HomeMy WebLinkAboutAgenda Report - August 19, 1987 (100)CITY COUNCIL MEETING
AUGUST 29, 1987
VARIOUS SPECIFICATIONS
APPROVED Council approved the following specifications
authorized advertising for bids thereon:
CC -12.1(b) 1. One Digger Derrick/Bucket Truck Combination
II. Three 15 - KV Vacuum Circuit Breakers
III. One 69-K:- S1r6 Circuit Breaker
15
and
r
t
y
t
COUNCIL C0111111UNICAT10",7
TO: THE CITY COUNCIL DATE P.�.
FROM: THE CITY MANAGER'S OFFICE August 19, 1987
SUBJECT: SPECIFICATIONS FOR THE PURCHASE OF DIGGER DERRICK/BUCKET TRUCK CO1IBINATION.
(EUD-87-9)
RECOMMENDED ACTION: That the City Council approve the specifications for
the purchase of one digger-derrick/bucket truck combination and authorize
advertisement for bids thereon. The bid opening date has been set for
Tuesday, September 22, 1987.
BACKGROUND INFORMATION: This unit is for replacement of existing line
truck #42. The estimated cost of this purchase is $120,000 with delivery
expected in approximately 35 weeks.
Funding for this purchase has been included in the 1987-88 fiscal -year
budget.
Henry J. RiA if
Electric Utilicy Director
cc: Assist. Electric Utility Director
Electric Utility Superintendent
Purchasing Officer
COUNCIL COINI ffUi4ICT10--
TO THE CITY COUNCIL DATE NO.
FROM: THE CITY MANAGER'S OFFICE August 19, 1987
SUBJECT: SPECIFICATIONS FOR THE PURCHASE. OF THREE 15 -KV VACMM CIRCUIT BREAKERS (EUD87-10)
RECO1*1ENDED ACTION: That the City Council approve the specifications
for the purchase of one 2000 amp. and two 1200 amp. three-phase vacuu^
power circuit breakers and authorize advertisement for bids thereon.
The bid opening date has been set for September 22, 1987.
BACKGROUND INFORMATION: The power circuit breakers will be installed
at the McLane Substation as a part of the Phase 2 development now in
progress. This second phase is required to suppiy.the area load,
including large industrial load now being developed, under 'emergency'
conditions, commencing with the 1988 summer season, and will be needed
to supply the 'normal' load in subsequent years. The cost estimate for
this purchase is $60,000 with delivery expected in six months.
Funding for this purchase is included in the Electric Utility Department's
1987-88 budget.
Hen J. Rice
Electric Utility Director
cc: Assist. Electric Utility Director
Electric Engineer
Purchasing Officer
TO: THE CITY COUNCIL
FROM: THE CITY MANAGER'S OFFICE
VWNCIL COMMUNICATIO'T
DATE NO.
August 19, 1987
SUBJECT: SPECIFICATIONS FOR THE PURCHASE OF 69 -KV SF6 CIRCUIT BREAKER (EUD87-11)
RECOMMENDED ACTION: That the City Council approve the specifications
for the purchase of one 69-kv SF6 three-phase power circuit breaker
and authorize advertisement for bids thereon. The bid openirg date
has been set for September 22, 1987.
BACKGROUND INFORMATION: This power circuit breaker will be installed
at the McLane Substation as a part of the Phase 2 development now in
progress. This second phase is required to supply the area load,
including large industrial load now being developed, under 'emergency'
conditions, commencing with the 1988 summer season, and will be needed
to supply the 'normal' load in subsequent years. The cost estimate for
this purchase is $55,000 with delivery expected in six months.
Funding for this purchase is included in the Electric Utility Depart-
ment's 1987-88 budget.
Henry J. Ric
Electric Utility Director
cc: Assist. Electric Utility Director
Electrical Engineer
Purchasing Officer