HomeMy WebLinkAboutAgenda Report - September 9, 1987CITY COUNCIL MEETING
SEPTEMBER 9, 1987
JOINT SPECIAL MEETING
LODI CITY COUNCIL/LODI PLANNING COMMISSION
HALE PARK RECREATION CENTER BUILDING
209 EAST LOCUST STREET, LODI
SEPTEMBER 9, 1987
7:30 P.M.
Pursuant to StatF Sr,atute, the following notice was mailed under
"Declaration of Mailing to persons listed on Exhibit B hereinafter set
forth" advising of a Joint Special Meeting of the City Council and
Planning Commission to be held September 9, 1987 at 7:30 p.m. at the
Hale Park Recreation Center Building, 209 East Locust Street, Lodi.
OC -53 (a) NOTICE OF JOINT SPECIAL MEETING
OC -53 (d) OF THE LODI CITY COUNCIL
AND THE PLANKING COMMISSION
NOTICE IS HEREBY GIVEN that Mayor Evelyn M. Olson has called a Special
Joint Meeting of the Lodi City Council and the Planning Commission for
Wednesday, September- 9, 1987 at 7:30 p.m. at the Hale Park Recreation
Center Building, 209 East Locust Street, Lodi (corner of Locust Street
and Stockton Street).
A copy of the Agenda for this meeting is attached, marked Exhibit A.
Dated: September 2, 19g7
s/Alice M. Reimche
City Clerk
EXHIBIT "B"
NOTICE OF SPECIAL COUNCIL MEETING
MAILING LIST
Fred M. Reid Lodi News Sentinel
1168 Northwnnri
#AA
w
CITY OF LOOP
WFORMATIONAL DATA FOR
LODI CITY COUNCIL
MEETING
ca3BCin jol2ir mmm% wm Tm im- Pikwlw. Conmissim
I a.
OFsepter.ber 9, 1987
CITY OF LODI
CITY HALL
=
Lodi, California.
AGENDA MEMO
September 2, 1981
To the Honorable Mayor and
Members of the City Council
--
Councilmembers:
Enclosed for your information and review is .the agenda for the Special
Meeting of Wednesday, September 9, 1987. The meeting will be held in the
Hale Park Building at 7:30 p.m. The Special Meeting has been called to
provide for a joint meeting of the City Count -i and the Planning Commission
to review the East Side Plan Alternatives Draft Environmental Impact Report.
Mr. Ron Bass, Project Manager, Jones and Stokes Associates, will be in
attendance to summarize the voluminous document distributed to the City
Council in late July.
In the near future the City Council will want to schedule a public hearing
on this matter.
The . City Clerk has placed three display advertisements in the Lodi
!sews -Sentinel to call attention to this meeting.
Respectfully submitted,
Thomas A. Peterson
#_=
City Manager
TAP:br
Enclosures
L.
TXTA.07A AGNDMM14
���� LO
��
SPECIAL JOINT MEETING
LODI CITY COUNCIL AND
Fe
IS MEETING WILL BE HELD AT LODI PLANNING COMMISSION
LE PARK RECREATION CENTER BLDG. DATE: SEPTEMBER 9, 1987
3
09 FAST LOCUST -STREET, LODI TIME: 7:30 P.M.
I. Roll Call City Clerk
II. Introductions - Mayor Olson
III. Presentation by Ron Bass, Project Manager, Jones and Stokes Associates,
Inc., of City of Lodi East Side Pian Alternatives Draft Environmental Impact
Report (Discussion and appropriate action)
IV. Adjournment
Pursuant to Section 54954.2(a) of the Government Code of the State of California,
this Agenda was posted at least 72 hours in advance of the scheduled meeting at a
public place freely accessible to the public 24 hours a day.
Alice M. Refmc eh ,Lity Clerk
For information concerning this Agenda
please contact Alice M. Reimche, City Clerk +
Telephone - 333-6702 i1
THE FOLt.( WING DOCU-WII S
wnL REQUIRE MORE THAN ONE SHOT
AS 'nlEy ARE OVERSIZED
AND 6JILL Nar FIT IN THE FRAKE
Table 3-1. Summary of Environmental Impacts and MI
_Option
Z Option 2
Topic Historic
Pull Historic
(EIR Chapter) Rate
Buildout Rate
Project Moratorium would
Moratorium would Study Area Zoning Stu
Description be lifted. 232
be lifted. 2,643 would be reduced won
(2) single -family (sf)
sf du would be to R-1. Existing to
du would be con-
converted, creat- mf units would mf
vented, creating
Ing an additional maintain Zoning mal
an additional
17,180 ■f du, with corresponding to our
1,508 multi-family
a population of actual density. act
(mf) 01, with a
17,180 in the No new sf con- No
population of
Study Area, versions would ver
3,016 In the Study
occur. occ
Area.
Lend Use (4) Impact Land use conflicts
Total oonversion No impact. No
between existing
of the a
sf units and
would intensity
potential mf
cix s g_na
units; intensifi-
borbood D—ro ems.
cation of existing
naigbborbood
o Loss of privacy
problems:
o Inadequate off -
Loss of
o privacy
p acy
street parking
o Inadequate off-
o Illegal parking
street parking,.
A
o Ille7al parking
-
Signifl- Significant.
Significant- None.
tact
unavoidable. I
i
Mitigation Develop
None available. None required
Measure performance
Adoption of strict -
standards:
performance star-
dards would bow It .Jr
o Amend SPARC
ever, partially
requirements to
mitigate this -
screen new mfiapact,ia
units from their
neigbbors,
o Amend SPARC
requirements to
o Amend SPARC
screen nen mf
requirements to
units from their
prohibit exter-
neigbbors.
nal balconies
o Amend SPARC
o Amend city Zon-
requirements to
ing Ordinance to
prohibit exter-
require two
nal balconies
parking spaces
per of du
o Amend city Zon-
ing Ordinance to -
o Enforce tte East
require two
Side Area park-
parking spaces
--
1ng program.
per of do
Underlined lmpacts Cannot be mitigated to a less-than-significant level. .
terisk ! following mitigation measure denotes
that the identified measure does not reducei.
See Table 3-7 for recommended policies and implementation measures of Performance Standards—-
b
To accommodate new development, the existing system would require Improvements. This -impact,='
C For improvements and capital costs required to upgrade the existing system see topicalc�n
?JA Not applicable.
Use (4) Impact
Signifi-
cance
Mitigation
Measure
Table 3-1. Summary of Environmental Impacts and Mitigation Measures for the East Side Plan Alternatives
Option 1 Option 1 Option 3
Historic '— 1� istoricFull Historic fli11
Rate Buildout Rate Buildout Rate Buildout
Moratorium would Moratorium would Study Arca Zon.ng
be lifted. 232 be lifted. 2,643 would be reduced
single-family (sf) sf du would be to R-1. Existing
du would be con- converted, creat- mf units would
verted, seating Ing an additional maintain Zoning
an additional 17,180 mf du, vitt corresponding to
1,508 multi -family a population of actual density.
(mf) du, with a 17,180 in the No new sf con-
populat:on of Study Area. versions would
3,016 in the Study occur.
Area.
Land use conflicts
between existing
sf units and
potential of
units; intensifi-
cation of existing
neighborhood
problems:
o toss of pr_vacy
o Inadequate off-
street parking
o Illegal parking
Significant.
Deve'_op
performancS
standards.
o Amend SPARC
requirements to
screen new mf
units from their
neighbors.
o Amend SPARC
requirements to
prouibit exter-
nal balconies
o Amend city Zon-
ing Ordinance to
require two
parking spaces
per mf du
o Enforce the East
Side Area park,
Ing program.
Total conversion
oor_fie to liea
would Inteaslfr
ex ne
or pro ems.
o Loss of privacy
o Inadequate off-
street parking
o Illegal parking
Significant -
unavoidable.
None available.
Adoption of strict
performance stan-
dards would, how-
ever, partially
mitigate this
impact.*°
o Amend SPARC
requirements to
screen new mf
units from their
neighbors.
o Amend SPARC
requirements to
prohibit exter-
nal balconies
o Amend city Zon-
ing Ordinance to
require two
parking spaces
per mf du
Study Area Zoning Study Area Zoning
would be reduced would be reduced
to R-1. Existing to either R-1,
mf units would R-2, R-3, or R-4.
maintain Zoning 232 sf Ls would be
corresponding to converted, creat -
actual density, ing an additional
No Dew sf con- 928 mf du, with a
versions would popul—ion of
occur. 1.856 in the Study
Area.
SJ
No impact. No impact.
None. None.
None required. None required.
Land use conflicts
between existing
of units and
potential new mf
units, intensifi-
cation of existing
neighborhood
problems:
o Loss of privacy
o Inadequate off-
street parking
o Illegal parking
Significant.
Develop
performancra
standards*
o Amend SPARC
requirements to
screen new of
units from their
neighbors.
o Amend SPARC
requirements to
prohibit exter-
nal balconies
o Amend city Zon-
ing Ordinance to
require two
parking spaces
per mf du
o Enforce the East
Side Area park-
ing program.
Study Area Zoning Sin.
would be reduced Ion-
to either R-1, be
R-2, R-;, or R-4. thr-
2,643 sf du would are
be converted, Stu
creating an addi- the
tional 10,572 mf Stu
du, with a popula- ..won
tion of 21,144 in to "
the Study Area. urn:
tec
adc
mf
Por
3,0
Are
o Loss of priva.y.
o Inadequate of!
street parkin)
o Illegal parklig.
Significant- :A.Sic
unavoidable.
None available. P
Adoption of strick;;klpey
performance star-
dards would, hov -'%'
ever, partially o ?
mitigate this
o Amend SPARC
requirements t -
screen new of'o
::.
units from their:;._
neighbors.
o Amend SPARC;%
requirements to :_:.,',:; o
prohibit exter-
nal balconies - -
o Amend city Zon-
ing Ordinance t,'.
require two -'o
parking spaces
per mf du
erlined IIts = Cannot be mitigated to a less -than -significant leve;.
erisk o ov Ing mitigation measure denotes that the identl.`led measure does not reduce impacts to a less -than -significant level.
ee Table 3-2 for recommended policies and Implementation measures of Perform^nce Standards. `
o accommodate new development, the existing system would require improvemer.c- This impact Includes both the incrementalcapital costs and improvemen. S u:
or improvements and capital costs required to upgrade the existing system see topical chapters of text.
Not applicable. .
of Environme tal LX;acts ane mitigation !fires !or the East Side Plan A'c.tPr"ti>_-=
with
c -tin t Wa urt_o- 4
e stozic ii -.s or._ Pt '.? — Historic coli
Rate BIT -1 ldt Rate SLiida t Kate =.ti_: cut
Study Area Zoning
would be reduced
to R-1. Existing
of units would
eaintatn Zoning
corresponding to
actual density.
No new sf can -
versions would
oCCUr.
Study Azea Zoning
would be reduced
to R-1. Existing
of units would
maintala Zoning,
corresponding to
actual density.
So new sf con-
versions would
occur.
Study Area Zcaing
would be reduced
to either R-1,
R-2, 2-3, or R-4.
232 sf du would be
converted, creat-
ing an additional
92,1 mf du, with a
population of
1,k55 to the Study
Area.
Study Area Zoning
would be reduced
to either P-1,
R-2, R-3, or R-4.
2,643 sf d= would
be converted,
creating an addl-
tional 10,572 of
du, wit$ a popula-
tion of 21,144 in
the Study Awa .
Single-family
conversions would
be allowed only in
three 'target
areas'. withl, the
Study Area v1ile
the remainder of
Study Area Zoning
would be reduced
to R-1. 2.332 sf du
would be conver-
ted, creating an
addltioaal 1,508
mf du, with a
population of
-,016 in the Study
Area.
Si_gie-familg
C0M erSiOCs woule
be allawed only in
three 'target
areas'Zit^ the
Study Areawhile
the reeainder of
Study Area Zoo:. g
would a reduced
to R-1. 341 5! du
would :e conver-
ted, .creat,rq as
add i tlaoal 2,"17
sf C:, wit: a
papaiatton 0
4,434 !n tie Study
Area.
No impact. No impact.
Land use conflicts
Total cemversfm
land use conflicts
'Total conversion
Lea
between existing
�e Are
between existing
o_ e u mea
sf units and
wcu intensliv
sf units and
woo
potential new mf
existing ne
potential new of
existia mei
ems.
units; latemsifl-
.-;Grbooc pt ens.
units; intensifl-
,r. p rob I ems.
cation of existing
cation of existing
yacy
neighborhood
o Loss of privacy
neighborhood
o I.«ss of privacy
problems:
proble=s:
ff-
o Iiadequate off-
o Iaackctute off -
g
o Loss of privacy
stmt parking
o Loss of privacy
street parking
:Ing
o Inadequate off-
o Illegal parking
o Inadequate off-
o Illegal parking
street parking
street parking
o Illegal parking
o Illegal parking
None. Noce.
Significant.
Significant-
Significant.
Significant -
unavoidable.
unavoidable.
Nona required. None required.
.Act
Develop
None available.
Develop
None available.
performaac$
Adoption of strict
performene
Adoption of strict
-
standards=
performance stan-
standards:
performance stan-
dards would, how-
dards would, how -
o Amend SPARC
ever, partially
o Amend SPARC
ever, partially
requirements to
mitigate this
a
requirements to
mitigate this
screen new of
impact-
screen new mf
Lz;act.*a
omits from their
units from their
neighbors.
o Amend SPARC
neighbors.
o Amend SPARC
to
requirements to
requirea=*ts t^.
o Amend SPARC
screen new of
o Amend SPARC
screen new of
it
requirements to
units from their
requirements to
units from their
prohibit exter-
neighbors.
prohibit eater-
neighbors.
nal balconies
nal balconies
o Amend SPARC
o Amend SPARC
to
o Amend city Zoo-
requirements to
o Amend city Zof-
requirements to
z-
Ing Ordinance to
prohibit ester-
Ing Ordinance to
prohibit exter-
zequire two
nal balconies
require two
nal balconies
Parking spaces
parking spaces
-
per of du
o Amend city Zoo
per of du
o Amend city Zoo
to
Ing Ordinance to
Ing Ordinance to
o Enforce the East
require two
o Enforce the East
require two
s
Side Area park-
parking spaces
Side Area park-
parking spaces
ing pry
per mf du
ing program.
per mf du
t level.
led measure does not reduce impacts to a less -than -significant level.
es of Performance Standards.
e improvements. This impact includes both the incrementsa capital costs and improvements under Option 2.
Iting system see topical chapters of text.
I
Topic
(EIR Chapter)
Land Use (4)
(Continued)
Option I
Historic Ful F
Rate Buildout
o Enforce the East
Side Area park-
ing program.
------------------------------- ---------------------------
Population (5) Impact Net population Net ulation No impact.
increase of 2,394 increase o
In the Study Area. 777777. he
toy Area.
Signifi- Significant- Significant- None.
cane unavoidable. unavoidable.
Mitigation None available. None available. None required.
Measure
Table 3-1..
_ Option 2
stor c
Rate
Impact Demographic Demographic No impact.
than es resultingcchaannceesreres_uullt g
a rea Els-
��d��
pope at on that is po-aTio�a t�bai
�Oun r more Es oua er anT
trans en . more transient.
Elderly residents
vould be Mired
to relocate Into
mf units or
ouu&_37-the
Cdr) __
No ±mph
I
None..
None rf
No imp.
Signifi- Significant-
Significant- None. None _
tante unavoidable
unavoidable
Mitigation None available.
None available. None required. None
Measure
Housing (6) Impact Conversion of 232
Conversion of No impact. No
sf u screw innq
tts
anadditional
at units in
creating
addItional 1 508
0508 y Area.
mf units inthe-
e
u�dy�
Signifi- Significant-
Signifi-
Significant- None. KOLit
cane unavoidable.
unavoidable.'=
x
Mitioti')n None avrilable.
None available. None required. None
Measure
Impact Low -quality ■f
Low -quality mf No impact. No
construction.
construction.
o Poor architec-
o Poor architec-
tural design
tural design
o Lack of land-
o Lack of land-
scaping
soaping
Underlined Im acts = Cannot be mitigated to a less
-than -significant level.
§sterisk fo Iowing mitigation measure denotes that the identified measure does not reduce impact
See Table 3-2 for recommended policies and implementation
measures of Performance Standards.
b To accommodate new development, the existing system
would require improvements. This impact inch
c For. improvements and capital co:;ts requlred to
upgrade the existing system see topical chapters of
NA = Not applicable,
Table 3-1. (Continued)
Option 1
Option 2
Option 3
Topic
Historic
F'u�i —
Historic
istor c
aIi
- -
IR Chapter)
Rate
Buildout
Rate Buildout
Rate
BulIdout
nd Use (4)
o Enforce the East
o Enforce the East
ontlnued)
Side Area park-
Side Area park-
ing program.
Ing program.
pulation (5) Impact
Net ulatioa
Net upo ul tion
No Impact. No impact.
Net po lam
Net ulation
a
increase o 394
increase oo —
increase o�I-�3�4
inc O!oof IT o_6._1
I
In Area.
Abe
udy Area.
in the ust tly Area.
I
tu�—
Si.gnifi-
Significant-
Significant-
None. None.
Significant-
Significant-
-.S:
cane
unavoidable.
unavoidable_
unavoidable_
unavoidable.
w
Mitigation
None available.
None available.
None required. None required.
None available.
None available.
lb
Measure
Impact
Demographic
Demographic
No impact. No Impact.
Demographic
Demographic
Di
chances
s resultin
changes eltin
changesltisg
a3i
_resulting
—mchoarr
nutooArea
n a Area
in a
�n agto Area
FetiIs�
22221.r. r
art r
unmore
geen
os
transwe
transient.
and less transient
and less trauslent
Elderly eameats
ESnE options RZ
umn option I and
would be
_41.
Licerl
o re oca e o
resrauld be
-'`
at units orired
o relo-
outside of the
cote to a -
uArea.
-
MoenE un or
.
ots
u rna.
Signifi-
Significant-
Significant-
None- None.
Significant-
Significant-
canoe
unavoidable
unavoidable
unavoidable
unavoidable::
`C1
Mitigation
g
None available.
None available.
None required. None required.
None available.
None available.
Measure
�
_--------««---««—«--«----------
using (6) Impact
------------
Conversion of 232
«------ «—««
Conversion of
-------------««—-----««—«--««----—«--«—«««—«----««--
No Impact. No impact.
Conversion of 232
Conversion of
s�Y._
sf units crea .n
t643 sf units
s is crea�ti�nq
2 643s{ tts
a1
an additional
.2
creating an
an addif�anaT-93$
ew
crn
.81
I-568 ifs inin
add �lC578
ii s n —
a t .an 10 572
T�
Ge Sf ldp Area.
mf un�5 13 the-Uu
y Area.
Mt UnItS '. _
J
u${ay Area.
u
Sigl ifi-
Significant-
Significant-
None. None.
Significant-
Significant-
canoe
unavoidable.
unavoidable.
unavoidable.
unavoidable.
ri.ID
'W
Mitigation
None available.
None available.
None required. None required.
None available.
None available.
ah
Measure
Impact
Low -quality at
Lov-quality at
No impact. No impact.
Lor -quality mf
Lor -quality of
7a
construction.
construction_
construction.
construction.
,.,.,p
o Poor architec-
o Poor arcbitec-
o Poor arcbitec-
o Poor a_-chitec-
�0.
tural design
tural design
Lural design
Lural design -.
o Lack of land-
o Lack of :and-
o Lack of land-
o Lack of land-
:0
scaping
soaping
soaping
soaping
-
derlined ImDaCtS = Cannot
be mitigated to a less -than -significant leve L
tcrisk following mitigation measure denotes
that the identified
measure does not reduce impacts to a less-tban-significant
level.
See Table 3-2 for recommended policies and implementation measures of Performance Standards.
-
?o accommodate new development, the existing system would require improvements.
This impact includes uotb the Incremental capital costs and improvements m
For improvements and capital
costs required to vn':ade the existing
system nee topical chapters of text.
= Not applicable.
Table 3-1. (Continued)
Option 2 Option 3 Option 4
—i3"istoz c F1Z�— Historic -T5i7i— Historic F5ifI
Rate Buildout Rate Buildout Rate Buildout
o Enforce the East o Enforce the East
Side Area park- Side Area park-
ing program. Ing program -
o impact.
No impact.
Ne_tuQop lation
Netpopulation
Net popuIatiou
Net ulation
increaseeoo 1 2:4
n t to v
increase o x,061
�n �ireStudy Area.
nc`r-e'as—e�R 2 3994
in a tuS dy Area.
increase a 520
in the study Area.
area.
e.
None.
Significant-
Significant-
Significant-
Significant -
unavoidable.
unavoidable.
unavoidable.
unavoidable.
one required.
None required.
None available.
None available.
None available.
None available.
o impact.
No impact.
Demographic
Djmo za hic
Deoogragtsis
D®_c�r_a�IIic
changes resulting
c�iaa s resulting
�ltin
changes iesultinq
In a Stuff
n au Area
Sn a ulation—
in a ulation
uta
_ _
1 to on xi ile
1_ s younger
i�oun�er
tamille
pun er am es
oua r am
more transient
and mo_re_- ans ent
and less rans entan
--les
ess ansTent
In the"target
n the
tOptions
than option I Ann
areas.-
areas. er
3.
I�e'T
res en s xou be
ki-res ea -paid be
required o
required o re o-
ieiocate Into
cateinto apart:
apartment un Iis or
ment units or
outsice of ie
`
out$ owe
targeareas.
u�
None.
None.
Significant-
Significant-
Significant-
Significant -
unavoidable
unavoidable
unavoidable
unavoidable
i
Hone required.
f
None required.
None available.
None available.
None available.
None available.
1 - --- ---------
ko impact.
------------- --------------------------------------��__-----��_�_---__--__-_�___�_---___�-
No impact.
Conversion of 232
Conversion of
Conversion of 232
Conversion of 341
sf units creates
2,643 sf units
Tru—nits creatin
s units _c_reat2a
an Lon $
crea as
an additional
an additional
m
a ona 0.572
�m unifs in
2,217 mf i in
Sru7y- Area
the Study Area.
tae Study Area.
3 yuArea_
None.
None.
Significant-
Signif!;:ant-
Significant-
Significant-
unavoldab2e.
unavoidable.
unavoidable.
unavoidable.
None required.
None regrsired.
None available.
None available.
None available.
None available.
No impact.
No impact.
Lox -quality mf
Lox -quality mf
Lox -quality mf
Lox -quality mf
construction.
construction.
construction.
construction.
o Poor architec-
o Poor arcbitec-
o Poor architec-
o Poor architec-
tural design
Lural design
tural design
Lural design
o Lack of land-
o Lack of land-
o Lack of land-
o Lack of land-
scaping
scaping
scaping
scaping
asure does not reduce impacts to a less -than -significant level.
Performance Standards.
ovements. This impa.:t includes both the incremental capital costs and LTprovements under Option 2.
stem see topical chapters of text.
2
Table 3-1. (Col
control. control.
o Amend SPARC o Amend SPARC
requirements to requirements to
discourage con- discourage con-
struction of struction of
bulky apartment bulky apartment
buildings. buildiDp.
Underlined Impacts Cannot be mitigated to a less -than -significant level.
Asterisk M following mitigation measure denotes that the identified measure does not reduce impa<
See Table 3-2 for recommended policies and implementation measures of Performance Standards..:
b To accommodate new development, the existing system would require improvements. This impact incl
c For improvements and capital costs required to upgrade the existing system see topical chapters_c
NA = Not applicable.
Option 1
Option 2
Topic
Historic
Full
Historic
(EIR Chapter)
Rate
Buildout
Rate
But
Housing (6) Signifi-
Significant.
Significant.
None.
None.
(Continued) canoe
Mitigation
Develop perfor-
Develop perfor-
None required.
None regi
Measure
a
mance standards:
a
mance standards:
o Amend SPARC
o Amend SPARC
requirements to
requirements to
require archi-
require archi-
tectural
tectural
control.
control.
I
o Continue to
o Continue to
develop, or
develop, or
update and
update and
enforce
enforce
community design
community design
policies as part
policies as part
of SPARC.
of SPARC.
Impact
Conflict with
Conflict with
Conflict with
Conflict,
adopted ��ousinq
a�ousin
adopted housing
adopted l
po c-1� ies
policies
policies promoting
policiee
encoura in the
encouraging the
the construction
the con
Drotection an
rotund
of a variety of
of a vat
Improvement o-
housing.
housing
�exis��m�-
res
res
aiaZ—e�T �orT>Z» -
h o4
en a or -
Signifi-
Significant-
Significant-
Significant.
Signif
canoe
unav-Widable.
unavoidable.
Mitigation
None available.
None available.
Permit a variety
Perot`
Measure
Adoption of strict
Adoption of strict
of housing to be
of"Loos
performa—
performance
constructed
c
standards would,
standards would,
elsewhere in Lodi.
elserhe.
hoverer, partially
however, partially
mitigate this
mitigate this
impact.ia
impact.ia
o Continue to
o Continue to
develop, or
develop, or
update and
update and
enforce commu-
enforce commu-
nity design
pity design
policies as part
policies as part
of SPARC.
of SPARC.
o Amend SPARC
o Amend SPARC
requirements to
requirements to
require archi-
require archi-
tectural
tectural
control. control.
o Amend SPARC o Amend SPARC
requirements to requirements to
discourage con- discourage con-
struction of struction of
bulky apartment bulky apartment
buildings. buildiDp.
Underlined Impacts Cannot be mitigated to a less -than -significant level.
Asterisk M following mitigation measure denotes that the identified measure does not reduce impa<
See Table 3-2 for recommended policies and implementation measures of Performance Standards..:
b To accommodate new development, the existing system would require improvements. This impact incl
c For improvements and capital costs required to upgrade the existing system see topical chapters_c
NA = Not applicable.
erllned im is = Cannot be mitigated to a less-th-significant level.
Brisk anfollowing mitigation measure denotes that the identified measure does not reduce impacts to a less -than -significant level.
ee Table 3-2 for recommended policies and implementation measures of Performance Standards.
o accommodate new development, the existing system would require improvements. This impact includes both the incremental capital costs and improvements Uik
or improvements and capital costs required to upgrade the existing system see topical chapters of text.
= Not applicable. '
<Y.
Table 3-1. (continued)
_tion
2
_ Option 2
option 3
Historic
�—
'—S�stoi3c Fu..
—ii oric
Full
tet)
Rate
Buildout
Rate Buildout
Rate
Buildout
]m
(6) Signifi-
Significant.
Significant.
None. None.
Significant.
Significant.
Signif
ed) canoe
Mitigation
Develop perfor-
Develop perfor-
None required. None required.
Develop perfor-
Develop perfor-
Develop
Measure
mance standards:"
a
mance standards:
a
mance staca�rds:
a
mance standards:
mance s
o Amend SPARC
o Amend SPARC
o Amend SPARC
o Amend SPARC
o Amend
requirements to
requirements to
requirements to
requirements to
re
require archi-
require archi-
require archi-
require arca -
requir
tectural
tectural
tectural
tectural
tec
control.
control.
control.
control.
contro
o Continue to
o Continue to
o Continue to
o Continue to
o Con
-
develop, or
develop, or
develop, or
develop, or
deve2
update and
update and
update and
update and
update
-
enforce
enforce
enforce
enforce
enfo
community design
community design
community design
community design
"
policies as part
policies as part
policies as part
policies as part
pol
of SPARC.
of SPARC.
of SPARC.
of SPARC.
of SP
Impact
Conflict with
Conflict with
Conflict with Conflict with
Conflict with
Conflict with
Conflic
.:
adopted housinq
ooted9
adopted housing adopted housing
adopted housingadopted
h�
ad ted
P=°-
po]lci-ea
Ifo- est--
policies promoting policies promotin-j
policies
policies
en In the
encouraging the_
the construction the construction
eacoura the
encour aging the
encu
�rot�-ec•io�n a�n�
ro ec on
of a variety of of a variety of
ro on aa
—rotectionn and
ro
-
roam v�m{�oT
enrovesem o
houslog. housing.
rovemen o
-
ex
n me r-
oo
n t`
ho�
hoods.
m r-
on
WE.
er-
eaa neighbor-
hoods.
m
Slgnlfl-
Significant-
Significant-
Significant. Significant.
Significant-
Significant-
Slgni
cance
unavoidable.
unavoidable.
unavoidable.
unavoidable.
umr
ct
Mitigation
None available.
None available.
Permit a variety Permit a variety
None available.
Nose available.
Nape
Measure
Adoption of strict
Adoption of strict
of housing to be of housing to be
Adoption of strict
Adoption of strict:
performance
performance
constructed constructed
performance
performaura
per
standards would,
standards wocld,
elsewhere in Lodi. elsewhere in Lodi.
standards would,
standards would,
s
however, partially
however, partially
however, partially
however, partially
mitigatethismitigate
this
mitigate this
mitigate this
mitfg
impact.•
impact.'°
impact.'a
impact.ea
o Continue to
O Continue to
O Continue to
o Continue to
O
develop, or
develop, or
develop, or
develop, or
update and
update and
update and
update and
_
enforce commu-
enforce eommu-
enforce commu-
enforce commu-
nity design
pity design
pity design
nity design:
policies as part
policies as part
policies as part
policies as part
of SPARC.
of SPARC.
of SPARC.
of SPARC.
o Amend SPARC
o Amend SPARC
o Amend SPARC
o Amend SPARC
requirements to
requirements to
requirements to
regUlrementm CO
require archi-
require archi-
require arcbi-
require archi-
tectural
tectural
tectural
tectural
control.
control.
control.
control.
o Amend SPARC
o Amend SPARC
o Amend SPARC
o Amend SPARC 0-1
requirements to
requirements to
requirements to
requirements Lo,;.....'
discourage con-
discourage con-
discourage con-
discourage con-
struction of
struction of
struction of
struction of
bulky apartment
bulky apartment
bulky apartment
bulky apartment
buildings.
buildings.
buildings.
buildings.
-
erllned im is = Cannot be mitigated to a less-th-significant level.
Brisk anfollowing mitigation measure denotes that the identified measure does not reduce impacts to a less -than -significant level.
ee Table 3-2 for recommended policies and implementation measures of Performance Standards.
o accommodate new development, the existing system would require improvements. This impact includes both the incremental capital costs and improvements Uik
or improvements and capital costs required to upgrade the existing system see topical chapters of text.
= Not applicable. '
<Y.
Table 3-1. (Continued)
option 2 Option 3 Option 4
Historic Full Ffis r1c Full Historic Full
Rate Buildout Rate Bu_ldout Rate Buildout
se. None
:e required. None required.
Significant.
Develop perfor-
mance standards:
o Amend SPARC
requirements to
require archi-
tectural
control.
o Continue to
develop, or
update and
enforce
community design
policies as part
of SPARC.
Significant.
Develop perfor- a
mance standards:
o Amerd SPARC
requirements to
require archi-
tectural
control.
o Continue to
develop, or
update and
enforce
community design
policies as pest
of SPARC.
Significant.
Develop perfor-
mance standards:a
o Amend SPARC
requirements to
require archi-
tectural
control.
o Continue to
develop, or
update and
enforce
commuait,f design
policies as part
of SPARC.
Significant..
Develop perfor-
mance standards:&
o Amend SPARC
requirements to
require archi-
tectural
control.
o Continue to
develop, or
update and
enforce
community design
policies as part
of SPARC.
.flict with Conflict with Conflict with Conflict with Conf-lct with Conflict with
,pied housing adopted housing adopted housing adopted housing a�in adopted hcnisi
lcies promoting policies promoting policies policies
licies
construction the construction en�cou�racina the encouura the enm ira is the encouraging the
a variety of of a variety of Baal
m ae pro on onand
sing. housing. improvemento rovmen o rovemen rovement
r.x res - resz- resl- ae
m e
r -
m ce g r- m
hoods.
aificar!. Significant. Significant- Significant- Significant- Significant -
unavoidable. unavoidable. unavoidable. unavoidable.
sit a variety Permit a variety None available. None available. None available. None available_
:lousing to be of housing to be Adoption of strict Adoption of strict Adoption of strict Adoption of strict
structed constructed performance performance performance performance
awhere in Lodi. elsewhere in Lodi. standards would, standards would, standards would, standards would,
however, partially however, partially however, partially however, partially
mitigate this mitigate this mitigate this mitigate this
impact.*a impact.ia iuspact.ia impact.*a
o Continue to o Continue to o Continue to o Continue to
develop, or develop, or develop, or develop, or
update and update and update and update and
enforce cornu- enforce eoamu- enforce cornu- enforce comu-
n3ty design nity design nity design pity design
policies as part policies as part policies as part policies as part
of SPARC. of SPARC. of SPARC. of SPARC.
o Amend SPARC o Amend SPARC o Amend SPARC o Amend SPARC
requirements to requirements to requirements to requirements to
require archi- require archi- require archi- require andsi-
tectural tectural tectural tectural
control. control. control. control.
o Amend SPARC o Amend SPARC o Amend SPARC o Amend SPARC
requirements to requirements to requirements to requirements to
discourage con- discourage con- discourage con- discourage con-
struction of stzuction of struction of struetion of
bulky apartment bulky apartment bulky apartment bulky apartment
buildings. buildings. buildings. buildings.
c does Dot reduce impacts to a less -than -significant level.
�rsu:ce Standards.
---Its.
This impact includes botb t;e incremental Cap-"--' a:.d :,., rovezents under Option 2.
see topical chapters of text.
3
UnderlinedImpacts a Cannot be mitigated to a less -than -significant level.
�sterisk following mitigation measure denotes that the identified measure does not
See Table 3-2 for recommended polici; - and implementation measures of Performance Stu
b To accommodate new development, the existing system would require improvements.: ThL
c For improvements and capital costs required to upgrade the existing system see topics
NA = Not applicable.
Option 1
Topic
Historic
Full
Historic
(EIR Chapter)
Rate
Buildout
Rate.
Housing (6)
Impact
No impact.
No impact.
Conflict with
(Continued)
adopted housing?
policies dealing
with the San
Joaquin Council
Governments
(Council) Fair
Share Housing
Allocation Plan.
No new additions
to the Study Are
housing stock
would occur.
Signifi-
None.
None.
Significant.
tante
Mitigation
None required.
None required.
Permit adequate
Measure
housing to be
constructed else
where in Lodi;
ensure through C
permitting proce
that future
residential
development will
iiclude adequate
affordable
housing.
Employment (7)
Impact
Increased demand
Increased demand
No pct..., ._
for retail goods
for retail goods
and services in
and services in
Lodi and San
Lodi and San
Joaquin County.
Joaquin County.
Signifi-
canoe
Beneficial.
Beneficial.
None. -
Mitigation
None required.
None required.
None required: V
Measure
Impact
Generation of 287
Generation of
No impact.
local, direct, and
3,382 local,
secondary full-
directs and
time jobs:
secondary
generation of 263
full-time jobs;
person-years of
generation of
construction-
2,993 person-years
related
of construction -
employment.
related
employment.
signifi-
Beneficial.
Beneficial.
None.
canoe
Mitigation
None required.
None required.
{x
None regnied
Measure
a�
UnderlinedImpacts a Cannot be mitigated to a less -than -significant level.
�sterisk following mitigation measure denotes that the identified measure does not
See Table 3-2 for recommended polici; - and implementation measures of Performance Stu
b To accommodate new development, the existing system would require improvements.: ThL
c For improvements and capital costs required to upgrade the existing system see topics
NA = Not applicable.
Elm
IM
low
Table 3-1. (Continued)
Topic toric tion 1 rwi�lisf ric Option 2 toric tion 3 k -U11
Chapter) Rate Buildout Rate Buildout Rate Buildout
Ing (6) Impact No impact. No impact. Conflict with Conflict with No impact. No impact. No -.
timned) adopted housing adopted housing
policies dealing policies dealing
with the San with Council's
Joaquin Council of Fair Share Housing
Governments Allocation Plan.
(Council) Fair No new additions
Share Housing to the Study Area
Allocation Plan. housing stock
No new additions would occur.
to the Study Area
housing stock
would occur.
Signal- None. None. Significant. Significant None. None. Nor.
canoe
Mitigation None required. None required. Permit adequate Permit adequate None required. None required. No:-
:Measure housing to be housing to be
constructed else- constructed else-
where in Lodi; where In Lodi;
ensure through the ensure through the
permitting process permitting process
that future that future
residential residential
development will development will
include adequate include adequate
affordable affordable
housing. housing.
ployment (7) Impact Increased demcad Increo--d demand No impact. No impact. Increased demand Increased demand -*In4:__
for retail goody for retail goods for retail goods for retail goods
and services in and stwvices in and services in and services in -?• Lodi and and San Lodi and San _. Lodi and San Lodi and San Lc::
Joaquin County. Joaquin County: Joaquin County. Joaquin County, # Jc-
Signifi- Beneficial. Beneficial. None. None. Beneficial. Beneficial.. Be-,
canoe
Mitigation None required. None required. None required. None required. None required. None required.,
Measure
Impact Generation of 287 Generation of No impact. No impact. Generation of 153 Generation
local, direct, and 3,382 local, local, direct, and 1,774 local,
secondary full- direct, and secondary full- direct, amd::r
time jabs; secondary time jobs; secondary full t,
generation of 263 full-time jobs; generation of 162 time jobs;
person-years of generation of person-years of generation of
construction- 2,993 person -rears construction- 1,842 person-yous;r= cc'
related of construction- related of comsiructlon-.i:i::':. z
employment. related employment. related
employment. employment..
Signifi- Beneficial. Beneficial. None. None. Beneficial. Beneficial. B;--
cance
Mitigation None required. None required. None required. None required. None required. None required _ _-N-
Measure
derlined Impacts = Cannot be mitigated to a less -than -significant level.
terlsk following mitigation measure denotes that the identified measure does not reduce impacts to a less -than -significant level,
See Table 3-2 for recommended policies and implementat: : measures of Performance Standards.
To accommodate new development, the existing system would require improvements. This impact includes both the incremental capital costs and improvements
For improvements and capital costs required to upgrade the existing sysLec see topical chapters of text.
= Not applicable.
Table 3-1. (Continued)
None required. None required. None required. None required. None required. None required.
3
.------------- ------------------- —-------------------------------------------------- —-------------- --------------------
evel.
a measure does not reduce impacts to a less -than -significant level.
of Performance Standards.
mprovements. This impact includes both the incremental capital costs and Lnprc ments under Option 2.
a system see topical chapters of text.
z
;i 4
_ Option 2
Option 3
Option 4
toric
Full
Historic
Full
Historic
Full
Rate
Buildout
Rate
Buildout
Rate
Buildout
Conflict with
Conflict with
No impact.
No impact.
No impact.
No impact.
adopted housing
adopted boua:.-.7
policies dealing
policies dealing
with the San
with Council's
Joaquin Council of
Fair Share Housing
Governments
Allocation Plan.
(Council) Fair
No new additions
Share Housing
to the Study Area
Allocation Plan.
housing stock
No new additions
would occur.
to the Study Area
uousing stock
would occur.
Significant.
Significant
None.
None.
None.
None.
Permit adequate
Permit adequate
None required.
None required.
None required.
None required.
housing to he
housing to be
constructed else-
constructed else-
where in Lodi;
where in Lodi;
ensure through the
ensure through the
3
permitting process
permitting process
that future
that future
i
residential
residential
development will
development w'll
include adequate
include adequate
affordable
affordable
housing.
housing.
a
}
No impact.
No impact.
Increased demand
Increased demand
Increased demand
Increased demand
s
for retail goods
for retail goods
for retail goods
for retail goods
and services in
and services in
and services in
and services in
Lodi and San
Lodi and San
Lodi and San
Lodi and San
Joaquin County.
Joaquin County.
Joaquin County.
Joaquin County.
None.
None.
Beneficial.
Beneficial.
Beneficial.
Beneficial.
)
None required.
None required.
None required.
None required.
None required.
None required.
3
No impact.
No impact.
Generation of 153
Generation of
Generation of 297
Generation of 437
local, direct, and
1,774 local,
local, direct, and
local, direct, and
secondary full-
direct, and
secondary full-
secondary full-
time jobs;
secondary full-
time jobs;
time jobs;
generation of 162
time jobs;
generation of 263
generation of 386
person-years of
generation of
person-years of
person-years of
construction-
1,842 person-years
construction-
construction -
related
of construction-
related
related
employment.
related
employment.
employment.
employment.
+
None.
None.
Beneficial.
Beneficial.
Beneficial.
Beneficial.
None required. None required. None required. None required. None required. None required.
3
.------------- ------------------- —-------------------------------------------------- —-------------- --------------------
evel.
a measure does not reduce impacts to a less -than -significant level.
of Performance Standards.
mprovements. This impact includes both the incremental capital costs and Lnprc ments under Option 2.
a system see topical chapters of text.
z
;i 4
Table 3-1. =_
Option 1 Option 2
Topic Historic Full Historic
(EIR Chapter) Rate Buildout Rate
Fiscal and Impact Generation of Generation of No impact. Na
Economic $468,700 in annual $5,208,700 in
Conditions (8) revenues and annual revenues
$633,700 in annual and $6,934,100 in
costs. Annual annual costs.
deficit of Annual deficit of
$165,000, repre- $1,725,400, repre-
senting a 26 senting a 25
percent shortfall percent shortfall
in annual in annual
revenues. revenues.
Signifi- Significant. Significant. None. None.
canoe
z
Mitigation Adopt and imple- Adopt and imple- None required. None
Measrre ment a different meat a different
land use mix; land use mix;
designate the designate the
Study Area as a Study Area as a
redevelopment redevelopment
area; designate area; designate
the Study Area as the Study Area as
an assessment dis- an assessment
trict; designate district; desig-
the Study Area as nate the Study
a Mello -Roos Area as a Hello -
Community Faci11- Roos Community
ties District. Facilities _
District.
Impact $9.7 million in $17.9 million in No impact.c No
capital improve- capital improve-
ments to the menu to the
city's water, city's water;
sewerage, and bsewerage, and
drainage systems. drainage,
systems.
Siynifi- NA NA None. None
canoe
Mitigation NA NA Sone required Nane':
Measure
Water (9) Impact Increase in the Increase in the No impacts No
peak hourly flow peak hourly flow
rate by 3 MGD. rate by 30 MGD.
Signifi- Significant. Significant. None. lions`
canoe
Mitigation Construct two Construct 12 wells None required. None
Measure wells and install and install 12,500
16,000 If of If of 14 -inch and
I2 -inch main 36,000 1f'of
transgission 12 -inch main
line. transwission
line.
Underlined Im acts = Cannot be mitigated to a less -than -significant level_
§sterisk following mitigation measure denotes that the identified measLre does not reduce
b See Table 3-2 for recommended policies and implementation measures of Performance Standards.
To accommodate new development, the existing system would require improvements. This impact in
c For improvements and capital costs required to upgrade the existing system see topical chapters
NA = Not applicable.
Table 3-1. (Continued)
_ Option 1 Option 2 Option 3
Topic Historic Fall — Historic Full Historic
Fuir—
(EIR Chapter) Rate Buildout Rate Buildout Rate Buildout
Fiscal and Impact Generation of Generation of No impact. No impact. Generation of Generation of 1
Economic $468,700 in annual $5,208,700 in S247,600 in annual $2,731,900 in
Conditions (8) revenues and annual revenues revenues and annual revenue
$633,700 in annual and $6,934,100 in $340,700 in annual and $3,906,700 in
costs- Annual annual costs. costs. Annual annual costs.
deficit of Annual deficit of deficit of Amoral deficit of .i
5165,000, repre- $1,725,400, rtpre- $93,000, repre- $1,174,800, repre-
senting a 26 senting a 25 senting a 27 senting a 30
percent shortfall percent shortfall percent sbortfall pc=-ent shortfall
7
1n annual 1n annual is annual in annual
revenues. revenues. revenues. reveaies.
Signifi- Significant. Significant. None. None. Significant. Signif.cant,
cane
Mitigation Adopt and imple- Adopt and imple- None required. None required. Adopt and imple- Adopt and Imple- J
Measure met a different meat a different meat a different meat a different -'-.I
land use mix; land use mix; land use mix; land use mix;
designate the designate the designate the designate the
Study Area as a Study Area as a Study Area as a Study Area as a
redevelopment redevelopment redevelopment redevelopment i
area; designate area; designate area; designate area; designate
the Study Area as the Study Area as the Study Area as the Study Area
an assessment dis- am assessment an assessment an assessment _
tract; designate district; desig- district; desig- district; desiq-',.:_.; -=
the Study Area as nate the Study nate the Study nate the Sttidt
a Mello -Roos Area as a Mello- Area as a Mello- Area as a Mello-
f Community Facili- Rcis Community Roos Community Roos Community -
ties District. Facilities Facilities Facilities
District. District. District
Impact $9.7 million in $17.9 million in No impact.c No impect .c $4.9 million in $15 million is
capital improve- capital improve— capital improve- capital
improve- j
ments to the ments to the ments to the ments to the
city's water, city's water, city's water, city's water,
! sewerage, and b sewerage, and sewerage, and b sewerage, and - L
drainage systems. drainngeb drainage systems. drainage systeets
systems.
Signifi- NA NA None. None. NA NA = milt
Mitigation NA NA None required. None required. NA NA _
Measure ,
t
Water (9) Impact Increase in the Increase in the No impact.c No impact .c Increase in the Increase ins-tLe.'-� •'" 1
I peak hourly flow peak hourly flow peak hourly flow peak hourlp.floir .>y
` rate by 3 MGD, rate by 30 MGD. rate of 1.9 MGD, rate of 19 Mm_ z
Signifi- Significant. Significant. None, None. Significant. Significant S
canoe
Mitigation Construct two Construct 12 wells None required. None required, Construct one well Construct
Measure wells and install and install 12,500 and install 5,000 wells and install
16,000 if of if of 14 -inch and if of 12 -inch 5,000 if of�
12 -inch main 36,000 if of traassission 14 -inch and 33,00
' tr"ission 12 -inch main line. if of 12-
line, trans$ission tra"Bisslon" 1
line. line.
I
r:inderllned impacts = Cannot be mitigated to a less -than -significant level. ..
Asterisk M folla+Ing mitigation measure denotes that the identified measure does not reduce impacts to a less -than -significant level -
See Table 3-2 for rerommeended policies and implementation measures of Performance Standards.
To accommodate new development, the existing system would require improvements, This Impact Includes both the incremental capital costs and imprvements.0
"C" For improverents and capital costs required to upgrade the existing sysm tesee topical chapters of text. -
k4 = Not applicable. "y
Table 3-1. (Cont.'.nued)
Option 2 Option 3 Option 4
toric —Nil Historic Full Historic Full
Rate Buildout Rate Buildout Rate Buildout
No impact. . No impact.
None. None.
None required. None required.
No impact.c too impact.c
None. None.
None required. None required.
No impact.c
Generation of
$247,600 ir. annual
revenues and
$340,700 in annual
costs. Annual
deficit of
$93,000, repre-
senting a 27
percent shortfall
in annual
revenues.
Significant.
Adopt and imple-
ment a different
land use mix;
designate the
Study Area as a
redevelopment
area; designate
the Study Area as
an cssessment
district.; desig-
nate the Study
Area as a Mello -
Roos Community
Facilities
District.
$4.9 million in
capital improve-
ments to the
city's water,
sewerage, and
drainage systems.
h
NA
NA
No impacts Increase in the
None. None.
Is None required. None required.
peak hourly flow
rate of 1.9 MGD.
Significant.
Construct one well
and install 5,000
If of 12 -inch
trans$ission
line.
Generat'�)n of
$2,731,900 in
annual revenues
and 53,906,700 in
annual costs.
Annual deficit of
$ .,174,800, repre-
senting a 30
percent shortfall
in annual
revenues.
Significant.
Adopt and imple-
ment a different
land use mix;
designate the
Study Area as a
redevelopment
area; designate
the Study Area as
an assessment
district; desig-
nate the Study
Area as a Mello -
Roos Community
Facilities
District.
S15 million in
capital improve-
ments to the
city's water,
sewerage, and
drainage systems b
Increase in the
peak hourly flow
rate of 19 MGD.
Significant.
Construct seven
wells and install
5,000 If of
14 -inch and 33,000
If of 12 -inch main
transBission
line.
Generation of
$468,700 in annual
revenues and
$633,700 in annual
costs. Annual
deficit of
$165,000, repre-
senting a 26
percent shortfall
in annual
revenues.
Significant.
Adopt and imple-
ment a different
land use mix;
designate the
Study Area as a
redevelopment
area; designate
the Study Area as
an assessment
district; desig-
nate the Study
Area as a Mello -
Roos Community
Facilities
District.
$4.9 million in
capital improve-
ments to the
city's water,
sewerage, and
drainage systems.b
0,
Increase in the
peak hourly flow
rate of 3 MGD.
Significant.
Construct two
wells and install
5,000 if of
12 -inch main
trans$iss ion
line.
level.
ed measure does not reduce impacts to a less -than -significant level.
s of Performance Standards.
improvements. This impact includes both the lncrerenta capital costs and improvements under Option 2.
ng system see topical chapters of text.
Generation of
$672,200 in annual
rever.ues and
$922,600 ii annual
costs. Annual
deficit of
$250,400 repre-
senting a 27
percent shortfall
in annual
revenues.
Significant.
Adopt and imple-
ment a different
land use mix;
designate the
Study Area as a
redevelopment
area; designate
the Study Area as
an assessment
district; desig-
nate the Study
Area as a Mello -
Roos Community
Facilities
District.
$6.2 million in
capital improve-
ments to the
city's water,
sewerage, and
drainage systems D
NA
NA
Increase in the
peak hourly flow
rate of 3.8 Mm.
Significant.
Construct two
wells and install
10,000 If of
12 -inch main
trans$ission
line.
s
Eli
Table 3-1.
Option 1 Option
Topic Historic Full Historic
(EIR Chapter) Rate Buildout Rate
Nater (9) Impact Grid system Grid system No impacts No
(Continued) improvements would improvements
be required to would be required
meet fire flow to meet fire flow
requirements. requirements.
Signifi- Significant. Significant. None. Not
Cance
Mitigation Install 83,800 if Install 83,800 if None required. Nor
Measure of 8 -inch and of 8 -inch and
6,800 if of 6 -inch 6,800 If of 6-incb
pipe and 74 new pipe and 74 new
fire hydrants; fire hydrants;
adopt an Ordinance adopt an Ordinance
requiring fire- requiring fire -
suppressing suppressing
devices on $ew mf devices on $ew mf
structures. structures.
Impact $5,657,200 in $10,757,200 in No impacts N t
capital capital
improvements improvements
to the city'sb to the city$% K
water system. water system.
Signifi- NA Nil None. ?+
cense.
Mitigation NA NA None required ': )
Measure
--- ----- ----------- --------------------------�-----------~----------------
Sewerage Impact $1,815,000 in $4,469,000 in No impacts soh:
(10) capital capital
improvements to improvements to
the City's b the city's b G
trunk sewers. trunk sewers.
Signifi- NA NA None.
cane
Mitigation NA NA None required
Measure
impact 56,600 if of 84,500 If of No impacts
replacement colt replacement cols
lection sewers. lection sewers.
Signifi- Significant. Significant. None.r
Cance
Mitigation Install 56,000 if Install 84,500 if Note required Nt�
Measure of collEction of collfiction
sewers. sewers.
:4
Impact $6,282,600 in $9,379,500 in No impact.c NO
c-pita2 Improve -
capital improve-
ments to the meats to the
city's col- b city's col- b
lection sewers. lection sewers.
Underlined Im acts = Cannot be mitigated to a less -than. -significant level.
Asterisk ! following mitigation measure denote:; that the identified measure does not redtice-im
See Table 3-2 for recommended policies and implementation measures of Performance Standards.';'
b To accommodate new development, the existing system would require improvements. This impact:.1
C For improvements and capital costs required to upgrade the existing system see topical chapter
NA = Not applicable.
Table 3-1. (Continued)
Topic
Chapter)
Historic tion 1 Full Historic
Rate Buildout Rate
Option 2 Pull
Buildout
— Historic Option 3 gul—
Rate Buildout
(9) Impact
Grid system
Grid system No impnci.c
No impact
Grid system
Grid system
tined)
improvements would
improvements
impaovemeats would
improvements would
be required to
would be required
be requited to
be required to
meet fire flow
to meet fire flow
meet fire flow
meet fire flow
requirements.
requirements.
requirements.
requirements.
Signifi-
Significant.
Significant. None.
None.
Significant.
Significant.
cane
Mitigation
Install 83,800 1f
Install 83,800 If None required.
None required.
Install 60,300 if
Install 60,300 if
Measure
of 8-incb and
of 8 -inch and
of 8 -inch and
of 8 -inch and
6,800 if of 6 -inch
6,800 If of 6 -inch
16,000 if of
16,000 if of
pipe and 74 new
pipe and 74 new
6 -Inch pipe and 62
6 -inch pipe Bad 62
fire hydrants;
fire hydrants;
new fire hydrants;
new fire hydrants;
adopt an Ordinance
adopt an Ordinance
adopt an Ordinance
adopt an Ordinance
requiring fire-
requiring fire-
requiring fire-
requiring fire -
suppressing
suppressing
suppressing
suppressing
devices on $ew mf
devices on new mf
devices on Few mf
devices on $ew mf
structures.
structures.
structures.
structures.
Impact
$5,657,200 1n
$10,757,200 in No impe+:t.c
No impact.c
$3,985,100 in
$7,825,100 in
capital
capital
capital
capital
improvements
improvements
improvements
improvements
to the city's,
to the clty'ab
to the city'sb
to the city'sb
water system.
water system.
water system.
water system.
Signifi-
NA
NA None.
None.
NA
NA
tante
- Mitigation
NA
NA None required.
None required.
Nit
NA
Measure
_rage Impact
$1,815,000 in
$4,469,000 In No Impacts
No fact
S1,817,000 in
$3,487,000 in
capital
capital
capital
cepital
Improvements to
improvements to
improvements to
improvements.
the city's b
trunk
the city's b
the city's b
trunk
the city's b
sewers.
trunk sewers.
sewers.
trunk severs. ,, ,:N .'
Signifi-
HA
NA None.
None.
NA
NA
canoe
Mitigation
NA
NA None required.
NA
NA
NA
-- --
Measure
Impact
56,600 if of
84,500 if of No impacts
No impact
.7,900 if of
84,500 if of
replacement col-
replacement col-
replacement col
replacement co
lection sewers.b
lectlan sewers.b
lection sewers.s
lection sewers..
Signifi-
canoe
Significant.
Significant. None.
None.
Significant.
Significant
Mitigation
Install 56,000 if
Install 84,500 if None required.
None required.
Install 27,900 if
Install 94,506
Measure
of collection
of collection
of collection
of eollfictioq ?.
sewers.
sewers.
sewers.
sewers.
Impact
$6,282,600 in
$9,379,503 in No imp+ct.c
No impact c
53,096,900 in
$9,3791500 Say
capital improve-
capital improve-
capital improve-
capital improvo,
ments to the
meats to the
meats to the
menta to the rN7
City's col- b
city's col- b
city's col-,
city's col-'%-
lection sewers.
lection se+trs.
lection sewers.
lection seve4 -=
:erlined Impacts a Cannot
be mitigated to a less -than -significant level.
�.eris of wing mitigation measure denotes
that the identified measure does not reduce impacts to a less -thaw -significant level.
gee Table 3-2 for recommended policies and implementation measures of Performance Standards.
-
'o accommodate new development, the existing system would require improvements. This
impact includes both the incremental capital costs and impl� :
=or improvements and capital costs required to upgrade the existing system Be* topical
chapters of text.
'
= Not applicable._!.
Table 3-1. (continued)
- Historic
Rate
_ Rate
Option 2
Full
Buildout
0^tion 3
..istnric u a
Rate Buildout
Option 4
HistoricFull
trate Buildout '
r impact.c
No Impact-
Grid system
Grid system
Grid system
Grid system
improvements would
lmprovrsvuts would
improvements would
improvements would
be required to
be required to
be required to
be required to
meet fire flow
meet fire flow
meet fire flow
meet fire flow
-
requirements.
requirements.
requirements.
requirements.
I ae.
None.
Significant_
Significant.
Significant.
Significant.
.ae required.
None required.
Install 60,300 if
Install 60.300 if
Install 33,800 If
Install 33,800 If
Of 8 -inch and
of 8 -inch and
of S -Inch and
of 8 -inch and
'
16,000 If of
16,000 if of
26,800 if of
26,800 If of
6 -inch pipe and 62
6 -inch pipe and 62
6 -inch pipe and 45
6 -inch pipe and 45
new fire hy.tr'ants;
new fire hydrants;
new fire hydrants;
new fire hydrants;
adopt an Ordinance
adopt an ordinance
adopt an Ordinance
adopt an Ordinance
requiring fire-
requiring fire-
requiring fire-
requiring fire -
suppressing
suppressing
suppressing
suppressing
devices on Bev mf
devices oo BOW mf
devices on Bev mf
devices on Bev mf
structures.
structures.
structures.
structures.
,i, impact.c impact.c
No impact.c
$3,985,100 in
$7,825,100 in
S3,440,000 in
$4,100,000 In
capital
capital
capital
capital
improvements
improvements
improvements
improvements
to the city'sb
to the clty'sb
to the clty'sb
to the city'sb
water system_
water system.
water system.
water system.
--�e.
None.
NA
NA
NA
NA
t�nne required.
None required.
NA
NA
NA
NA
:a impact.c
No impact.c
$1,817,000 in
$3,487,000 in
$2,077,000 in
$2,642,000 in
capital
capital
capital
capital
Improvements tofmprovments
to
improvements to
improvements to
the cup's b
the cut' s b
the city's b
the city's b
)
trunk sewers.
trunk sewers.
trunk severs.
trunk sewers.
None.
NA
NA
NA
NA
A; one required.
i
NA
NA
Nk
NA
NA
'�`o impact.c
No impact.c
27,900 if of
84,500 if of
11,300 if of
16,900 If of
replacement rnlb
replacement cols
replacement co16
replacement uro15
lection sev`rs.
lection severs.
lection sewers.
lection sewers -
t, -,one.
None.
Significant.
Significant.
Significant.
Significant.
>-tnne required.
None required.
Install 27,900 If
Install 84,500 if
Install 11,300 if
Install 16,900 if
Of collection
of collection
of collection
of collgction
sewers.
sewers.
sewers.
sewers.
vo impact
No impact
53,0%,900 in
59,379,500 in
$1,335,000 in
$1,832,000 is
capital improve-
capital improve-
capital improve-
capital improve-
ments to the
ments to the
meats to the
Monts to the
city's col- b
city's col-
city's col- b
city's col-
lection sewers.
b
lection sewers.
lection severs.
lection severs.
t
'_-asure does not reduce impacts to a less -than -significant level.
"Performance Standards.
t0vements. This
impact inclades both the incremental capital costs and Improvements under Option 2.
c:stem see topical
chapters of text.
i
1:
i
6
Table 3-1.
Option I
option 2
Topic
Historic
Pull Historic
p
= .Chapter)
Rate
Buldout Rate
Sewerage Signifl-
NA
NA None.
Non
(10) Cauca
.
(Continued)
Mitigation
NA
NA None required.
Nor
Measare
Impact
Sewer capacity
Sewer capacity No impact c
No
deficiencies in
deficiencies in
1,630 if of trunk
15,675 if of
severs and 27,900
trunk sewers and
If of Vlection
56,600 1f of
severs.
collectgon
severs.
Signifl-
Significant.
Significant. None.
Nor,
canoe
Mitigation
Upgrade 1,630 If
Upgrade 15,675 If None required.
Nor
Measure
of trunk severs
of trunk sewers
and 27,900 if of
and 56,600 If of
collect4on
collection
sewers.
sewers.
-
---------------------------------------------------
------------------------------j
Drainage (11) Impact
Increased runoff
Increased runoff No impact.
No
due to larger
due to larger
impervious
impervious
S
surfaces,
surfaces,
resulting in
resulting In
ponding ♦t cath
basins and
ponding at catch
basins and
}
ilooding in $Ileys
flooding in $lleys
i
and gutters.
and gutters.
3
Sigalfl-
Significant (if
Significant. None.
carie
development oocnrs
In conoemtrated
areas).
5
Mitigation
provide additional
Provide additional None required.
`
Xoz
Measure
storm drains=
storm drains,
s
develop
develop
performenog
perfoxmancS
standards:
standards:
i
G Continue to
o Continue to
develop, or
develop, or
=
update and
update and
enforce commu-
enforce cocmu-
aity design
nity design
policies as part
policies as part
"
of the SPARC b
of the SPARC b
requirements.
requirements.
s
Impact
Stora drainage
Storm drainage No impacts
pipe b
pipe b
deficiencies.
deficiencies:
Underlined Impacts v Cannot
be mitigated to a less -than -significant level.
Asterisk foil -owing mitigation measure denotes
that the identified measure does not
reduce._I
Sea Table 3-2 for recommended policies and implementation measures of performance Stsndird --
b
To accommodate new development, the existing system would require improvements. This-:i;paCC:.-
c For improvements and capital costs required to upgrade the existing system see topical Chap
NA a Not applicable.
Table 3-1. (Continued)
Option 1
Option 2
Option 3
Historic
Full
Historic Full
Historic
-r)
Rate
Buildout
Rate Buildout
Rate
Buildout
Signifi-
NA
NA
None. None.
NA
NA
N.\
,Once
Mitigation
NA
NA
None required. None required.
NA
NA
NA
Measure
Impact
Sever capacity
Sewer capacity
No Impact -c No impact c
Sever capacity
Sever capacity
Sever
deficiencies in
deficiencies in
deficiencies in
deficiencies in
def=t.
1,630 If of trunk
15,675 if of
1,750 lg of trunk
10,570 If of trunk
3,255
severs and 27,900
trunk severs and
sewers.
severs and 56,600
sewer_
if of c813ection
56,600 If of
if of c$llection
If of
severs.
collecquo
severs.
sever:
sewers.
Signifi-
tante
Significant.
Significant.
None. None.
Significant.
Significant.
S. 'r'!
Mitigaticn
Upgrade 1,630 if
Upgrade 15,675 If
None required. None required.
Upgrade 1,750 If
Upgrade 10,570 If
Upgra-
Measure
of trunk sewers
of trunk severs
of trunk severs.
of trunk severs
of t>
and 27,900 If of
and 56,600 if of
and 56,000 lf.of
and 1
collection
collecquo
collectAon
colla
severs.
severs.
severs.
sever-
--------------------------------------------------------------------------------------------------------------------------------------------
tl) Impact
Increased runoff
Increased runoff
No impact. No impact.
Increased runoff
Increased runoff
Inge
due to larger
due to larger
due to larger
due to larger
due t
Impervious
impervious
impervious
impervious
impel
surfaces,
surfaces,
surfaces,
surfaces,
surfs
resulting in
resulting in
resulting in
resulting in
resui
ponding at catch
ponding at catch
ponding at catch
ponding at catch
pondl
basins and
basins and
basins and
basins and
bas L•=
flooding in $lleys
flooding in 911eys
flooding in SIleys
flooding in glleys
floor
and gutters.
and gutters.
and gutters.
and gutters.
and c
wt,r,,.
Only .'
signifi-
Significant (if
Significant.
None. None,
Significant (if
Significant.
Si
tante
development occurs
developwent occurs
In concentrated
in concentrated
areas).
areas).
Mitigation
Provide additional
Provide additional
None required. None required.
Provide additional
Provide additional
PSovi
Measure
storm drains;
storm drains;
storm drains;
storm drains=
atom
develop
develop
develop
develop
deve!
perforwancg
performenc&
performnnofi
perforwancl.
pert,
standards:
"standards.
staadards:
":,standards:
Stan,
o Continue to
o Continue to
o Continue to
o Continue to
0 CO:
develop, or
develop, or
develop, or
develop, or
:de -
update and
update and
update and
update and
-:UP,
enforce commu-
enforce commu-
enforce comma-
enforce commu-
en:
nity design
nity design
nity design
nity design
nit
policies as part
policies as part
policies as part
policies as part
po:
of the SPARC D
of the SPARC b
of the SPARC
of the SPARC
of
requirements
requirements
requirements.D
requirements.D
re..
Impact
Stora drainage
Storm drainage
No Impect.c No Impacts
Storm drainage
Storm drainage
Stor,
pipe b
deficiencies,
pip- b
deficiencies.
pipe b
deficiencies.
pipe b
deficiencies.
pipe
deli•
-:�d�Imactss = Cannot
be mitigated to a les3-than-slgaificant level.
if) following mitigation measure denotes
that the identified
measure does not reduce impacts to a
less -than -significant level.
:le 3-2 for recommended policies and implementation measures of Performance Standards.
-
,amodate new development, the existing system would require improvements. This impact includes both the incremental capital costs and Improvements.ruide
uovements and capital costs required to upgrade the existing
system sea topical chapters of text.
applicable.
-
Table 3-1. (Continued)
Option 2
Option 3
Option 4
Historic Full
Historic
historic
F6T1
Rate Buildout
Rate
Bulldout
Rate
Buildout
None. None.
NA
NA
NA
NA
None required. None required.
NA
NA
NA
NA
No Impact.' No impact .c
Sever capacity
Serer capacity
Sever capacity
Sever capacity
deficiencies in
deficiencies in
deficiencies in
deficiencies in
1,750 1t of trunk
10,570 If of trunk
56,600
3,2`_5 if of trunk
6,480 If of trunk
severs.
severs and
If of cgllection
severs and 1,350
if of 91lection
severs and 6,950
if of cBllection
severs.
severs.
severs.
None. None.
Significant.
Significant.
Significant.
Significant.
Vone required. None required.
Upgrade 1,750 Ifb
Upgrade 10,570 if
Upgrade 3,255 if
Upgrade 6,480 if
of trunk severs.
of trunk severs
of trunk severs
of trunk severs
and 56,000 if of.
and 1,350 if of
and 6,950 if of b
-
collectdon
0ollect4on
collection severs_
sewers.
------
sewers.
.--------- —---------------------------------------------------------------
No impact. No impact.
Increased runoff
-'
Increased runoff
--------------------
Increased runoff
----- `-------- -----
Increased runoff
due to larger
- due to larger
due to larger
due to larger
impervious
impervious
impervious
impervious
surfaces,
surfaces,
surfaces,
surfaces,
resulting in
resulting in
resulting in
resulting in
ponding at catch
ponding at catch
ponding at catch
ponding at catch
basins and
basins and
basins and
basins and
flooding in alleys
flooding in alleys
flooding in alleys
flooding in alleys
and gutters,
and gutters.
and gutters in the
and gutters in the
"target areas.
•target areas"
only.
only.
None. None,
Significant (if
Significant.
Significant.
Significant.
development occurs
in concentrated
areas).
None required. None required.
Provide rddltional
Provide addit1vnal
Provide additional
Provide additional
storm drains;
storm drains;
storm drains;
storm drains;
develop
develop
develop
develop
performan%
performance
performancl
performanci
standards:
standards:
standards:
standards:
o Continue to
o Continue to
o Continue to
o Continue to
develop, or
develop, or
develop, or
develop, or
update and
update and
update and
update and
enforce commu-
enforce commu-
enforce commu-
enforce commu-
nity design
nity design
nity design
nity design
policies as part
policies as part
policies as part
policies as part
of the SPARC bof
the SPARC b
of the SPARC b
of the SPARC b
requirements.
requirements,
requirements,
requirements.
No ixpact.c No impact.c
Storm drainage
Storm drainage
Storm drainage
Storm drainage
pipe b
pipe b
pipe b
pipe b
deficiencies.
deficiencies.
deficiencies.
deficiencies.
al .
easure does not reduce impacts to a less -than -significant level.
Performance Standards.
-ovements. This impact includes both the incremental capital
costs and improvements under Option 2.
rstem see topical chapters of text.
7
Table 3-1.
Option I Option
Topic Historic Full Historic
(EIR Chapter) Rate Buildout Rate
Drainage (11) Signifi- Significant. Significant. None.
(Continued) canoe
Mitigation Install needed Install needed b None required.
Measure storm drain pipe:b storm drain pipe:
o 18- and 21 -inch o 18- and 21 -inch
pipe on Acacia pipe on Acacia
0 18 -inch pipe on o 18-incb pipe on
Vine, Cherokee, Vine, Cherokee,
P-)plar, and Poplar, and
Garfield Garfield
o 21 -Inch pipe on o 21 -inch pipe on
Vine Vine
0 18 -inch pipe on o 18 -inch pipe on
Flora Flora
0 15-, 21-, an9 ci 15-, 21-, and
30 -inch pip. on 30 -inch pipe on
Hutchins, Ela, Hutchins, Elm,
and Locust and Locust
0 15-, 18-, 21-, 0 15-. IP-, 21-,
and 30 -inch pipe and 30 -inch pipe
on Calaveras, on Calaveras,
Lockeford, and Lockeford, and
Cen•.ral Central
0 15- and 18 -inch o 15- and 18 -inch
pipe on Olive pipe on Olive
0 12 -inch pipe on o 12-incb pipe on
Forrest Forrest
,i
Impact Inadequate Inadequate No impact.
revenues generated revenues
to finance storm generated to
'
drainage system finanne storm
improvements. drainage system
improvements.
Siguifi- Si�nificAmt. Significant. None.
cane
Mitigation Use .a -Tract Use Infract None required.
Measure fund:; establish funds; establish
an asausssent an assessment
district in the district in the
1
Study Area; Study Area;
establish a establish a
citywide storm citywide storm
drainage main- drainage —1n-
tenance and tenance and
Underlined Ink -acts . Cannot be mitigated to a less -then -significant levet.
j
Fjter-s o owing mitigation measure denotes that the identified measure does not re
See Table 3-2 for recommended policies and implementation measures of Performance Stand
b To accommodate new development, the existing system would require Improvements. This L
C For improvements and capital costs required to upgrade the existing system see topical
i
NA Not applicable.
Noe
Nor
�k
None
None
Table 3-1. (Continued)
Topic Historic tion I Full
Historic tion 2 ' pull
Historic tion 3 Full
(EIR Chapter) Rate Buildout Rate Buildout Rate Buildout
Drainage (11) Signi'fl-
(Continued) canoe
Mitigation
Measure
Significant. Significant- None. None.
Install needed b
Install needed b None required. None required.
storm drain pipe:
storm drain pipe:
o 18- and 21 -inch
o 18- and 21 -inch
pipe on Acacia
pipe on Acacia
0 18 -inch pipe on
o 18 -inch pipe on
Vine, Cherokee,
Vine, Cherokee,
Poplar, and
Poplar, and
Garfield
Garfield
o 21 -inch pipe on
o 21 -inch pipe on
Vine
Vine
o 18-incb pipe on
o 18 -inch pipe on
Flora
Flora
0 15-, 21-, and
o 15-, 21-, and
30 -inch pipe on
30 -inch pipe on
Hutchins, Elm,
Hutchins, Ela,
and Locust
and Locust
0 15-, 18-, 21-,
0 15-, 18-, 21-,
and 30 -inch pipe
and 30 -inch pipe
on Calavere?;
on Calaveras,
Lockeford, and
Lockeford, and
Central
Central
o IS- and I8-incb
o 1 - and Winch
pipe on Olive
pipe on Olive
0 12-incb pipe on
o 12 -inch pipe on
Forrest
Forrest
Significant. Significant.
Install needed bInstall neede%
storm drain pipe: storm drain F=
0 18- and 21-incb o 18- and 21
pipe on Acacia pipe on Aca_
0 18 -inch pipe on o 18 -inch pil:-
Vine, Cherokee, Vine, Cbem
Poplar, and Poplar, and
Garfield Garfield
0 21 -inch pipe on o 21 -inch pip,
Vine Vine
0 18 -Inch pipe on o 18 -inch pip,
Flora Flora
0 15-, 21-, and o 15-, 21-, ar
30 -inch pipe on 30 -inch pip, -
Hutchins, Elm, Hutchins, El-
and Locust and Locust
0 15-, 18-, 21-, o 15-, 18-, 21
and 30 -inch pipe and 30 -inch
on Calaveras, on Calaveras.
Lockeford, and Lockeford, a
Central Central
o IS- and 18 -inch o 15- arA 18-i.
pipe on Olive pipe on Oliw
0 12-incb pipe on 0 12-1nch pipe
Forrest Forrest
Impact Inadequate Inadequate No impact. No impact.
Inadequate
Inadequate
revenues generated revenues
revenues generated
revenues g®ere
to finance storm generated to
to finance storm
to finance stow
drainage system finance storm
drainage system
drainage systee
improvements. drainage system
improvements.
improvements.
improvements.
Signifi- Significant. Significant. None. None.
Cance
Significant.
Significant. ;.
Mitigation Use In -Tract Use In -Tract None required. None required.
Use In -Tract
Use In Tract ;
Measure funds; establish funds; establish
funds; establish
funds; establis'
an assessment an assessment
an assessment
an assessment
district in the district in the
district in the
district in the
Study Area; Study Area;
Study Area;
Study Area;
establish a establish a
c+stablish a
establish a
citywide storm citywide storm
citywide storm
citywide storm
drainage main- drainage main-
drainage main-
drainage main-
tenance and tenance and
tenance and
tenance and
Underlined Impacts = Cannot be mitigated to a less-tnan-significant level.
terisk (*) fol ing mitigation measure donotes that the identified measure does Dot reduce impacts to a less-than-significaut level.
See Table 3-2 for recommended policies and implementation measures of Performance Standards.
b To accommodate new development, the existing system would require improvements. This impact includes both the incremental capital costs and improve:
C For improvements and capital costs required to upgrade the existing system see topical chapters of text.
NA = Not applicable.
r
Table 3-1. (Continued)
Option 2
Option 3
__ Option 4
Eistoric Furl-
Historic
Full
Historic
Full
Rate Buildout
Rate
B Ildout
Rate
9ui ldout
None.
Significant,
Significant.
Significant.
Significant.
-equired. None required.
Install neededb
Install needed b
Install needed
Install needed
Stora drain pipe:
store drain pipe:
drain pipe:
drain pipe:
o IS- and 21 -inch
o 18- and 21 -inch
O 18 -inch pipe on
o 18-incb pipe on
pipe on Acacia
pipe on Acacia
Acacia
Acacia
o 18 -inch pipe on
o 18 -inch pipe on
o 18-, 24-, and
o 18-, 24-, and
Vine, Cherokee,
Vine, Cherokee,
30 -inch pipe on
30 -inch pipe on
Poplar, and
Poplar, and
Vine, Cherokee,
Vine, Cherokee,
Garfield
Garfield
Poplar, and
Poplar, and
Garfield
Garfield
0 21 -Inch pipe on
o 21 -inch pipe on
Vine
Vine
o 28 -inch pipe on
o 18 -inch pipe on
Vine
Vine
0 18 -inch pipe on
o 18 -inch pipe on
Flora
Flora
o 15 -Inch pipe on
o 15 -inch pipe on
f
Flora
Flora
o 15-, 21-, and
o 25-, 21-, and
30 -inch pipe on
30 -inch pipe on
o 15-, 21-, and
o 15-, 22-, and
Hutchins, Ela,
Hutchins, Ela,-
30 -inch pipe rn
30 -inch pipe on
and Locust
and Locust
Hutchins, Ela,
Hutchins, Ela,
and Locust
and Locust
o 15-, 18-, 2I-,
o 15-, I8-, 21-,
and 30 -inch pipe
and 30 -inch pipe
o 15-, 18-, 21,
o 15-, 18-, 21,
on Calaveras,
on Calaveras.
and 30 -inch pipe
and 30-incb pipe
Lockeford, and
Lockeford, and
on Hutchins,
on Hutchins,
Central
Central
Ela, and Locust
Ela, and Locust
o IS- and 18 -Inch
o 15- and 18 -Inch
o 15-, 18-, 21-,
o 15-, 18-, 21-,
pipe on Olive
pipe on Olive
and 30 -inch pipe
rad 30-incb pipe
on Calaveras.
on Calaveras, .
0 12 -inch pipe on
o 12 -inch pipe on
Lockeford, and
Lockeford, and
Forrest
Forrest
Central
Central
o is- and 18 -Such
o 15- and 18 -inch
pipe on Olive
pipe on 011ve
t
o 12 -inch pipe on
o 12 -inch pipe on
Forrest
Forrest
pact. No impact.
Inadequate
Inadequate
Inadequate
Inadequate
revenues generated
revenues generated
revenues generated
revenues generated
to finance storm
to finance storm
to finance storm
to finance storm
drainage system
drainage system
drainage system
drainage system
improvements.
Improvements.
improvements.
improvements.
None.
Significant.
Significant.
Significant.
Significant.
required. None required.
Use In -Tract
Use In-T_act
Use In -'Pratt
Use In -Tract
funds; establish
funds; establish
funds; establish
funds; establish
an assessment
an assessment
an assessment
an assessment
district in the
district In the
district In the
district in the
Study Area;
Study Area;
Study Area;
Study Area;
establish a
establish a
establish a
establish a
citywide store
citywide storm
citywide storm
citywide storm
drainage main-
drainage main-
drainage main-
drainage main-
tenance and
tenance anu
Lenance and
tenance and
s not reduce impacts to a less -than -significant level-
ce Standards.
This impact includes both the incremental capital costs and improvements under Option 2.
topical chapters of text.
s
pe , —
year. year.
Signifi- Less than Less than None. Non
cance significant significant
Mitigation None required. None required. None required. Non
Measure
Police Impact Increased demand Increased demand No impact. No
Protection for police for police
(13) services. services and
facilities.
Signifi- Significant. Significant. None. Non,
canoe
mitigation Hire five police Hire 52 police None required, lion
Measure officers, two 'officers, 22:;..:
support staff, and support staff,
purchase two and purchase 16
patrol cars, patrol cars;
e, ,and or build
new police
facilities.
Impact Increased Increased No impact.
vandalism. vandalism.
Signifi- Significant. Significant. None. Nom
cane
Mitigation Develop Develop None required. Boni
Measure performnno& perform"
stendazds: standards:
Underlined Impacts a Cannot be mitigated to a less -than -significant level.
jilifisk-TwY following mitigation measure denotes that the identified measure does not reduce iq
See Table 3-2 for recommended policies and implementation measures of Performance Stenderdi
b To accommodate new development, the existing system would require improvements. This impaet,if
c For improvements and capital costs required to upgrade the existing system see topical dapter;
NA = Not applicable.
>4
{
L ':
Table 3-1.
Option 1
option 2
Topic
iii-siric
Historic
(EIR Chapter)
Rate
Buildout
Rate
Drainage (11)
improvement
improvement
(Continued)
district; adopt a
district; adopt a
special East Side
special East Side
storm drainage
storm drainage
fee.
fee.
Impact
S874,000 in
$874,000 in
No Impact.c
No t�.
capital
capital
improvements to
improvements to
the city's stormb
the city's storms
drainage system.
drainage system.
Signifi-
cance
NA
NA
None.
Non:
!litigation
NA
NA
None required.-
Non,-
measure
Solid Waste
Impact
Solid waste
Solid waste
No impact.
No s,
(12)
generation of
3 559 tons r
generation of
40 545 tons r
pe , —
year. year.
Signifi- Less than Less than None. Non
cance significant significant
Mitigation None required. None required. None required. Non
Measure
Police Impact Increased demand Increased demand No impact. No
Protection for police for police
(13) services. services and
facilities.
Signifi- Significant. Significant. None. Non,
canoe
mitigation Hire five police Hire 52 police None required, lion
Measure officers, two 'officers, 22:;..:
support staff, and support staff,
purchase two and purchase 16
patrol cars, patrol cars;
e, ,and or build
new police
facilities.
Impact Increased Increased No impact.
vandalism. vandalism.
Signifi- Significant. Significant. None. Nom
cane
Mitigation Develop Develop None required. Boni
Measure performnno& perform"
stendazds: standards:
Underlined Impacts a Cannot be mitigated to a less -than -significant level.
jilifisk-TwY following mitigation measure denotes that the identified measure does not reduce iq
See Table 3-2 for recommended policies and implementation measures of Performance Stenderdi
b To accommodate new development, the existing system would require improvements. This impaet,if
c For improvements and capital costs required to upgrade the existing system see topical dapter;
NA = Not applicable.
>4
{
L ':
Table 3-1. (Continued)
Underlined lmp�acts - Cannot be mitigated to a less-tban-significant level.
er s following mitigation measure denotes that the identified measure does not reduce impacts to a less -than -significant level.
See Table 3-2 for recommended policies and implementation measures of performance Standards.
b To accommodate new development, the existing system would require improvements. This impact includes both the incremental capital costs and
C For improvements and capital costs required to upgrade the existing system see topical chapters of text.
NA = Not applicable.
Option 1
_
Option 2
Option 3
Topic
Historic
'�4-iT
Historic
hill`
`Historic
iSilT -
R Chapter)
Rate
Buildout
Rate
Buildout
Rate
Buildout
linage (11)
improvement
improvement
improvement
improvement ,
ontinued)
district; adopt a
district; adopt a
dastrict; adopt a
district; adopt a c:
special East Side
special East Side
special East Side
special Fast Side _
storm drainage
storm drainage
storm drainage
storm drainage
fee,
fee.
fee.
fee.
Impact
$874,000 in
$874,000 in
No impact•c
No impact.c
$874,000 in
$874,000 in ,
capital
capital
capital
capital
improvements to
improvements to
improvements to
improvements to
the city's stormb
the city's stormb
the city's stormb
the city's gtor% -
drainage system.
drainage system.
drainage system_
drainage system.
Signifi-
Nk
NA
None.
None.
NA
NA
cane
Mitigation
NA
NA
None required.
None required.
NA
NA
Measure
lid Haste
Impact
Solid waste
Solid waste
No impact.
No impact.
Solid waste
Solid waste.
i2)
generation of
generation of
generation of
generation of
3,559 tons per
40,545 tons per
2,190 tons per
24,950 tons per
year.
year.
year.
year.
Signifi-
Less than
Less than
None.
None.
Less than
Less than -
cance
significant
significant
significant.
significant. -
Mitigation
None required.
None required.
None required.
None required.
None required.
None required.! !._...
Measure
?olice
Impact
Increased demand
Increased demand
No impact.
No impact.
Increased demand
Increased daro;d,°
?rotection
for police
for police
for police
for police
(13)
services.
services and
services.
services asg
facilities.
facilities.:kF;:
Signifi-
Significant.
Significant.
None.
None.
Significant.
Siggificant:z::r';;kM
canoe
>--"-
Mitigation
Hire five police
!lire 52 police
None required.
None required.
Hire three police
Hire 32 pollclll,:,
Measure
officers, two
officers, 22
officers, two
officers, 14x`•;_:
support staff, and
support staff,
support staff, and
support stftff;`s
purchase two
and purchase 16
purchase one
purchase 10 patmi
patrol cars.
patrol cars;
patrol car,
cars; expand'='cry
expand or build
build new po110e=
new police
facilities ',?
facilities.
Impact
Increased
Increased
No impact.
No impact.
Increased
Increased
vandalism.
vandalism.
vandalism.
vandalism. ,
Signifi-
Significant.
Significant.
None.
None.
Significant.
Signiiicant:.,'�'xe"+-._
canoe
r #'
Mitigation
Develop
Develop
None required.
None`
required.
Develop
Develop
Measure
performancff
performancff
performancS
perform=
standards:
stand":
standards:
standards
Underlined lmp�acts - Cannot be mitigated to a less-tban-significant level.
er s following mitigation measure denotes that the identified measure does not reduce impacts to a less -than -significant level.
See Table 3-2 for recommended policies and implementation measures of performance Standards.
b To accommodate new development, the existing system would require improvements. This impact includes both the incremental capital costs and
C For improvements and capital costs required to upgrade the existing system see topical chapters of text.
NA = Not applicable.
Table 3-1. (Continued)
9
Option 2
Option 3
Option 4
nlsxor c
Rate
tSZ'��
Buildout
--Fistoz cid—
Rate
Buildout
His�r�—
Rate
Full
Bulldaut
improvement
improvement
improvement
improvement
district; adopt a
district; adopt a
district; adopt a
district; adopt a
special East Side
special Fast Side
special Fast Side
special East Side
storm drainage
storm drainage
storm drainage
storm drainage
fee.
fee.
fee.
fee.
No impacts
No impacts
5874,000 in
$874,000 1n
$1,295,OOo in
$1,295,000 In
capital
capital
capital
capital
improvements to
improvements to
improvements to
improvements to
the city's stormb
the city's stormb
the city's stnrs�
the city's storm,
drainage system.
drainage system,
drainage system.
drainage system.
None.
None.
NA
NA
NA
NA
None required.
None required.
NA
NA
HA
NA
No impact.
No impact.
Solid waste
;olid waste
Solid waste
.;olid waste
generation of
ganeration of
generation of
generation.of
2,190 tons per
24,950 tons per
3,559 tons per
5,232 tons per
year.
year.
year.
year.
None.
None.
Less than
Less than
Less than
Less than
significant.
significant.
significant,
significant.
None required.
None required.
None required.
None required.
None required.
None required.
No impact.
No impact.
Increased demand
Inueaaad 6esapd
Increased demand
Increased demand
for police
for polio
for police
for police
services.
services and
services.
services.
facilities.
None.
None.
Significant.
Siguificant.
Sigaiflcant.
Significant.
None required.
None required.
Hire three police
Hire 32 police
Hire five police
Hire seven police
officers, two
officers, 14
officers, two
officers, three
support staff, and
support staff, and
support staff, and
support staff, and
purchase one
purchase 10 patrol
purchase two
purchase two patrol
patrol car.
cars; expand or
patrol cars.
cars.
build new police
facilities.
No impact.
No impact.
Increased
Increased
Increased
Increased
vandalism.
vaudalim.
vandalism,
vandalism.
None.
None.
Significant.
Significant.
Significant.
Significant.
None required.
None required.
Develop
Develop
Develop
Develop
performancl
performnnc�
performancf
performance
standards:
standards:
standards:
standards:
a2.
aasure does not reduce
impacts to a less -than -significant level.
Performance Standards.
rovments. This
impact includes both the incremental capital costs and improvements under Option 2.
,stem see topical
chapters of text.
9
Table 3-
Option 1 Option
� Topic Historic FullAis crit
2 (EIR Chapter) Rate Buildout Rate
Police o Amend SPARC o Amend SPARC
Protection requirements to requirements to
(13) require archi- require archi-
(Continued) tectural control tectural control
of "vandal- of 'vandal -
resistant ' resistant
materials." materials."
Fire Impact Increased demand Increased demand No Impact. N,
Protection for fire for fire
(14) protection protection
services. services and
facilities.
Slgnifi- Significant. Signiflcaut. None. N.
tante
Mitigation Hire four fire Hire 42 fire None required. N
Measure fighters. fighters; purchase
new fire fighting
vehicles; expand
or build new
facilities.
Impact Increased fire Increased fire No impact. N•:
bazard, hazard.
Signifi- Significant. Significant. None. N<
teats
Mitigation Develop perfor- a Develop perfor- a None required. NL
Measure .sacs standards: Samoa standerds:
o Require nw of o Require new mf
units to be units to be
equipped with equipped with
sprinkler aprimkler
systems. systems.
Schools (35) Impact 648 (377 K-6 90 6'458 (4,295 K-6 No impact. Nv
Students '�
jra set
d. students
generated.
Signifl- Significant- Significant- None.
canoe unavoidable. unavoidable (with
available funding
mechanisms).
Mitigation Hire 25 teachers, Hire 298 teachers, None required.
Measure one administrator, 32. administrators,
one custodian, one 32 custodians, 32
clerical staff, clerical staff. -
three kitchen and 47 kltcbec:
staff, and staff and
purchase eight construct six
Onderl�uPacts ` Cannot be mitigated to a less -than -significant level.
teris o owing mitigation measure denotes that the identified measure does not re&Ace i
See Table 3-2 for recommended policies and implementation measures of Performance StandazCs.
b To accomodate new development, the existing system would require improvements. This Impact
c For improvements and capital costs required to upgrade the existing system see topical cbspte
NA " Not applicable.
Table 3-1. (Continued)
Topic
:R Chapter)
Option 1 _
Historic Full
Rate Buildout
option 2
Historic Ful 1
Rate Buildout
Option 3
Historic Ful I
Rate Buildout
rice
o Amend SPARC
o Amend SPARC
7-8 and 951
o Amend SPARC
o Amend SPARC
>tectlon
requirements to
requirements to
requirements to
requirements to
31
require archi-
require archi-
require archi-
require archi-
>nt.innued)
tectural control
tectural control
unavoidable (with
tectural control
tectural control
of *vandal-
of "vandal-
available funding
of "vandal-
of "vandal -
resistant
resistant
Hire 298 teachers, Hone required. None required.
resistant
resistant
----------------------------------------------------------------------------------------------------------------------------------------------
materials."
materials."
18 administrators,
materials."
materials."
:e Impact
Increased drrand
Increased demand
No Impact. No impact.
Increased demand
Increased demand
otection
for fire
for fire
and 27 kltebea-=
for fire
for fire
-4)
protection
protection
construct six
protection
protection
;nderlined I cts = Cannot be mitigated to a less -than -significant level.
services.
services and
rsterisk (N) tolloving mitigation measure denotes that the identified measure does not reduce impacts to a less -than -significant level.
services.
services and
' To accommodate new development, the existing system would require improvements. This impact includes both
facilities.
For improvements and capital costs required to
upgrade the existing system see topical chapters of text.
facilities.
Siguifi-
Significant.
Significant.
None. None.
Significant.
Significant.
Cance
Mitigation
Hire four fire
Hire 42 fire
None required. None required.
Hire three
Hire 26 fire
Measure
fighters.
fighters; purchase
fire fighters.
fighters; pur�:hase
new fire fighting
new fire fighting
vehicles; expand
vehicles; expand
or build new
or build new
facilities.
facilities. --
Impact
Increased fire
Increased fire
No impact. No impact.
Increased fire
Increased fire
hazard.
hazard.
hazard.
hazard.
Signifi-
canoe
Significant.
Significant.
None. None.
Significant.
Significant. _
Mitigation
Develop perfor-
Develop perfor- °
None required. None required.
Develop perfor-
Develop perfor-
Measure
mance standardsia
mance standards:
mance standards: °
mance standards:°
o Require new of
o Require mew of
o Require naw of
o Require now of
units to be
units to be
units to be
units to be..
equipped with
equipped with
equipped with
equipped with:
sprinkler
sprinkler
sprinkler
sprinkler
systems.
systems.
systems,
systems.
•chools (15) Impact 648 (3771;-6 90
6,4 (4,295 K6t No impact. No impact.
399 (232 K -6L 56
4,564 (2,643 K-fi
-u en7 136 y-11)
1 031 7-8 and
_and 8 63 9TH)634
7-8 and 951
nt
s-
geMr�ed.
geuera eed.
generated.
2i.'r--
signifi- Significant-
Significant- None. None.
Significant-
Significant-
Cance unavoidable.
unavoidable (with
unavoidable.
unavoidable (Ath
available funding
available funding
mechanisms).
mechanisms), .:
Mitigation Hire 25 teachers,
Hire 298 teachers, Hone required. None required.
Hire 14 teachers,
Hire 172 teachers,
- Measure one administrator,
32 administrators#
one administrator,
18 administrators,
one custodian, one
32 custodians, 32
one custodian, one
18 custodiansVIS
clerical staff,
clerical staff,
clerical staff,
clerical staff.
three kitchen
and 47 kitchen
and one kitchen
and 27 kltebea-=
staff, and
staff and
staff.*
staff and
purchase eight
construct six
construct fait��-
;nderlined I cts = Cannot be mitigated to a less -than -significant level.
rsterisk (N) tolloving mitigation measure denotes that the identified measure does not reduce impacts to a less -than -significant level.
See Table 3-2 for recommended policies and implementation measures of Performance Standards.
' To accommodate new development, the existing system would require improvements. This impact includes both
the incremental capital costs and improveme
For improvements and capital costs required to
upgrade the existing system see topical chapters of text.
'A = Not applicable.
Table 3-1. (Continued)
Option 2
k!—
Historic
Rate Ruildout
Qption 3 _
!slur c ILIIHistoric
Rate Buildout
option 4
FSiii
Rate Buildout
C
o Amend SPARC
o Amend SPARC
o Amend SPARC
o Amend SPARC
{ s to
requirements to
requirements to
requirements to
requirements to
i-
require archi-
require arch!-
require arch-
require archi-
ntrol
tectural control
tectural control
tectural control
tectural control
of "vandal-
of "vandal-
of "vandal-
of "vandal -
resistant
resistant
resistant
resistant
materials."
materials."
materials."
materials."
nand impact. No impact.
Increased demand
Increased demand
Increased demand
-----------------
Increased demand
for fire
for fire
for fire
for fire
protection
protection
protection
protection
servirrs.
services and
services.
services and
facilities.
facilities.
None. None.
Significant..,
Significant.
Significant.
Significant.
None required. None required.
Hire three
Hire 26 fire
Hire four fire
Hire six fire
ase
fire fighters.
fighters; purchase
fighters.
fighters; purchase
ting
new fire fighting
new fire fightiny
d
vehicles; expand
vehicles; expand
or build new
or build new
facilities.
facilities.
e No impact. No impact.
Increased fire
Increased fire
Increased fire
Increased fire
hazard.
hazard.
hazard.
hazard.
None. None.
Significant.
Significant.
Significant.
Significant.
r- None required. None required.
Develop perfor- a
Develop perfor- a
Develop perfor- m
Develop perfor-,
a
mance standards:
mance standards:
mance stands ds:
mance standards,
mf
o Require new mf
o Require new mf
o Require new mf
o Require new of
units to be
units to be
units to be
units to be
th
equipped with
equipped wit,`.
equipped with
equipped with
sprinkler
sprinkler
sprinkler
sprinkler
Systems.
Systems.
systems.
systems.
-6 No impact. No impact.
399 (23�
4,564 (2.643,3KK-6t
648 1377 K, -66t.990.
953 (554 K-6
7-8"and—d3 9�is�
and 951
7$- a�Y36 9-12)
- as 2w
st- its
genera ed.
s u m
genera
s is
4enera ed.
9- students
4enera
None. Noce.
Significant-
Significant-
Significant-
Significant-
ith
unavoidable.
unavoidable (with
unavoidable.
unavoidable.
�Inavailable
9
funding
mechanisms).
ors, Naze required. None required.
Hire 14 teachers,
Hire 172 teachers,
Hire 25 teachers,
Hire 42 teachers,
ors,
one administrator,
18 administrators,
one administrator,
three
32
one custodian, one
le custodians, le
one custodian, one
administrators,
clerical staff,
clerical staff,
clerical staff,
three custodians,
and one kitchen
and 27 kitchen
and three kitchen
three clerical
staff.*
staff and
staff, and
staff, and five
construct four
purchase eight
kitcheu staff,
t level.
ied measure does not reduce impacts to a less -than -significant level.
es of Performance Standards.
e improvements. This impact includes Loth the incremental capital costs and improvements under Option 2.
Ing system see topical chapters of text.
10
Table 3-1.
Option 1 Option 2
'- Topic Historic
��— Historic
(EIR Chapter) Rate
Buildout Rate
Schools (15) portable
elementary
(Continued) classrooms.*
schools, two
middle schools,
and one high
School.*
- Impact Absence of avail-
Absence of avail- No impact. No :
able land to
able land to
expand existing or
expand existing or
construct new
construct new
schools in the
schools In the
Study Area; new
Study Area; new
facilities would
facilities would
be located a
be located a
considerable
considerable
distance from
distance from
students they
students they
sem, creating
serve, creating
additional busing,
additional busing,
cost, and
cost, and
inconvenience.
1ncnaVenienoe.
Signifi- Significant.
Siguificant. None. NCO, -
canoe
Mitigation Develop a joint
Develop a joint None required. None
Measure (city, LUSD) Land
(city, IASD) Land
Banking Program to
Basking Program to
acquire Study Area
acquire Stndy Area
property as it
property as it
becomes available;
becomes available;
jointly work with
jointly work with
the state Depart-
the state Depart -
sent of Education
sent of E&Cation
to obtain a waiver
to obtain a waiver
on minimus parcel
on mislmma parcel
sizes for eleven-
sizes for elemen-
tary schools.
t.ary schools.
Parks and Impacts Increased demand
Increased demand No impact. No
Recreation for developed
ot'�r—leveTo��
(16) parkland; absence
'Toil absence
of available land
Of available lend
in theStudy Area
pro
to provide new
£ ems
new
parks •
r s__•
Signifi- Significant.
Significant- None. -Mono
canCQ
unavoidable.
Mitigation Provide 30.2 acres
Provide 363.6 None required.
Measure of parkland
aces of parkland
elsewhere in Lodi:
elsewhere in Lodi; =
develop a Land
develop a Land
Banking Program to
Banking Program to
acquire Study Area
acquire Study Area
property for park
property for park
development; amend
development; amend
SPARC requirements
SPARC requirements
to require mf
to require mf
Uo_dc�rlined�IS acts Cannot be mitigated to a less -than -significant level.
Jste-r— c— Ce) following mitigation measure denotes
that the identified measure does not reduce.ly;
See Table 3-2 for recommended policies and implementation measures of Performance Standards.
b To accommodate new development, the existing system would require improvements. This impact is
c For improvements and capital costs required to upgrade the existing system a" topical chapter!
NA Not applicable.
Table 3-1. (Continued)
Option 1 option 2
option 3
Historic
F�i]T Historic rul I
Historic
s or.
r) Rate
Buildout Rate Buildout
Rate
Buildout
gate
portable
elementary
elementary
portable
classrooms.*
schools, two
schools, one
classrooms.'
middle schools,
middle school, and
and one high
one high school.*
school.*
Impact Absence of avail-
Absence of avail- No impact. No impact.
Absence of avail-
Absence of avail-
Absence of
able land to
able land to
able land to
able lard to
able land t
expand existing or
expand existing or
expand existing or
expand existing or
expand exist
construct new
construct new
construct new
construct new
construct ul
schools in the
schools in the
schools in the
schools in the
schools in {
Study Area; new
Study Area; new
Study Area; new
Study Area; new
Study Area;
facilities would
facilities would
facilities would
facilities would
facilities 1
be located a
be located a
be located a
be located a
be located 4
considerable
considerable
considerable
considerable
considerable
distance from
distance from
distance from
distance from
distance fr1
students they
students they
students they
students they
students
serve, creating
serve, creating
serve, creating
serve, creating
serve,
additional busing,
additional busing,
additional busing,
additional busing,
additional'
cost, and
cost, and
cost, and
cost, and
cost, and
inconvenience,
inconvenience,
inconvenience.
Inconvenience.
iucouveni
Signifi- Significant.
Significant. None. None.
Significant.
Significant.
Significan
canoe
Mitigation Develop a joint
Develop a joint None required. None required.
Develop a joint
Develop a joint
Develop a
Measure (city, LOSD) Land
(city, L6SD) Land
(city, LBM) Land
(city, LOSD) Land
(city,;
Banking Program to
Banking Program to
Banking Program to
Banking Program to
Banking
acquire Study Area
acquire Study Area
acquire Study Area
acquire Study Area
aogeize
property as it
property as it
property as it
property as it
.
DroPerRT-'
becomes available;
becomes available;
became available;
becomes available,
becomes-
jointly work with
jointly work with
jointly work with
jointly work with
jointly:
the state Depart-
the state Depart-
the state Depart-
the state Depart-
the ata
meat of Education
went of Education
Sent of Education
went. of Education
aent.of;
to obtain a waiver
to obtain a waiver
to obtain a waiver
to obtain a waiver
to obtain.
on minimum parcel
.w minimus parcel
on minimum parcel
or minimum parcel
oa a
sizes for elemen-
sizes for elmen-
sizes for elmen-
sizes for elemen-
sizes foe
tary schools.
tary schools.
tory schools.
Lary schools.
tarn
Impacts Increased dmaad
Increased demand No impact. No impact.
Increased demand
Increased demand
Inereem04
n for developed
or eve
for developed
hoz .�ev�eo�_ _
for devil
parkland; absence
—XTAn3 AF�senea
parkland; absence
kiand; absence
parklandp
of available land
of avn a iaa
of available land
of available laud
of avail
in the S Area
Ludy
n e
in the S Area
Ludy
In the
to provide new
to new
to provide new
to roles
to
parks.
�u�s.
parks.
— --
asks.—
parks,;
Signi£i- Significant.
Significant- None. None.
Significant.
Significant-
Sigmlf
tante
unavoidable.
unavoidable.
Mitigation Provide 30.2 acres
Provide 363.6 None required. None required.
Provide 16.5 acres
Provide 211.4
Provide-,
Measure of parkland
acres of parkland
of parkland
acres of parkland
of par
elsewhere in Lodi;
elsewhere In Lodi;
elsewhere In Lodi;
elsewhere in Lodi;
e
develop a Land
develop a Land
develop a Land
develop a Load
deealcp_,
Banking Program to
Banking Program to
Banking Program to
Banking Program to
Banking.
acquire Study Area
acquire Study Area
acquire Study Area
acquire Study Area
acquire.
property for park
property for park
property for park
Property for park
property:
development; amend
development; amend
development; amend
development; amend
deve
SPARC requirements
SPARC requirements
SPARC requirements
SPARC requirements
SPARC
to require of
to require of
to require of
to require of
to
d Im = Cannot be mitigated to a less -than -significant level.
-
ECts
( owirg mitigation measure denotes
that the identified measure does not reduce Impacts to a less -than -significant level_
le 3-2 for recommended policies and implementation measures of Performance Standards.
amodate new development, .he existing system would require improvemen tz. This Impact includes both the incremental capital costs and improvements under Op
rovements and capital costs required to upgrade the existing system see Loplcal chapters of text.
applicable.
Table 3-1. (Continued)
Option 2 option 3 Option 4
Historic i--- toric Full � toricFull--
Rate Buildout Rate Buildout Rate Buildout
elementary portable construct one
schools, one classrooms.` elementary school,
middle school, and and purchase five
one high school.* portable
classrooms.`
No Impact_ No Impact. Absence of avail- Absence of avail- Absence of avail- Absence of avail-
able land to able land to able land to able land to
or expand existing or expand existing or expand existing or expand existing or
construct new construct new construct new construct new
schools in the schools in the schools in the schools in the -
Study Area; new Study Area; new Study Area; new Study Area; new
facilities would facilities would facilities would facilities would
be located a be located a be located a be located a
considerable considerable considerable considerable
distance from distance from distance from distance from
students they students they students they students they
serve, creating serve, creating serve, creating serve, creating
g, additional busing, additional busing, additional busing, additional busing,
cost, and cost, and cost, and cost, and
Inconvenience. inconvenience. inconvenience. Inconvenience.
None. None. Significant. Significant. Significant. Significant
None required. Kane required. Develop a joint Develop a joint Develop a joint Develop a joint
d (city, LOSD) Load (city, LDSD) Land (city, TIM) Land (city, LOSD) Land
to Banking Progzav o Banking Program to Banking Program to Banking Program to
a acquire Study Area acquire Study Area acquire Study Area acquire Study Area
property as it property as it property as it property as it
e; becomes available; becomes available; becomes available; becomes available;
th jointly work with jointly work with jointly work with jointly work with the state Depart- the state Depart- the state Depart- the state Depart -
on', ment of Education sent of Education sent of Education sent of Education -
ver to obtain a waiver to obtain a waiver to obtain a waiver to obtain a vaivee' -
1 on minimum parcel on minimum parcel on minl - parcel on minimum parcel
13- sizes for elmen- sizes for elesen- sizes for elemen- sizes for elemen-
tary schools. Lary schools. Lary schools. Lary schools.
d No impact. No impact. Increased demand Increased demand Increased demand Increased demand
for deve'-led for eve for developed for developed
parklanu; absence paren mance parkland; absence parkland; absence
of available land 01 available Lana of available land of available land
ea in the Study Area in the Study Area in the Study Area
to provide new �o row new to provide new to provide new
parks. pa parks. parks.
None. None. Significant. Significant- Significant. Significant.
unavoidable.
None required. None required. Provide le.5 acres Provide 211.4 Provide 30.2 acres Provide 44.3 acres
pnd of parkland acres of parkland of parkland of parkland
odi; elsewhere In Lodi; elsewhere in Lodi; elsewhere in Lodi; elsewhere in Lodi;
develop a Land develop a Land develop a Land develop a Land
M to Banking Program to Banking Prog.am to Banking Program to Banking Program to
;.rea acquire Study Area acquire Study Area acquire Study Area acquire Study Area
ark property for park property for park property for park property for park
mend development; amend development; amend development; -send development; amend -
ents SPARC requirements SPARC requirements SPARC requirements SPARC requirements
to require mf to require of to require of to require mf ,
n: level.
fled measure does not reduce impacts to a Iess-than-slgnlficant level.
res of Performance Standards.
re improvements. This impact includes both the incremental capita: Lrosts and improvements under Option 2.
ting system see topical chapters of text.
11
Topic
(FIR Chapter)
Parks and
Recreation
(18)
(Continued)
Natural Gas and
Electricity (17)
Table 3-1.
Option 1 Option 2
Historic Full Historic
Rate Buildout Rate
developments to
Include onsite
yards or play
areas.
developments to
include onsite
ya.-ds or play
areas.*
a Natural Gas Impact Increased demand Increased demand No impact. No )
for 77,813 mcf of for 886,488 mcf of
natural gas. natural gas.
o Electricity Impact Increased demand Incrersed demand No impact. He
for 7.5 million for 84.9 zillion
kWh of kWh of
electricity. electricity.
Siguifl- Less than Less than None. Non4
Mnce significant, significant.
Mitigation None required. None required. None required_ Now
Measure
Traffic and Impact Unacceptable LAS Unacceptable LOS No impact. No"
circulation at the following at the following
(18) roadway roadway
segmeat(s)z segment (s)
o Lodl Avenue o Lodi Avenue
between Stockton between Cherokee
Street and Lane and Central
Hutchins Street Avenue (LOS D)
(LDS D)
o Stockton Street _
between Tokay
Street and
Kettleman Lane
(Los E)`_'!
Slgulfl- Significant. Significant. None. Dbal
Cance
Mitigation Widen Lodi Avenue Widen Lodi Avenue None required.
Measure 12 feet or remove 17 feet or remove
on -street parking on -street parking
to provide to provide
additional street additional street
width for a width for a
two-way left turn tv"ay left turn
lane. lane; widen
Stockton Street to
a four -law
undivided arterial
from Tokay Street
to Kettlemen Lane;
signalise the
intersection of
Central Avenue and
Kettleman Law.
Underlined Im._pacts Cannot be mitigated to a less -than -significant level.
sterisk -following mitigation measure denotes that the identified measure does not reduce
See Table 3-2 for recommended policies and implementation measures of Performance Standards.,
b To accommodate new development, the existing system would require improvements. This Impact.
C For improvements and capital costs required to upgrade the existing system see topical c.bap
NA = Not applicable. _
c
Table 3-1. (Continued)
Option
1
Option 2 Option
3
for 545,515 mcf of
Historic
it
Historic ice--T{is�r c
pillAdevelopmm
Increased demand
er) Rate
Buildout
Rate Buildout Rate
Buildoutdevelopments
No impact_
to
developments to
developments to
developments toinclude
electricity.
onsite
include onsite
include onsite
include onsiteyards
significant.
or play
yards or play
yards or play
yards or Playareas.
No impact.
areas.•
areas.
areas."
Unaceeptable,WS
and
Ircreased demand
Increased <
for 47,885 mcf of
for 545,515 mcf of
(17)
natural gas.
natural gas.
natural ga:
Increased demand
s Impact
Increased demand
Increased demand
No Impact.
No impact_
kWh of
for 77,813 mcf of
for 886,488 sof of
electricity.
electricity.
electricit)
natural gas.
natural gas.
Less than
significant.
Y Impact
Increased demand
Increased demand
No impact.
No impact.
for 7.5 million
for 84.4 million
Unacceptable IAS
Unaceeptable,WS
Uaacoeptab
kWh of
kWh of
at t314foil
roadway
roadway
electricity.
electricity.
segment(s):
-segmentwI
Slgnifi-
Less than
Less than
None.
None.
canoe
significant.
significant.
between -E
Street and
Mitigation
Measure
None required.
None required.
None required.
None required.
Impact
Unacceptable LDS
Unacceptable IAS
No Impact.
No impact.
at the following
at the following
roadway
roadway
segment(s):
segment(s):
o Lodi Avenue
o Lodi Avenue
between Stockton
between Cherokee
Street and
Lane and Central
Hutchins Street
Avenue (FAS D)
(IAS D)
o Stockton Street
between Tokay
Street and
Kettleman Lane
(LOS Ii)
Siqnifi-
Significant.
Significant.
None.
None.
canoe
Mitigation
Widen Lodi Avenue
Widen Lodi Avenue
None required.
None r+quired.
Measure
12 feet or remove
12 feet or remove
on -street parking
on -street parking
to provide
to provide
additional street
additional street
width for a
width for a
two-way left turn
two-way left turn
lane.
lane; widen
Stockton Street to
a four -leve
undivided arterial
from Tokay Street
to Kettlesan Lane;
sigaelize the
intersection of
Central Avenue and
Kettleman Lane.
I m cts - Cannot be mitigated to a less -than -significant level.
9 -To -Mowing mitigation, measure denotes that the identified measure noes nct reduce impacts to a less -than -s ignlflcant level_
3-2 for recommended policies and implementation measures of Perforr..ance Standards.
Iodate new development, the existing system would require improvements. This impact includes both the incremental capital costs and improvements under Op
>vements and capital costs required to upgrade the existing system see to;a cal chapters of text. -
>plicable.
Increased demand
Ircreased demand
Increased <
for 47,885 mcf of
for 545,515 mcf of
for 77,813
natural gas.
natural gas.
natural ga:
Increased demand
Increased demand
Increased
foc 4.6 million
for 52.2 million
for 7.5 mi)
kWh of
kWh of
kWh of
electricity.
electricity.
electricit)
Less than
Less than
Less than
significant.
significant..,
signiflcaat
None required.
None required.
hone i6gnt,7
Unacceptable IAS
Unaceeptable,WS
Uaacoeptab
at the following
at the following
at t314foil
roadway
roadway
roadway -"
segment(a):
segment(s):
-segmentwI
o Lodi Avenue
o Lodi Avenue :'
o Lodi Aver
between Stockton
between SLocktonl�
between -E
Street and
Street and
Street. ab
Hutchins Street
Hutchins Street-
MutciciasA
(LOS D)
(LAS D)
(LOS D).'1
Significant. Significant. sigulficmt
Y
Widen Lodi Avenue Widen Lodi Avenue Widea"Leda
12 feet or remove 12 feet or rascve.. ll.feet_aZ
on -street parking on -street perlciag an -s .;j
to provide to provide to.provift
additional street additional street.'_' additiaml
width for a width for a width'fbr
two-way left turn two-way left tau - `:twv-way_:1 .
lane. lane. lane.'':
Table 3-1. (Continued)
Option 2
tion 3
Option
4
Historic Full
for c
Historic
Furi--
Rate Buildout
Rate
Buildout
Rate
Buildout
developments to
developments to
developments to
developments to
include onsite
include onsite
include onsite
include onsite
yards or play
yards or play
Yards or play
yards or play
areas.
areas.*
areas.
areas.
k No impact. No impact.
Increased demand
Increased demand
Increased demand
Increased demand
for 47,885 oaf of
for 545,515 mcf of
for 77,813 oaf of
for 114,397 mcf of
natural gas.
natural gas.
natural gas.
natural gas.
No impact. No impact.
Increased demand
Increased demand
Increased demand
Increased demand
for 4.6 million
for 52.2 million
for 7.5 million
for 11.0 million
I
kWh of
kWh of
kWh of
kWh of
electricity.
electricity.
electricity.
electricity.
None. None.
Less than
Less than
Less than
Less than
significant.
significant.
significant,
significant.
rNone required. None required.
None required.
None required.
None required.
None required.
i
No impact. No impact.
Unacceptable LOS
Unacceptable LOS
Unacceptable IAS
Unacceptable LOS
at the following
at the following
at the following
at the followiag
roadway
roadway
roadway
roadway
segment(s):
segment(s). :&.
segment(s):
segment(s):
o Lodi Avenue
o Lodi Avenue
o Lodi Avenue
o Lodi Avenue
between Stockton
between Stockton
between Stockton
between Stockton
Street and
Street and
Street and
Street and
Hutchins Street
Hutchins Street
Hutchins Street
Hutchins Street
(LDS D)
(LDS D)
(LOS D)
(Los D)
None. - None. Significant. Significant. Significant. Significant.
None required. None required. Widen Lodi Avenue Widen Lodi Avenue Widen Lodi Avenue Widen Lodi Avenue
12 feet or remove 12 feet or remove 12 feet or remove 12 feet or remove
on -street parking on -street parking on -street parking on -street parking
to provide to provide to provide to provide
additional street additional street additional street additional street
width for a width for a width for a width for a
two-way left turn two-way left turn two-way left turn two-way left tura
lane. lane. lane. lane.
evel.
measure does not reduce impacts to a less -than -significant level.
of Performance Standards.
mprovements. This impact includes both the incremental capital co -,Ls and iz,;ovemects under Option 2.
sv;tem see topical chapters of text.
12
Table
3-1.
Option I
Topic
Hi;,toric
Ful
Historic
(EIR Chapter,'
te
Buildout
Rate
Tr ffic and
a
Impact
Increased
Increased
No impact.
NO
Circulation
on -street parking;
on -street parking;
(18)
increased illegal
increased Illegal
(Continued)
on -street parking.
on -street parking.
Slgnifl-
Significant.
Significant.
None.
None
cance
Mitigation
Develop perfor-
Develop perfor-
No impact.
0
Measure
mance standards:&
=",e,ta==,°
o Amend city
o Amend city
Zoning Ordinance
Zoning L-rdinance
to require two
to require two
pLrkinq spaces
parking spaces
per mf unit
per af unit
0 Enforce the East
o Enforce the East
'
Parking Program.
'ar^inp'rosra=
Noise
impact
Additional noise
Additional noise
Additional noise
(19)
sources Including
sources including
sources including
traffic noise,
traffic nolsel
traffic noise,
traf
noise, and noise
noise, and noise
noise, and noise
no
from Indoor and
from Indoor and
from indoor and
frmom
~
^�
outdoor
outdoor
outdoor
on`
residential—
residential——
residential.—
res
' —
activities.
activities.
activities.
ac
Slgnifl-
Significant.
Significant.
Significant.
Canoe
Mitigation
Develop
Develop
Develop
measure
Perfo rmanct
Perform
Perin
Perfb
Standards:
Standards,
S tend "aancl
St
tion activities
tion activities
tion activities
to normal day-
to nornal daY-
to normal day-
time periods.
time periods.
time periods.
�
o Adopt a com-
o Adopt a coa-
o Adopt a com-
munity noise
munity noise
munity noise
ordinance.
ordinance.
ordinance.
o Ensure that
o Ensure that
o Ensure that
state noise
state noise
state noise
'z
|insulation
insulation
insulation
�
�---------------------------------------------------
used.
used.
used.
Underlined I dcts _- Cannot
be mitigated to a less-tban-significant level.
o
6wing mitigation measure denotes that the identified measure doei )t reduce
b ��i able
r reco—ended policies and Implementation meesures of Performance Standards.
To accommodate new dc-velopment, the existing system would require improvements. This impact I=
c Yor improvevents
�nd capital costs required to
upgrade the existing system see topical chapters,
~�
=~~^ ww^`"~^.
'— -.
���
Impact
Table 3-1. (Continued)
Option 1 Option 2 _ option 3
Historic Full —ifisForTc P&II—" Historic `FSifI--'—''iisto`r
Rate Buildout Rate Buildout Rate Buildout Rate
Increased Increased
on -street parking; on -street parking;
increased illegal increased illegal
ou-street parking. on -street parking.
Significant. Significant.
Develop perfor-
Develop perfor-
mance standards:a
mance standards:a
o Amend city
o Amend city
Zoning ordinance
Zoning Ordinance
to require two
to require two
parking spaces
parking spaces
per mf unit
per mf unit
o Enforce the East
o Enforce the East
Side Area
Side Area
Parking Program.
Parking Program.
Additional noise Additional noise
sources including sources including
traffic noise,
traffic noise,
construction
construction
noise, and noise
noise, and noise
from indoor and
from indoor and
outdoor
outdoor
residential
residential
activities.
activities.
Signifi-
Significant.
canoe
construction
!litigation
Develop
Measure
Performance
outdoor
Standards:
residential
o Limit oonstruc-
activities.
tion activities
to normal day-
time periods.
o Adopt a com-
munity noise
ordinance.
o Ensure that
state noise
insulation
standards are
used.
Significant
No Impact
None.
No impact.
Additional sol"
sources including
traffic noise,
construction
noise, and noise
from indoor and
outdoor
residential
activities.
Significant.
No impact. Increased Increased Increased
on -street parking; on -street parking; on -street pa
Increased illegal Increased illegal increased 11
on -street parking. on -street parking. on -street pa
None. Significant. Significant. Significant.
No impact. Develop perfor a Develop perfor- a Develop perfor-
mance standards: mance standards: mance standards:
o Amend city o Amend city o Amend city
Zoning Ordinance Zoning Ordinance Zoning Ordinan
to require two to require two to require two
parking spaces parking spaces parking spaces
per mf unit per mf unit per mf unit
o Enforce the East o Enforce the East o Enforce the Re
Side Area Side Area Side Area
Parking Program. Parking Program. Parking Progra
Additional noise Additional noise
sources including sources including
traffic noise,
traffic noise,
construction
construction
noise, and noise
noise, and noise
from indoor and
from indoor and
outdoor
outdoor
residential
residential
activities.
activities.
Significant. Significant.
Additional noise
sources including
traffic noise,
construction
noise, and noise
from indoor and
outdoor
residential
activities.
Significant.
Develop Develop Develop Develop Develop
Performance Performancg Performance Perfoananct Performance
Standards: Standards: Standards: Standards: Standards:
o Limit construe- o Limit construe- o Limit construe- o Limit construc- o Lir1t construe -
Lion activities tion activities tion activities tion activities tion activities
to normal day- to normal day- to normal day- to normal day- to normal day-
time periods. time periods. time periods. time periods. time periods.
o Adopt a com- o Adopt a cos- o Adopt a cam- o Adopt a com- o Adopt a com-
munity noise munity noise munity noise .unity noise munity noise
ordinance. ordinance. ordinance. ordinance. ordinance.
o Ensure that o Ensure that o Ensure that o Ensure that o Ensure that
state noise state noise state noise state noise state noise
insulation insulation insulation insulation insulation
standards are standards are standards are standards are standards are
used. used. used. used. used.
Additional =
sources incle
traffic noise_;
construction
noise, and z&
from indoor'ai
outdoor .-
residential
activities.
Significant.
Develop
o Limit const
tion activi'
to normal:;d
time period
o Adopt acorn
munity n019
o Ensure
state n
used.
m c's = Cannot be mitigated to a less -than -significant level.
.o �cving mitigation measure denotes that the identified measure does not reduce impacts to a less -than -significant level.
3-2 for recommended policies and Implementation measures of Performance Standards.
date new development, the existing syrt.er. xould require 'mprovemen!s. 71:is 1m,act includes both the incremental capital costs and improvements under
ements and capital costs required to c; .::der t..,e existing system sec ,iccl chatters of text.
'_:cable.
Table 3-1. (Continued)
Historic Option 2 �— �� or c tion 3 --Full Hist ric Option 4 Full_
Rate Buildout Rate Buildout Rate Buildout
No impact.
None.
No impact.
Additional noise
sources including
traffic noise,
construction
noise, and noise
from indoor and
outdoor
residential
activities.
Significant.
Develop
Performancpa
Standards:
o Limit construc-
tion activities
to normal day-
time periods.
o Adopt a com-
munity noise
ordinance.
o Ensure that
state noise
insulation
standards are
used.
No impact.
None.
No impact.
Additional noise
sources including
traffic noise,
construction
noise, and noise
from indoor and
outdoor
residential
activities.
Significant.
Develop
Performanc&
Standards:
o Limit construc-
tion activities
to normal day-
time periods.
o Adopt a com-
munity noise
ordinance.
o Ensure that
state noise
insulation
standards are
used.
Increased
on -street parking;
increased illegal
on -street parking.
Significant.
Develop perfor- a
mance standards:
o Amend city
Zoning Ordinance
to require two
parking spaces
per mf unit
o Enforce the East
Side Area
Parking Program.
Additional noise
sources including
traffic noise,
construction
noise, and noise
from indoor and
outdoor
residential
activities.
Significant.
Develop
Performanc&
Standards:
c Limit construc-
tion activities
to normal day-
time periods.
o Adopt a com-
munity noise
ordinance.
o Ensure that
state noise
insulation
standards are
used.
Increased
on -street parking;
increased illegal
on -street parking.
Significant.
Develop perfor-
mance standards:a
o Amend city
Zoning Ordinance
to require two
parking spaces
per mf unit
o Enforce the East
Side Area
Parking Program.
Additional noise
sources including
traffic noise,
construction
noise, and noise
from indoor and
outdoor
residential
activities.
Significant.
Develop
Performancs
Standards -
o, Limit construc-
tion activities
to normal day-
time periods.
o Adopt a com-
munity noise
ordinance.
o Ensure that
state noise
insulation
standards are
used.
Increased
on -street parking;
Increased illegal
on -street parking.
Significant.
Develop perfor- a
mance standards:
o Amend city
Zoning Ordinance
to require two
parking spaces
per mf unit
o Enforce the East
Side Area
Parking Program.
Additional noise
sources including
traffic noise,
construction
noise, and noise
from indoor and
outdoor
residential
activitic;.
Significant.
Develop
Perforsanc&
Standards:
o Limit construc-
tiin activities
to normal day-
time periods.
o Adopt a com-
munity noise
ordinance.
o Ensure that
state noise
Insulation
standards are
used.
level.
d measure does not reduce impacts to a less-t',rn-r•,",::°%stifit level.
of Performance Standards.
improvements. This impact includes both the 1.•clrm.ou(;:: capital costs anc' t-,rovemer,ts under Option 2.
g system see topical chapters of text.
Increased
on -street parking;
increased illegal
on -street p=.rking.
Significant
Develop perfor-
mance standards:a
o Amend city
Zoning Ordinance
to require two
parking spaces
per mf unit
o Enforce the East
Side Area
Parking Program.
Additional noise
sources including
traffic noise,
construction
noise, and noise
from indoor and
outdoor
residential
activities.
Significant.
Develop
Performanq
Standards:
o Limit construc-
tion activities
to normal day-
time periods.
o Adopt a com-
munity noise
ordinance.
o Ensure that
state noise
Insulation
standards are
used.
Table 3-1. 6
Option 1 ruff— Option 2
Topic � s or cHistoric
(EIR Chapter) Rate Bu11dout Rate B
Aesthetics Impact Continued Complete dis- Preservation of Preser
and degradation of the acemen othe the character of the ch
Neighborhood character of the character or tne the East Side the Ea
Character East Side neighborhood. neigbb
(20) neighborhood: r
o Unattractive o Unattractive
apartment design sign
o lack of land- o Lads of land-
scaping T—
o Parking lot o Par int
located in front oca front
of mf buildings, zr-nrsmdnas.
facing: the LM
_s
street sGi-e
o Inadequate off- o Inadequate off- 1
street parking-ks�eet parting
o Vier of garbage o Vier of
dumpsters from rs from
the street the street
•Bulky apartments `.
Signifi- Significant. Significant- Beneficial Benef
tante unavoidable.
Mitigation Develop None available. None required. ,None:
Measure performaacfi Adoption of strict
standards: performance
standards would,
o Ameud SPARC however, partially -
requirements to mitigate this
require new of impact -10
developments to _
conform to o Amend SPARC
strict archi- requirements to ;..�
tectural require new mf
controls. developments to
conform to
o Continue to strict archi-
develop, or [ectural
update and controls.
enforce,
community design o Continue to
policies as part develop, or
of the SPARC update and
requirements. enforce,
community design
Under l'ned lm ecis = Cannot be mitigated to a less -than -significant level.
er s o. owing mitigation measure denotes that the identified measure does not reduce
See able 3-2 for recommended policies and implementation meas•res of Performance Standards.
b Tc acco=odate new development, the existing system would require improvements. This impact
C For improvements and capital costs required to upgrade the existing system see topical chapters
NA = Not applicable. _
I
Table 3-1. (Continued)
Option 1 tion 2 Option 3
—itis or s or c Historic
Full
er) Rate Buildout Rate Buildout Rate Buildout Rato
Impact Continued
_Co letedis�-
-iac�
Preservation of
character of
degradation of the
of the
the
the East side
character of the
character ot Me
standards:
East Side.as
a nea -
neighborhood.
neighborhood:
bo hr o :
requirements to
- o Unattractive
o Unattractive
impact !
apartment design
a5if&nen tYesign
conform to
o Lack of land-
o Lack of land-
requirements to
scaping
scaP ngg
controls.
o Parking lot
o Parking lot
conform to
located in front
ocnlIn-front
develop, or
of of buildings,
o-im-HaTdggs54
controls.
facing the
tacn? the
community design
street
s�
develop, or
o Inadequate off-
o Inadequate off-
requirements.
street parking
sEreef Parks.
community eesign
o View of garbage
o View of garbage
o Parking lot
dumpsters from
MiEs urs rum
located in front
the streeteEL�
sF_T_-
confo
o Bulky apartments
of mf buildings,
o Parking
Signifi- Significant.
Significant- Beneficial
canoe
unavoidable.
mitigation Develop
None available. None required.
Measure perform"
Adoption of strict
standards:
performance
c arae er or a
standards would,
o Amend SPARC
however, partially
requirements to
mitigatethis
require new mf
impact !
developments to
nelghborrho
conform to
o Amend SPARC
strict archl-
requirements to
tectural
require new of
controls.
developments to
unavoidable.
conform to
o Continue to
strict archi-
develop, or
tectural
update and
controls.
enforce,
o Lack of land-
community design
o Continue to
policies as part
develop, or
of the SPARC
update and
requirements.
enforce,
mitigatethisregal
community eesign
Preservation of
Continued
Co Tete dis-
Continued
the character of
degradation of the
acumen o the
degradation
the East Side
character of the
c arae er or a
character �
neighborhood-
East Side
Last Side neigh-
—
East Side.
the street
neighborhood.
bortiooa..
nelghborrho
del
In the to
Beneficial Significant.
o Unattractive
o Unattractive
areas."
unavoidable.
apartment design
apartment design
None available.
Develop,
performnncfi
Adoption of strict
c Unattrac
standards:
o Lack of land-
o Lack of land-
apartmen
standards would,
scaping
scaping
however, partially
o Amend
requirements to
mitigatethisregal
o Lack of
require new of
o Parking lot
o Parking lot
- scaping'
located in front
located in front
o Amend SPARC
confo
of mf buildings,
of mf buildings,
o Parking
tectural
facing the
facing the
located;
developments to
street
street
of,af-bc
o Inadequate off-
o Inadequate off-
street parkingstreet
parking.:..",
o Inadequate off-
o InadeS
o View of garbage
o View of gatbage
street
- dumpsters from
dumpsters from
'-
the street
the street
o view 4
del
the sl
Beneficial Significant.
Significant-
Signifl+
unavoidable.
None required. Develop
None available.
Develop,
performnncfi
Adoption of strict
perform
standards:
performance
standw
standards would,
o Amend SPARC
however, partially
o Amend
requirements to
mitigatethisregal
require new of
Impact."regal
developments to
devel
conform to
o Amend SPARC
confo
strict archi-
requirements to
stric
tectural
require new mf
teem
controls,
developments to
contr
conform to
o Continue to
strict archi-
o Conti
develop, or
tectural
level
update and
controls.
updat
enforce,
enfor
o mmtmity design
o Continue to
camM
policies as part
develop, or
polic
of the SPARC
update and
of t1:
requirements.
enforce,
requi
community design
d Im acts = Cannot be mitigated to a less -than -significant level.
" to owing mitigation measure denotes that the identified measure does not reduce impacts to a less -than -significant level.
ie 3-2 for recommended policies and implementation measures of Performance Standards.
=c'e'ate new development, the existing system would require improvements. This Jmpact includes both the incremental capital costs and improvements under Op
:ovements and capital costs required to upgrade the existing system sec topical chapters of text.
replicable.
Tahle 3-1. (Continued)
Option 1 Option 3 Option 4
—"--Tr =SO `uT�"-`"Tiiscor c f�iTT— s toric F4"ii
;tate Buildout Rate Buildout Rate Buildout
Preservation of Preservation of
the character of the character of
the East Side the East Side
neighborhood. neighborhood.
Beneficial
None required.
Beneficial
None required.
Continued Com�ii
let dss--
degradation of the ��a_ceZ—_meof the
character of the cEa ac e
East Side aF E Se n
neighborhood. or oo .
o Unattractive o Unattractive
apartment design apartment design
o Lack of land- o Lack of land-
scaping scoping
o Parking lot o Parking lot
located in front located in front
of mf buildings, of mf buildings,
facing the facing the
street street
o Inadequate off- o Inadequate off -
Continued C_o%1tt_t d�is-_
degradation of the pace-p�l—mend tAe
character of the character of the
East Side East Si3e neigh-
neighborhood
e gh-neighborhood only borhood only in
in the "target tn2 gge
areas." areas.
o Unattractive o Unattractive
apartment design apartment design
o Lack of land- o Lack of land-
scaping scaping
o Parking lot o Parking lot
located in front located in front
of mf buildings, of mf buildings,
facing the, facing the
street. _. street.
street parking
street parking
o Inadequate off-
o Inadequate off -
o View of garbage
o View of garbage
street parking
street parking
dumpsters from
dumpsters from
the street
the street
o View of garbage
o View of garbage
dumpsters from
dumpsters from
the street
the street
o Bulky apartments
Significant.
Significant-
Significant.
Significant -
unavoidable.
unavoidable.
Develop
None available.
Develop
None available.
performance
Adoption of strict
performanc&
Adoption of strict
standards:
performance
standards:
performance
standards could,
standards would,
o Amend SPARC
however, partially
o Amend SPARC
however, partially
requirements to
mitigate
requirements to
mitigate
require new mf
athis
impact.*
require new mf
impact.*
developments to
developments to
conform to
o Amend SPARC
conform to
o Amend SPARC
strict archi-
requirements to
strict archi-
requirements to
tectural
require new mf
tectural
require new mf
controls.
developments to
controls.
developments to
conform to
conform to
o Continue to
strict arobi-
o Continue to
strict archl-
develop, or
tectural
develop, or
tectural
update and
controls.
update and
controls.
enforce,
enforce,
community design
o Continue to
community design
o Continue to
policies as part
develop, or
policies as part
develop, or
of the SPARC
update and
of the SPARC
update and
requirements.
enforce,
requirements.
enforce,
community design
community design
vel.
measure does not reduce impacts to a less -than -significant level.
f Performance Standards.
provements. This impact includes both the incremental capital costs and improvements under Option 1.
system see topical chapters of text.
Option 1
TopicHistoric s or
(EIR Chapter) Rate Buildout Rate
Aesthetics and
o Amend SPARC
policies as part
Neighborhood
requirements to
. the SPARC
Character
require mf
.-quirements.
(20)
developments to
(Continued)
locate the park-
o Amend SPARC
ing lot either
requirements to
on the side or
require mf
behind the
developments to
structure=
locate the park -
screen parking
ing lot either
lot from view;
on the side or
encourage alley
behind the
access to
structure;
parking.
screen parking
lot from view;
o Amend city
encourage alley
Zoning Ordinance
access to
to require two
parking.
parking spaces
per mf unit.
o Amend city
Zoning Ordinance
c Amend the SPARC
to require two
requirements to
parking spaces
require mf
per mf unit.
developments to
locate the
o Amend the SPARC
refuse area
requirements to
either behind
require mf
the structure or
developments to
enclosed within
locate the
a view -obscuring
refuse area
area.
either behind
the structure or
enclosed within
a view -obscuring
area.
o Require
o Require None required.
applicants to
applicants to
coordinate with
coordinate with
Sanitary City
Sanitary City
Disposal to
Disposal to
determine
determine
whether access
whether access
from the rear
from the rear
(alley) 1s
(alley) is
adequate for
adequate for
garbage collec-
garbage collec-
tion vehicles.
tion vehicles.
o Amend SPARC
o Amend SPARC
Table 3-1.
on 2
None
requirements to requirements to
discourage discourage
construction of construction of
excessively excessively
bulky apartment bulky apartment
buildings. buildings.
Gkit
Underlined Impacts Cannotbe mitigated to a lens -than -significant level.
isterisXo owing mitigation measure denotes that the identified measure does not reduce iml
b See Table 3-2 for recommended policies and implementation measures of Performance Standardp:
To accommodate new development, the existing system would require improvements. This imprict.it
c For improvements and capital costs required to --upgrade the existing system see topical chagteh
NA = Not applicable.
t tion'2
sort`
Rate
Table 3-1. (Continued)
Option 1 Option 2
Historic FuZT"—`-" HistoFic Full
Rate Buildout Rate Buildout
Option 3
Historic Full
Rate Buildout
s or
Rate
and o Amend SPARC
policies as part
o Amend SPARC
policies as part
o Amend SP
d requirements to
of the SPARC
requirements to
of the SPARC
requiremen
require mf
requirements,
require of
requirements.
require of
development.=.. to
developments to
developmen
locate the ;ark-
o Amend SPARC
locate the park-
o Amend SPARC
locate the
ing lot either
requirements to
Ing lot either
requirements to
Ing lot ei
on the side or
require of
on the side or
require of
on the si
behind the
developments to
behind the
developments to
bebind.the
structure;
locate the park-
structure;
locate the park-
structure;
screen parking
Ing lot either
screen parking
Ing lot either
screen
lot from view;
on the side or
lot from view;
on the side or
lot from..
encourage alley
behind the
encourage alley
behind the
encourage'
access to
structure;
access to
structure;
accessto
parking.
screen parking
parking.
screen parking
parking.
lot from view;
lot from view;
o Amend city
encourage alley
o Amend city
encourage alley
o -Amend cit
Zoning Ordinance
access to
Zoning Ordinance
access to
Zoning 0
to require two
parking.
to require two
parking.
to requi
parking spaces
parking spaces
parking
per mf unit.
o Amend city
per of unit.
o Amend city
per of un
Zoning Ordinance
Zoning Ordinance
o Amend the SPARC
to require two
o Amend the SPARC
to require two
o Amend •he
requirements to
parking spaces
requirements to
parking spaces
requires
require mf
per mf unit.
require of
per of unit.
require
developments to
developments to
develops
locate the
o Amend the SPARC
locate the
o Amend the SPARC
locate
refuse area
requirements to
refuse area
requirements to
refuse
either behind
require mf
either behind
require of
either
?`
the structure or
developments to
the structure or
developments to
the stru_
;'•
enclosed within
locate the
enclosed within
locate the
enclosed
a view -obscuring
refuse area
a vier -obscuring
refuse area
a view -
area.
either behind
area.
either behind
area,
the structure or
the structure or
enclose9 within
enclosed within
a view -obscuring
a view -obscuring
squired. ,.Jr ffiobA
area.
area.
..
o Require
qu
Re r required.
o Require None squired. None r fired.
o Require
o Require
o Require
applicants to
applicants to
applicants to
applicants to
applican
-'^�.
coordinate with
coordinate with
coordinate with
coordinate with
coordina
Sanitary City
Sanitary City
Sanitary City
Sanitary City
Sanitary
o-
Disposal to
Disposal to
Disposal to
Disposal to
Disposal
determine
determine
determine
determine
determin
whether access
whether access
whether access
whether access
whether
from the rear
from the rear
from the rear
from the rear
from the
MK
(alley) is
(alley) is
(alley) is
(alley) is
(alley)'
adequate for
adequate for
adequate for
adequate for
adequate
s "
garbage collet-
garbage collet-
garbage oollec-
garbage collet-
garbage-
tion vehicles,
tion vehicles.
tion vehicles.
tion vehicles.
tion ve
o Amend SPARC
o Amend SPARC
requirements to
requirements to
`: t �rF,4 :)•?
discourage
discourage
k
construction of
construction of
excessively
excessively
bulky apartment
bulky apartment
buildings.
buildings.
does nat"161-
mance Starnd!ettias;
to. This
d Impacts a Cannot be mitigated to a less-than-significcnt level.
-than
-significant level.
ee topical,Ohm,
o owing mitigation measure denotes
that the identified measure does not reduce impacts to a less
Performance
s;(i:4'c
le 3-2 for recommended policies and implementation measures of Standards.
mmodate new development, the existing system would require improvements. This impact includes both the
text.
incremental capital costs and improvements under Opt
Hx,E
rovements and capital costs required to
upgrade the existing system see topical chapters of
applicable.
y$ w
Table 3-1. (Continued)
_ Option
Option 1 ption 3
s or c Full A stor c Ou is Optica 4 Historic r9li "—
Rate Buildout Rate Buildout Rate Buildout
None required.
None requires:.
o Amend SPARC
requirements to
require of
developments to
locate the park-
ing lot either
on the side or
behind the
structure;
screen parking
lot from view;
encourage alley
access to
parking.
o Amend city
Zoning Ordinance
to require two
parking spaces
per of unit.
o Amend the SPARC
requirements to
require of
developments to
locate tht
refuse area
either behind
the structure or
enclosed within
A view -obscuring
area.
o Require
applicants to
coordinate with
Sanitary City
Disposal to
determine
whether access
from the rear
(alley) is
adequate for
garbage collec-
tion vehicles.
policies as part
of the SPARC
requirements.
o Amend SPARC
requirements to
require of
developments to
locate the park-
ing lot either
on the side or
behind the
structure;
screen parking
lot from view;
encourage alley
access to
parking.
o Amend city
Zoning Ordinance
to require two
parking spaces
per of unit.
o Amend the SPARC
requirements to
require of
developments to
locate the
refuse area
either behind
the structure or
enclosed within
a view -obscuring
area.
o Require
applicants to
coordinate with
Sanitary City
Disposal to
determine
whether access
from the rear
(alley) is
adequate for
garbage collec-
tion vehicles.
o Amend SPARC
requirements to
require of
developments to
locate the park-
ing lot either
on the side or
behind the
structure;
screen parking
lot from view;
encourage alley
access to
parking.
o Amend city
Zoning Ordinance
to require two
parking spaces
per of unit.
o Amea1 the SPARC
requirements to
require of
developments to
locate the
refuse area
either behind
the structure or
enclosed within
a view-obscurinq
area.
o Require
applicants to
coordinate with
Sanitary City
Disposal to
determine
whether access
from the rear
(alley) is
adequate for
garbage collec-
tion vehicles.
policies as part
of the SPARC
requirements.
o Amend SPARC
requirements to
require of
developments to
locate the park-
ing lot either
on the side or
behind the
structure;
screen parking
lot from view;
encourage alley
access to
park=g-
o Amend city
Zoning Ordinance
to remire two
parkii►g spaces
per of unit.
o Amend the SPAS
requirements to
require of
developments to
locate the
refuse area
either behind
the structure or
enclosed within
a view -obscuring
area.
o Require
applicants to
coordinate with
Sanitary city
Disposal to
determine
whether access
from the rear
(alley) is
adequate for
garbage collec-
tion vehicles.
Signifi- Significant. Significant- Beneficial.
Benef
cance unavoidable.
Table
3-1-;`a
None
a
Measure mance standards: Adoption of strict
Option 1
Option 2
Topic
HisEoric
requirements to however, partially
'�iif—oric
discourage mitigate this
(BIR Chapter)
Rate
Buildout
Rate
f
Aesthetics Impact
Degradation of the
Complete____d_iss--
Preservation of
Prese:
and Neighbor-
overall low
dis Taceeeo�of
the overall low
the ov
hood Character
density character
the overall ow
density character
densit
(20)
of the Fast Side
de`nsItyrac er
of the East Side
of Ox
(Continued)
neighborhood.
ot too .a'st bum`
neighborhood.
night
A
ae Q�l Or 1�.
Signifi- Significant. Significant- Beneficial.
Benef
cance unavoidable.
Mitigation Develop perfor- None availaele. None required.
None
a
Measure mance standards: Adoption of strict
performance
o Amend SPARC standards would,
requirements to however, partially
discourage mitigate this
construction of impact:*a
excessively
bulky apartment o Amend SPARC
buildings. requirelents t0
discourage::
construction of
excessively
bulky apartment
buildings.
Underlined l�mQac�ts Cannot be mitigated to a less -than -significant level.
�s er�"isc�C)—fo11-owing mitigation measure denotes that the identified measure does not-reduoq
See Table 3-2 for recommended policies and implementation measures of --Performance Standards;:
b
To accommodate new development, the existing system would require impsoveWmts. This,
c For improvements and capital costs required to upgrade time existing system see topice1
NA a Not applicable.
#,
A
"yq ;
Table 3-1. (Continued)
Impacts - Cannot be mitigated to a less -than -significant level.
;) ?o7'iowing mitigation measure denotes that the identified measure does not reduce impacts to a less -than -significant level.
e 3-2 for recommended policies and implementation measures of Performance Standards.
modats new development, the existing system would require improvements. This impact includes both the incremental capital costs and improJements
ovements and capital costs required to upgrade the existing system see topical chapters of text.
pplictible.
Opt ton 1
'tion 2
option
3
Historic
Fes_
s or c
Full
Historic
Full
or ,
Rate
Buildout
Rate
Buildout
Rate
Buildout
Rate
Impact
Degradation of the
Com lete dis-
Preservation of
Preservation of
Preservation of
Preservation of the
Degradation i
overall low3i
agent of
the overall lox
the overall low
the overall low
overall low density
overall low
density character
thi overs ox
density character
density character
density character
character of the
density char+
of the East Side
density cbaara'cEer
of the East Side
of the East Side
of th*: East Side
East Side
of the East ,
neighborhood.
of the East Side`
neighborhood.
neighborhood.
neighborhood.
neighborhood.
neighborhood
nnegi:5oriood:"�
in the "tarq
areas"f.pres
tion of the
density char
of the East
neighborhood
side the "ta-
areas."
Signifi-
Significant.
Significant-
Beneficial.
Beneficial.
Beneficial.
Beneficial.
Significant;
cance
unavoidable.
beneficial. j
Mitigation
Develop perfor-
None available.
None required.
None required.
None required.
Nome required.
Develop per
Measure
mance standards: °
Adoption of strict
mance s
performance
o Amend SPARC
standards would,
o Amend SP
requirements to
however, partially
requir
discourage
mitigate this
disceura
construction of
impact:*a
construct
excessively
excessiv_
bulky apartment
o Amend SPARC
bulky a
buildings.
requirements to
buildin
discourage
construction of
excessively
bulky apartment
buildings.
Impacts - Cannot be mitigated to a less -than -significant level.
;) ?o7'iowing mitigation measure denotes that the identified measure does not reduce impacts to a less -than -significant level.
e 3-2 for recommended policies and implementation measures of Performance Standards.
modats new development, the existing system would require improvements. This impact includes both the incremental capital costs and improJements
ovements and capital costs required to upgrade the existing system see topical chapters of text.
pplictible.
Table 3-1. (Continued)
level.
measure does not reduce impacts to a less -than -significant level.
of Performance Standards.
improvements. This impact includes both the incremental capital costs and improvements under option 2.
g system see topical chapters of text.
tion 2
option
3
Option
4
--'FifsEoric
_ Full
AisEor c
FullHistoric
Full
Rate
Buildout
Rate
Buildout
Rate
Buildout
Preservation of
Preservation of
Preservation of
Preservation of the
Degradation of theComplete
displace -
the overall low
the overall low
the overall low
overall low density
overall low
men o e over -
density character
density character
density character
character of the
density character
all low URI
er
of the East Side
of the East Side
of the East Side
East Side
of the East Side
caaracter Of the
neighborhood.
neighborhood.
neighborhood.
neighborhood.
neighborhood only
East y e"i nd ei —
in the "target
bor"nooa�oni
areas"; preserva•
In the rget
tion of the low
areas"; preserva-
density character
��of the low
of the East Side
density character
neighborhood out-
of the East Side
side the "target
neighborhood
areas."
outside of the
"target areas."
Ben -ficial.
Beneficial.
Beneficial.
Beneficial.
Significant;
Signifieant-
beneficial.
unavoidable;
beneficial.
r
None required.
None required.
None required.
None required.
Develop perfor-
None available.
ct
mance standards:a
Adoption of strict
performance
o Amend SPARC
standards would,
ly
requirements to
however, partially
discourage
mitigate this
construction of
i,,.,: i'a
excessively
bulky apartment
o Amend SPARC
o
buildings.
requirements to
discourage
f
construction of
excessively
bulky apartment
buildings.
level.
measure does not reduce impacts to a less -than -significant level.
of Performance Standards.
improvements. This impact includes both the incremental capital costs and improvements under option 2.
g system see topical chapters of text.
CITY COUNCIL
EV[E)-YN Ni OLSON. ,Mayor
JOHN R. (Randy) SNIDER
Mayor Pro Tempore
DAVID M HINCHMAN
JAMES W. PINKERTON, Jr.
FRED M.REID
CITE' OF LORI
CITY HALL. 221 WEST PINE STREET
CALL BOX 3006
LODI. CALIFORNIA 95241-1910
(209)334-5634
TELECOPIER (209) 333-6795
September 4, 1987
Mr. Ron Bass
Jones and Stokes Associates
2321 P Street
Sacramento, CA 95816
Dear Mr. Bass:
THOMAS A PE TERSON
City Manager
ALICE M. REIMCHE
City Clerk
RONALD M STEIN
City Attorney
Enclosed is a packet for the Special meeting with the Planning
-`` Commission. The meeting is being held on September 9, 1987, 7:30
p.m.at Hale Park Recreation Center Building, 209 East Locust Street
(map enclosed).
Thanks so much for your help in sending all the summaries for enclosure
in the packets.
Please call if you have any questions.
Very truly yours,
Alice M. Reimche
City Clerk
CITY COUNCIL
EVELYN M OLSON. Mayor
-JOHN R. (Randy) SNIDER
Mayor Pro Tempore
DAVID M. HINCH:MAN
JAMES W PINKERTON, Jr.
FRED M. REID
CITY OF LORI
CITY HALL, 221 WEST PINE STREET
CAL 130X. 3006
LODI, CALIFORNIA 95241-1 91 0
(209) 334-5634
TELECOPIER A209) 333-6795
September 11, 1987
Mr. Roger Stafford
801 South Mills Avenue
Lodi, CA 95240
Dear Mr. Stafford:
THOMAS A. PETERSON
City Manager
ALICE M REIMCHE
City Cierk
Ro BALD ,1 STEN
City .Attorney
This letter will confirm action taken at the Special Joint Meeting of
the Lodi City Council and the Lodi Planning Commission held on
September 9, 1987 to receive a presentation by Ron Bass Project
Manager, Jones and Stokes Associates, Inc., of the City of Lodi East
Side Plan Alternatives Draft Environmental Report.
Following the presentation by Mr. Bass, public input and discussion, by
motion action, the matter was referred to the Community Development
Department to chart a recommendation to go before the Planning
Commission. The Planning Commission will then make its recommendation
to the Council.
Should you have any questions regarding this matter, please do not
hesitate to call this office.
Very truly yours,
�n
Alice M. Reimche
City Clerk
AMR:jj
I
SIGN IN SHEET FOR ADDRESSING COUNCIL
NAME ADDRESS
-4 Wz,&4.,*Lf t4f
1" 233
lev
'I ON
SIGN IN SHEET FOR ADDRESSING COUNCIL
NAME ADDRESS
11A/y ky
0 k e
/I-
/!,'/fj S -r-
THE fDL14YArliC dpCUME,R'S
WILL REC)UIRE MORE THAN ONE SHOT
AS THEY ARE O V_wRSIZED
AND WILL NOT FII' IN THE FME
't
NATIONAL FLOOD INSURANCE PROGRAM!
I� f' f►
�fI' I
,;. IEFI SRM
FLOOD INSURANCE RATE MAP
fi CITY OF
LODI,
CALIFORNIA
SAN JOAQUIN COUNTY
,� MAP INDEX
and
STREET INDEX
PANELS PRINTED: 1, 2
ff
_� I f I
COMMUNITY -PANEL NUMBERS
060300 0001 -0002
MAP REVISED:
JUNE 18, 1981
III I Emergency Management Agency
Federal I
TO
00
�0
Fn
O�
.i Z
z
j c N
0
m
O
Z
r
r..
m
G)
m
Q
im
!
060300 0001 E !----',*e"=.. ^�.u~o*ycn
�
S
���n�U� ~ ���d���� ������ 8��U��X ,
FLOOD PRONE ''---
N �
NAMED StREETS ^
^^^u mmvE ....................'.'..'.....
mwo mm
CHURCH STREET .............................
m00i
'zu"/ AVENUE . . . . . . . . . . . .. . . . ..'.'....'.. ''
0001 (H2)
DEvwEnmv . . .. .. .... ..... . ..r..'.^...... .
0001(02
EDGE ~oouCOURT .............. .............
0001 vC2/
EooEWouuunwE . . . . . . . . . . . . . . ^. ..^ . . . . . . . .
ono �z
nxEcmwoononw
ono���...�....���..^...^....^.^ ' (C2)
GREEN OAKS DRIVE . . . . . . . . . . . . . .'^. ... . . ' . . ..
000 1(02)
^mEW000cuun ...........................
o0oJCz
JomcW000DRIVE ......................... .'.nou(0)
wpuu`wDuvwE .................... 4c........
mon C2)
^owcOun ................................
pmn(Fo
LAKEWOOD o.......'''....''``^''^'^^`'^'^m001
(Du)
LAUREL AVENUE ...'.''.',..... ^^.^.,'.^^,ODD'
�usccoonr .......'...'.....'���.^.^..^'`^
LILAC STREET '..'...,'^'.........^^'''``'^^'^0001~2'
^`
LINCOLN AVENUE ''''''^'''^'''''T.'.......'..
(E2)(E2)
LOWER SACRAMENTO ROAD ...'.... ,'.'''^'''^^m001(9»)
m^PLEwuooDRIVE .............. L...'........000
(02)
mmv^LEcnon/ ..............................
0001 (E2)
000 ' (Em
^mnv^LEnoAo . .... ..... ..' '''.''' .'' ' ^''''
0001 (F2)
w*°o^nmvE ..............^...: .............
ww^ELummcow^yDRIVE .................. ....
0001 (F2)
woorH~000umvE . . . . . . . . . . . . . . . . . . . . . . . . . ..
000 mn
NORTH HAM LANE ............................
000(Co
ORANGEWOOD DRIVE .........................
oommw
on^omvE ...................... .... ......
000 pm
N
RIO VISTA DRIVE ...................'.....'^.'p90`1021'
P-.
CORPORATE LIMITS
NOTE TO USER
This index provides a list of all streets shown on the Flood insur-
ance Rate Map (FIRM) that are partially or totally within Special
Flood Hazard Areas (SFHAs). This index should not be used as an
w:horkative source for determining whether specific streets.
properties, or buildings are within an SFHA. The appropriate
FIRM panel must be consulted for these purposes. This index is
intended to be used only as a guide for determining which FIRM
Panel displays the street in question and the relative location of
the meet on the FIRM panel.
KEY
Riverview Drive ................. 00155 (B6)
(
street name panel number grid location
MAP REPOSITORY
City Hag Community Development
221 W. Pine St Lodi, CA 95240
(Maps available for reference only.
not for distribution)
Oak
P
TF
ROYAL OAKS COURT..........................
0001 IE21
STATE HIGHWAY 99
............. 0001 (C2)
1URNER ROAD ...........0001
(A2. 82. C2. D2. E2. F2. G2, H2. J2)
U S HIGHWAY 50 ............................
0001 (G2)
WILLOW GLEN DRIVE ..........................
0001 (E2)
WINTON DRIVE .........................
. .... 0001 (F2)
WYN WAY..................................0001102)
YULONI DRIVE ..............
........... . .... 0001 (F2)
NOTE TO USER
This index provides a list of all streets shown on the Flood insur-
ance Rate Map (FIRM) that are partially or totally within Special
Flood Hazard Areas (SFHAs). This index should not be used as an
w:horkative source for determining whether specific streets.
properties, or buildings are within an SFHA. The appropriate
FIRM panel must be consulted for these purposes. This index is
intended to be used only as a guide for determining which FIRM
Panel displays the street in question and the relative location of
the meet on the FIRM panel.
KEY
Riverview Drive ................. 00155 (B6)
(
street name panel number grid location
MAP REPOSITORY
City Hag Community Development
221 W. Pine St Lodi, CA 95240
(Maps available for reference only.
not for distribution)
Oak
D
G
m
z
c
m
r
E
O
O