Loading...
HomeMy WebLinkAboutAgenda Report - August 20, 1986 (64)' CITY COUNCIL NOTING AUGUST 20, 1986 REQUEST FOR PROPOSALS APPROVED FOR COMPUTER AIDED DRAFTING (CAD) SYSTEM Council approved "Request for Proposals - Computer Aided \ Drafting (CAD) System". OC -12.1(b) Council was informed that the approvers 1986-87 Budget includes an allocation of $63,600 for the acquisition of canputer hardware, software, and training for a ccniputer aided drafting (CAD) system. The system will handle the Public Works Department's mapping needs and will eventually be used to furnish base and special maps to other City departments. e 1 P TY v LODI COUNCIL N IL COMMUNICATION PUBLIC WORKS DEPARTMENT TO: City Council FROM: City Manager DATE: August 13, 1986 SUBJECT: Request for Proposals - Computer Aided Drafting (CAD) System RECOMMENDED ACTION: Approve the attached "Request for Proposals - Computer Aided Drafting(CAD) System." BACKGROUND INFORMATION: The approved 1986/87 Budget includes an allocation of ,600 for the acquisition of computer hardware, software, and training for a computer aided drafting (CAD) system. The system will handle the Public Works Department's mapping needs and will eventually be used to furnish base and special maps to other City departments. The main advantage of CAD systems is that the information to be shown need only be "drawn" once. It then can be combined to create maps at any scale. For example, street rights-of-way would be entered into a discrete "layer" and used as a basis for all the utility maps. Thus, changes are entered only once. The request for proposals is essentially a description of the City's proposed applications, its needs, and the performancecriteria for the computer` hardware and software. Jack L. Ronsko tPublic orks Director I Attachment f cc: Finance Director, MIS Committee Chairman JLR/RCP/ma APPROVED: �I Jn'y� FILE NO. THOMAS A. PETERSON, City' -Manager .1 j August 14, 1986 To Prospective Suppliers: THOMAS A. PETERSON City Manager ALICE M. REIMCHE City Clerk RONALD M. STEIN City Attorney The City of Lodi is requesting proposals for a computer aided drafting (CAD) system. The system is to be used for mapping the City's streets, utilities and miscellaneous features and for general civil and mechanical drafting. The system is to support three to six users, sharing a common database. Proposals must be for a complete, compatible and fully supported software and hardware package. Detailed requirements are contained in the document "Request for Proposals - Computer Aided Drafting System for the City of Lodi" available at the office of the Public Works Director, City of Lodi, 221 W. Pine Street, Call Box 3006, Lodi, CA 95241-1910 (telephone 209-333-6706). Proposals will be accepted until 3:00 p.m. Thursday, September 18, 1986, at the above office. Jack L. Ronsko Public Works Director Enclosure JLR/RPC/cag CITY COUNCIL FRED M. REID. Mayor �{ T CITY O 1� L O D I EVELYN M. OLSON Mayor Pro Tempore CITY HALL, 221 WEST PINE STREET DAVID M. HINCHMAN CALL BOX 3006 JAMES W. PINKERTON. Jr. LODI, CALIFORNIA 95241-1910 JOHN 9. (Randy) SNIDER (209) 334-5634 August 14, 1986 To Prospective Suppliers: THOMAS A. PETERSON City Manager ALICE M. REIMCHE City Clerk RONALD M. STEIN City Attorney The City of Lodi is requesting proposals for a computer aided drafting (CAD) system. The system is to be used for mapping the City's streets, utilities and miscellaneous features and for general civil and mechanical drafting. The system is to support three to six users, sharing a common database. Proposals must be for a complete, compatible and fully supported software and hardware package. Detailed requirements are contained in the document "Request for Proposals - Computer Aided Drafting System for the City of Lodi" available at the office of the Public Works Director, City of Lodi, 221 W. Pine Street, Call Box 3006, Lodi, CA 95241-1910 (telephone 209-333-6706). Proposals will be accepted until 3:00 p.m. Thursday, September 18, 1986, at the above office. Jack L. Ronsko Public Works Director Enclosure JLR/RPC/cag CITY OF LODI _. PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION COMPUTER AIDED DRAFTING SYSTEM REQUEST FOR PROPOSALS TABLE OF CONTENTS I INTRODUCTION II APPLICATION INFORMATION A. General Background B. Application Details 1. Facility Mapping 2. Construction Details 3. Special Exhibits and Location Maps 4. Construction Plans III SOFTWARE A. General Requirements B. Software Features C. Software Support IV HARDWARE A. General Requirements B. Specific Requirements 1. Computer (CPU) 2. Data Storage 3. Graphics Terminal 4. Printer 5. Plotter 6. Miscellaneous C. Hardware Support V INSTALLATION & TRAINING A. Installation B. Training VI PAYMENT VII PROPOSAL REQUIREMENTS APPENDIX REQUEST FOR PROPOSALS COMPUTER AIDED DRAFTING SYSTEM for the CITY OF LODI I INTRODUCTION The Computer Aided Drafting (CAD) System is to be used -by the City of Lodi Public Works Department, Engineering Division to draft maps of City streets, utilities, and miscellaneous features and for general civil and mechanical drafting. The system is planned to be used initially with one terminal and with three terminals in two years. - Additional terminals or stand alone workstations may be added by other Departments in subsequent years. II APPLICATION INFORMATION A. General Background The City of Lodi has a population of 41,000 within 9.1 square miles (5,800 acres) of mostly developed land (approximately 18,000 parcels). There are 132 miles of street and roughly 140 miles each of water, wastewater, and storm drain lines. The City has been growing at an average rate of 2% per year over the last 30 years. The City's present data processing systems consist of the following: o IBM S/36 @ City Hall -,used for accounting billing, word processing, building permit processing and general database applications o IBM S/36 @ Police Department - used for dispatch and incident records and analysis o IBM and HP PC's @ Public Works and Engineering - used for various engineering, maintenance and record keeping programs Itis not the City's intent to use the CAD system to replace any of these systems. B. Application Details 1. Facility Mapping The primary application of the CAD system is to draft maps of City facilities. Secondary applications include construction details (Standard Plans), special exhibits, location maps and construction plans: Facility maps will include single maps of the entire City with relatively little detail and maps of sections of the City with substantial detail. It is desired that the system handle all this information in one "drawing" with multiple ".layers." It is understood that this may seriously degrade system performance and that sectioning of the City may be more appropriate. The system must use a common data base with true ground coordinate capability. The proposal should discuss this aspect in detail including descriptions of how sectioned drawings/symbols are created, updated, resealed, combined, and manipulated by the system. The following table shows most City features and facilities and the way it is intended they be plotted: Entire City Sections Street - Centerlines Street width dimensions Rights-of-way Lane line and other striping Curblines Signs Names Lot dimensions Property lines Easements Utilities - Water, wastewater Addresses & storm drain mains Utility services with sizes Valves, manholes, etc. Misc. facilities - Approximately 30 types such as: Fire hydrants Street lights Traffic signals Parks Major buildings Samples of portions of present maps are included in Appendix. (B-la,b,& 0. The City intends to draft this database using information from record maps, construction plans and special surveys. 2. Construction Details The City prepares "Standard Plans" for use as refHrence drawings on construction projects. There are presently 65 of these drawings. It is intended to draw these with the CAD system and use them as is or modify them as needed for specific projects. A sample is included in Appendix B2. 3. Special Exhibits and Location Maps The City frequently prepares drawings showing proposed work and its relation to existing facilities. It is intended to extract the appropriate portion of the database, add the proposed work, and create a new drawing. It is estimated there would be 40 such drawings stored at any given time. See Appendix B3 for an example. -2- ''"` 4. Construction Plans The City prepares roughly '60-24" X 36" construction drawings for civil engineering projects each year. It is intended that the basic street and utility. information be extracted from the database and project details be added to create a new drawing. Although civil design software and surveying/data collection hardware is not part of this purchase, the supplier i -s encouraged to describe other software/hardware packages compatible with the proposed CAD system. III SOFTWARE A. General Requirements The drafting software shall be fully integrated including drawing creation, editing, and plotting; and system management'. The software shall not rely on operator knowledge of the computer's operating system. However, access to the operating system must be easily available in the event the City wishes to use the computer for other programs. Disc space required for storage of the operating system and CAD program shall be indicated in the proposal. The supplier shall estimate the storage requirements of the drawings indicated in Section II of this RFP. Systems having optional modules or auxiliary programs shall be clearly identified as to what is included in the proposal. Options and interfaces to other programs/languages shall be described. The proposal shall include discussion (including applicable costs) of the system's compatibility with other CAD systems and the Initial Graphics Exchange Specification. B. Software Features The complexity of drafting software precludes listing detailed requirements in this RFP. The proposal shall include sufficient descriptions of the software capabilities and command structure to allow the City to evaluate the system. Suppliers are encouraged to emphasize features applicable to the City's application. It is suggested that a set of actual user manuals be included in the proposal. (The City will return any proposal materials requested by the supplier at the end of the evaluation.) -3- C. Software Support The proposal shall describe software support including the following: 1) Help with software questions and problems 2) Help with software/hardware interface questions and problems 3) User group program 4) Software updates and enhancements 5) Operating system updates and enhancements IV HARDWARE A. General Requirements All system components shall be completely compatible with each other and the CAD software, and preferably made by, the same well established manufacturer. All components shall have the following features: 1) 115 VAC (nominal) line voltage operation 2) Low noise operation 3) Attractive enclosures suitable for open placement, in an office 4) All hardware shall be movable and fit through 36" X 80" doors 5) Meet all Federal and State regulations regarding interference and radiation. The supplier shall refer to the Application information provided in Section II of this RFP and Appendix C "System Configuration and Staging" for determining hardware requirements. The proposal shall include manufacturer's descriptive brochures for all hardware components. B. Specific Requirements 1. Computer (CPU) For the purposes of this RFP the CPU includes the central processor, power supply, system memory, peripheral controllers, and buses. The CPU design shall incorporate state-of-the-art electronics, and modular, plug-in circuit cards. All input and output shall be properly buffered and interfaced to reduce CPU performance degradation during data transfer or plotting. The CPU shall utilize a 16 bit word (minimum) and be suitable for multi-user, multi -task operation so that each CRT operator can be viewing different displays or performing different operations while the CAD system is functioning. A hardware floating point processor shall be included. The CPU shall be furnished with sufficient ROM/RAM to quickly and efficiently operate the CAD .system (See Appendix C). -4- 2. Data Storage Data storage shall be provided with a Winchester Disc drive and magnetic tape. Formatted capacities shall be a minimum of 120 mb and 60 mb respectively. Disc controllers shall incorporate an error checking scheme during read/write operations with suitable correction or warning routines. 3. Graphics Terminal All graphics terminals shall be flicker free and provide a sharp display of characters on a screen measuring 12" (minimum, diagonal). The CRT shall be enclosed in a free standing enclosure for placement on the operator's desk. The graphics terminal shall include both a separate keyboard with a numeric key pad and a separate command entry and cursor control pad compatible with the CAD software. The following features are desired: o display 8 colors minimum o high resolution, minimum 512H X 390V o external power switch and brightness & contrast controls o tilt & swivel adjustment o anti -glare screen o silent operation -convection cooled preferred o screen saver feature (shut off display after user selected inactive period) o automatic degauss o 60H refresh rate, non -interlaced 4. Printer The CAD system shall include a system printer for hard copy listings of drawings and other system outputs. Graphics printing (screen dumps of drawings) is not required. The printer shall have a minimum printing speed of 150 cps and utilize perforated tractor feed paper 8-1/2" or 15" wide. The system shall provide output formatting which skips the perforation. 5. Plotter The CAD system shall. be furnished with an "E -size" plotter (nominal 36" width X 48' length sheet size). Plotter performance specifications shall equal or exceed those of the HP7585B. The plotter shall include the manufacturer's normal accessories -5- plus three p pen holders and an assortment of roller b< :l or ball point, fiber tip and technical drafting pens, and paper and vellum drafting media. Plotting shall be done in "backgound mode," i.e. data entry and other mapping work shall be capable of being accomplished while plotting other drawings. 6. Miscellaneous The system shall be furnished with all data cables and power cords necessary to connect and operate the complete system. All cables shall be shielded. The initial system will be installed in one location; however the cables shall allow the graphics terminal to be located at least 10 feet from the CPU and the plotter 20 feet from the CPU. All hardware documentation shall be included. Static and power surge protection as recommended by the hardware manufacturer shall be included. Power failure protection is not required, however the proposal shall discuss data loss and system integrity in the event of a power failure. C. Hardware Support The proposal shall include hardware service support for one year. The support level shall be on-site, next day service, all parts and labor included. The support shall be from the hardware manufacturer. The supplier may provide an option for third party support. In each case, the location of the support center shall be indicated. The proposal shall be clear as to the end of manufacturer's warranty period and the beginning of extended support service. V INSTALLATION & TRAINING A. Installation The proposal shall include delivery, installation and testing of all hardware and software. The City can rovide non-technical assistance, including the use of hand trucks. IThe system is to be installed on the second floor of City Hall.) No cutting or wiring through ceiling or walls will be required. B. Training The proposal shall include software and hardware training. The training shall include two phases: -6- 1) -System overview and capabilities - primarily .for 'the system manager (an Engineer) who will supervise overall system use and implementation 2) System operation - primarily for system operators (engineering technicians) who will actually use the system On-line training courses and "help" screens shall be described. The proposal shall indicate the location and duration of all proposed training. All supplier expenses involved in training shall be included. VI PRICE AND PAYMENT The proposal shall clearly indicate the price of the hardware, software, support and miscellaneous items requested in this RFP. Training shall be itemized. The Initial, Year 2, Year 3 and Ultimate prices shall be indicated separately. All prices shall be current. Year 2 and subsequent prices will not be considered binding. All quotations shall be protected from price increase for a minimum of 30 days. Sales tax on applicable items shall be included. Upon completion of installation and testing of software and hardware, the City will pay 90% of the purchase price of the items included. Upon completion of training, the City will pay 100% of the price for training. During the 30 days following the completion of installation/testing or training, whichever is last, the City will use and test the system. Following satisfactory completion of this test period, final payment will be made. Payment for maintenance and support will be in accordance with terms agreed to between the City and the supplier. VII PROPOSAL REQUIREMENTS In addition to the items specifically requested in this RFP, the proposal shall include the following information: 1) Background description of the software including introduction date, revision history and company background 2) List of users of the proposed system, preferably public agencies using the system for purposes similar to Lodi's application 3) A copy of the software license agreement 4) Availability of demonstrations 5) Complete Hardware list for the initial system and the three additional stages (See Appendix C). -7- ' '� ^, 6' � Background description of the hardware - �CPU, di scterminal ^and plotter) including� introduction date, production history, company and anticipated support life' 7Delivery time from date of order 8) Cost breakdown and total cost with options and "not -included" items clearly identified. 9) Name and telephone number of supplier contactperson who can ` answer technical questions about the proposed system, � IM A City Map B -la 8-1/2 X 11 section of 500 scale utility map b 200 scale base map C 200 scale utility map B2 Standard Plan B3 Typical Exhibit C System Configuration & Staging M m -R p► W. LODI f AVE t \ NORMANDY :r / O \ S4orw% Snn►tgry SeukY M2�f Ssmi��Y ;-2-- � 1 _ r / \ w Z 2 3 3 W ARL NGTON \ < I !� ► - _ 1 Wy 1t� DR.' 1 4 ' h • iiLi tj ! _ ` 1 6 -3- 33 6 { I i ; Y ; ; !k:, 1 „® • `x=o CED t �m 1. @ wT A R A P L. 0099++4— SCALE t --t -»_41 • ` o 1 } •. /•2] 2 •o.), . s ro io a a to •azo INDEX NUMBER DATE q•� DATE I,. _® coD .31 70 I ® ® (LTD Q7b i cSID TO • )O ,. o Exul$ IT- � 9 1 _ �w s'• I�k I w � •1`t ,Z,� It • S T. ' ••h ..:• . ,]» ! MIT a i—mlfi 1773 00, ® . (SID i k - . ® I ,,. ), too t Ig 1 I oo., j r f 1i f 1 (n - _ I troar cwrxc.ra«.1 -t'- c -...c.- ' ' 1 .00 Ikit - 11 w q w a kh i w (30> 11® ® (M ^m i ® <0:> CsD cit) (]MD Ow Mwe. N �+ so , . S T. CLAIRE D R. r o ® �11141 53 so Al - lit � �a �•r•?• I t1 t = - c 1) tij,� U) iit z 1 IAJ :, ac @ @-j�@ LTI-P, - -- — - + ol !I it CITY OF LODI PUBLIC WORKS DEPARTMENT PRINT INDEX NUMBER DATE q•� DATE I,. REVISED ( 17Ta R a PL_ SCALE wa» - - o m Saa.■ � 34 M4 x aw i� Tw '04., . .Sar x. fe _ 1' �').): 2 wY•. .. A t ,�_ —bio [^ u ._.367v t _ n ' { ![� 3 •.). 439J l r •..��� CLD R. v d '. 6rt. ♦JII` '!Ir, Sfc • 51: ,l `t JJu . e.( - to CD --- t- f r �I 3 Ham_ .__ �• ' -. ..-- i y' trJ xo t, 13 ii 'Tfi:". � .. 6.. - )et s. , I �:4 •ti[?---� .-sem—��. r'Sr.., 12 N 12011 i STO w STO w -�'� x_313 [:+ ' -)••E� - .E-11'� l t X>w a :1 CITY OF LODI PUBLIC WORKS DEPARTMENT t .,•.. PRINT INDEX NUMBER DATE DATE REVISED CITY OF LO®I I WAT=SERVICE PUBLIC WORKS DEPARTMENT Street surface 36'min. Locat;: service 12" south or east of lot r 12" Sidewalk —\ F— Support box with — t bricks all around on Compacted sub - grade (900AAC) 6 Plug openings. 3O'min. I service see noted /-Trace Mire * 14 so i0 8 Radius per ���\ CO0te TW monuf• 1 \ or MN W�'s' r j6� s ecure trace wire S45° sound fittings 16"Tin. L NOTES 1. Maintain 24' clearance between tap and any coupling, fitting or adjacent tap. Plastic services shall be looped approxioately 6' vertically or laterally to provide slack in the line. If the service is installed in the sue trench as the sanitary service, the water service shall be installed without splices and the trench section shown app)ies: 2. Backfill shall conform to Std Plan 301. 3. Alternate fittings oust be approved by the Engineer. MATERIALS 1 Corporation Stop Mueller H-15006, 1'1 Mueller H-15024 */saddle 2 Service Pipe C.T.S. PE 3408, CL. 160 trace wire 3 Angle Stop Mueller H-14267, catalog size 5/8' x 3/4' x I' 4 Spacer Mueller H-10887, catalog size 314', or Sch 80 PVC (9. 19. 1'straight thread), w/washers 5 Coupling Mueller H-10891, catalog size 518' r 3/4' x 1' w/ brass bushing or ford SPH -23 (Mo bushing req'd) 6 Custooer Valve Mueller H-8130 or Stockhao 0-216 angle globe valve w/handwheel 7 Custooer stub IPS PVC Sch. 40 per Dnifore Plusbing Code. Extend past edge of box (Sane size as service pipe) 8 Service Box Christy 8-16 PID -30 lid or 61D30 (Traffic areas) 9 Saddle Roaac 101S, Mueller H-134% series (req'd for PVC pains only) K. T.T_- Dr. ped B� pp.c E� By / 10 -79 F el. w04S Di'ecto' f2 -1zSEPT. 'h ,e R. 'heck, ed C.P.484Dote 19 3-86 Center box over valves. Set box 1/2" to I" above ex. ground or adjacent sidewalk. 9"min. 14'mox.r Moldedlmole 7 t8"min. res a _—� adopter Tope en '-'� ," Mf N Elbow House service by others. plostic service only) /--4 rebor-36"Ig. w/32"10 wire ties. See note 2 W 3"min. IS"min h- 41SS TRENCH SECTION STD PLAN 403 TURNER 3 , 0 J QV Vf W TURNER Q Ru Na, „J IQ ROAD u rRtb ROAD T1 f; I -1 SS PROPOSED 'NO PARKIW PIWO"D 'NO PPRKfNG' �exlsrlNG 'M PARKING' ....•... EwsTlN4 'HO PAPXIK*' Lone NO ' PARKING ANY TIME R K TURNER ROAD "Cb' CITY OF L O D I SWR, SAC. SOUTH-LWR.SAr-.NOKTH ' 01i 7�8to :CiPUBLIC WORKS DEPARTMENT PROPOSED STRIPING PLAN APPENDIX C SYSTEM CONFIGURATION & STAGING Initial Computer w/ ROM/RAM F.P. Processor I/O Boards Spare rack space Enclosure Hard Disc Tape Backup Terminal (1) Printer Plotter Maintenance Software License Software Support Year 2 1 add'l X X X X provide as recommended/required - provide in initial system o not required Year 3 Ultimate X X X _ o 1 add'l 2 add'l X X X X X X