Loading...
HomeMy WebLinkAboutAgenda Report - September 1, 1982 (34)CITY OF LODI f PUBLIC WORKS DEPARTMENT COUNCIL COMMUNICATION Flcn City Council City Manager �+...�. August 26, 1982 : Contract for Salas Park Control and Pump Structure ENDED ACTION: That the City Council award the Base Bid + Alternate forws Park Control b Pump Structure to Claude C. Wood Co., the low bidder, amount of $154,700. L. Ronsko is Works Director chment APPROVED: H N Y A. -CLAVES, City Manager FILE NO. BACKGROUND INFORMATION: Plans and specifications for this project were ap- proved by the City Council on August 4, 1982. Bids were opened on Wednesday, August 25, 1982, and the following 10 bids were received: BASE BID + BIDDER LOCATION BASE BID ALTERNATE C. C. Wood Lodi, CA. $147,900 $154,700 R. Goold b Son Stockton, CA. 152,900 160,100 Subgrade Const. Rancho Cordova, CA. 164,496 171,651 Kaweah Const. Co. Visalia, CA. 175.500 181,500 Amber Sierra Const. Inc. Sacramento, CA. 177,700 185,700 Duanco Const. Fresno. CA. 178,000 185,750 DCM Const. Sacramento, CA.. 182,366 187,771 Agir Corp. Modesto, CA. 183,124 189,980 Wickum Const. Merced, CA. 186,600 192,900 Wayne Freg-len Stockton, CA. 222,806 230,806 Engineer's Estimate 150,000 159,000 A tabulation of the bids has also been attached. The Base Bid + Alternate includes the installation of an electric gate operator. This gate will ul-timately control the flow of storm water from Salas Park to Beckman Park. In the future; a flow meter will be installed to control the gate. It is felt that it will be more economical to install the electric operator now than to wait until some future date. The flow meter is being deferred until more refined conjrol is needed when the "D" Area is developed. L. Ronsko is Works Director chment APPROVED: H N Y A. -CLAVES, City Manager FILE NO. SALAS PARK CONTROL AND PUMP STRUCTURE BASE BID ITEM APPROXIMATE NO. QUANTITY DESCRIPTION 1. LS Y' 2. LS k 6fiti 3• LS Site Work - Civil - ., LS Excava•t i o.,n S.a•f a-ty SALAS PARK CONTROL AND PUMP STRUCTURE BASE BID ITEM APPROXIMATE NO. QUANTITY DESCRIPTION 1. LS Control and Pump Structure 2. LS Inlvtl0u,t:let Structure 3• LS Site Work - Civil 4. LS Excava•t i o.,n S.a•f a-ty 5 • 2 EA Submer--s i;bte Pwnp and Motor 6. LS TelemetarinD system 7. LS Motor Control Cemser B. LS Site Work - Electrical ALTERNATE P, i D 1. LS Electric Gate Operator ,., TOTAL BASE Bio TOTAL BASE BID PLUS ALTERNATE R. GOOLD b SON BASE BID 1. S 56,800.0.0 *40001 2. - 13,300.00 3. 14,000.00 4. - 1,000.00 5. S 9.550.00 19,100.00 6. - 25,700.00 7. - 18130040 B. - 4,700.00 ALTERNATE BID 7,200.00 TOTAL BASE 540 $1$2,900.00 TOTAL BASE BID PLUS ALTERNATE 5160,100.00 ENGINEER'S ESTIMATE UNIT TOTAL PRICE PRICE LS S 46,500.00 LS 91000.0.0 LS 20„0.00.00 LS 2,.00.0.0:0 S 13,750.00 25,500..00 22,500.0.0 16,500.00 8,000.00 S 9,000,00 $159,000.00 5159,000.00 Tabulation of bids received August 25, 1982 CLAUDE C. W0.00 COMPANY UN -1T TOTAL PRICE PRICE S 42,500.00 8,500.00 • 23., 500..00 500.00 S 11,:0."0.0.00 22,000.00 � • 26,500.00 18,000..00 6,400.00 $ 6.800.00 $ 157.906.00 $ 155,700.00 SUBGRAOE KAWEAH j CONSTRUCTION CONSTRUCTION S 56.414-00 - S 62.500.00 - 13,829.00 - 14,�"00.00 22,576.00 3:5,000.00 30.00 500..00 $11,121.00 22,242.00 $8,000.00 1-6,,000..00 24,982.00 - 25.,000.00 18,74640 - 16,000,00 6,107.00 - 6,000.00 S 7,155 00 $ 6,000 4.0 5164,496.40 S 175,500.00 $171,651.00 $ 181,500.00 (� . 1 1,11111! 1 Mi .J.,.�':'s ,t t::� y ♦f M `� ,sl. �'' `'' F... r -i• iJ - '! 1 1. ij. I , ,' - �!. 'S', '' _ P"'�'"`^r[j •- t � MAS PARK CONTROL AND PUMP STRUCTURE. ¢ont'd. BASE BID ITEM AMBER $4 EARA OUANCO No. CONSTRUCTION COMPANY CONST- ,_RUCTION, DCM.CONSTRUCTION 1. $ $3.700.00 - S. 50,000.00 - $ '52,836.00 2. - 17,800-00 - 10,000.00 - 16,582.:00 3. - 26,000.00 25,000.00 - 39,792.00 4. - 3,500.00 20,0.00.00 1,500.00 5. $12,800.00 25,60.,0,40 $11,000.00 22,00.0.00 $10,913.00 21;826.00: 6. 26,600.00 • 25,000.00 - 26,000.00 7. - 18,000.00 - 20.000.00 - 17,_80.0.010 8. - 6,500.00 • 6,000.00 - 6,000.00 4J u ALTERNATE BIO 1. ; $ 81000.00 S 7_5_.;00 $ 5.,435.00 TOTAL .BASE BID $ 177,700.00 $ 178,0.00.00 $ 182.33.6,00 TOTAL BASE BID PLUS ALTERNATE S 185,700.00 S 185,750.00 S 187,771.00 AGIR CORPORATION WICKUM CONSTRUCTION WAYNE FREGIEN BASE 810 1 - S 61.479.00 - S 43,400.00 - $ 86,79.2.00 2. • .40,970.0.0 - 16,000,00 16..1:8$.60 >� 3. - 9,000.00 - 48,}00.00• 40,628.0.0 4. 1.00 - 100.00 - 4,.000,00 5. $25,949.00 25,949.00 $12,400.00 24,800.00 $11.968.00 23,936.00 6. - 23,787.00 - 27,600.00 - 26,790.00 7. - 16,207.00 - 17,200.00 - 18.23.4.00 8. - 5,731.00 9,200.00 - 6,238.00 ALTERNATE BID 1. $ 6,856.00 $ 6,300.00 $ 8,000.00 TOTAL BASE $10 S 183,124.00 S 186,600.00 S 222.8.06,00 TOTAL BASE BID PLUS ALTERNATE $ 189,980.00 $ 192,900.00 $ 230.806.00 a.' _ i ' . NCO RESOLUTION NO. 82-96 AWARD - Salas Park Pump and Control Structure WHEREAS, in answer to notice duly published in accordance with lau and the order of this Cit, Council, sealed bids were received and publicly opened by the City Clerk of this City on August 25, 1982 at 11:00 a.m. for the contract for Salas Park Pump and Control Structure as described in the specifications therefor approved by the City Council on August 4, 1982; and WHEREAS, said bids have been conpared, cher.}:ed, and tabulated and a report thereof filed with the City Manager as follows: WHEREAS, the City Manager recommends that award be made to the low bidder, Claude C. Wood Company, NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lodi that award of contract for Salas Park Pump and Control Structure be and the same is hereby made to Claude C. Wood Company, the low bidder, in the amount of $154,700. Dated: September 1, 1982 I hereby certify that Resolution No. 82-96 was passed and adopted by the City Council of the City of Lodi in a regular meeting held September 1, 1982 by the following vote: 82-96 BASE BID + BIDDER BASE BID ALTERNATE C. C. Wood $147,900 $1541700 R. Goold 6 Son 152,900 160,100 Subgrade Const. 1641496 171,651 Kaweah Const. Co. 175,500 181,500 Amber Sierra Const. Inc. 1771700 185,700 Duanco Const. 178,000 185,750 DCM Const. 182,366 187,771 Agir Corp. 183,124 189,980 Wickum Const. 186,600 192,900 Wayne Fregien 222,806 230,806 Engineer's Estimate 150,000 159,00,0 WHEREAS, the City Manager recommends that award be made to the low bidder, Claude C. Wood Company, NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lodi that award of contract for Salas Park Pump and Control Structure be and the same is hereby made to Claude C. Wood Company, the low bidder, in the amount of $154,700. Dated: September 1, 1982 I hereby certify that Resolution No. 82-96 was passed and adopted by the City Council of the City of Lodi in a regular meeting held September 1, 1982 by the following vote: 82-96 Ayes Council Member - Snider, Pinkerton, Olson, Murphy and Reid Noes: Council Member - None Absent: Council Member - None Ct'frcv ih ALICE M REIMCHE City Clerk 82-96