HomeMy WebLinkAboutAgenda Report - September 1, 1982 (34)CITY OF LODI
f
PUBLIC WORKS DEPARTMENT
COUNCIL COMMUNICATION
Flcn
City Council
City Manager
�+...�.
August 26, 1982
: Contract for Salas Park Control and Pump Structure
ENDED ACTION: That the City Council award the Base Bid + Alternate
forws Park Control b Pump Structure to Claude C. Wood Co., the low bidder,
amount of $154,700.
L. Ronsko
is Works Director
chment
APPROVED:
H N Y A. -CLAVES, City Manager
FILE NO.
BACKGROUND INFORMATION:
Plans and specifications for this project were ap-
proved by the City Council
on August 4, 1982. Bids
were opened
on Wednesday,
August 25, 1982, and the
following 10 bids were received:
BASE BID +
BIDDER
LOCATION
BASE BID
ALTERNATE
C. C. Wood
Lodi, CA.
$147,900
$154,700
R. Goold b Son
Stockton, CA.
152,900
160,100
Subgrade Const.
Rancho Cordova, CA.
164,496
171,651
Kaweah Const. Co.
Visalia, CA.
175.500
181,500
Amber Sierra Const. Inc.
Sacramento, CA.
177,700
185,700
Duanco Const.
Fresno. CA.
178,000
185,750
DCM Const.
Sacramento, CA..
182,366
187,771
Agir Corp.
Modesto, CA.
183,124
189,980
Wickum Const.
Merced, CA.
186,600
192,900
Wayne Freg-len
Stockton, CA.
222,806
230,806
Engineer's Estimate
150,000
159,000
A tabulation of the bids
has also been attached.
The Base Bid + Alternate
includes the installation
of an electric gate operator.
This gate will ul-timately
control the flow of storm water from
Salas Park to
Beckman Park. In the future;
a flow meter will be
installed to control the gate.
It is felt that it will be
more economical to install the electric operator now
than to wait until some future
date. The flow meter is being deferred until more
refined conjrol is needed
when the "D" Area is developed.
L. Ronsko
is Works Director
chment
APPROVED:
H N Y A. -CLAVES, City Manager
FILE NO.
SALAS PARK CONTROL AND PUMP STRUCTURE
BASE
BID
ITEM
APPROXIMATE
NO.
QUANTITY
DESCRIPTION
1.
LS
Y'
2.
LS
k
6fiti
3•
LS
Site Work - Civil
- .,
LS
Excava•t i o.,n S.a•f a-ty
SALAS PARK CONTROL AND PUMP STRUCTURE
BASE
BID
ITEM
APPROXIMATE
NO.
QUANTITY
DESCRIPTION
1.
LS
Control and Pump Structure
2.
LS
Inlvtl0u,t:let Structure
3•
LS
Site Work - Civil
4.
LS
Excava•t i o.,n S.a•f a-ty
5 •
2 EA
Submer--s i;bte Pwnp and Motor
6.
LS
TelemetarinD system
7.
LS
Motor Control Cemser
B.
LS
Site Work - Electrical
ALTERNATE P, i D
1.
LS
Electric Gate Operator
,.,
TOTAL BASE Bio
TOTAL BASE BID
PLUS ALTERNATE
R. GOOLD
b SON
BASE BID
1. S 56,800.0.0
*40001 2. - 13,300.00
3. 14,000.00
4. - 1,000.00
5. S 9.550.00 19,100.00
6. - 25,700.00
7. - 18130040
B. - 4,700.00
ALTERNATE BID
7,200.00
TOTAL BASE 540 $1$2,900.00
TOTAL BASE BID PLUS ALTERNATE 5160,100.00
ENGINEER'S
ESTIMATE
UNIT TOTAL
PRICE PRICE
LS S 46,500.00
LS 91000.0.0
LS 20„0.00.00
LS 2,.00.0.0:0
S 13,750.00 25,500..00
22,500.0.0
16,500.00
8,000.00
S 9,000,00
$159,000.00
5159,000.00
Tabulation of bids received August 25, 1982
CLAUDE C.
W0.00 COMPANY
UN -1T TOTAL
PRICE PRICE
S 42,500.00
8,500.00
• 23., 500..00
500.00
S 11,:0."0.0.00 22,000.00 �
• 26,500.00
18,000..00
6,400.00
$ 6.800.00
$ 157.906.00
$ 155,700.00
SUBGRAOE KAWEAH j
CONSTRUCTION CONSTRUCTION
S 56.414-00 - S 62.500.00
- 13,829.00 - 14,�"00.00
22,576.00 3:5,000.00
30.00 500..00
$11,121.00 22,242.00 $8,000.00 1-6,,000..00
24,982.00 - 25.,000.00
18,74640 - 16,000,00
6,107.00 - 6,000.00
S 7,155 00 $ 6,000 4.0
5164,496.40 S 175,500.00
$171,651.00 $ 181,500.00 (�
. 1
1,11111! 1 Mi
.J.,.�':'s ,t t::� y ♦f M
`� ,sl. �'' `'' F... r -i• iJ
-
'! 1 1. ij. I , ,' - �!. 'S', '' _ P"'�'"`^r[j •-
t �
MAS PARK CONTROL AND PUMP STRUCTURE. ¢ont'd.
BASE BID
ITEM AMBER $4 EARA OUANCO
No. CONSTRUCTION COMPANY CONST- ,_RUCTION, DCM.CONSTRUCTION
1. $ $3.700.00 - S. 50,000.00 - $ '52,836.00
2. - 17,800-00 - 10,000.00 - 16,582.:00
3. - 26,000.00 25,000.00 - 39,792.00
4. - 3,500.00 20,0.00.00 1,500.00
5. $12,800.00 25,60.,0,40 $11,000.00 22,00.0.00 $10,913.00 21;826.00:
6. 26,600.00 • 25,000.00 - 26,000.00
7. - 18,000.00 - 20.000.00 - 17,_80.0.010
8. - 6,500.00 • 6,000.00 - 6,000.00 4J
u ALTERNATE BIO
1. ; $ 81000.00 S 7_5_.;00 $ 5.,435.00
TOTAL .BASE BID $ 177,700.00 $ 178,0.00.00 $ 182.33.6,00
TOTAL BASE BID PLUS ALTERNATE S 185,700.00 S 185,750.00 S 187,771.00
AGIR CORPORATION WICKUM CONSTRUCTION WAYNE FREGIEN
BASE 810
1 - S 61.479.00 - S 43,400.00 - $ 86,79.2.00
2. • .40,970.0.0 - 16,000,00 16..1:8$.60
>� 3. - 9,000.00 - 48,}00.00• 40,628.0.0
4. 1.00 - 100.00 - 4,.000,00
5. $25,949.00 25,949.00 $12,400.00 24,800.00 $11.968.00 23,936.00
6. - 23,787.00 - 27,600.00 - 26,790.00
7. - 16,207.00 - 17,200.00 - 18.23.4.00
8. - 5,731.00 9,200.00 - 6,238.00
ALTERNATE BID
1. $ 6,856.00 $ 6,300.00 $ 8,000.00
TOTAL BASE $10 S 183,124.00 S 186,600.00 S 222.8.06,00
TOTAL BASE BID PLUS ALTERNATE $ 189,980.00 $ 192,900.00 $ 230.806.00
a.' _ i ' .
NCO
RESOLUTION NO. 82-96
AWARD - Salas Park Pump and Control Structure
WHEREAS, in answer to notice duly published in
accordance with lau and the order of this Cit, Council, sealed
bids were received and publicly opened by the City Clerk of
this City on August 25, 1982 at 11:00 a.m. for the contract
for Salas Park Pump and Control Structure as described in the
specifications therefor approved by the City Council on
August 4, 1982; and
WHEREAS, said bids have been conpared, cher.}:ed, and
tabulated and a report thereof filed with the City Manager as
follows:
WHEREAS, the City Manager recommends that award be
made to the low bidder, Claude C. Wood Company,
NOW, THEREFORE, BE IT RESOLVED by the City Council of
the City of Lodi that award of contract for Salas Park Pump and
Control Structure be and the same is hereby made to Claude C. Wood
Company, the low bidder, in the amount of $154,700.
Dated: September 1, 1982
I hereby certify that Resolution No. 82-96 was
passed and adopted by the City Council of the
City of Lodi in a regular meeting held September
1, 1982 by the following vote:
82-96
BASE BID +
BIDDER
BASE BID
ALTERNATE
C. C. Wood
$147,900
$1541700
R. Goold 6 Son
152,900
160,100
Subgrade Const.
1641496
171,651
Kaweah Const. Co.
175,500
181,500
Amber Sierra Const. Inc.
1771700
185,700
Duanco Const.
178,000
185,750
DCM Const.
182,366
187,771
Agir Corp.
183,124
189,980
Wickum Const.
186,600
192,900
Wayne Fregien
222,806
230,806
Engineer's Estimate
150,000
159,00,0
WHEREAS, the City Manager recommends that award be
made to the low bidder, Claude C. Wood Company,
NOW, THEREFORE, BE IT RESOLVED by the City Council of
the City of Lodi that award of contract for Salas Park Pump and
Control Structure be and the same is hereby made to Claude C. Wood
Company, the low bidder, in the amount of $154,700.
Dated: September 1, 1982
I hereby certify that Resolution No. 82-96 was
passed and adopted by the City Council of the
City of Lodi in a regular meeting held September
1, 1982 by the following vote:
82-96
Ayes Council Member - Snider, Pinkerton,
Olson, Murphy and
Reid
Noes: Council Member - None
Absent: Council Member - None
Ct'frcv ih
ALICE M REIMCHE
City Clerk
82-96