HomeMy WebLinkAboutAgenda Report - September 3, 1986 (88)CITY ODUNCIL MEETING SEER 3, 1986 IMPLEMEWATION OF UNDERGROUND STORAGE TANK PROGRAM Council was reminded that on May 6, 1986, it met with Public Works and San Joaquin Local health District staff to OC -24(a) review Assembly Bills 2013 and 1362 pertaining to CC -24(b) underground fuel storage tanks. At ti-lat time, it was estimated that the total cost to t21e city to implement the program would be approximately $280,000 and that a reimbursement of approximately $135,000 from the State was a possibility if certain conditions prevailed. New estimates show, that the total cost will be approximately $251,500 with a State reimbursement of $141,000. After obtaining cost estimates and additional discussion with the County Health District, it is recommended that the City's underground storage tank program be completed in two phases. Each phase was detailed for the benefit of the Council including the anticipated costs. Council approved a Special Allocation request in the amount of $77,000 for completion of Phase 1 of. the Underground Storage Tank Program. MEMORANDUM, City of Lodi, Public Works Department TO: City Manager FROM: Director of Public Works DATE: August 27, 1986 SUBJECT: Implementation of Underground Storage Tank Program RECOMMENDED ACTION: Approve attached Special Allocation Request for the completion of Phase 1 of the Underground Storage Tank Program. BACKGROUND INFORMATION: On May 6, 1986, the Council met with Public Works and San Joaquin Local ea th District staff to review Assembly Bills 2013 and 1362 pertaining to underground fuel storage tanks. At that time, it was estimated that the total cost to implement the program would be approximately $280,000 and that a reimburseme it of approximately $135,000 from the State was a possibility if certain Condit 7s prevailed. New estimates show that the total cost will be approximately $25.,500 with a State reimbursement of $141,000. After obtaining cost estimates and additional d4scussion with the County Health District, it is recommended that our underground storage tank program be completed in two phases. Those phases are discussed below. PHASE 1 Phase 1 will be completed during this fiscal year. During this phase, 12 of the City's 20 underground tanks will be removed as soon as possible. Seven of the smaller tanks are recommended to be replaced with above -ground tanks. The estimated cost to remove and replace these tanks is $42,800. The cost of removing five tanks that are no longer used and will not be replaced is $25,000. Another item that must be completed this year is the installation of a monitoring well on the 18,400 -gallon unleaded fuel tank behind the Public Sa`ity Building. The cost of this will be $8,000. If the tank does not leak, we w.11 be permitted to abandon it in place under the Phase 2 work. If the tests show that there is a leak on the Public Safety Building tank, we will be required to remove the tank and clean up all spil'oje. We are not anticipating that this will happen; however, if it should, the cost will be more than the $11,000 we estimated under Phase 2 for the abandonment. The City must also pay the San Joaquin Local Health District a $90 closure fee for each tank removed. City Manager _ Underground Storage Tank Program Page 2 A cost breakdown of the Phase I work is as follows: Remove and Replace 7 Tanks $42,800 Remove 5 Tanks 25,000 Monitor Well for Tank @ Public Safety Building 81000 County Closure Fees 11100 $76,900* PRASE 2 During Phase 2, which would be budgeted for and accomplished during the 1987-88 fiscal year, seven single -walled underground tanks would be removed and replaced with double -wailed tanks. It is estimated that the cost Lo remove, replace, install monitoring equipment, and do the engineering for these tanks is $132,000. The State would reimburse the difference in cost between a single- and double -walled tank and required monitoring equipment. The large tank at the Public Safety Building, if found not to be leaking, would be abandoned in place at a cost of $11,000. A new replacement, double -wailed tank, costing approximately $30,500, would be installed. The City must also pay $1,200 in permit fees for those tanks that are remaining underground. There are new regulations pending regarding regular gasoline. It is being proposed that regular gasoline no longer be manufactured. If that should happen, we would eliminate the regular gasoline tank at the Municipal Service Center and increase the size of the unleaded gasoline tank at that location. Any new regulations regarding regular gas tanks should be known prior to the time we must replace any tanks under Phase 2. A cost breakdown of the Phase 2 work is as follows: Remove and Replace 7 Underground Tanks $132,000 Abandon Public Safety Building Tank 11,000 Install New Public Safety Building Tank 30,500 County Permit Fees 1,200 $174,700 *In addition to this amount, a special allocation for the testing and calibration ($3850) has already been approved. City Manager Underground Storage Tank Program Page 3 The City's initial costs and State reimbursement is itemized below and is shown in detail on Exhibit A. Phase 1 Initial City Cost $76,900 Possible State Reimbursement* 51,100 Total City Cost $25,800 Phase 2 Initial City Cost $174,700 Possible State Reimbursement* 90,000 Total City Cost $84,700 Total Phase 1 & Phase 2 City Costs $110,500 eJack.nsko ks Director Attachments JLR/SB/ma cc: Dick Wiech *State will not reimburse any cost involved on a tank that has leaked. . CITY OF L D I SPECIAL ALLOCATIC N REQUEST TO: Finonce Director City Monger Dote: August 27. 1986 FROM: Public Works Director Account Number: 121-350.58 Request is node for funds to occomplish the following which wos not included in the current budget: PROJECT DESCRIPTION & JUSTIFICATION COMPLETION OF PHASE 1 OF UNDERGROUND STORAGE TANK PROGRAM ESTIMATED COST $77,000 Remove and replace 7 tanks $42,800 Remove 5 tanks 25,000 Mcnitor well for Public Safety Building tank 8,000 Closure fee i, 100 $76,900 (See attached memo dated August 27, 1986 for detail description of Phase 1 work) FUND OR ACCOUNT TO BE CHARGED Current Budget Contingent Fund S Capital Outlay Reserve S Utility Outlay Reserve $ t Prior Year Reserve $ General Fuad Surplus j s Reirnbursoble Account S S of ►e� t !— i APPROVALS Fund Verification Approval Finance Director Submit this form in triplicate. City Monoger dote D City Council Amount Approved $ y TEE FULU)WING DOCUM NIS WILL RBWIRE MORE MAN ONE SEDT AS THEY ARE OVERSIZED AND WILL. NOT FIT IN THE FRAME u i i P00DUC'O'*"_ REPLACEMENT ane/ REMOVAL r� "q-:iCE r_^- It TOR EQUI^nENT AND aL Lnh:, ivET-RING LO CATI2n SIZE t:S:.GC OR REMOVAL COST OF TANK Sl .E-DDOUBLE-_ iCi&EERiHG `EES PSB 19,400 Unleaded ® Abandon Tank i11,000 5it,000 $12,500 S8•�QO 43 52,500 None APPlicable 15,000 gat. Tank 23,003 10,000 Diesel ® 20.300 --- 8,150 750 2,100 8 - - 7 P&Rs 250 Waste Oil 3.500 3.500 --- --- 1,000 Diesel A 12,000 --- 2,725 1.500 1,200 5 2.000 Regular. 13.000 --- 3.900 1.500 1.300 5 Fire Station "" 250 5 No. 2 8,000 Diesel 10,000 10.000 --- MSC 500 Waste Oil A 9.600 --- 1,775 750 750 7 5.000 Unleaded A 18,000 --- 5.500 1.500 2.000 '-Y B 5.000 Diesel A 18,000 --- 5,500 1.500 2.000 -Y B 10,000 Regular A 21,000 --- 8,150 1.500 2,000 -5' 8 White Slough 1,000 Diesel 8.000 3.500 --- --- 250 7 2.000 Diesel 3.500 3.500 -- --- 250 7 WELLS Well c4 350 Diesel 5.500 3.500 --- --- 250 7 =5 350 Diesel 5.500 3.500 --- - " 250 7 r6 (old) 350 Diesel3.500 3.5:0 --- --- 250 7 ;8 350 Diesel 5.500 3,500 --- --- 250 7 =9 350 Diesel 5.500 3.500 --- --- 250 7 913 350 Diesel 5.500 3.500 --- --- 250 7 =16 350 Diesel 5.500 3.500 --- --- 250 7 117 350 Diesel 3.500 3.500 --- --- 250 7 State Monitoring Alternates attached A Precision testing of these sites to be completed under Phase 1. All other costs are included ulder Phase 11. ee 'his is a monitoring .ell. K-E-xh--i bit A ::S- t 73TSL C3S- zE 7ES- !t#G Cat! 1 e -'eziace 3 zr.Cvl 16al z:-z-Zle -all -.1-; • rel- za- "Dela. S ;.,Z 5000 5 15,500 S 3w 2elL�s F2 ;---rtl --eve. ta-14, to be &!Awdo",d in place. Repisct .;th same S;Z, douDte _all non;tored tank. 22.350 11.550 Z. no replacactent tank to be installed. Waste oil to 3.500 0 be deposited in the nSC aste oil tank. Replan ith same S;Ze dot1le .all monitored tank. 1 It. 700 3.275 390 42 15,800 9.100 390 e. qO-wQ teak. P;P;ng and island co,-,plete. Fire Dept- ill T0.250 Z Se reuse tank as a rater tank. (Separate funded project). This SOO 541. caste oil tank should be replaced rith a I,000 ga I . 11.100 7.325 350 r dou0le -all monitored tank. With the ele=ination of the 250 gal. caste 0;1 tank at I'Llts, the additionpi canAcit- -s rec.;red. 81 Replace +',th ramie.,alte size 4otle all monitored tank. 21.500 z.500 )SO -3 • 21,500 12.500 ISO 3 24,500 12-850 ISO. 210-vve tank MW piping to Tank to be replaced -ith 8.250 4.500 a diked above ground 3.L -*20 ;al. tank. Remove tank -4 Piping to bu;Tding- The 3.000 gal. tank listed 3.750 0 above illti Serve as the re2lace�nt. x. 4e.-ove tank. Tank to De rec;aced -ith a diked above ground 5.750 2.000 P3 gal. tank. 5.750 2.000 Remove tank. 1b replac*'*r: tank reru;red at this time. 3.750 0 (Well site was relocated). qerove tank. Tank to be replaced .;th a diked above groo-.d 5.750 --.000 300 gal. tank. • 5,750 2.000 5.750 2.000 5.750 2,1100 2,e-ove Lana. %o replace -tent tank recu;red at trw;% tite+e. (Nio ;ererator) 3.750 0 SUSTOTAL S249.200 ;108.150 53,430 r41SC. pEqM ITS 2.300 2.300 TOT -IL 5251.500 S110.450 K-E-xh--i bit A