Loading...
HomeMy WebLinkAboutAgenda Report - September 9, 1987CITY COUNCIL MEETING SEPTEMBER 9, 1987 JOINT SPECIAL MEETING LODI CITY COUNCIL/LODI PLANNING COMMISSION HALE PARK RECREATION CENTER BUILDING 209 EAST LOCUST STREET, LODI SEPTEMBER 9, 1987 7:30 P.M. Pursuant to StatF Sr,atute, the following notice was mailed under "Declaration of Mailing to persons listed on Exhibit B hereinafter set forth" advising of a Joint Special Meeting of the City Council and Planning Commission to be held September 9, 1987 at 7:30 p.m. at the Hale Park Recreation Center Building, 209 East Locust Street, Lodi. OC -53 (a) NOTICE OF JOINT SPECIAL MEETING OC -53 (d) OF THE LODI CITY COUNCIL AND THE PLANKING COMMISSION NOTICE IS HEREBY GIVEN that Mayor Evelyn M. Olson has called a Special Joint Meeting of the Lodi City Council and the Planning Commission for Wednesday, September- 9, 1987 at 7:30 p.m. at the Hale Park Recreation Center Building, 209 East Locust Street, Lodi (corner of Locust Street and Stockton Street). A copy of the Agenda for this meeting is attached, marked Exhibit A. Dated: September 2, 19g7 s/Alice M. Reimche City Clerk EXHIBIT "B" NOTICE OF SPECIAL COUNCIL MEETING MAILING LIST Fred M. Reid Lodi News Sentinel 1168 Northwnnri #AA w CITY OF LOOP WFORMATIONAL DATA FOR LODI CITY COUNCIL MEETING ca3BCin jol2ir mmm% wm Tm im- Pikwlw. Conmissim I a. OFsepter.ber 9, 1987 CITY OF LODI CITY HALL = Lodi, California. AGENDA MEMO September 2, 1981 To the Honorable Mayor and Members of the City Council -- Councilmembers: Enclosed for your information and review is .the agenda for the Special Meeting of Wednesday, September 9, 1987. The meeting will be held in the Hale Park Building at 7:30 p.m. The Special Meeting has been called to provide for a joint meeting of the City Count -i and the Planning Commission to review the East Side Plan Alternatives Draft Environmental Impact Report. Mr. Ron Bass, Project Manager, Jones and Stokes Associates, will be in attendance to summarize the voluminous document distributed to the City Council in late July. In the near future the City Council will want to schedule a public hearing on this matter. The . City Clerk has placed three display advertisements in the Lodi !sews -Sentinel to call attention to this meeting. Respectfully submitted, Thomas A. Peterson #_= City Manager TAP:br Enclosures L. TXTA.07A AGNDMM14 ���� LO �� SPECIAL JOINT MEETING LODI CITY COUNCIL AND Fe IS MEETING WILL BE HELD AT LODI PLANNING COMMISSION LE PARK RECREATION CENTER BLDG. DATE: SEPTEMBER 9, 1987 3 09 FAST LOCUST -STREET, LODI TIME: 7:30 P.M. I. Roll Call City Clerk II. Introductions - Mayor Olson III. Presentation by Ron Bass, Project Manager, Jones and Stokes Associates, Inc., of City of Lodi East Side Pian Alternatives Draft Environmental Impact Report (Discussion and appropriate action) IV. Adjournment Pursuant to Section 54954.2(a) of the Government Code of the State of California, this Agenda was posted at least 72 hours in advance of the scheduled meeting at a public place freely accessible to the public 24 hours a day. Alice M. Refmc eh ,Lity Clerk For information concerning this Agenda please contact Alice M. Reimche, City Clerk + Telephone - 333-6702 i1 THE FOLt.( WING DOCU-WII S wnL REQUIRE MORE THAN ONE SHOT AS 'nlEy ARE OVERSIZED AND 6JILL Nar FIT IN THE FRAKE Table 3-1. Summary of Environmental Impacts and MI _Option Z Option 2 Topic Historic Pull Historic (EIR Chapter) Rate Buildout Rate Project Moratorium would Moratorium would Study Area Zoning Stu Description be lifted. 232 be lifted. 2,643 would be reduced won (2) single -family (sf) sf du would be to R-1. Existing to du would be con- converted, creat- mf units would mf vented, creating Ing an additional maintain Zoning mal an additional 17,180 ■f du, with corresponding to our 1,508 multi-family a population of actual density. act (mf) 01, with a 17,180 in the No new sf con- No population of Study Area, versions would ver 3,016 In the Study occur. occ Area. Lend Use (4) Impact Land use conflicts Total oonversion No impact. No between existing of the a sf units and would intensity potential mf cix s g_na units; intensifi- borbood D—ro ems. cation of existing naigbborbood o Loss of privacy problems: o Inadequate off - Loss of o privacy p acy street parking o Inadequate off- o Illegal parking street parking,. A o Ille7al parking - Signifl- Significant. Significant- None. tact unavoidable. I i Mitigation Develop None available. None required Measure performance Adoption of strict - standards: performance star- dards would bow It .Jr o Amend SPARC ever, partially requirements to mitigate this - screen new mfiapact,ia units from their neigbbors, o Amend SPARC requirements to o Amend SPARC screen nen mf requirements to units from their prohibit exter- neigbbors. nal balconies o Amend SPARC o Amend city Zon- requirements to ing Ordinance to prohibit exter- require two nal balconies parking spaces per of du o Amend city Zon- ing Ordinance to - o Enforce tte East require two Side Area park- parking spaces -- 1ng program. per of do Underlined lmpacts Cannot be mitigated to a less-than-significant level. . terisk ! following mitigation measure denotes that the identified measure does not reducei. See Table 3-7 for recommended policies and implementation measures of Performance Standards—- b To accommodate new development, the existing system would require Improvements. This -impact,=' C For improvements and capital costs required to upgrade the existing system see topicalc�n ?JA Not applicable. Use (4) Impact Signifi- cance Mitigation Measure Table 3-1. Summary of Environmental Impacts and Mitigation Measures for the East Side Plan Alternatives Option 1 Option 1 Option 3 Historic '— 1� istoricFull Historic fli11 Rate Buildout Rate Buildout Rate Buildout Moratorium would Moratorium would Study Arca Zon.ng be lifted. 232 be lifted. 2,643 would be reduced single-family (sf) sf du would be to R-1. Existing du would be con- converted, creat- mf units would verted, seating Ing an additional maintain Zoning an additional 17,180 mf du, vitt corresponding to 1,508 multi -family a population of actual density. (mf) du, with a 17,180 in the No new sf con- populat:on of Study Area. versions would 3,016 in the Study occur. Area. Land use conflicts between existing sf units and potential of units; intensifi- cation of existing neighborhood problems: o toss of pr_vacy o Inadequate off- street parking o Illegal parking Significant. Deve'_op performancS standards. o Amend SPARC requirements to screen new mf units from their neighbors. o Amend SPARC requirements to prouibit exter- nal balconies o Amend city Zon- ing Ordinance to require two parking spaces per mf du o Enforce the East Side Area park, Ing program. Total conversion oor_fie to liea would Inteaslfr ex ne or pro ems. o Loss of privacy o Inadequate off- street parking o Illegal parking Significant - unavoidable. None available. Adoption of strict performance stan- dards would, how- ever, partially mitigate this impact.*° o Amend SPARC requirements to screen new mf units from their neighbors. o Amend SPARC requirements to prohibit exter- nal balconies o Amend city Zon- ing Ordinance to require two parking spaces per mf du Study Area Zoning Study Area Zoning would be reduced would be reduced to R-1. Existing to either R-1, mf units would R-2, R-3, or R-4. maintain Zoning 232 sf Ls would be corresponding to converted, creat - actual density, ing an additional No Dew sf con- 928 mf du, with a versions would popul—ion of occur. 1.856 in the Study Area. SJ No impact. No impact. None. None. None required. None required. Land use conflicts between existing of units and potential new mf units, intensifi- cation of existing neighborhood problems: o Loss of privacy o Inadequate off- street parking o Illegal parking Significant. Develop performancra standards* o Amend SPARC requirements to screen new of units from their neighbors. o Amend SPARC requirements to prohibit exter- nal balconies o Amend city Zon- ing Ordinance to require two parking spaces per mf du o Enforce the East Side Area park- ing program. Study Area Zoning Sin. would be reduced Ion- to either R-1, be R-2, R-;, or R-4. thr- 2,643 sf du would are be converted, Stu creating an addi- the tional 10,572 mf Stu du, with a popula- ..won tion of 21,144 in to " the Study Area. urn: tec adc mf Por 3,0 Are o Loss of priva.y. o Inadequate of! street parkin) o Illegal parklig. Significant- :A.Sic unavoidable. None available. P Adoption of strick;;klpey performance star- dards would, hov -'%' ever, partially o ? mitigate this o Amend SPARC requirements t - screen new of'o ::. units from their:;._ neighbors. o Amend SPARC;% requirements to :_:.,',:; o prohibit exter- nal balconies - - o Amend city Zon- ing Ordinance t,'. require two -'o parking spaces per mf du erlined IIts = Cannot be mitigated to a less -than -significant leve;. erisk o ov Ing mitigation measure denotes that the identl.`led measure does not reduce impacts to a less -than -significant level. ee Table 3-2 for recommended policies and Implementation measures of Perform^nce Standards. ` o accommodate new development, the existing system would require improvemer­.c- This impact Includes both the incrementalcapital costs and improvemen. S u: or improvements and capital costs required to upgrade the existing system see topical chapters of text. Not applicable. . of Environme tal LX;acts ane mitigation !fires !or the East Side Plan A'c.tPr"ti>_-= with c -tin t Wa urt_o- 4 e stozic ii -.s or._ Pt '.? — Historic coli Rate BIT -1 ldt Rate SLiida t Kate =.ti_: cut Study Area Zoning would be reduced to R-1. Existing of units would eaintatn Zoning corresponding to actual density. No new sf can - versions would oCCUr. Study Azea Zoning would be reduced to R-1. Existing of units would maintala Zoning, corresponding to actual density. So new sf con- versions would occur. Study Area Zcaing would be reduced to either R-1, R-2, 2-3, or R-4. 232 sf du would be converted, creat- ing an additional 92,1 mf du, with a population of 1,k55 to the Study Area. Study Area Zoning would be reduced to either P-1, R-2, R-3, or R-4. 2,643 sf d= would be converted, creating an addl- tional 10,572 of du, wit$ a popula- tion of 21,144 in the Study Awa . Single-family conversions would be allowed only in three 'target areas'. withl, the Study Area v1ile the remainder of Study Area Zoning would be reduced to R-1. 2.332 sf du would be conver- ted, creating an addltioaal 1,508 mf du, with a population of -,016 in the Study Area. Si_gie-familg C0M erSiOCs woule be allawed only in three 'target areas'Zit^ the Study Areawhile the reeainder of Study Area Zoo:. g would a reduced to R-1. 341 5! du would :e conver- ted, .creat,rq as add i tlaoal 2,"17 sf C:, wit: a papaiatton 0 4,434 !n tie Study Area. No impact. No impact. Land use conflicts Total cemversfm land use conflicts 'Total conversion Lea between existing �e Are between existing o_ e u mea sf units and wcu intensliv sf units and woo potential new mf existing ne potential new of existia mei ems. units; latemsifl- .-;Grbooc pt ens. units; intensifl- ,r. p rob I ems. cation of existing cation of existing yacy neighborhood o Loss of privacy neighborhood o I.«ss of privacy problems: proble=s: ff- o Iiadequate off- o Iaackctute off - g o Loss of privacy stmt parking o Loss of privacy street parking :Ing o Inadequate off- o Illegal parking o Inadequate off- o Illegal parking street parking street parking o Illegal parking o Illegal parking None. Noce. Significant. Significant- Significant. Significant - unavoidable. unavoidable. Nona required. None required. .Act Develop None available. Develop None available. performaac$ Adoption of strict performene Adoption of strict - standards= performance stan- standards: performance stan- dards would, how- dards would, how - o Amend SPARC ever, partially o Amend SPARC ever, partially requirements to mitigate this a requirements to mitigate this screen new of impact- screen new mf Lz;act.*a omits from their units from their neighbors. o Amend SPARC neighbors. o Amend SPARC to requirements to requirea=*ts t^. o Amend SPARC screen new of o Amend SPARC screen new of it requirements to units from their requirements to units from their prohibit exter- neighbors. prohibit eater- neighbors. nal balconies nal balconies o Amend SPARC o Amend SPARC to o Amend city Zoo- requirements to o Amend city Zof- requirements to z- Ing Ordinance to prohibit ester- Ing Ordinance to prohibit exter- zequire two nal balconies require two nal balconies Parking spaces parking spaces - per of du o Amend city Zoo per of du o Amend city Zoo to Ing Ordinance to Ing Ordinance to o Enforce the East require two o Enforce the East require two s Side Area park- parking spaces Side Area park- parking spaces ing pry per mf du ing program. per mf du t level. led measure does not reduce impacts to a less -than -significant level. es of Performance Standards. e improvements. This impact includes both the incrementsa capital costs and improvements under Option 2. Iting system see topical chapters of text. I Topic (EIR Chapter) Land Use (4) (Continued) Option I Historic Ful F Rate Buildout o Enforce the East Side Area park- ing program. ------------------------------- --------------------------- Population (5) Impact Net population Net ulation No impact. increase of 2,394 increase o In the Study Area. 777777. he toy Area. Signifi- Significant- Significant- None. cane unavoidable. unavoidable. Mitigation None available. None available. None required. Measure Table 3-1.. _ Option 2 stor c Rate Impact Demographic Demographic No impact. than es resultingcchaannceesreres_uullt g a rea Els- ��d�� pope at on that is po-aTio�a t�bai �Oun r more Es oua er anT trans en . more transient. Elderly residents vould be Mired to relocate Into mf units or ouu&_37-the Cdr) __ No ±mph I None.. None rf No imp. Signifi- Significant- Significant- None. None _ tante unavoidable unavoidable Mitigation None available. None available. None required. None Measure Housing (6) Impact Conversion of 232 Conversion of No impact. No sf u screw innq tts anadditional at units in creating addItional 1 508 0508 y Area. mf units inthe- e u�dy� Signifi- Significant- Signifi- Significant- None. KOLit cane unavoidable. unavoidable.'= x Mitioti')n None avrilable. None available. None required. None Measure Impact Low -quality ■f Low -quality mf No impact. No construction. construction. o Poor architec- o Poor architec- tural design tural design o Lack of land- o Lack of land- scaping soaping Underlined Im acts = Cannot be mitigated to a less -than -significant level. §sterisk fo Iowing mitigation measure denotes that the identified measure does not reduce impact See Table 3-2 for recommended policies and implementation measures of Performance Standards. b To accommodate new development, the existing system would require improvements. This impact inch c For. improvements and capital co:;ts requlred to upgrade the existing system see topical chapters of NA = Not applicable, Table 3-1. (Continued) Option 1 Option 2 Option 3 Topic Historic F'u�i — Historic istor c aIi - - IR Chapter) Rate Buildout Rate Buildout Rate BulIdout nd Use (4) o Enforce the East o Enforce the East ontlnued) Side Area park- Side Area park- ing program. Ing program. pulation (5) Impact Net ulatioa Net upo ul tion No Impact. No impact. Net po lam Net ulation a increase o 394 increase oo — increase o�I-�3�4 inc O!oof IT o_6._1 I In Area. Abe udy Area. in the ust tly Area. I tu�— Si.gnifi- Significant- Significant- None. None. Significant- Significant- -.S: cane unavoidable. unavoidable_ unavoidable_ unavoidable. w Mitigation None available. None available. None required. None required. None available. None available. lb Measure Impact Demographic Demographic No impact. No Impact. Demographic Demographic Di chances s resultin changes eltin changesltisg a3i _resulting —mchoarr nutooArea n a Area in a �n agto Area FetiIs� 22221.r. r art r unmore geen os transwe transient. and less transient and less trauslent Elderly eameats ESnE options RZ umn option I and would be _41. Licerl o re oca e o resrauld be -'` at units orired o relo- outside of the cote to a - uArea. - MoenE un or . ots u rna. Signifi- Significant- Significant- None- None. Significant- Significant- canoe unavoidable unavoidable unavoidable unavoidable:: `C1 Mitigation g None available. None available. None required. None required. None available. None available. Measure � _--------««---««—«--«---------- using (6) Impact ------------ Conversion of 232 «------ «—«« Conversion of -------------««—-----««—«--««----—«--«—«««—«----««-- No Impact. No impact. Conversion of 232 Conversion of s�Y._ sf units crea .n t643 sf units s is crea�ti�nq 2 643s{ tts a1 an additional .2 creating an an addif�anaT-93$ ew crn .81 I-568 ifs inin add �lC578 ii s n — a t .an 10 572 T� Ge Sf ldp Area. mf un�5 13 the-Uu y Area. Mt UnItS '. _ J u${ay Area. u Sigl ifi- Significant- Significant- None. None. Significant- Significant- canoe unavoidable. unavoidable. unavoidable. unavoidable. ri.ID 'W Mitigation None available. None available. None required. None required. None available. None available. ah Measure Impact Low -quality at Lov-quality at No impact. No impact. Lor -quality mf Lor -quality of 7a construction. construction_ construction. construction. ,.,.,p o Poor architec- o Poor arcbitec- o Poor arcbitec- o Poor a_-chitec- �0. tural design tural design Lural design Lural design -. o Lack of land- o Lack of :and- o Lack of land- o Lack of land- :0 scaping soaping soaping soaping - derlined ImDaCtS = Cannot be mitigated to a less -than -significant leve L tcrisk following mitigation measure denotes that the identified measure does not reduce impacts to a less-tban-significant level. See Table 3-2 for recommended policies and implementation measures of Performance Standards. - ?o accommodate new development, the existing system would require improvements. This impact includes uotb the Incremental capital costs and improvements m For improvements and capital costs required to vn':ade the existing system nee topical chapters of text. = Not applicable. Table 3-1. (Continued) Option 2 Option 3 Option 4 —i3"istoz c F1Z�— Historic -T5i7i— Historic F5ifI Rate Buildout Rate Buildout Rate Buildout o Enforce the East o Enforce the East Side Area park- Side Area park- ing program. Ing program - o impact. No impact. Ne_tuQop lation Netpopulation Net popuIatiou Net ulation increaseeoo 1 2:4 n t to v increase o x,061 �n �ireStudy Area. nc`r-e'as—e�R 2 3994 in a tuS dy Area. increase a 520 in the study Area. area. e. None. Significant- Significant- Significant- Significant - unavoidable. unavoidable. unavoidable. unavoidable. one required. None required. None available. None available. None available. None available. o impact. No impact. Demographic Djmo za hic Deoogragtsis D®_c�r_a�IIic changes resulting c�iaa s resulting �ltin changes iesultinq In a Stuff n au Area Sn a ulation— in a ulation uta _ _ 1 to on xi ile 1_ s younger i�oun�er tamille pun er am es oua r am more transient and mo_re_- ans ent and less rans entan --les ess ansTent In the"target n the tOptions than option I Ann areas.- areas. er 3. I�e'T res en s xou be ki-res ea -paid be required o required o re o- ieiocate Into cateinto apart: apartment un Iis or ment units or outsice of ie ` out$ owe targeareas. u� None. None. Significant- Significant- Significant- Significant - unavoidable unavoidable unavoidable unavoidable i Hone required. f None required. None available. None available. None available. None available. 1 - --- --------- ko impact. ------------- --------------------------------------��__-----��_�_---__--__-_�___�_---___�- No impact. Conversion of 232 Conversion of Conversion of 232 Conversion of 341 sf units creates 2,643 sf units Tru—nits creatin s units _c_reat2a an Lon $ crea as an additional an additional m a ona 0.572 �m unifs in 2,217 mf i in Sru7y- Area the Study Area. tae Study Area. 3 yuArea_ None. None. Significant- Signif!;:ant- Significant- Significant- unavoldab2e. unavoidable. unavoidable. unavoidable. None required. None regrsired. None available. None available. None available. None available. No impact. No impact. Lox -quality mf Lox -quality mf Lox -quality mf Lox -quality mf construction. construction. construction. construction. o Poor architec- o Poor arcbitec- o Poor architec- o Poor architec- tural design Lural design tural design Lural design o Lack of land- o Lack of land- o Lack of land- o Lack of land- scaping scaping scaping scaping asure does not reduce impacts to a less -than -significant level. Performance Standards. ovements. This impa.:t includes both the incremental capital costs and LTprovements under Option 2. stem see topical chapters of text. 2 Table 3-1. (Col control. control. o Amend SPARC o Amend SPARC requirements to requirements to discourage con- discourage con- struction of struction of bulky apartment bulky apartment buildings. buildiDp. Underlined Impacts Cannot be mitigated to a less -than -significant level. Asterisk M following mitigation measure denotes that the identified measure does not reduce impa< See Table 3-2 for recommended policies and implementation measures of Performance Standards..: b To accommodate new development, the existing system would require improvements. This impact incl c For improvements and capital costs required to upgrade the existing system see topical chapters_c NA = Not applicable. Option 1 Option 2 Topic Historic Full Historic (EIR Chapter) Rate Buildout Rate But Housing (6) Signifi- Significant. Significant. None. None. (Continued) canoe Mitigation Develop perfor- Develop perfor- None required. None regi Measure a mance standards: a mance standards: o Amend SPARC o Amend SPARC requirements to requirements to require archi- require archi- tectural tectural control. control. I o Continue to o Continue to develop, or develop, or update and update and enforce enforce community design community design policies as part policies as part of SPARC. of SPARC. Impact Conflict with Conflict with Conflict with Conflict, adopted ��ousinq a�ousin adopted housing adopted l po c-1� ies policies policies promoting policiee encoura in the encouraging the the construction the con Drotection an rotund of a variety of of a vat Improvement o- housing. housing �exis��m�- res res aiaZ—e�T �orT>Z» - h o4 en a or - Signifi- Significant- Significant- Significant. Signif canoe unav-Widable. unavoidable. Mitigation None available. None available. Permit a variety Perot` Measure Adoption of strict Adoption of strict of housing to be of"Loos performa— performance constructed c standards would, standards would, elsewhere in Lodi. elserhe. hoverer, partially however, partially mitigate this mitigate this impact.ia impact.ia o Continue to o Continue to develop, or develop, or update and update and enforce commu- enforce commu- nity design pity design policies as part policies as part of SPARC. of SPARC. o Amend SPARC o Amend SPARC requirements to requirements to require archi- require archi- tectural tectural control. control. o Amend SPARC o Amend SPARC requirements to requirements to discourage con- discourage con- struction of struction of bulky apartment bulky apartment buildings. buildiDp. Underlined Impacts Cannot be mitigated to a less -than -significant level. Asterisk M following mitigation measure denotes that the identified measure does not reduce impa< See Table 3-2 for recommended policies and implementation measures of Performance Standards..: b To accommodate new development, the existing system would require improvements. This impact incl c For improvements and capital costs required to upgrade the existing system see topical chapters_c NA = Not applicable. erllned im is = Cannot be mitigated to a less-th-significant level. Brisk anfollowing mitigation measure denotes that the identified measure does not reduce impacts to a less -than -significant level. ee Table 3-2 for recommended policies and implementation measures of Performance Standards. o accommodate new development, the existing system would require improvements. This impact includes both the incremental capital costs and improvements Uik or improvements and capital costs required to upgrade the existing system see topical chapters of text. = Not applicable. ' <Y. Table 3-1. (continued) _tion 2 _ Option 2 option 3 Historic �— '—S�stoi3c Fu.. —ii oric Full tet) Rate Buildout Rate Buildout Rate Buildout ]m (6) Signifi- Significant. Significant. None. None. Significant. Significant. Signif ed) canoe Mitigation Develop perfor- Develop perfor- None required. None required. Develop perfor- Develop perfor- Develop Measure mance standards:" a mance standards: a mance staca�rds: a mance standards: mance s o Amend SPARC o Amend SPARC o Amend SPARC o Amend SPARC o Amend requirements to requirements to requirements to requirements to re require archi- require archi- require archi- require arca - requir tectural tectural tectural tectural tec control. control. control. control. contro o Continue to o Continue to o Continue to o Continue to o Con - develop, or develop, or develop, or develop, or deve2 update and update and update and update and update - enforce enforce enforce enforce enfo community design community design community design community design " policies as part policies as part policies as part policies as part pol of SPARC. of SPARC. of SPARC. of SPARC. of SP Impact Conflict with Conflict with Conflict with Conflict with Conflict with Conflict with Conflic .: adopted housinq ooted9 adopted housing adopted housing adopted housingadopted h� ad ted P=°- po]lci-ea Ifo- est-- policies promoting policies promotin-j policies policies en In the encouraging the_ the construction the construction eacoura the encour aging the encu �rot�-ec•io�n a�n� ro ec on of a variety of of a variety of ro on aa —rotectionn and ro - roam v�m{�oT enrovesem o houslog. housing. rovemen o - ex n me r- oo n t` ho� hoods. m r- on WE. er- eaa neighbor- hoods. m Slgnlfl- Significant- Significant- Significant. Significant. Significant- Significant- Slgni cance unavoidable. unavoidable. unavoidable. unavoidable. umr ct Mitigation None available. None available. Permit a variety Permit a variety None available. Nose available. Nape Measure Adoption of strict Adoption of strict of housing to be of housing to be Adoption of strict Adoption of strict: performance performance constructed constructed performance performaura per standards would, standards wocld, elsewhere in Lodi. elsewhere in Lodi. standards would, standards would, s however, partially however, partially however, partially however, partially mitigatethismitigate this mitigate this mitigate this mitfg impact.• impact.'° impact.'a impact.ea o Continue to O Continue to O Continue to o Continue to O develop, or develop, or develop, or develop, or update and update and update and update and _ enforce commu- enforce eommu- enforce commu- enforce commu- nity design pity design pity design nity design: policies as part policies as part policies as part policies as part of SPARC. of SPARC. of SPARC. of SPARC. o Amend SPARC o Amend SPARC o Amend SPARC o Amend SPARC requirements to requirements to requirements to regUlrementm CO require archi- require archi- require arcbi- require archi- tectural tectural tectural tectural control. control. control. control. o Amend SPARC o Amend SPARC o Amend SPARC o Amend SPARC 0-1 requirements to requirements to requirements to requirements Lo,;.....' discourage con- discourage con- discourage con- discourage con- struction of struction of struction of struction of bulky apartment bulky apartment bulky apartment bulky apartment buildings. buildings. buildings. buildings. - erllned im is = Cannot be mitigated to a less-th-significant level. Brisk anfollowing mitigation measure denotes that the identified measure does not reduce impacts to a less -than -significant level. ee Table 3-2 for recommended policies and implementation measures of Performance Standards. o accommodate new development, the existing system would require improvements. This impact includes both the incremental capital costs and improvements Uik or improvements and capital costs required to upgrade the existing system see topical chapters of text. = Not applicable. ' <Y. Table 3-1. (Continued) option 2 Option 3 Option 4 Historic Full Ffis r1c Full Historic Full Rate Buildout Rate Bu_ldout Rate Buildout se. None :e required. None required. Significant. Develop perfor- mance standards: o Amend SPARC requirements to require archi- tectural control. o Continue to develop, or update and enforce community design policies as part of SPARC. Significant. Develop perfor- a mance standards: o Amerd SPARC requirements to require archi- tectural control. o Continue to develop, or update and enforce community design policies as pest of SPARC. Significant. Develop perfor- mance standards:a o Amend SPARC requirements to require archi- tectural control. o Continue to develop, or update and enforce commuait,f design policies as part of SPARC. Significant.. Develop perfor- mance standards:& o Amend SPARC requirements to require archi- tectural control. o Continue to develop, or update and enforce community design policies as part of SPARC. .flict with Conflict with Conflict with Conflict with Conf-lct with Conflict with ,pied housing adopted housing adopted housing adopted housing a�in adopted hcnisi lcies promoting policies promoting policies policies licies construction the construction en�cou�racina the encouura the enm ira is the encouraging the a variety of of a variety of Baal m ae pro on onand sing. housing. improvemento rovmen o rovemen rovement r.x res - resz- resl- ae m e r - m ce g r- m hoods. aificar!. Significant. Significant- Significant- Significant- Significant - unavoidable. unavoidable. unavoidable. unavoidable. sit a variety Permit a variety None available. None available. None available. None available_ :lousing to be of housing to be Adoption of strict Adoption of strict Adoption of strict Adoption of strict structed constructed performance performance performance performance awhere in Lodi. elsewhere in Lodi. standards would, standards would, standards would, standards would, however, partially however, partially however, partially however, partially mitigate this mitigate this mitigate this mitigate this impact.*a impact.ia iuspact.ia impact.*a o Continue to o Continue to o Continue to o Continue to develop, or develop, or develop, or develop, or update and update and update and update and enforce cornu- enforce eoamu- enforce cornu- enforce comu- n3ty design nity design nity design pity design policies as part policies as part policies as part policies as part of SPARC. of SPARC. of SPARC. of SPARC. o Amend SPARC o Amend SPARC o Amend SPARC o Amend SPARC requirements to requirements to requirements to requirements to require archi- require archi- require archi- require andsi- tectural tectural tectural tectural control. control. control. control. o Amend SPARC o Amend SPARC o Amend SPARC o Amend SPARC requirements to requirements to requirements to requirements to discourage con- discourage con- discourage con- discourage con- struction of stzuction of struction of struetion of bulky apartment bulky apartment bulky apartment bulky apartment buildings. buildings. buildings. buildings. c does Dot reduce impacts to a less -than -significant level. �rsu:ce Standards. ---Its. This impact includes botb t;e incremental Cap-"--' a:.d :,., rovezents under Option 2. see topical chapters of text. 3 UnderlinedImpacts a Cannot be mitigated to a less -than -significant level. �sterisk following mitigation measure denotes that the identified measure does not See Table 3-2 for recommended polici; - and implementation measures of Performance Stu b To accommodate new development, the existing system would require improvements.: ThL c For improvements and capital costs required to upgrade the existing system see topics NA = Not applicable. Option 1 Topic Historic Full Historic (EIR Chapter) Rate Buildout Rate. Housing (6) Impact No impact. No impact. Conflict with (Continued) adopted housing? policies dealing with the San Joaquin Council Governments (Council) Fair Share Housing Allocation Plan. No new additions to the Study Are housing stock would occur. Signifi- None. None. Significant. tante Mitigation None required. None required. Permit adequate Measure housing to be constructed else where in Lodi; ensure through C permitting proce that future residential development will iiclude adequate affordable housing. Employment (7) Impact Increased demand Increased demand No pct..., ._ for retail goods for retail goods and services in and services in Lodi and San Lodi and San Joaquin County. Joaquin County. Signifi- canoe Beneficial. Beneficial. None. - Mitigation None required. None required. None required: V Measure Impact Generation of 287 Generation of No impact. local, direct, and 3,382 local, secondary full- directs and time jobs: secondary generation of 263 full-time jobs; person-years of generation of construction- 2,993 person-years related of construction - employment. related employment. signifi- Beneficial. Beneficial. None. canoe Mitigation None required. None required. {x None regnied Measure a� UnderlinedImpacts a Cannot be mitigated to a less -than -significant level. �sterisk following mitigation measure denotes that the identified measure does not See Table 3-2 for recommended polici; - and implementation measures of Performance Stu b To accommodate new development, the existing system would require improvements.: ThL c For improvements and capital costs required to upgrade the existing system see topics NA = Not applicable. Elm IM low Table 3-1. (Continued) Topic toric tion 1 rwi�lisf ric Option 2 toric tion 3 k -U11 Chapter) Rate Buildout Rate Buildout Rate Buildout Ing (6) Impact No impact. No impact. Conflict with Conflict with No impact. No impact. No -. timned) adopted housing adopted housing policies dealing policies dealing with the San with Council's Joaquin Council of Fair Share Housing Governments Allocation Plan. (Council) Fair No new additions Share Housing to the Study Area Allocation Plan. housing stock No new additions would occur. to the Study Area housing stock would occur. Signal- None. None. Significant. Significant None. None. Nor. canoe Mitigation None required. None required. Permit adequate Permit adequate None required. None required. No:- :Measure housing to be housing to be constructed else- constructed else- where in Lodi; where In Lodi; ensure through the ensure through the permitting process permitting process that future that future residential residential development will development will include adequate include adequate affordable affordable housing. housing. ployment (7) Impact Increased demcad Increo--d demand No impact. No impact. Increased demand Increased demand -*In4:__ for retail goody for retail goods for retail goods for retail goods and services in and stwvices in and services in and services in -?• Lodi and and San Lodi and San _. Lodi and San Lodi and San Lc:: Joaquin County. Joaquin County: Joaquin County. Joaquin County, # Jc- Signifi- Beneficial. Beneficial. None. None. Beneficial. Beneficial.. Be-, canoe Mitigation None required. None required. None required. None required. None required. None required., Measure Impact Generation of 287 Generation of No impact. No impact. Generation of 153 Generation local, direct, and 3,382 local, local, direct, and 1,774 local, secondary full- direct, and secondary full- direct, amd::r time jabs; secondary time jobs; secondary full t, generation of 263 full-time jobs; generation of 162 time jobs; person-years of generation of person-years of generation of construction- 2,993 person -rears construction- 1,842 person-yous;r= cc' related of construction- related of comsiructlon-.i:i::':. z employment. related employment. related employment. employment.. Signifi- Beneficial. Beneficial. None. None. Beneficial. Beneficial. B;-- cance Mitigation None required. None required. None required. None required. None required. None required _ _-N- Measure derlined Impacts = Cannot be mitigated to a less -than -significant level. terlsk following mitigation measure denotes that the identified measure does not reduce impacts to a less -than -significant level, See Table 3-2 for recommended policies and implementat: : measures of Performance Standards. To accommodate new development, the existing system would require improvements. This impact includes both the incremental capital costs and improvements For improvements and capital costs required to upgrade the existing sysLec see topical chapters of text. = Not applicable. Table 3-1. (Continued) None required. None required. None required. None required. None required. None required. 3 .------------- ------------------- —-------------------------------------------------- —-------------- -------------------- evel. a measure does not reduce impacts to a less -than -significant level. of Performance Standards. mprovements. This impact includes both the incremental capital costs and Lnprc ments under Option 2. a system see topical chapters of text. z ;i 4 _ Option 2 Option 3 Option 4 toric Full Historic Full Historic Full Rate Buildout Rate Buildout Rate Buildout Conflict with Conflict with No impact. No impact. No impact. No impact. adopted housing adopted boua:.-.7 policies dealing policies dealing with the San with Council's Joaquin Council of Fair Share Housing Governments Allocation Plan. (Council) Fair No new additions Share Housing to the Study Area Allocation Plan. housing stock No new additions would occur. to the Study Area uousing stock would occur. Significant. Significant None. None. None. None. Permit adequate Permit adequate None required. None required. None required. None required. housing to he housing to be constructed else- constructed else- where in Lodi; where in Lodi; ensure through the ensure through the 3 permitting process permitting process that future that future i residential residential development will development w'll include adequate include adequate affordable affordable housing. housing. a } No impact. No impact. Increased demand Increased demand Increased demand Increased demand s for retail goods for retail goods for retail goods for retail goods and services in and services in and services in and services in Lodi and San Lodi and San Lodi and San Lodi and San Joaquin County. Joaquin County. Joaquin County. Joaquin County. None. None. Beneficial. Beneficial. Beneficial. Beneficial. ) None required. None required. None required. None required. None required. None required. 3 No impact. No impact. Generation of 153 Generation of Generation of 297 Generation of 437 local, direct, and 1,774 local, local, direct, and local, direct, and secondary full- direct, and secondary full- secondary full- time jobs; secondary full- time jobs; time jobs; generation of 162 time jobs; generation of 263 generation of 386 person-years of generation of person-years of person-years of construction- 1,842 person-years construction- construction - related of construction- related related employment. related employment. employment. employment. + None. None. Beneficial. Beneficial. Beneficial. Beneficial. None required. None required. None required. None required. None required. None required. 3 .------------- ------------------- —-------------------------------------------------- —-------------- -------------------- evel. a measure does not reduce impacts to a less -than -significant level. of Performance Standards. mprovements. This impact includes both the incremental capital costs and Lnprc ments under Option 2. a system see topical chapters of text. z ;i 4 Table 3-1. =_ Option 1 Option 2 Topic Historic Full Historic (EIR Chapter) Rate Buildout Rate Fiscal and Impact Generation of Generation of No impact. Na Economic $468,700 in annual $5,208,700 in Conditions (8) revenues and annual revenues $633,700 in annual and $6,934,100 in costs. Annual annual costs. deficit of Annual deficit of $165,000, repre- $1,725,400, repre- senting a 26 senting a 25 percent shortfall percent shortfall in annual in annual revenues. revenues. Signifi- Significant. Significant. None. None. canoe z Mitigation Adopt and imple- Adopt and imple- None required. None Measrre ment a different meat a different land use mix; land use mix; designate the designate the Study Area as a Study Area as a redevelopment redevelopment area; designate area; designate the Study Area as the Study Area as an assessment dis- an assessment trict; designate district; desig- the Study Area as nate the Study a Mello -Roos Area as a Hello - Community Faci11- Roos Community ties District. Facilities _ District. Impact $9.7 million in $17.9 million in No impact.c No capital improve- capital improve- ments to the menu to the city's water, city's water; sewerage, and bsewerage, and drainage systems. drainage, systems. Siynifi- NA NA None. None canoe Mitigation NA NA Sone required Nane': Measure Water (9) Impact Increase in the Increase in the No impacts No peak hourly flow peak hourly flow rate by 3 MGD. rate by 30 MGD. Signifi- Significant. Significant. None. lions` canoe Mitigation Construct two Construct 12 wells None required. None Measure wells and install and install 12,500 16,000 If of If of 14 -inch and I2 -inch main 36,000 1f'of transgission 12 -inch main line. transwission line. Underlined Im acts = Cannot be mitigated to a less -than -significant level_ §sterisk following mitigation measure denotes that the identified measLre does not reduce b See Table 3-2 for recommended policies and implementation measures of Performance Standards. To accommodate new development, the existing system would require improvements. This impact in c For improvements and capital costs required to upgrade the existing system see topical chapters NA = Not applicable. Table 3-1. (Continued) _ Option 1 Option 2 Option 3 Topic Historic Fall — Historic Full Historic Fuir— (EIR Chapter) Rate Buildout Rate Buildout Rate Buildout Fiscal and Impact Generation of Generation of No impact. No impact. Generation of Generation of 1 Economic $468,700 in annual $5,208,700 in S247,600 in annual $2,731,900 in Conditions (8) revenues and annual revenues revenues and annual revenue $633,700 in annual and $6,934,100 in $340,700 in annual and $3,906,700 in costs- Annual annual costs. costs. Annual annual costs. deficit of Annual deficit of deficit of Amoral deficit of .i 5165,000, repre- $1,725,400, rtpre- $93,000, repre- $1,174,800, repre- senting a 26 senting a 25 senting a 27 senting a 30 percent shortfall percent shortfall percent sbortfall pc=-ent shortfall 7 1n annual 1n annual is annual in annual revenues. revenues. revenues. reveaies. Signifi- Significant. Significant. None. None. Significant. Signif.cant, cane Mitigation Adopt and imple- Adopt and imple- None required. None required. Adopt and imple- Adopt and Imple- J Measure met a different meat a different meat a different meat a different -'-.I land use mix; land use mix; land use mix; land use mix; designate the designate the designate the designate the Study Area as a Study Area as a Study Area as a Study Area as a redevelopment redevelopment redevelopment redevelopment i area; designate area; designate area; designate area; designate the Study Area as the Study Area as the Study Area as the Study Area an assessment dis- am assessment an assessment an assessment _ tract; designate district; desig- district; desig- district; desiq-',.:_.; -= the Study Area as nate the Study nate the Study nate the Sttidt a Mello -Roos Area as a Mello- Area as a Mello- Area as a Mello- f Community Facili- Rcis Community Roos Community Roos Community - ties District. Facilities Facilities Facilities District. District. District Impact $9.7 million in $17.9 million in No impact.c No impect .c $4.9 million in $15 million is capital improve- capital improve— capital improve- capital improve- j ments to the ments to the ments to the ments to the city's water, city's water, city's water, city's water, ! sewerage, and b sewerage, and sewerage, and b sewerage, and - L drainage systems. drainngeb drainage systems. drainage systeets systems. Signifi- NA NA None. None. NA NA = milt Mitigation NA NA None required. None required. NA NA _ Measure , t Water (9) Impact Increase in the Increase in the No impact.c No impact .c Increase in the Increase ins-tLe.'-� •'" 1 I peak hourly flow peak hourly flow peak hourly flow peak hourlp.floir .>y ` rate by 3 MGD, rate by 30 MGD. rate of 1.9 MGD, rate of 19 Mm_ z Signifi- Significant. Significant. None, None. Significant. Significant S canoe Mitigation Construct two Construct 12 wells None required. None required, Construct one well Construct Measure wells and install and install 12,500 and install 5,000 wells and install 16,000 if of if of 14 -inch and if of 12 -inch 5,000 if of� 12 -inch main 36,000 if of traassission 14 -inch and 33,00 ' tr"ission 12 -inch main line. if of 12- line, trans$ission tra"Bisslon" 1 line. line. I r:inderllned impacts = Cannot be mitigated to a less -than -significant level. .. Asterisk M folla+Ing mitigation measure denotes that the identified measure does not reduce impacts to a less -than -significant level - See Table 3-2 for rerommeended policies and implementation measures of Performance Standards. To accommodate new development, the existing system would require improvements, This Impact Includes both the incremental capital costs and imprvements.0 "C" For improverents and capital costs required to upgrade the existing sysm tesee topical chapters of text. - k4 = Not applicable. "y Table 3-1. (Cont.'.nued) Option 2 Option 3 Option 4 toric —Nil Historic Full Historic Full Rate Buildout Rate Buildout Rate Buildout No impact. . No impact. None. None. None required. None required. No impact.c too impact.c None. None. None required. None required. No impact.c Generation of $247,600 ir. annual revenues and $340,700 in annual costs. Annual deficit of $93,000, repre- senting a 27 percent shortfall in annual revenues. Significant. Adopt and imple- ment a different land use mix; designate the Study Area as a redevelopment area; designate the Study Area as an cssessment district.; desig- nate the Study Area as a Mello - Roos Community Facilities District. $4.9 million in capital improve- ments to the city's water, sewerage, and drainage systems. h NA NA No impacts Increase in the None. None. Is None required. None required. peak hourly flow rate of 1.9 MGD. Significant. Construct one well and install 5,000 If of 12 -inch trans$ission line. Generat'�)n of $2,731,900 in annual revenues and 53,906,700 in annual costs. Annual deficit of $ .,174,800, repre- senting a 30 percent shortfall in annual revenues. Significant. Adopt and imple- ment a different land use mix; designate the Study Area as a redevelopment area; designate the Study Area as an assessment district; desig- nate the Study Area as a Mello - Roos Community Facilities District. S15 million in capital improve- ments to the city's water, sewerage, and drainage systems b Increase in the peak hourly flow rate of 19 MGD. Significant. Construct seven wells and install 5,000 If of 14 -inch and 33,000 If of 12 -inch main transBission line. Generation of $468,700 in annual revenues and $633,700 in annual costs. Annual deficit of $165,000, repre- senting a 26 percent shortfall in annual revenues. Significant. Adopt and imple- ment a different land use mix; designate the Study Area as a redevelopment area; designate the Study Area as an assessment district; desig- nate the Study Area as a Mello - Roos Community Facilities District. $4.9 million in capital improve- ments to the city's water, sewerage, and drainage systems.b 0, Increase in the peak hourly flow rate of 3 MGD. Significant. Construct two wells and install 5,000 if of 12 -inch main trans$iss ion line. level. ed measure does not reduce impacts to a less -than -significant level. s of Performance Standards. improvements. This impact includes both the lncrerenta capital costs and improvements under Option 2. ng system see topical chapters of text. Generation of $672,200 in annual rever.ues and $922,600 ii annual costs. Annual deficit of $250,400 repre- senting a 27 percent shortfall in annual revenues. Significant. Adopt and imple- ment a different land use mix; designate the Study Area as a redevelopment area; designate the Study Area as an assessment district; desig- nate the Study Area as a Mello - Roos Community Facilities District. $6.2 million in capital improve- ments to the city's water, sewerage, and drainage systems D NA NA Increase in the peak hourly flow rate of 3.8 Mm. Significant. Construct two wells and install 10,000 If of 12 -inch main trans$ission line. s Eli Table 3-1. Option 1 Option Topic Historic Full Historic (EIR Chapter) Rate Buildout Rate Nater (9) Impact Grid system Grid system No impacts No (Continued) improvements would improvements be required to would be required meet fire flow to meet fire flow requirements. requirements. Signifi- Significant. Significant. None. Not Cance Mitigation Install 83,800 if Install 83,800 if None required. Nor Measure of 8 -inch and of 8 -inch and 6,800 if of 6 -inch 6,800 If of 6-incb pipe and 74 new pipe and 74 new fire hydrants; fire hydrants; adopt an Ordinance adopt an Ordinance requiring fire- requiring fire - suppressing suppressing devices on $ew mf devices on $ew mf structures. structures. Impact $5,657,200 in $10,757,200 in No impacts N t capital capital improvements improvements to the city'sb to the city$% K water system. water system. Signifi- NA Nil None. ?+ cense. Mitigation NA NA None required ': ) Measure --- ----- ----------- --------------------------�-----------~---------------- Sewerage Impact $1,815,000 in $4,469,000 in No impacts soh: (10) capital capital improvements to improvements to the City's b the city's b G trunk sewers. trunk sewers. Signifi- NA NA None. cane Mitigation NA NA None required Measure impact 56,600 if of 84,500 If of No impacts replacement colt replacement cols lection sewers. lection sewers. Signifi- Significant. Significant. None.r Cance Mitigation Install 56,000 if Install 84,500 if Note required Nt� Measure of collEction of collfiction sewers. sewers. :4 Impact $6,282,600 in $9,379,500 in No impact.c NO c-pita2 Improve - capital improve- ments to the meats to the city's col- b city's col- b lection sewers. lection sewers. Underlined Im acts = Cannot be mitigated to a less -than. -significant level. Asterisk ! following mitigation measure denote:; that the identified measure does not redtice-im See Table 3-2 for recommended policies and implementation measures of Performance Standards.';' b To accommodate new development, the existing system would require improvements. This impact:.1 C For improvements and capital costs required to upgrade the existing system see topical chapter NA = Not applicable. Table 3-1. (Continued) Topic Chapter) Historic tion 1 Full Historic Rate Buildout Rate Option 2 Pull Buildout — Historic Option 3 gul— Rate Buildout (9) Impact Grid system Grid system No impnci.c No impact Grid system Grid system tined) improvements would improvements impaovemeats would improvements would be required to would be required be requited to be required to meet fire flow to meet fire flow meet fire flow meet fire flow requirements. requirements. requirements. requirements. Signifi- Significant. Significant. None. None. Significant. Significant. cane Mitigation Install 83,800 1f Install 83,800 If None required. None required. Install 60,300 if Install 60,300 if Measure of 8-incb and of 8 -inch and of 8 -inch and of 8 -inch and 6,800 if of 6 -inch 6,800 If of 6 -inch 16,000 if of 16,000 if of pipe and 74 new pipe and 74 new 6 -Inch pipe and 62 6 -inch pipe Bad 62 fire hydrants; fire hydrants; new fire hydrants; new fire hydrants; adopt an Ordinance adopt an Ordinance adopt an Ordinance adopt an Ordinance requiring fire- requiring fire- requiring fire- requiring fire - suppressing suppressing suppressing suppressing devices on $ew mf devices on new mf devices on Few mf devices on $ew mf structures. structures. structures. structures. Impact $5,657,200 1n $10,757,200 in No impe+:t.c No impact.c $3,985,100 in $7,825,100 in capital capital capital capital improvements improvements improvements improvements to the city's, to the clty'ab to the city'sb to the city'sb water system. water system. water system. water system. Signifi- NA NA None. None. NA NA tante - Mitigation NA NA None required. None required. Nit NA Measure _rage Impact $1,815,000 in $4,469,000 In No Impacts No fact S1,817,000 in $3,487,000 in capital capital capital cepital Improvements to improvements to improvements to improvements. the city's b trunk the city's b the city's b trunk the city's b sewers. trunk sewers. sewers. trunk severs. ,, ,:N .' Signifi- HA NA None. None. NA NA canoe Mitigation NA NA None required. NA NA NA -- -- Measure Impact 56,600 if of 84,500 if of No impacts No impact .7,900 if of 84,500 if of replacement col- replacement col- replacement col replacement co lection sewers.b lectlan sewers.b lection sewers.s lection sewers.. Signifi- canoe Significant. Significant. None. None. Significant. Significant Mitigation Install 56,000 if Install 84,500 if None required. None required. Install 27,900 if Install 94,506 Measure of collection of collection of collection of eollfictioq ?. sewers. sewers. sewers. sewers. Impact $6,282,600 in $9,379,503 in No imp+ct.c No impact c 53,096,900 in $9,3791500 Say capital improve- capital improve- capital improve- capital improvo, ments to the meats to the meats to the menta to the rN7 City's col- b city's col- b city's col-, city's col-'%- lection sewers. lection se+trs. lection sewers. lection seve4 -= :erlined Impacts a Cannot be mitigated to a less -than -significant level. �.eris of wing mitigation measure denotes that the identified measure does not reduce impacts to a less -thaw -significant level. gee Table 3-2 for recommended policies and implementation measures of Performance Standards. - 'o accommodate new development, the existing system would require improvements. This impact includes both the incremental capital costs and impl� : =or improvements and capital costs required to upgrade the existing system Be* topical chapters of text. ' = Not applicable._!. Table 3-1. (continued) - Historic Rate _ Rate Option 2 Full Buildout 0^tion 3 ..istnric u a Rate Buildout Option 4 HistoricFull trate Buildout ' r impact.c No Impact- Grid system Grid system Grid system Grid system improvements would lmprovrsvuts would improvements would improvements would be required to be required to be required to be required to meet fire flow meet fire flow meet fire flow meet fire flow - requirements. requirements. requirements. requirements. I ae. None. Significant_ Significant. Significant. Significant. .ae required. None required. Install 60,300 if Install 60.300 if Install 33,800 If Install 33,800 If Of 8 -inch and of 8 -inch and of S -Inch and of 8 -inch and ' 16,000 If of 16,000 if of 26,800 if of 26,800 If of 6 -inch pipe and 62 6 -inch pipe and 62 6 -inch pipe and 45 6 -inch pipe and 45 new fire hy.tr'ants; new fire hydrants; new fire hydrants; new fire hydrants; adopt an Ordinance adopt an ordinance adopt an Ordinance adopt an Ordinance requiring fire- requiring fire- requiring fire- requiring fire - suppressing suppressing suppressing suppressing devices on Bev mf devices oo BOW mf devices on Bev mf devices on Bev mf structures. structures. structures. structures. ,i, impact.c impact.c No impact.c $3,985,100 in $7,825,100 in S3,440,000 in $4,100,000 In capital capital capital capital improvements improvements improvements improvements to the city'sb to the clty'sb to the clty'sb to the city'sb water system_ water system. water system. water system. --�e. None. NA NA NA NA t�nne required. None required. NA NA NA NA :a impact.c No impact.c $1,817,000 in $3,487,000 in $2,077,000 in $2,642,000 in capital capital capital capital Improvements tofmprovments to improvements to improvements to the cup's b the cut' s b the city's b the city's b ) trunk sewers. trunk sewers. trunk severs. trunk sewers. None. NA NA NA NA A; one required. i NA NA Nk NA NA '�`o impact.c No impact.c 27,900 if of 84,500 if of 11,300 if of 16,900 If of replacement rnlb replacement cols replacement co16 replacement uro15 lection sev`rs. lection severs. lection sewers. lection sewers - t, -,one. None. Significant. Significant. Significant. Significant. >-tnne required. None required. Install 27,900 If Install 84,500 if Install 11,300 if Install 16,900 if Of collection of collection of collection of collgction sewers. sewers. sewers. sewers. vo impact No impact 53,0%,900 in 59,379,500 in $1,335,000 in $1,832,000 is capital improve- capital improve- capital improve- capital improve- ments to the ments to the meats to the Monts to the city's col- b city's col- city's col- b city's col- lection sewers. b lection sewers. lection severs. lection severs. t '_-asure does not reduce impacts to a less -than -significant level. "Performance Standards. t0vements. This impact inclades both the incremental capital costs and Improvements under Option 2. c:stem see topical chapters of text. i 1: i 6 Table 3-1. Option I option 2 Topic Historic Pull Historic p = .Chapter) Rate Buldout Rate Sewerage Signifl- NA NA None. Non (10) Cauca . (Continued) Mitigation NA NA None required. Nor Measare Impact Sewer capacity Sewer capacity No impact c No deficiencies in deficiencies in 1,630 if of trunk 15,675 if of severs and 27,900 trunk sewers and If of Vlection 56,600 1f of severs. collectgon severs. Signifl- Significant. Significant. None. Nor, canoe Mitigation Upgrade 1,630 If Upgrade 15,675 If None required. Nor Measure of trunk severs of trunk sewers and 27,900 if of and 56,600 If of collect4on collection sewers. sewers. - --------------------------------------------------- ------------------------------j Drainage (11) Impact Increased runoff Increased runoff No impact. No due to larger due to larger impervious impervious S surfaces, surfaces, resulting in resulting In ponding ♦t cath basins and ponding at catch basins and } ilooding in $Ileys flooding in $lleys i and gutters. and gutters. 3 Sigalfl- Significant (if Significant. None. carie development oocnrs In conoemtrated areas). 5 Mitigation provide additional Provide additional None required. ` Xoz Measure storm drains= storm drains, s develop develop performenog perfoxmancS standards: standards: i G Continue to o Continue to develop, or develop, or = update and update and enforce commu- enforce cocmu- aity design nity design policies as part policies as part " of the SPARC b of the SPARC b requirements. requirements. s Impact Stora drainage Storm drainage No impacts pipe b pipe b deficiencies. deficiencies: Underlined Impacts v Cannot be mitigated to a less -than -significant level. Asterisk foil -owing mitigation measure denotes that the identified measure does not reduce._I Sea Table 3-2 for recommended policies and implementation measures of performance Stsndird -- b To accommodate new development, the existing system would require improvements. This-:i;paCC:.- c For improvements and capital costs required to upgrade the existing system see topical Chap NA a Not applicable. Table 3-1. (Continued) Option 1 Option 2 Option 3 Historic Full Historic Full Historic -r) Rate Buildout Rate Buildout Rate Buildout Signifi- NA NA None. None. NA NA N.\ ,Once Mitigation NA NA None required. None required. NA NA NA Measure Impact Sever capacity Sewer capacity No Impact -c No impact c Sever capacity Sever capacity Sever deficiencies in deficiencies in deficiencies in deficiencies in def=t. 1,630 If of trunk 15,675 if of 1,750 lg of trunk 10,570 If of trunk 3,255 severs and 27,900 trunk severs and sewers. severs and 56,600 sewer_ if of c813ection 56,600 If of if of c$llection If of severs. collecquo severs. sever: sewers. Signifi- tante Significant. Significant. None. None. Significant. Significant. S. 'r'! Mitigaticn Upgrade 1,630 if Upgrade 15,675 If None required. None required. Upgrade 1,750 If Upgrade 10,570 If Upgra- Measure of trunk sewers of trunk severs of trunk severs. of trunk severs of t> and 27,900 If of and 56,600 if of and 56,000 lf.of and 1 collection collecquo collectAon colla severs. severs. severs. sever- -------------------------------------------------------------------------------------------------------------------------------------------- tl) Impact Increased runoff Increased runoff No impact. No impact. Increased runoff Increased runoff Inge due to larger due to larger due to larger due to larger due t Impervious impervious impervious impervious impel surfaces, surfaces, surfaces, surfaces, surfs resulting in resulting in resulting in resulting in resui ponding at catch ponding at catch ponding at catch ponding at catch pondl basins and basins and basins and basins and bas L•= flooding in $lleys flooding in 911eys flooding in SIleys flooding in glleys floor and gutters. and gutters. and gutters. and gutters. and c wt,r,,. Only .' signifi- Significant (if Significant. None. None, Significant (if Significant. Si tante development occurs developwent occurs In concentrated in concentrated areas). areas). Mitigation Provide additional Provide additional None required. None required. Provide additional Provide additional PSovi Measure storm drains; storm drains; storm drains; storm drains= atom develop develop develop develop deve! perforwancg performenc& performnnofi perforwancl. pert, standards: "standards. staadards: ":,standards: Stan, o Continue to o Continue to o Continue to o Continue to 0 CO: develop, or develop, or develop, or develop, or :de - update and update and update and update and -:UP, enforce commu- enforce commu- enforce comma- enforce commu- en: nity design nity design nity design nity design nit policies as part policies as part policies as part policies as part po: of the SPARC D of the SPARC b of the SPARC of the SPARC of requirements requirements requirements.D requirements.D re.. Impact Stora drainage Storm drainage No Impect.c No Impacts Storm drainage Storm drainage Stor, pipe b deficiencies, pip- b deficiencies. pipe b deficiencies. pipe b deficiencies. pipe deli• -:�d�Imactss = Cannot be mitigated to a les3-than-slgaificant level. if) following mitigation measure denotes that the identified measure does not reduce impacts to a less -than -significant level. :le 3-2 for recommended policies and implementation measures of Performance Standards. - ,amodate new development, the existing system would require improvements. This impact includes both the incremental capital costs and Improvements.ruide uovements and capital costs required to upgrade the existing system sea topical chapters of text. applicable. - Table 3-1. (Continued) Option 2 Option 3 Option 4 Historic Full Historic historic F6T1 Rate Buildout Rate Bulldout Rate Buildout None. None. NA NA NA NA None required. None required. NA NA NA NA No Impact.' No impact .c Sever capacity Serer capacity Sever capacity Sever capacity deficiencies in deficiencies in deficiencies in deficiencies in 1,750 1t of trunk 10,570 If of trunk 56,600 3,2`_5 if of trunk 6,480 If of trunk severs. severs and If of cgllection severs and 1,350 if of 91lection severs and 6,950 if of cBllection severs. severs. severs. None. None. Significant. Significant. Significant. Significant. Vone required. None required. Upgrade 1,750 Ifb Upgrade 10,570 if Upgrade 3,255 if Upgrade 6,480 if of trunk severs. of trunk severs of trunk severs of trunk severs and 56,000 if of. and 1,350 if of and 6,950 if of b - collectdon 0ollect4on collection severs_ sewers. ------ sewers. .--------- —--------------------------------------------------------------- No impact. No impact. Increased runoff -' Increased runoff -------------------- Increased runoff ----- `-------- ----- Increased runoff due to larger - due to larger due to larger due to larger impervious impervious impervious impervious surfaces, surfaces, surfaces, surfaces, resulting in resulting in resulting in resulting in ponding at catch ponding at catch ponding at catch ponding at catch basins and basins and basins and basins and flooding in alleys flooding in alleys flooding in alleys flooding in alleys and gutters, and gutters. and gutters in the and gutters in the "target areas. •target areas" only. only. None. None, Significant (if Significant. Significant. Significant. development occurs in concentrated areas). None required. None required. Provide rddltional Provide addit1vnal Provide additional Provide additional storm drains; storm drains; storm drains; storm drains; develop develop develop develop performan% performance performancl performanci standards: standards: standards: standards: o Continue to o Continue to o Continue to o Continue to develop, or develop, or develop, or develop, or update and update and update and update and enforce commu- enforce commu- enforce commu- enforce commu- nity design nity design nity design nity design policies as part policies as part policies as part policies as part of the SPARC bof the SPARC b of the SPARC b of the SPARC b requirements. requirements, requirements, requirements. No ixpact.c No impact.c Storm drainage Storm drainage Storm drainage Storm drainage pipe b pipe b pipe b pipe b deficiencies. deficiencies. deficiencies. deficiencies. al . easure does not reduce impacts to a less -than -significant level. Performance Standards. -ovements. This impact includes both the incremental capital costs and improvements under Option 2. rstem see topical chapters of text. 7 Table 3-1. Option I Option Topic Historic Full Historic (EIR Chapter) Rate Buildout Rate Drainage (11) Signifi- Significant. Significant. None. (Continued) canoe Mitigation Install needed Install needed b None required. Measure storm drain pipe:b storm drain pipe: o 18- and 21 -inch o 18- and 21 -inch pipe on Acacia pipe on Acacia 0 18 -inch pipe on o 18-incb pipe on Vine, Cherokee, Vine, Cherokee, P-)plar, and Poplar, and Garfield Garfield o 21 -Inch pipe on o 21 -inch pipe on Vine Vine 0 18 -inch pipe on o 18 -inch pipe on Flora Flora 0 15-, 21-, an9 ci 15-, 21-, and 30 -inch pip. on 30 -inch pipe on Hutchins, Ela, Hutchins, Elm, and Locust and Locust 0 15-, 18-, 21-, 0 15-. IP-, 21-, and 30 -inch pipe and 30 -inch pipe on Calaveras, on Calaveras, Lockeford, and Lockeford, and Cen•.ral Central 0 15- and 18 -inch o 15- and 18 -inch pipe on Olive pipe on Olive 0 12 -inch pipe on o 12-incb pipe on Forrest Forrest ,i Impact Inadequate Inadequate No impact. revenues generated revenues to finance storm generated to ' drainage system finanne storm improvements. drainage system improvements. Siguifi- Si�nificAmt. Significant. None. cane Mitigation Use .a -Tract Use Infract None required. Measure fund:; establish funds; establish an asausssent an assessment district in the district in the 1 Study Area; Study Area; establish a establish a citywide storm citywide storm drainage main- drainage —1n- tenance and tenance and Underlined Ink -acts . Cannot be mitigated to a less -then -significant levet. j Fjter-s o owing mitigation measure denotes that the identified measure does not re See Table 3-2 for recommended policies and implementation measures of Performance Stand b To accommodate new development, the existing system would require Improvements. This L C For improvements and capital costs required to upgrade the existing system see topical i NA Not applicable. Noe Nor �k None None Table 3-1. (Continued) Topic Historic tion I Full Historic tion 2 ' pull Historic tion 3 Full (EIR Chapter) Rate Buildout Rate Buildout Rate Buildout Drainage (11) Signi'fl- (Continued) canoe Mitigation Measure Significant. Significant- None. None. Install needed b Install needed b None required. None required. storm drain pipe: storm drain pipe: o 18- and 21 -inch o 18- and 21 -inch pipe on Acacia pipe on Acacia 0 18 -inch pipe on o 18 -inch pipe on Vine, Cherokee, Vine, Cherokee, Poplar, and Poplar, and Garfield Garfield o 21 -inch pipe on o 21 -inch pipe on Vine Vine o 18-incb pipe on o 18 -inch pipe on Flora Flora 0 15-, 21-, and o 15-, 21-, and 30 -inch pipe on 30 -inch pipe on Hutchins, Elm, Hutchins, Ela, and Locust and Locust 0 15-, 18-, 21-, 0 15-, 18-, 21-, and 30 -inch pipe and 30 -inch pipe on Calavere?; on Calaveras, Lockeford, and Lockeford, and Central Central o IS- and I8-incb o 1 - and Winch pipe on Olive pipe on Olive 0 12-incb pipe on o 12 -inch pipe on Forrest Forrest Significant. Significant. Install needed bInstall neede% storm drain pipe: storm drain F= 0 18- and 21-incb o 18- and 21 pipe on Acacia pipe on Aca_ 0 18 -inch pipe on o 18 -inch pil:- Vine, Cherokee, Vine, Cbem Poplar, and Poplar, and Garfield Garfield 0 21 -inch pipe on o 21 -inch pip, Vine Vine 0 18 -Inch pipe on o 18 -inch pip, Flora Flora 0 15-, 21-, and o 15-, 21-, ar 30 -inch pipe on 30 -inch pip, - Hutchins, Elm, Hutchins, El- and Locust and Locust 0 15-, 18-, 21-, o 15-, 18-, 21 and 30 -inch pipe and 30 -inch on Calaveras, on Calaveras. Lockeford, and Lockeford, a Central Central o IS- and 18 -inch o 15- arA 18-i. pipe on Olive pipe on Oliw 0 12-incb pipe on 0 12-1nch pipe Forrest Forrest Impact Inadequate Inadequate No impact. No impact. Inadequate Inadequate revenues generated revenues revenues generated revenues g®ere to finance storm generated to to finance storm to finance stow drainage system finance storm drainage system drainage systee improvements. drainage system improvements. improvements. improvements. Signifi- Significant. Significant. None. None. Cance Significant. Significant. ;. Mitigation Use In -Tract Use In -Tract None required. None required. Use In -Tract Use In Tract ; Measure funds; establish funds; establish funds; establish funds; establis' an assessment an assessment an assessment an assessment district in the district in the district in the district in the Study Area; Study Area; Study Area; Study Area; establish a establish a c+stablish a establish a citywide storm citywide storm citywide storm citywide storm drainage main- drainage main- drainage main- drainage main- tenance and tenance and tenance and tenance and Underlined Impacts = Cannot be mitigated to a less-tnan-significant level. terisk (*) fol ing mitigation measure donotes that the identified measure does Dot reduce impacts to a less-than-significaut level. See Table 3-2 for recommended policies and implementation measures of Performance Standards. b To accommodate new development, the existing system would require improvements. This impact includes both the incremental capital costs and improve: C For improvements and capital costs required to upgrade the existing system see topical chapters of text. NA = Not applicable. r Table 3-1. (Continued) Option 2 Option 3 __ Option 4 Eistoric Furl- Historic Full Historic Full Rate Buildout Rate B Ildout Rate 9ui ldout None. Significant, Significant. Significant. Significant. -equired. None required. Install neededb Install needed b Install needed Install needed Stora drain pipe: store drain pipe: drain pipe: drain pipe: o IS- and 21 -inch o 18- and 21 -inch O 18 -inch pipe on o 18-incb pipe on pipe on Acacia pipe on Acacia Acacia Acacia o 18 -inch pipe on o 18 -inch pipe on o 18-, 24-, and o 18-, 24-, and Vine, Cherokee, Vine, Cherokee, 30 -inch pipe on 30 -inch pipe on Poplar, and Poplar, and Vine, Cherokee, Vine, Cherokee, Garfield Garfield Poplar, and Poplar, and Garfield Garfield 0 21 -Inch pipe on o 21 -inch pipe on Vine Vine o 28 -inch pipe on o 18 -inch pipe on Vine Vine 0 18 -inch pipe on o 18 -inch pipe on Flora Flora o 15 -Inch pipe on o 15 -inch pipe on f Flora Flora o 15-, 21-, and o 25-, 21-, and 30 -inch pipe on 30 -inch pipe on o 15-, 21-, and o 15-, 22-, and Hutchins, Ela, Hutchins, Ela,- 30 -inch pipe rn 30 -inch pipe on and Locust and Locust Hutchins, Ela, Hutchins, Ela, and Locust and Locust o 15-, 18-, 2I-, o 15-, I8-, 21-, and 30 -inch pipe and 30 -inch pipe o 15-, 18-, 21, o 15-, 18-, 21, on Calaveras, on Calaveras. and 30 -inch pipe and 30-incb pipe Lockeford, and Lockeford, and on Hutchins, on Hutchins, Central Central Ela, and Locust Ela, and Locust o IS- and 18 -Inch o 15- and 18 -Inch o 15-, 18-, 21-, o 15-, 18-, 21-, pipe on Olive pipe on Olive and 30 -inch pipe rad 30-incb pipe on Calaveras. on Calaveras, . 0 12 -inch pipe on o 12 -inch pipe on Lockeford, and Lockeford, and Forrest Forrest Central Central o is- and 18 -Such o 15- and 18 -inch pipe on Olive pipe on 011ve t o 12 -inch pipe on o 12 -inch pipe on Forrest Forrest pact. No impact. Inadequate Inadequate Inadequate Inadequate revenues generated revenues generated revenues generated revenues generated to finance storm to finance storm to finance storm to finance storm drainage system drainage system drainage system drainage system improvements. Improvements. improvements. improvements. None. Significant. Significant. Significant. Significant. required. None required. Use In -Tract Use In-T_act Use In -'Pratt Use In -Tract funds; establish funds; establish funds; establish funds; establish an assessment an assessment an assessment an assessment district in the district In the district In the district in the Study Area; Study Area; Study Area; Study Area; establish a establish a establish a establish a citywide store citywide storm citywide storm citywide storm drainage main- drainage main- drainage main- drainage main- tenance and tenance anu Lenance and tenance and s not reduce impacts to a less -than -significant level- ce Standards. This impact includes both the incremental capital costs and improvements under Option 2. topical chapters of text. s pe , — year. year. Signifi- Less than Less than None. Non cance significant significant Mitigation None required. None required. None required. Non Measure Police Impact Increased demand Increased demand No impact. No Protection for police for police (13) services. services and facilities. Signifi- Significant. Significant. None. Non, canoe mitigation Hire five police Hire 52 police None required, lion Measure officers, two 'officers, 22:;..: support staff, and support staff, purchase two and purchase 16 patrol cars, patrol cars; e, ,and or build new police facilities. Impact Increased Increased No impact. vandalism. vandalism. Signifi- Significant. Significant. None. Nom cane Mitigation Develop Develop None required. Boni Measure performnno& perform" stendazds: standards: Underlined Impacts a Cannot be mitigated to a less -than -significant level. jilifisk-TwY following mitigation measure denotes that the identified measure does not reduce iq See Table 3-2 for recommended policies and implementation measures of Performance Stenderdi b To accommodate new development, the existing system would require improvements. This impaet,if c For improvements and capital costs required to upgrade the existing system see topical dapter; NA = Not applicable. >4 { L ': Table 3-1. Option 1 option 2 Topic iii-siric Historic (EIR Chapter) Rate Buildout Rate Drainage (11) improvement improvement (Continued) district; adopt a district; adopt a special East Side special East Side storm drainage storm drainage fee. fee. Impact S874,000 in $874,000 in No Impact.c No t�. capital capital improvements to improvements to the city's stormb the city's storms drainage system. drainage system. Signifi- cance NA NA None. Non: !litigation NA NA None required.- Non,- measure Solid Waste Impact Solid waste Solid waste No impact. No s, (12) generation of 3 559 tons r generation of 40 545 tons r pe , — year. year. Signifi- Less than Less than None. Non cance significant significant Mitigation None required. None required. None required. Non Measure Police Impact Increased demand Increased demand No impact. No Protection for police for police (13) services. services and facilities. Signifi- Significant. Significant. None. Non, canoe mitigation Hire five police Hire 52 police None required, lion Measure officers, two 'officers, 22:;..: support staff, and support staff, purchase two and purchase 16 patrol cars, patrol cars; e, ,and or build new police facilities. Impact Increased Increased No impact. vandalism. vandalism. Signifi- Significant. Significant. None. Nom cane Mitigation Develop Develop None required. Boni Measure performnno& perform" stendazds: standards: Underlined Impacts a Cannot be mitigated to a less -than -significant level. jilifisk-TwY following mitigation measure denotes that the identified measure does not reduce iq See Table 3-2 for recommended policies and implementation measures of Performance Stenderdi b To accommodate new development, the existing system would require improvements. This impaet,if c For improvements and capital costs required to upgrade the existing system see topical dapter; NA = Not applicable. >4 { L ': Table 3-1. (Continued) Underlined lmp�acts - Cannot be mitigated to a less-tban-significant level. er s following mitigation measure denotes that the identified measure does not reduce impacts to a less -than -significant level. See Table 3-2 for recommended policies and implementation measures of performance Standards. b To accommodate new development, the existing system would require improvements. This impact includes both the incremental capital costs and C For improvements and capital costs required to upgrade the existing system see topical chapters of text. NA = Not applicable. Option 1 _ Option 2 Option 3 Topic Historic '�4-iT Historic hill` `Historic iSilT - R Chapter) Rate Buildout Rate Buildout Rate Buildout linage (11) improvement improvement improvement improvement , ontinued) district; adopt a district; adopt a dastrict; adopt a district; adopt a c: special East Side special East Side special East Side special Fast Side _ storm drainage storm drainage storm drainage storm drainage fee, fee. fee. fee. Impact $874,000 in $874,000 in No impact•c No impact.c $874,000 in $874,000 in , capital capital capital capital improvements to improvements to improvements to improvements to the city's stormb the city's stormb the city's stormb the city's gtor% - drainage system. drainage system. drainage system_ drainage system. Signifi- Nk NA None. None. NA NA cane Mitigation NA NA None required. None required. NA NA Measure lid Haste Impact Solid waste Solid waste No impact. No impact. Solid waste Solid waste. i2) generation of generation of generation of generation of 3,559 tons per 40,545 tons per 2,190 tons per 24,950 tons per year. year. year. year. Signifi- Less than Less than None. None. Less than Less than - cance significant significant significant. significant. - Mitigation None required. None required. None required. None required. None required. None required.! !._... Measure ?olice Impact Increased demand Increased demand No impact. No impact. Increased demand Increased daro;d,° ?rotection for police for police for police for police (13) services. services and services. services asg facilities. facilities.:kF;: Signifi- Significant. Significant. None. None. Significant. Siggificant:z::r';;kM canoe >--"- Mitigation Hire five police !lire 52 police None required. None required. Hire three police Hire 32 pollclll,:, Measure officers, two officers, 22 officers, two officers, 14x`•;_: support staff, and support staff, support staff, and support stftff;`s purchase two and purchase 16 purchase one purchase 10 patmi patrol cars. patrol cars; patrol car, cars; expand'='cry expand or build build new po110e= new police facilities ',? facilities. Impact Increased Increased No impact. No impact. Increased Increased vandalism. vandalism. vandalism. vandalism. , Signifi- Significant. Significant. None. None. Significant. Signiiicant:.,'�'xe"+-._ canoe r #' Mitigation Develop Develop None required. None` required. Develop Develop Measure performancff performancff performancS perform= standards: stand": standards: standards Underlined lmp�acts - Cannot be mitigated to a less-tban-significant level. er s following mitigation measure denotes that the identified measure does not reduce impacts to a less -than -significant level. See Table 3-2 for recommended policies and implementation measures of performance Standards. b To accommodate new development, the existing system would require improvements. This impact includes both the incremental capital costs and C For improvements and capital costs required to upgrade the existing system see topical chapters of text. NA = Not applicable. Table 3-1. (Continued) 9 Option 2 Option 3 Option 4 nlsxor c Rate tSZ'�� Buildout --Fistoz cid— Rate Buildout His�r�— Rate Full Bulldaut improvement improvement improvement improvement district; adopt a district; adopt a district; adopt a district; adopt a special East Side special Fast Side special Fast Side special East Side storm drainage storm drainage storm drainage storm drainage fee. fee. fee. fee. No impacts No impacts 5874,000 in $874,000 1n $1,295,OOo in $1,295,000 In capital capital capital capital improvements to improvements to improvements to improvements to the city's stormb the city's stormb the city's stnrs� the city's storm, drainage system. drainage system, drainage system. drainage system. None. None. NA NA NA NA None required. None required. NA NA HA NA No impact. No impact. Solid waste ;olid waste Solid waste .;olid waste generation of ganeration of generation of generation.of 2,190 tons per 24,950 tons per 3,559 tons per 5,232 tons per year. year. year. year. None. None. Less than Less than Less than Less than significant. significant. significant, significant. None required. None required. None required. None required. None required. None required. No impact. No impact. Increased demand Inueaaad 6esapd Increased demand Increased demand for police for polio for police for police services. services and services. services. facilities. None. None. Significant. Siguificant. Sigaiflcant. Significant. None required. None required. Hire three police Hire 32 police Hire five police Hire seven police officers, two officers, 14 officers, two officers, three support staff, and support staff, and support staff, and support staff, and purchase one purchase 10 patrol purchase two purchase two patrol patrol car. cars; expand or patrol cars. cars. build new police facilities. No impact. No impact. Increased Increased Increased Increased vandalism. vaudalim. vandalism, vandalism. None. None. Significant. Significant. Significant. Significant. None required. None required. Develop Develop Develop Develop performancl performnnc� performancf performance standards: standards: standards: standards: a2. aasure does not reduce impacts to a less -than -significant level. Performance Standards. rovments. This impact includes both the incremental capital costs and improvements under Option 2. ,stem see topical chapters of text. 9 Table 3- Option 1 Option � Topic Historic FullAis crit 2 (EIR Chapter) Rate Buildout Rate Police o Amend SPARC o Amend SPARC Protection requirements to requirements to (13) require archi- require archi- (Continued) tectural control tectural control of "vandal- of 'vandal - resistant ' resistant materials." materials." Fire Impact Increased demand Increased demand No Impact. N, Protection for fire for fire (14) protection protection services. services and facilities. Slgnifi- Significant. Signiflcaut. None. N. tante Mitigation Hire four fire Hire 42 fire None required. N Measure fighters. fighters; purchase new fire fighting vehicles; expand or build new facilities. Impact Increased fire Increased fire No impact. N•: bazard, hazard. Signifi- Significant. Significant. None. N< teats Mitigation Develop perfor- a Develop perfor- a None required. NL Measure .sacs standards: Samoa standerds: o Require nw of o Require new mf units to be units to be equipped with equipped with sprinkler aprimkler systems. systems. Schools (35) Impact 648 (377 K-6 90 6'458 (4,295 K-6 No impact. Nv Students '� jra set d. students generated. Signifl- Significant- Significant- None. canoe unavoidable. unavoidable (with available funding mechanisms). Mitigation Hire 25 teachers, Hire 298 teachers, None required. Measure one administrator, 32. administrators, one custodian, one 32 custodians, 32 clerical staff, clerical staff. - three kitchen and 47 kltcbec: staff, and staff and purchase eight construct six Onderl�uPacts ` Cannot be mitigated to a less -than -significant level. teris o owing mitigation measure denotes that the identified measure does not re&Ace i See Table 3-2 for recommended policies and implementation measures of Performance StandazCs. b To accomodate new development, the existing system would require improvements. This Impact c For improvements and capital costs required to upgrade the existing system see topical cbspte NA " Not applicable. Table 3-1. (Continued) Topic :R Chapter) Option 1 _ Historic Full Rate Buildout option 2 Historic Ful 1 Rate Buildout Option 3 Historic Ful I Rate Buildout rice o Amend SPARC o Amend SPARC 7-8 and 951 o Amend SPARC o Amend SPARC >tectlon requirements to requirements to requirements to requirements to 31 require archi- require archi- require archi- require archi- >nt.innued) tectural control tectural control unavoidable (with tectural control tectural control of *vandal- of "vandal- available funding of "vandal- of "vandal - resistant resistant Hire 298 teachers, Hone required. None required. resistant resistant ---------------------------------------------------------------------------------------------------------------------------------------------- materials." materials." 18 administrators, materials." materials." :e Impact Increased drrand Increased demand No Impact. No impact. Increased demand Increased demand otection for fire for fire and 27 kltebea-= for fire for fire -4) protection protection construct six protection protection ;nderlined I cts = Cannot be mitigated to a less -than -significant level. services. services and rsterisk (N) tolloving mitigation measure denotes that the identified measure does not reduce impacts to a less -than -significant level. services. services and ' To accommodate new development, the existing system would require improvements. This impact includes both facilities. For improvements and capital costs required to upgrade the existing system see topical chapters of text. facilities. Siguifi- Significant. Significant. None. None. Significant. Significant. Cance Mitigation Hire four fire Hire 42 fire None required. None required. Hire three Hire 26 fire Measure fighters. fighters; purchase fire fighters. fighters; pur�:hase new fire fighting new fire fighting vehicles; expand vehicles; expand or build new or build new facilities. facilities. -- Impact Increased fire Increased fire No impact. No impact. Increased fire Increased fire hazard. hazard. hazard. hazard. Signifi- canoe Significant. Significant. None. None. Significant. Significant. _ Mitigation Develop perfor- Develop perfor- ° None required. None required. Develop perfor- Develop perfor- Measure mance standardsia mance standards: mance standards: ° mance standards:° o Require new of o Require mew of o Require naw of o Require now of units to be units to be units to be units to be.. equipped with equipped with equipped with equipped with: sprinkler sprinkler sprinkler sprinkler systems. systems. systems, systems. •chools (15) Impact 648 (3771;-6 90 6,4 (4,295 K6t No impact. No impact. 399 (232 K -6L 56 4,564 (2,643 K-fi -u en7 136 y-11) 1 031 7-8 and _and 8 63 9TH)634 7-8 and 951 nt s- geMr�ed. geuera eed. generated. 2i.'r-- signifi- Significant- Significant- None. None. Significant- Significant- Cance unavoidable. unavoidable (with unavoidable. unavoidable (Ath available funding available funding mechanisms). mechanisms), .: Mitigation Hire 25 teachers, Hire 298 teachers, Hone required. None required. Hire 14 teachers, Hire 172 teachers, - Measure one administrator, 32 administrators# one administrator, 18 administrators, one custodian, one 32 custodians, 32 one custodian, one 18 custodiansVIS clerical staff, clerical staff, clerical staff, clerical staff. three kitchen and 47 kitchen and one kitchen and 27 kltebea-= staff, and staff and staff.* staff and purchase eight construct six construct fait��- ;nderlined I cts = Cannot be mitigated to a less -than -significant level. rsterisk (N) tolloving mitigation measure denotes that the identified measure does not reduce impacts to a less -than -significant level. See Table 3-2 for recommended policies and implementation measures of Performance Standards. ' To accommodate new development, the existing system would require improvements. This impact includes both the incremental capital costs and improveme For improvements and capital costs required to upgrade the existing system see topical chapters of text. 'A = Not applicable. Table 3-1. (Continued) Option 2 k!— Historic Rate Ruildout Qption 3 _ !slur c ILIIHistoric Rate Buildout option 4 FSiii Rate Buildout C o Amend SPARC o Amend SPARC o Amend SPARC o Amend SPARC { s to requirements to requirements to requirements to requirements to i- require archi- require arch!- require arch- require archi- ntrol tectural control tectural control tectural control tectural control of "vandal- of "vandal- of "vandal- of "vandal - resistant resistant resistant resistant materials." materials." materials." materials." nand impact. No impact. Increased demand Increased demand Increased demand ----------------- Increased demand for fire for fire for fire for fire protection protection protection protection servirrs. services and services. services and facilities. facilities. None. None. Significant.., Significant. Significant. Significant. None required. None required. Hire three Hire 26 fire Hire four fire Hire six fire ase fire fighters. fighters; purchase fighters. fighters; purchase ting new fire fighting new fire fightiny d vehicles; expand vehicles; expand or build new or build new facilities. facilities. e No impact. No impact. Increased fire Increased fire Increased fire Increased fire hazard. hazard. hazard. hazard. None. None. Significant. Significant. Significant. Significant. r- None required. None required. Develop perfor- a Develop perfor- a Develop perfor- m Develop perfor-, a mance standards: mance standards: mance stands ds: mance standards, mf o Require new mf o Require new mf o Require new mf o Require new of units to be units to be units to be units to be th equipped with equipped wit,`. equipped with equipped with sprinkler sprinkler sprinkler sprinkler Systems. Systems. systems. systems. -6 No impact. No impact. 399 (23� 4,564 (2.643,3KK-6t 648 1377 K, -66t.990. 953 (554 K-6 7-8"and—d3 9�is� and 951 7$- a�Y36 9-12) - as 2w st- its genera ed. s u m genera s is 4enera ed. 9- students 4enera None. Noce. Significant- Significant- Significant- Significant- ith unavoidable. unavoidable (with unavoidable. unavoidable. �Inavailable 9 funding mechanisms). ors, Naze required. None required. Hire 14 teachers, Hire 172 teachers, Hire 25 teachers, Hire 42 teachers, ors, one administrator, 18 administrators, one administrator, three 32 one custodian, one le custodians, le one custodian, one administrators, clerical staff, clerical staff, clerical staff, three custodians, and one kitchen and 27 kitchen and three kitchen three clerical staff.* staff and staff, and staff, and five construct four purchase eight kitcheu staff, t level. ied measure does not reduce impacts to a less -than -significant level. es of Performance Standards. e improvements. This impact includes Loth the incremental capital costs and improvements under Option 2. Ing system see topical chapters of text. 10 Table 3-1. Option 1 Option 2 '- Topic Historic ��— Historic (EIR Chapter) Rate Buildout Rate Schools (15) portable elementary (Continued) classrooms.* schools, two middle schools, and one high School.* - Impact Absence of avail- Absence of avail- No impact. No : able land to able land to expand existing or expand existing or construct new construct new schools in the schools In the Study Area; new Study Area; new facilities would facilities would be located a be located a considerable considerable distance from distance from students they students they sem, creating serve, creating additional busing, additional busing, cost, and cost, and inconvenience. 1ncnaVenienoe. Signifi- Significant. Siguificant. None. NCO, - canoe Mitigation Develop a joint Develop a joint None required. None Measure (city, LUSD) Land (city, IASD) Land Banking Program to Basking Program to acquire Study Area acquire Stndy Area property as it property as it becomes available; becomes available; jointly work with jointly work with the state Depart- the state Depart - sent of Education sent of E&Cation to obtain a waiver to obtain a waiver on minimus parcel on mislmma parcel sizes for eleven- sizes for elemen- tary schools. t.ary schools. Parks and Impacts Increased demand Increased demand No impact. No Recreation for developed ot'�r—leveTo�� (16) parkland; absence 'Toil absence of available land Of available lend in theStudy Area pro to provide new £ ems new parks • r s__• Signifi- Significant. Significant- None. -Mono canCQ unavoidable. Mitigation Provide 30.2 acres Provide 363.6 None required. Measure of parkland aces of parkland elsewhere in Lodi: elsewhere in Lodi; = develop a Land develop a Land Banking Program to Banking Program to acquire Study Area acquire Study Area property for park property for park development; amend development; amend SPARC requirements SPARC requirements to require mf to require mf Uo_dc�rlined�IS acts Cannot be mitigated to a less -than -significant level. Jste-r— c— Ce) following mitigation measure denotes that the identified measure does not reduce.ly; See Table 3-2 for recommended policies and implementation measures of Performance Standards. b To accommodate new development, the existing system would require improvements. This impact is c For improvements and capital costs required to upgrade the existing system a" topical chapter! NA Not applicable. Table 3-1. (Continued) Option 1 option 2 option 3 Historic F�i]T Historic rul I Historic s or. r) Rate Buildout Rate Buildout Rate Buildout gate portable elementary elementary portable classrooms.* schools, two schools, one classrooms.' middle schools, middle school, and and one high one high school.* school.* Impact Absence of avail- Absence of avail- No impact. No impact. Absence of avail- Absence of avail- Absence of able land to able land to able land to able lard to able land t expand existing or expand existing or expand existing or expand existing or expand exist construct new construct new construct new construct new construct ul schools in the schools in the schools in the schools in the schools in { Study Area; new Study Area; new Study Area; new Study Area; new Study Area; facilities would facilities would facilities would facilities would facilities 1 be located a be located a be located a be located a be located 4 considerable considerable considerable considerable considerable distance from distance from distance from distance from distance fr1 students they students they students they students they students serve, creating serve, creating serve, creating serve, creating serve, additional busing, additional busing, additional busing, additional busing, additional' cost, and cost, and cost, and cost, and cost, and inconvenience, inconvenience, inconvenience. Inconvenience. iucouveni Signifi- Significant. Significant. None. None. Significant. Significant. Significan canoe Mitigation Develop a joint Develop a joint None required. None required. Develop a joint Develop a joint Develop a Measure (city, LOSD) Land (city, L6SD) Land (city, LBM) Land (city, LOSD) Land (city,; Banking Program to Banking Program to Banking Program to Banking Program to Banking acquire Study Area acquire Study Area acquire Study Area acquire Study Area aogeize property as it property as it property as it property as it . DroPerRT-' becomes available; becomes available; became available; becomes available, becomes- jointly work with jointly work with jointly work with jointly work with jointly: the state Depart- the state Depart- the state Depart- the state Depart- the ata meat of Education went of Education Sent of Education went. of Education aent.of; to obtain a waiver to obtain a waiver to obtain a waiver to obtain a waiver to obtain. on minimum parcel .w minimus parcel on minimum parcel or minimum parcel oa a sizes for elemen- sizes for elmen- sizes for elmen- sizes for elemen- sizes foe tary schools. tary schools. tory schools. Lary schools. tarn Impacts Increased dmaad Increased demand No impact. No impact. Increased demand Increased demand Inereem04 n for developed or eve for developed hoz .�ev�eo�_ _ for devil parkland; absence —XTAn3 AF�senea parkland; absence kiand; absence parklandp of available land of avn a iaa of available land of available laud of avail in the S Area Ludy n e in the S Area Ludy In the to provide new to new to provide new to roles to parks. �u�s. parks. — -- asks.— parks,; Signi£i- Significant. Significant- None. None. Significant. Significant- Sigmlf tante unavoidable. unavoidable. Mitigation Provide 30.2 acres Provide 363.6 None required. None required. Provide 16.5 acres Provide 211.4 Provide-, Measure of parkland acres of parkland of parkland acres of parkland of par elsewhere in Lodi; elsewhere In Lodi; elsewhere In Lodi; elsewhere in Lodi; e develop a Land develop a Land develop a Land develop a Load deealcp_, Banking Program to Banking Program to Banking Program to Banking Program to Banking. acquire Study Area acquire Study Area acquire Study Area acquire Study Area acquire. property for park property for park property for park Property for park property: development; amend development; amend development; amend development; amend deve SPARC requirements SPARC requirements SPARC requirements SPARC requirements SPARC to require of to require of to require of to require of to d Im = Cannot be mitigated to a less -than -significant level. - ECts ( owirg mitigation measure denotes that the identified measure does not reduce Impacts to a less -than -significant level_ le 3-2 for recommended policies and implementation measures of Performance Standards. amodate new development, .he existing system would require improvemen tz. This Impact includes both the incremental capital costs and improvements under Op rovements and capital costs required to upgrade the existing system see Loplcal chapters of text. applicable. Table 3-1. (Continued) Option 2 option 3 Option 4 Historic i--- toric Full � toricFull-- Rate Buildout Rate Buildout Rate Buildout elementary portable construct one schools, one classrooms.` elementary school, middle school, and and purchase five one high school.* portable classrooms.` No Impact_ No Impact. Absence of avail- Absence of avail- Absence of avail- Absence of avail- able land to able land to able land to able land to or expand existing or expand existing or expand existing or expand existing or construct new construct new construct new construct new schools in the schools in the schools in the schools in the - Study Area; new Study Area; new Study Area; new Study Area; new facilities would facilities would facilities would facilities would be located a be located a be located a be located a considerable considerable considerable considerable distance from distance from distance from distance from students they students they students they students they serve, creating serve, creating serve, creating serve, creating g, additional busing, additional busing, additional busing, additional busing, cost, and cost, and cost, and cost, and Inconvenience. inconvenience. inconvenience. Inconvenience. None. None. Significant. Significant. Significant. Significant None required. Kane required. Develop a joint Develop a joint Develop a joint Develop a joint d (city, LOSD) Load (city, LDSD) Land (city, TIM) Land (city, LOSD) Land to Banking Progzav o Banking Program to Banking Program to Banking Program to a acquire Study Area acquire Study Area acquire Study Area acquire Study Area property as it property as it property as it property as it e; becomes available; becomes available; becomes available; becomes available; th jointly work with jointly work with jointly work with jointly work with the state Depart- the state Depart- the state Depart- the state Depart - on', ment of Education sent of Education sent of Education sent of Education - ver to obtain a waiver to obtain a waiver to obtain a waiver to obtain a vaivee' - 1 on minimum parcel on minimum parcel on minl - parcel on minimum parcel 13- sizes for elmen- sizes for elesen- sizes for elemen- sizes for elemen- tary schools. Lary schools. Lary schools. Lary schools. d No impact. No impact. Increased demand Increased demand Increased demand Increased demand for deve'-led for eve for developed for developed parklanu; absence paren mance parkland; absence parkland; absence of available land 01 available Lana of available land of available land ea in the Study Area in the Study Area in the Study Area to provide new �o row new to provide new to provide new parks. pa parks. parks. None. None. Significant. Significant- Significant. Significant. unavoidable. None required. None required. Provide le.5 acres Provide 211.4 Provide 30.2 acres Provide 44.3 acres pnd of parkland acres of parkland of parkland of parkland odi; elsewhere In Lodi; elsewhere in Lodi; elsewhere in Lodi; elsewhere in Lodi; develop a Land develop a Land develop a Land develop a Land M to Banking Program to Banking Prog.am to Banking Program to Banking Program to ;.rea acquire Study Area acquire Study Area acquire Study Area acquire Study Area ark property for park property for park property for park property for park mend development; amend development; amend development; -send development; amend - ents SPARC requirements SPARC requirements SPARC requirements SPARC requirements to require mf to require of to require of to require mf , n: level. fled measure does not reduce impacts to a Iess-than-slgnlficant level. res of Performance Standards. re improvements. This impact includes both the incremental capita: Lrosts and improvements under Option 2. ting system see topical chapters of text. 11 Topic (FIR Chapter) Parks and Recreation (18) (Continued) Natural Gas and Electricity (17) Table 3-1. Option 1 Option 2 Historic Full Historic Rate Buildout Rate developments to Include onsite yards or play areas. developments to include onsite ya.-ds or play areas.* a Natural Gas Impact Increased demand Increased demand No impact. No ) for 77,813 mcf of for 886,488 mcf of natural gas. natural gas. o Electricity Impact Increased demand Incrersed demand No impact. He for 7.5 million for 84.9 zillion kWh of kWh of electricity. electricity. Siguifl- Less than Less than None. Non4 Mnce significant, significant. Mitigation None required. None required. None required_ Now Measure Traffic and Impact Unacceptable LAS Unacceptable LOS No impact. No" circulation at the following at the following (18) roadway roadway segmeat(s)z segment (s) o Lodl Avenue o Lodi Avenue between Stockton between Cherokee Street and Lane and Central Hutchins Street Avenue (LOS D) (LDS D) o Stockton Street _ between Tokay Street and Kettleman Lane (Los E)`_'! Slgulfl- Significant. Significant. None. Dbal Cance Mitigation Widen Lodi Avenue Widen Lodi Avenue None required. Measure 12 feet or remove 17 feet or remove on -street parking on -street parking to provide to provide additional street additional street width for a width for a two-way left turn tv"ay left turn lane. lane; widen Stockton Street to a four -law undivided arterial from Tokay Street to Kettlemen Lane; signalise the intersection of Central Avenue and Kettleman Law. Underlined Im._pacts Cannot be mitigated to a less -than -significant level. sterisk -following mitigation measure denotes that the identified measure does not reduce See Table 3-2 for recommended policies and implementation measures of Performance Standards., b To accommodate new development, the existing system would require improvements. This Impact. C For improvements and capital costs required to upgrade the existing system see topical c.bap NA = Not applicable. _ c Table 3-1. (Continued) Option 1 Option 2 Option 3 for 545,515 mcf of Historic it Historic ice--T{is�r c pillAdevelopmm Increased demand er) Rate Buildout Rate Buildout Rate Buildoutdevelopments No impact_ to developments to developments to developments toinclude electricity. onsite include onsite include onsite include onsiteyards significant. or play yards or play yards or play yards or Playareas. No impact. areas.• areas. areas." Unaceeptable,WS and Ircreased demand Increased < for 47,885 mcf of for 545,515 mcf of (17) natural gas. natural gas. natural ga: Increased demand s Impact Increased demand Increased demand No Impact. No impact_ kWh of for 77,813 mcf of for 886,488 sof of electricity. electricity. electricit) natural gas. natural gas. Less than significant. Y Impact Increased demand Increased demand No impact. No impact. for 7.5 million for 84.4 million Unacceptable IAS Unaceeptable,WS Uaacoeptab kWh of kWh of at t314foil roadway roadway electricity. electricity. segment(s): -segmentwI Slgnifi- Less than Less than None. None. canoe significant. significant. between -E Street and Mitigation Measure None required. None required. None required. None required. Impact Unacceptable LDS Unacceptable IAS No Impact. No impact. at the following at the following roadway roadway segment(s): segment(s): o Lodi Avenue o Lodi Avenue between Stockton between Cherokee Street and Lane and Central Hutchins Street Avenue (FAS D) (IAS D) o Stockton Street between Tokay Street and Kettleman Lane (LOS Ii) Siqnifi- Significant. Significant. None. None. canoe Mitigation Widen Lodi Avenue Widen Lodi Avenue None required. None r+quired. Measure 12 feet or remove 12 feet or remove on -street parking on -street parking to provide to provide additional street additional street width for a width for a two-way left turn two-way left turn lane. lane; widen Stockton Street to a four -leve undivided arterial from Tokay Street to Kettlesan Lane; sigaelize the intersection of Central Avenue and Kettleman Lane. I m cts - Cannot be mitigated to a less -than -significant level. 9 -To -Mowing mitigation, measure denotes that the identified measure noes nct reduce impacts to a less -than -s ignlflcant level_ 3-2 for recommended policies and implementation measures of Perforr..ance Standards. Iodate new development, the existing system would require improvements. This impact includes both the incremental capital costs and improvements under Op >vements and capital costs required to upgrade the existing system see to;a cal chapters of text. - >plicable. Increased demand Ircreased demand Increased < for 47,885 mcf of for 545,515 mcf of for 77,813 natural gas. natural gas. natural ga: Increased demand Increased demand Increased foc 4.6 million for 52.2 million for 7.5 mi) kWh of kWh of kWh of electricity. electricity. electricit) Less than Less than Less than significant. significant.., signiflcaat None required. None required. hone i6gnt,7 Unacceptable IAS Unaceeptable,WS Uaacoeptab at the following at the following at t314foil roadway roadway roadway -" segment(a): segment(s): -segmentwI o Lodi Avenue o Lodi Avenue :' o Lodi Aver between Stockton between SLocktonl� between -E Street and Street and Street. ab Hutchins Street Hutchins Street- MutciciasA (LOS D) (LAS D) (LOS D).'1 Significant. Significant. sigulficmt Y Widen Lodi Avenue Widen Lodi Avenue Widea"Leda 12 feet or remove 12 feet or rascve.. ll.feet_aZ on -street parking on -street perlciag an -s .;j to provide to provide to.provift additional street additional street.'_' additiaml width for a width for a width'fbr two-way left turn two-way left tau - `:twv-way_:1 . lane. lane. lane.'': Table 3-1. (Continued) Option 2 tion 3 Option 4 Historic Full for c Historic Furi-- Rate Buildout Rate Buildout Rate Buildout developments to developments to developments to developments to include onsite include onsite include onsite include onsite yards or play yards or play Yards or play yards or play areas. areas.* areas. areas. k No impact. No impact. Increased demand Increased demand Increased demand Increased demand for 47,885 oaf of for 545,515 mcf of for 77,813 oaf of for 114,397 mcf of natural gas. natural gas. natural gas. natural gas. No impact. No impact. Increased demand Increased demand Increased demand Increased demand for 4.6 million for 52.2 million for 7.5 million for 11.0 million I kWh of kWh of kWh of kWh of electricity. electricity. electricity. electricity. None. None. Less than Less than Less than Less than significant. significant. significant, significant. rNone required. None required. None required. None required. None required. None required. i No impact. No impact. Unacceptable LOS Unacceptable LOS Unacceptable IAS Unacceptable LOS at the following at the following at the following at the followiag roadway roadway roadway roadway segment(s): segment(s). :&. segment(s): segment(s): o Lodi Avenue o Lodi Avenue o Lodi Avenue o Lodi Avenue between Stockton between Stockton between Stockton between Stockton Street and Street and Street and Street and Hutchins Street Hutchins Street Hutchins Street Hutchins Street (LDS D) (LDS D) (LOS D) (Los D) None. - None. Significant. Significant. Significant. Significant. None required. None required. Widen Lodi Avenue Widen Lodi Avenue Widen Lodi Avenue Widen Lodi Avenue 12 feet or remove 12 feet or remove 12 feet or remove 12 feet or remove on -street parking on -street parking on -street parking on -street parking to provide to provide to provide to provide additional street additional street additional street additional street width for a width for a width for a width for a two-way left turn two-way left turn two-way left turn two-way left tura lane. lane. lane. lane. evel. measure does not reduce impacts to a less -than -significant level. of Performance Standards. mprovements. This impact includes both the incremental capital co -,Ls and iz,;ovemects under Option 2. sv;tem see topical chapters of text. 12 Table 3-1. Option I Topic Hi;,toric Ful Historic (EIR Chapter,' te Buildout Rate Tr ffic and a Impact Increased Increased No impact. NO Circulation on -street parking; on -street parking; (18) increased illegal increased Illegal (Continued) on -street parking. on -street parking. Slgnifl- Significant. Significant. None. None cance Mitigation Develop perfor- Develop perfor- No impact. 0 Measure mance standards:& =",e,ta==,° o Amend city o Amend city Zoning Ordinance Zoning L-rdinance to require two to require two pLrkinq spaces parking spaces per mf unit per af unit 0 Enforce the East o Enforce the East ' Parking Program. 'ar^inp'rosra= Noise impact Additional noise Additional noise Additional noise (19) sources Including sources including sources including traffic noise, traffic nolsel traffic noise, traf noise, and noise noise, and noise noise, and noise no from Indoor and from Indoor and from indoor and frmom ~ ^� outdoor outdoor outdoor on` residential— residential—— residential.— res ' — activities. activities. activities. ac Slgnifl- Significant. Significant. Significant. Canoe Mitigation Develop Develop Develop measure Perfo rmanct Perform Perin Perfb Standards: Standards, S tend "aancl St tion activities tion activities tion activities to normal day- to nornal daY- to normal day- time periods. time periods. time periods. � o Adopt a com- o Adopt a coa- o Adopt a com- munity noise munity noise munity noise ordinance. ordinance. ordinance. o Ensure that o Ensure that o Ensure that state noise state noise state noise 'z |insulation insulation insulation � �--------------------------------------------------- used. used. used. Underlined I dcts _- Cannot be mitigated to a less-tban-significant level. o 6wing mitigation measure denotes that the identified measure doei )t reduce b ��i able r reco—ended policies and Implementation meesures of Performance Standards. To accommodate new dc-velopment, the existing system would require improvements. This impact I= c Yor improvevents �nd capital costs required to upgrade the existing system see topical chapters, ~� =~~^ ww^`"~^. '— -. ��� Impact Table 3-1. (Continued) Option 1 Option 2 _ option 3 Historic Full —ifisForTc P&II—" Historic `FSifI--'—''iisto`r Rate Buildout Rate Buildout Rate Buildout Rate Increased Increased on -street parking; on -street parking; increased illegal increased illegal ou-street parking. on -street parking. Significant. Significant. Develop perfor- Develop perfor- mance standards:a mance standards:a o Amend city o Amend city Zoning ordinance Zoning Ordinance to require two to require two parking spaces parking spaces per mf unit per mf unit o Enforce the East o Enforce the East Side Area Side Area Parking Program. Parking Program. Additional noise Additional noise sources including sources including traffic noise, traffic noise, construction construction noise, and noise noise, and noise from indoor and from indoor and outdoor outdoor residential residential activities. activities. Signifi- Significant. canoe construction !litigation Develop Measure Performance outdoor Standards: residential o Limit oonstruc- activities. tion activities to normal day- time periods. o Adopt a com- munity noise ordinance. o Ensure that state noise insulation standards are used. Significant No Impact None. No impact. Additional sol" sources including traffic noise, construction noise, and noise from indoor and outdoor residential activities. Significant. No impact. Increased Increased Increased on -street parking; on -street parking; on -street pa Increased illegal Increased illegal increased 11 on -street parking. on -street parking. on -street pa None. Significant. Significant. Significant. No impact. Develop perfor a Develop perfor- a Develop perfor- mance standards: mance standards: mance standards: o Amend city o Amend city o Amend city Zoning Ordinance Zoning Ordinance Zoning Ordinan to require two to require two to require two parking spaces parking spaces parking spaces per mf unit per mf unit per mf unit o Enforce the East o Enforce the East o Enforce the Re Side Area Side Area Side Area Parking Program. Parking Program. Parking Progra Additional noise Additional noise sources including sources including traffic noise, traffic noise, construction construction noise, and noise noise, and noise from indoor and from indoor and outdoor outdoor residential residential activities. activities. Significant. Significant. Additional noise sources including traffic noise, construction noise, and noise from indoor and outdoor residential activities. Significant. Develop Develop Develop Develop Develop Performance Performancg Performance Perfoananct Performance Standards: Standards: Standards: Standards: Standards: o Limit construe- o Limit construe- o Limit construe- o Limit construc- o Lir1t construe - Lion activities tion activities tion activities tion activities tion activities to normal day- to normal day- to normal day- to normal day- to normal day- time periods. time periods. time periods. time periods. time periods. o Adopt a com- o Adopt a cos- o Adopt a cam- o Adopt a com- o Adopt a com- munity noise munity noise munity noise .unity noise munity noise ordinance. ordinance. ordinance. ordinance. ordinance. o Ensure that o Ensure that o Ensure that o Ensure that o Ensure that state noise state noise state noise state noise state noise insulation insulation insulation insulation insulation standards are standards are standards are standards are standards are used. used. used. used. used. Additional = sources incle traffic noise_; construction noise, and z& from indoor'ai outdoor .- residential activities. Significant. Develop o Limit const tion activi' to normal:;d time period o Adopt acorn munity n019 o Ensure state n used. m c's = Cannot be mitigated to a less -than -significant level. .o �cving mitigation measure denotes that the identified measure does not reduce impacts to a less -than -significant level. 3-2 for recommended policies and Implementation measures of Performance Standards. date new development, the existing syrt.er. xould require 'mprovemen!s. 71:is 1m,act includes both the incremental capital costs and improvements under ements and capital costs required to c; .::der t..,e existing system sec ,iccl chatters of text. '_:cable. Table 3-1. (Continued) Historic Option 2 �— �� or c tion 3 --Full Hist ric Option 4 Full_ Rate Buildout Rate Buildout Rate Buildout No impact. None. No impact. Additional noise sources including traffic noise, construction noise, and noise from indoor and outdoor residential activities. Significant. Develop Performancpa Standards: o Limit construc- tion activities to normal day- time periods. o Adopt a com- munity noise ordinance. o Ensure that state noise insulation standards are used. No impact. None. No impact. Additional noise sources including traffic noise, construction noise, and noise from indoor and outdoor residential activities. Significant. Develop Performanc& Standards: o Limit construc- tion activities to normal day- time periods. o Adopt a com- munity noise ordinance. o Ensure that state noise insulation standards are used. Increased on -street parking; increased illegal on -street parking. Significant. Develop perfor- a mance standards: o Amend city Zoning Ordinance to require two parking spaces per mf unit o Enforce the East Side Area Parking Program. Additional noise sources including traffic noise, construction noise, and noise from indoor and outdoor residential activities. Significant. Develop Performanc& Standards: c Limit construc- tion activities to normal day- time periods. o Adopt a com- munity noise ordinance. o Ensure that state noise insulation standards are used. Increased on -street parking; increased illegal on -street parking. Significant. Develop perfor- mance standards:a o Amend city Zoning Ordinance to require two parking spaces per mf unit o Enforce the East Side Area Parking Program. Additional noise sources including traffic noise, construction noise, and noise from indoor and outdoor residential activities. Significant. Develop Performancs Standards - o, Limit construc- tion activities to normal day- time periods. o Adopt a com- munity noise ordinance. o Ensure that state noise insulation standards are used. Increased on -street parking; Increased illegal on -street parking. Significant. Develop perfor- a mance standards: o Amend city Zoning Ordinance to require two parking spaces per mf unit o Enforce the East Side Area Parking Program. Additional noise sources including traffic noise, construction noise, and noise from indoor and outdoor residential activitic;. Significant. Develop Perforsanc& Standards: o Limit construc- tiin activities to normal day- time periods. o Adopt a com- munity noise ordinance. o Ensure that state noise Insulation standards are used. level. d measure does not reduce impacts to a less-t',rn-r•,",::°%stifit level. of Performance Standards. improvements. This impact includes both the 1.•clrm.ou(;:: capital costs anc' t-,rovemer,ts under Option 2. g system see topical chapters of text. Increased on -street parking; increased illegal on -street p=.rking. Significant Develop perfor- mance standards:a o Amend city Zoning Ordinance to require two parking spaces per mf unit o Enforce the East Side Area Parking Program. Additional noise sources including traffic noise, construction noise, and noise from indoor and outdoor residential activities. Significant. Develop Performanq Standards: o Limit construc- tion activities to normal day- time periods. o Adopt a com- munity noise ordinance. o Ensure that state noise Insulation standards are used. Table 3-1. 6 Option 1 ruff— Option 2 Topic � s or cHistoric (EIR Chapter) Rate Bu11dout Rate B Aesthetics Impact Continued Complete dis- Preservation of Preser and degradation of the acemen ­othe the character of the ch Neighborhood character of the character or tne the East Side the Ea Character East Side neighborhood. neigbb (20) neighborhood: r o Unattractive o Unattractive apartment design sign o lack of land- o Lads of land- scaping T— o Parking lot o Par int located in front oca front of mf buildings, zr-nrsmdnas. facing: the LM _s street sGi-e o Inadequate off- o Inadequate off- 1 street parking-ks�eet parting o Vier of garbage o Vier of dumpsters from rs from the street the street •Bulky apartments `. Signifi- Significant. Significant- Beneficial Benef tante unavoidable. Mitigation Develop None available. None required. ,None: Measure performaacfi Adoption of strict standards: performance standards would, o Ameud SPARC however, partially - requirements to mitigate this require new of impact -10 developments to _ conform to o Amend SPARC strict archi- requirements to ;..� tectural require new mf controls. developments to conform to o Continue to strict archi- develop, or [ectural update and controls. enforce, community design o Continue to policies as part develop, or of the SPARC update and requirements. enforce, community design Under l'ned lm ecis = Cannot be mitigated to a less -than -significant level. er s o. owing mitigation measure denotes that the identified measure does not reduce See able 3-2 for recommended policies and implementation meas•res of Performance Standards. b Tc acco=odate new development, the existing system would require improvements. This impact C For improvements and capital costs required to upgrade the existing system see topical chapters NA = Not applicable. _ I Table 3-1. (Continued) Option 1 tion 2 Option 3 —itis or s or c Historic Full er) Rate Buildout Rate Buildout Rate Buildout Rato Impact Continued _Co letedis�- -iac� Preservation of character of degradation of the of the the the East side character of the character ot Me standards: East Side.as a nea - neighborhood. neighborhood: bo hr o : requirements to - o Unattractive o Unattractive impact ! apartment design a5if&nen tYesign conform to o Lack of land- o Lack of land- requirements to scaping scaP ngg controls. o Parking lot o Parking lot conform to located in front ocnlIn-front develop, or of of buildings, o-im-HaTdggs54 controls. facing the tacn? the community design street s� develop, or o Inadequate off- o Inadequate off- requirements. street parking sEreef Parks. community eesign o View of garbage o View of garbage o Parking lot dumpsters from MiEs urs rum located in front the streeteEL� sF_T_- confo o Bulky apartments of mf buildings, o Parking Signifi- Significant. Significant- Beneficial canoe unavoidable. mitigation Develop None available. None required. Measure perform" Adoption of strict standards: performance c arae er or a standards would, o Amend SPARC however, partially requirements to mitigatethis require new mf impact ! developments to nelghborrho conform to o Amend SPARC strict archl- requirements to tectural require new of controls. developments to unavoidable. conform to o Continue to strict archi- develop, or tectural update and controls. enforce, o Lack of land- community design o Continue to policies as part develop, or of the SPARC update and requirements. enforce, mitigatethisregal community eesign Preservation of Continued Co Tete dis- Continued the character of degradation of the acumen o the degradation the East Side character of the c arae er or a character � neighborhood- East Side Last Side neigh- — East Side. the street neighborhood. bortiooa.. nelghborrho del In the to Beneficial Significant. o Unattractive o Unattractive areas." unavoidable. apartment design apartment design None available. Develop, performnncfi Adoption of strict c Unattrac standards: o Lack of land- o Lack of land- apartmen standards would, scaping scaping however, partially o Amend requirements to mitigatethisregal o Lack of require new of o Parking lot o Parking lot - scaping' located in front located in front o Amend SPARC confo of mf buildings, of mf buildings, o Parking tectural facing the facing the located; developments to street street of,af-bc o Inadequate off- o Inadequate off- street parkingstreet parking.:..", o Inadequate off- o InadeS o View of garbage o View of gatbage street - dumpsters from dumpsters from '- the street the street o view 4 del the sl Beneficial Significant. Significant- Signifl+ unavoidable. None required. Develop None available. Develop, performnncfi Adoption of strict perform standards: performance standw standards would, o Amend SPARC however, partially o Amend requirements to mitigatethisregal require new of Impact."regal developments to devel conform to o Amend SPARC confo strict archi- requirements to stric tectural require new mf teem controls, developments to contr conform to o Continue to strict archi- o Conti develop, or tectural level update and controls. updat enforce, enfor o mmtmity design o Continue to camM policies as part develop, or polic of the SPARC update and of t1: requirements. enforce, requi community design d Im acts = Cannot be mitigated to a less -than -significant level. " to owing mitigation measure denotes that the identified measure does not reduce impacts to a less -than -significant level. ie 3-2 for recommended policies and implementation measures of Performance Standards. =c'e'ate new development, the existing system would require improvements. This Jmpact includes both the incremental capital costs and improvements under Op :ovements and capital costs required to upgrade the existing system sec topical chapters of text. replicable. Tahle 3-1. (Continued) Option 1 Option 3 Option 4 —"--Tr =SO `uT�"-`"Tiiscor c f�iTT— s toric F4"ii ;tate Buildout Rate Buildout Rate Buildout Preservation of Preservation of the character of the character of the East Side the East Side neighborhood. neighborhood. Beneficial None required. Beneficial None required. Continued Com�ii let dss-- degradation of the ��a_ceZ—_meof the character of the cEa ac e East Side aF E Se n neighborhood. or oo . o Unattractive o Unattractive apartment design apartment design o Lack of land- o Lack of land- scaping scoping o Parking lot o Parking lot located in front located in front of mf buildings, of mf buildings, facing the facing the street street o Inadequate off- o Inadequate off - Continued C_o%1tt_t d�is-_ degradation of the pace-p�l—mend tAe character of the character of the East Side East Si3e neigh- neighborhood e gh-neighborhood only borhood only in in the "target tn2 gge areas." areas. o Unattractive o Unattractive apartment design apartment design o Lack of land- o Lack of land- scaping scaping o Parking lot o Parking lot located in front located in front of mf buildings, of mf buildings, facing the, facing the street. _. street. street parking street parking o Inadequate off- o Inadequate off - o View of garbage o View of garbage street parking street parking dumpsters from dumpsters from the street the street o View of garbage o View of garbage dumpsters from dumpsters from the street the street o Bulky apartments Significant. Significant- Significant. Significant - unavoidable. unavoidable. Develop None available. Develop None available. performance Adoption of strict performanc& Adoption of strict standards: performance standards: performance standards could, standards would, o Amend SPARC however, partially o Amend SPARC however, partially requirements to mitigate requirements to mitigate require new mf athis impact.* require new mf impact.* developments to developments to conform to o Amend SPARC conform to o Amend SPARC strict archi- requirements to strict archi- requirements to tectural require new mf tectural require new mf controls. developments to controls. developments to conform to conform to o Continue to strict arobi- o Continue to strict archl- develop, or tectural develop, or tectural update and controls. update and controls. enforce, enforce, community design o Continue to community design o Continue to policies as part develop, or policies as part develop, or of the SPARC update and of the SPARC update and requirements. enforce, requirements. enforce, community design community design vel. measure does not reduce impacts to a less -than -significant level. f Performance Standards. provements. This impact includes both the incremental capital costs and improvements under Option 1. system see topical chapters of text. Option 1 TopicHistoric s or (EIR Chapter) Rate Buildout Rate Aesthetics and o Amend SPARC policies as part Neighborhood requirements to . the SPARC Character require mf .-quirements. (20) developments to (Continued) locate the park- o Amend SPARC ing lot either requirements to on the side or require mf behind the developments to structure= locate the park - screen parking ing lot either lot from view; on the side or encourage alley behind the access to structure; parking. screen parking lot from view; o Amend city encourage alley Zoning Ordinance access to to require two parking. parking spaces per mf unit. o Amend city Zoning Ordinance c Amend the SPARC to require two requirements to parking spaces require mf per mf unit. developments to locate the o Amend the SPARC refuse area requirements to either behind require mf the structure or developments to enclosed within locate the a view -obscuring refuse area area. either behind the structure or enclosed within a view -obscuring area. o Require o Require None required. applicants to applicants to coordinate with coordinate with Sanitary City Sanitary City Disposal to Disposal to determine determine whether access whether access from the rear from the rear (alley) 1s (alley) is adequate for adequate for garbage collec- garbage collec- tion vehicles. tion vehicles. o Amend SPARC o Amend SPARC Table 3-1. on 2 None requirements to requirements to discourage discourage construction of construction of excessively excessively bulky apartment bulky apartment buildings. buildings. Gkit Underlined Impacts Cannotbe mitigated to a lens -than -significant level. isterisXo owing mitigation measure denotes that the identified measure does not reduce iml b See Table 3-2 for recommended policies and implementation measures of Performance Standardp: To accommodate new development, the existing system would require improvements. This imprict.it c For improvements and capital costs required to --upgrade the existing system see topical chagteh NA = Not applicable. t tion'2 sort` Rate Table 3-1. (Continued) Option 1 Option 2 Historic FuZT"—`-" HistoFic Full Rate Buildout Rate Buildout Option 3 Historic Full Rate Buildout s or Rate and o Amend SPARC policies as part o Amend SPARC policies as part o Amend SP d requirements to of the SPARC requirements to of the SPARC requiremen require mf requirements, require of requirements. require of development.=.. to developments to developmen locate the ;ark- o Amend SPARC locate the park- o Amend SPARC locate the ing lot either requirements to Ing lot either requirements to Ing lot ei on the side or require of on the side or require of on the si behind the developments to behind the developments to bebind.the structure; locate the park- structure; locate the park- structure; screen parking Ing lot either screen parking Ing lot either screen lot from view; on the side or lot from view; on the side or lot from.. encourage alley behind the encourage alley behind the encourage' access to structure; access to structure; accessto parking. screen parking parking. screen parking parking. lot from view; lot from view; o Amend city encourage alley o Amend city encourage alley o -Amend cit Zoning Ordinance access to Zoning Ordinance access to Zoning 0 to require two parking. to require two parking. to requi parking spaces parking spaces parking per mf unit. o Amend city per of unit. o Amend city per of un Zoning Ordinance Zoning Ordinance o Amend the SPARC to require two o Amend the SPARC to require two o Amend •he requirements to parking spaces requirements to parking spaces requires require mf per mf unit. require of per of unit. require developments to developments to develops locate the o Amend the SPARC locate the o Amend the SPARC locate refuse area requirements to refuse area requirements to refuse either behind require mf either behind require of either ?` the structure or developments to the structure or developments to the stru_ ;'• enclosed within locate the enclosed within locate the enclosed a view -obscuring refuse area a vier -obscuring refuse area a view - area. either behind area. either behind area, the structure or the structure or enclose9 within enclosed within a view -obscuring a view -obscuring squired. ,.Jr ffiobA area. area. .. o Require qu Re r required. o Require None squired. None r fired. o Require o Require o Require applicants to applicants to applicants to applicants to applican -'^�. coordinate with coordinate with coordinate with coordinate with coordina Sanitary City Sanitary City Sanitary City Sanitary City Sanitary o- Disposal to Disposal to Disposal to Disposal to Disposal determine determine determine determine determin whether access whether access whether access whether access whether from the rear from the rear from the rear from the rear from the MK (alley) is (alley) is (alley) is (alley) is (alley)' adequate for adequate for adequate for adequate for adequate s " garbage collet- garbage collet- garbage oollec- garbage collet- garbage- tion vehicles, tion vehicles. tion vehicles. tion vehicles. tion ve o Amend SPARC o Amend SPARC requirements to requirements to `: t �rF,4 :)•? discourage discourage k construction of construction of excessively excessively bulky apartment bulky apartment buildings. buildings. does nat"161- mance Starnd!ettias; to. This d Impacts a Cannot be mitigated to a less-than-significcnt level. -than -significant level. ee topical,Ohm, o owing mitigation measure denotes that the identified measure does not reduce impacts to a less Performance s;(i:4'c le 3-2 for recommended policies and implementation measures of Standards. mmodate new development, the existing system would require improvements. This impact includes both the text. incremental capital costs and improvements under Opt Hx,E rovements and capital costs required to upgrade the existing system see topical chapters of applicable. y$ w Table 3-1. (Continued) _ Option Option 1 ption 3 s or c Full A stor c Ou is Optica 4 Historic r9li "— Rate Buildout Rate Buildout Rate Buildout None required. None requires:. o Amend SPARC requirements to require of developments to locate the park- ing lot either on the side or behind the structure; screen parking lot from view; encourage alley access to parking. o Amend city Zoning Ordinance to require two parking spaces per of unit. o Amend the SPARC requirements to require of developments to locate tht refuse area either behind the structure or enclosed within A view -obscuring area. o Require applicants to coordinate with Sanitary City Disposal to determine whether access from the rear (alley) is adequate for garbage collec- tion vehicles. policies as part of the SPARC requirements. o Amend SPARC requirements to require of developments to locate the park- ing lot either on the side or behind the structure; screen parking lot from view; encourage alley access to parking. o Amend city Zoning Ordinance to require two parking spaces per of unit. o Amend the SPARC requirements to require of developments to locate the refuse area either behind the structure or enclosed within a view -obscuring area. o Require applicants to coordinate with Sanitary City Disposal to determine whether access from the rear (alley) is adequate for garbage collec- tion vehicles. o Amend SPARC requirements to require of developments to locate the park- ing lot either on the side or behind the structure; screen parking lot from view; encourage alley access to parking. o Amend city Zoning Ordinance to require two parking spaces per of unit. o Amea1 the SPARC requirements to require of developments to locate the refuse area either behind the structure or enclosed within a view-obscurinq area. o Require applicants to coordinate with Sanitary City Disposal to determine whether access from the rear (alley) is adequate for garbage collec- tion vehicles. policies as part of the SPARC requirements. o Amend SPARC requirements to require of developments to locate the park- ing lot either on the side or behind the structure; screen parking lot from view; encourage alley access to park=g- o Amend city Zoning Ordinance to remire two parkii►g spaces per of unit. o Amend the SPAS requirements to require of developments to locate the refuse area either behind the structure or enclosed within a view -obscuring area. o Require applicants to coordinate with Sanitary city Disposal to determine whether access from the rear (alley) is adequate for garbage collec- tion vehicles. Signifi- Significant. Significant- Beneficial. Benef cance unavoidable. Table 3-1-;`a None a Measure mance standards: Adoption of strict Option 1 Option 2 Topic HisEoric requirements to however, partially '�iif—oric discourage mitigate this (BIR Chapter) Rate Buildout Rate f Aesthetics Impact Degradation of the Complete____d_iss-- Preservation of Prese: and Neighbor- overall low dis Taceeeo�of the overall low the ov hood Character density character the overall ow density character densit (20) of the Fast Side de`nsItyrac er of the East Side of Ox (Continued) neighborhood. ot too .a'st bum` neighborhood. night A ae Q�l Or 1�. Signifi- Significant. Significant- Beneficial. Benef cance unavoidable. Mitigation Develop perfor- None availaele. None required. None a Measure mance standards: Adoption of strict performance o Amend SPARC standards would, requirements to however, partially discourage mitigate this construction of impact:*a excessively bulky apartment o Amend SPARC buildings. requirelents t0 discourage:: construction of excessively bulky apartment buildings. Underlined l�mQac�ts Cannot be mitigated to a less -than -significant level. �s er�"isc�C)—fo11-owing mitigation measure denotes that the identified measure does not-reduoq See Table 3-2 for recommended policies and implementation measures of --Performance Standards;: b To accommodate new development, the existing system would require impsoveWmts. This, c For improvements and capital costs required to upgrade time existing system see topice1 NA a Not applicable. #, A "yq ; Table 3-1. (Continued) Impacts - Cannot be mitigated to a less -than -significant level. ;) ?o7'iowing mitigation measure denotes that the identified measure does not reduce impacts to a less -than -significant level. e 3-2 for recommended policies and implementation measures of Performance Standards. modats new development, the existing system would require improvements. This impact includes both the incremental capital costs and improJements ovements and capital costs required to upgrade the existing system see topical chapters of text. pplictible. Opt ton 1 'tion 2 option 3 Historic Fes_ s or c Full Historic Full or , Rate Buildout Rate Buildout Rate Buildout Rate Impact Degradation of the Com lete dis- Preservation of Preservation of Preservation of Preservation of the Degradation i overall low3i agent of the overall lox the overall low the overall low overall low density overall low density character thi overs ox density character density character density character character of the density char+ of the East Side density cbaara'cEer of the East Side of the East Side of th*: East Side East Side of the East , neighborhood. of the East Side` neighborhood. neighborhood. neighborhood. neighborhood. neighborhood nnegi:5oriood:"� in the "tarq areas"f.pres tion of the density char of the East neighborhood side the "ta- areas." Signifi- Significant. Significant- Beneficial. Beneficial. Beneficial. Beneficial. Significant; cance unavoidable. beneficial. j Mitigation Develop perfor- None available. None required. None required. None required. Nome required. Develop per Measure mance standards: ° Adoption of strict mance s performance o Amend SPARC standards would, o Amend SP requirements to however, partially requir discourage mitigate this disceura construction of impact:*a construct excessively excessiv_ bulky apartment o Amend SPARC bulky a buildings. requirements to buildin discourage construction of excessively bulky apartment buildings. Impacts - Cannot be mitigated to a less -than -significant level. ;) ?o7'iowing mitigation measure denotes that the identified measure does not reduce impacts to a less -than -significant level. e 3-2 for recommended policies and implementation measures of Performance Standards. modats new development, the existing system would require improvements. This impact includes both the incremental capital costs and improJements ovements and capital costs required to upgrade the existing system see topical chapters of text. pplictible. Table 3-1. (Continued) level. measure does not reduce impacts to a less -than -significant level. of Performance Standards. improvements. This impact includes both the incremental capital costs and improvements under option 2. g system see topical chapters of text. tion 2 option 3 Option 4 --'FifsEoric _ Full AisEor c FullHistoric Full Rate Buildout Rate Buildout Rate Buildout Preservation of Preservation of Preservation of Preservation of the Degradation of theComplete displace - the overall low the overall low the overall low overall low density overall low men o e over - density character density character density character character of the density character all low URI er of the East Side of the East Side of the East Side East Side of the East Side caaracter Of the neighborhood. neighborhood. neighborhood. neighborhood. neighborhood only East y e"i nd ei — in the "target bor"nooa�oni areas"; preserva• In the rget tion of the low areas"; preserva- density character ��of the low of the East Side density character neighborhood out- of the East Side side the "target neighborhood areas." outside of the "target areas." Ben -ficial. Beneficial. Beneficial. Beneficial. Significant; Signifieant- beneficial. unavoidable; beneficial. r None required. None required. None required. None required. Develop perfor- None available. ct mance standards:a Adoption of strict performance o Amend SPARC standards would, ly requirements to however, partially discourage mitigate this construction of i,,.,: i'a excessively bulky apartment o Amend SPARC o buildings. requirements to discourage f construction of excessively bulky apartment buildings. level. measure does not reduce impacts to a less -than -significant level. of Performance Standards. improvements. This impact includes both the incremental capital costs and improvements under option 2. g system see topical chapters of text. CITY COUNCIL EV[E)-YN Ni OLSON. ,Mayor JOHN R. (Randy) SNIDER Mayor Pro Tempore DAVID M HINCHMAN JAMES W. PINKERTON, Jr. FRED M.REID CITE' OF LORI CITY HALL. 221 WEST PINE STREET CALL BOX 3006 LODI. CALIFORNIA 95241-1910 (209)334-5634 TELECOPIER (209) 333-6795 September 4, 1987 Mr. Ron Bass Jones and Stokes Associates 2321 P Street Sacramento, CA 95816 Dear Mr. Bass: THOMAS A PE TERSON City Manager ALICE M. REIMCHE City Clerk RONALD M STEIN City Attorney Enclosed is a packet for the Special meeting with the Planning -`` Commission. The meeting is being held on September 9, 1987, 7:30 p.m.at Hale Park Recreation Center Building, 209 East Locust Street (map enclosed). Thanks so much for your help in sending all the summaries for enclosure in the packets. Please call if you have any questions. Very truly yours, Alice M. Reimche City Clerk CITY COUNCIL EVELYN M OLSON. Mayor -JOHN R. (Randy) SNIDER Mayor Pro Tempore DAVID M. HINCH:MAN JAMES W PINKERTON, Jr. FRED M. REID CITY OF LORI CITY HALL, 221 WEST PINE STREET CAL 130X. 3006 LODI, CALIFORNIA 95241-1 91 0 (209) 334-5634 TELECOPIER A209) 333-6795 September 11, 1987 Mr. Roger Stafford 801 South Mills Avenue Lodi, CA 95240 Dear Mr. Stafford: THOMAS A. PETERSON City Manager ALICE M REIMCHE City Cierk Ro BALD ,1 STEN City .Attorney This letter will confirm action taken at the Special Joint Meeting of the Lodi City Council and the Lodi Planning Commission held on September 9, 1987 to receive a presentation by Ron Bass Project Manager, Jones and Stokes Associates, Inc., of the City of Lodi East Side Plan Alternatives Draft Environmental Report. Following the presentation by Mr. Bass, public input and discussion, by motion action, the matter was referred to the Community Development Department to chart a recommendation to go before the Planning Commission. The Planning Commission will then make its recommendation to the Council. Should you have any questions regarding this matter, please do not hesitate to call this office. Very truly yours, �n Alice M. Reimche City Clerk AMR:jj I SIGN IN SHEET FOR ADDRESSING COUNCIL NAME ADDRESS -4 Wz,&4.,*Lf t4f 1" 233 lev 'I ON SIGN IN SHEET FOR ADDRESSING COUNCIL NAME ADDRESS 11A/y ky 0 k e /I- /!,'/fj S -r- THE fDL14YArliC dpCUME,R'S WILL REC)UIRE MORE THAN ONE SHOT AS THEY ARE O V_wRSIZED AND WILL NOT FII' IN THE FME 't NATIONAL FLOOD INSURANCE PROGRAM! I� f' f► �fI' I ,;. IEFI SRM FLOOD INSURANCE RATE MAP fi CITY OF LODI, CALIFORNIA SAN JOAQUIN COUNTY ,� MAP INDEX and STREET INDEX PANELS PRINTED: 1, 2 ff _� I f I COMMUNITY -PANEL NUMBERS 060300 0001 -0002 MAP REVISED: JUNE 18, 1981 III I Emergency Management Agency Federal I TO 00 �0 Fn O� .i Z z j c N 0 m O Z r r.. m G) m Q im ! 060300 0001 E !----',*e"=.. ^�.u~o*ycn � S ���n�U� ~ ���d���� ������ 8��U��X , FLOOD PRONE ''--- N � NAMED StREETS ^ ^^^u mmvE ....................'.'..'..... mwo mm CHURCH STREET ............................. m00i 'zu"/ AVENUE . . . . . . . . . . . .. . . . ..'.'....'.. '' 0001 (H2) DEvwEnmv . . .. .. .... ..... . ..r..'.^...... . 0001(02 EDGE ~oouCOURT .............. ............. 0001 vC2/ EooEWouuunwE . . . . . . . . . . . . . . ^. ..^ . . . . . . . . ono �z nxEcmwoononw ono���...�....���..^...^....^.^ ' (C2) GREEN OAKS DRIVE . . . . . . . . . . . . . .'^. ... . . ' . . .. 000 1(02) ^mEW000cuun ........................... o0oJCz JomcW000DRIVE ......................... .'.nou(0) wpuu`wDuvwE .................... 4c........ mon C2) ^owcOun ................................ pmn(Fo LAKEWOOD o.......'''....''``^''^'^^`'^'^m001 (Du) LAUREL AVENUE ...'.''.',..... ^^.^.,'.^^,ODD' �usccoonr .......'...'.....'���.^.^..^'`^ LILAC STREET '..'...,'^'.........^^'''``'^^'^0001~2' ^` LINCOLN AVENUE ''''''^'''^'''''T.'.......'.. (E2)(E2) LOWER SACRAMENTO ROAD ...'.... ,'.'''^'''^^m001(9») m^PLEwuooDRIVE .............. L...'........000 (02) mmv^LEcnon/ .............................. 0001 (E2) 000 ' (Em ^mnv^LEnoAo . .... ..... ..' '''.''' .'' ' ^'''' 0001 (F2) w*°o^nmvE ..............^...: ............. ww^ELummcow^yDRIVE .................. .... 0001 (F2) woorH~000umvE . . . . . . . . . . . . . . . . . . . . . . . . . .. 000 mn NORTH HAM LANE ............................ 000(Co ORANGEWOOD DRIVE ......................... oommw on^omvE ...................... .... ...... 000 pm N RIO VISTA DRIVE ...................'.....'^.'p90`1021' P-. CORPORATE LIMITS NOTE TO USER This index provides a list of all streets shown on the Flood insur- ance Rate Map (FIRM) that are partially or totally within Special Flood Hazard Areas (SFHAs). This index should not be used as an w:horkative source for determining whether specific streets. properties, or buildings are within an SFHA. The appropriate FIRM panel must be consulted for these purposes. This index is intended to be used only as a guide for determining which FIRM Panel displays the street in question and the relative location of the meet on the FIRM panel. KEY Riverview Drive ................. 00155 (B6) ( street name panel number grid location MAP REPOSITORY City Hag Community Development 221 W. Pine St Lodi, CA 95240 (Maps available for reference only. not for distribution) Oak P TF ROYAL OAKS COURT.......................... 0001 IE21 STATE HIGHWAY 99 ............. 0001 (C2) 1URNER ROAD ...........0001 (A2. 82. C2. D2. E2. F2. G2, H2. J2) U S HIGHWAY 50 ............................ 0001 (G2) WILLOW GLEN DRIVE .......................... 0001 (E2) WINTON DRIVE ......................... . .... 0001 (F2) WYN WAY..................................0001102) YULONI DRIVE .............. ........... . .... 0001 (F2) NOTE TO USER This index provides a list of all streets shown on the Flood insur- ance Rate Map (FIRM) that are partially or totally within Special Flood Hazard Areas (SFHAs). This index should not be used as an w:horkative source for determining whether specific streets. properties, or buildings are within an SFHA. The appropriate FIRM panel must be consulted for these purposes. This index is intended to be used only as a guide for determining which FIRM Panel displays the street in question and the relative location of the meet on the FIRM panel. KEY Riverview Drive ................. 00155 (B6) ( street name panel number grid location MAP REPOSITORY City Hag Community Development 221 W. Pine St Lodi, CA 95240 (Maps available for reference only. not for distribution) Oak D G m z c m r E O O