HomeMy WebLinkAboutAgenda Report - August 20, 1986 (79)APPROVE PLANS AND
SPECIFICATION FOR
HUIC HINS STREET
SQUARE FINE ARDS
COMPLEX Council approved the plans and specifications for "Hutchins
Street Square Fine Arts complex" and authorized the
CC -12.1(a) advertising for bids thereon.
This project consists of the remodeling of the music
building, including an addition enclosing the area between
the existing auditorium and the music building. It will
make the facility available to the handicapped with an
_ elevator.
Four acid -on bids will be received. They are for a walled
garden to the east, walkway area to the west, new stairs to
the north, and a new roof.
e 1 L
CITY OF LODI
COUNCIL COMMUNICATION
PUBLIC WORKS DEPARTMENT
TO: City Council Project Data
Budgeted Xiount: $500,000
FROM: City Manager Budgeted Fund: General Fund
Base Project Estimate: $632,500
DATE: August 11, 1986 Total Project Estimate: $730,000
Bid Opening Date: 9/10/86
SUBJECT: Hutchins Street Square Overrun Fund: Hutchins Street
Fine Arts Complex Square Foundation
RECOMMENDED ACTION: That the City Council approve the plans and specifications
for the above project and authorize advertisement for bids thereon.
BACKGROUND INFORMATION: This project consists of the remodeling of the music
building, including an addition enclosing the area between the existing
auditorium and the music building. It will make the facility available to the
handicapped with an elevator.
Four (4) add-on bids will be received. They are for a walled garden to the east,
walkway area to the west, new stairs to the north, and a new roof.
The basic project cost is estimated to be $632,500, including inspection and
contingencies. The add-on items are estimated at $97,500 and would increase the
total cost to $730,000.
Jack\L. Ronsko
Publi Works Director
cc:._ ssistant Finance Director
Hutchins Street Square Foundation
Lodi Design Group
JLR/GER/ma