdown of the estimated total cost of replacing these four tanks is as follows: Double -Wall Fuel Tanks $38,000 Installation by formal contract 40,000 TOTAL $78,000 Jac L. Ronsko Publ c Works Director JLR/RW/ma s cc: Purchasing Officer Building & Equipment Maintenance Supt. APPROVED: _ FILE NO. ISM S1�A FETER S 0 N, Cit I Mana er CTANK2/TXTW.02M September 9, 1987 'O NCIL COMMUNICATIP-N TO. THE CITY COUNCIL DATE Meeting of ' NO. FROM: THE CITY MANAGEWS OFFICE September 16, 1987 SUBJECT. INSTALLATZOtz OF ELECTRIC SLTUSTRUCTURES - (E TL -s7-13) LOWER SACRAMENTO ROAD RUTLEDGE DRIVE AND TURNER ROAD RECOMMENDED ACTION: That the City Council approve the plans and specifications for the installation of electric substructures (vaults and conduits) Gn Lower Sacramento Road (160 ft.), Rutledge Drive (720 ft.) and Turner Road (440 ft.), all in the Town and Country area, and authorize advertisement for bids thereon. The bid opening date has been set for October 6, 1987. BACKGROUND INFORMATION: The installation of the substructures will enable the Electric Utility Department to reconstruct the underground direct -buried 12-kv e'.istribution system in the area. The existing system, installed in 1968-69, is rapidly failing due to cable deterioration. This project wi_il complete the reconstruction in the area. Funding was included in the 1987-88 fiscal year budget. The estimated cost of this portion of the reconstruction project is $23,000. Henry J. Ri Electric Utility Director cc: Public Works Director Assist. Electric Utility Director Electrical Engineer Purchasing Officer