HomeMy WebLinkAboutAgenda Report - August 17, 1983 (45)CITY CrYI jCIL MEETING `
` AUGUST !7, 1983
Council was infomwed that in the 1982-83 CIP} funds were
approved for replacement of the clean-up at the Vinewood
Ptrrp i ng S t a t i ozi .
\' Staff requested funds at this time because the existing
RITLA( ENT AT pub a t Beckman Park PuT i ng Station is encoun' e r i ng bea r i r -L;
BBQ PAm problems and may Dave to be pulled in the very near
future -1t is also icrpo='tart that the City has the puTV instal Ied
prior to the early winter which is expected.
OCCNC I L APPIWIM A SPBC I AL ALI MAT I CN IN THE tVVD[)t`lr CV
$11, 040 PGF2 UE RFPLAf,HMgr OF 'n IE CL ANUP "IP AT TIIF.
BBaVAN PARK MIP ING STATICN.
... .., ..._.. .,. .._.-! .» .t,.asn.• '. t�r a 6.
13
333 -
it
Y1 k'
4 I
f.
'. r J.r
f Gr f iY4
7yi
sn v: �}� f _ �('' w i'?+. .»'�.ici l�rrk •'nitiY",.-La?•�3 T.1� KAY }. �'• �c
5 v • _ X)-}. }, �Rtt.Efigr ,�+ M Ar1.t i4 , f �? `•
>
j tl t" �as'� �' Y �, J�� Y. Swe,i?•. _, t !:
u=�' k z.�: -, •:s.r .. �.:"".. � . � d's;.^-.'t�'��v��S•�.�!�ci`;, s' Fa •,._t ,�.�`c.^` .. �. - .... -...
F.]
CITY QF LODI
• CAPITAL IMPROVEMENT PROGRAM
PROJECT TLE:
CLE 74P PUMP REPLACINF r
�{ k
PROJECT DESCRIPTION, JUSTIFICATION & RELATED PROJECTS:
phis projectrl.ncludes the reRlacanent �f the :existlnq' clean -u
1ne►�od':Airk Lvdi`' Lake` ani"etlanan Park wlh nrw pumps �e Ne � t ,'�,:
the°�sl tin -up: `ase.
The present clean-up pumps are ditch pumps, the same type as used for the
main duty pumps. The clean-up pump rrust start and stop more often, handle
more debris and lift the water higher than the main duty pumps.
The proposed pump is a submersible trash purn,n of a type which has been
successfully used in other pump stations.
The estimated cost allows for installatin by a contractor.
a. Vinewood Park ( 5 hp) $ 5,000
b. Beckman' trk f 10 'her) 4`10 000
C. Lodi Lake ( 5 hp) $ 6,000
ESTIMATM Estimated Fiscal UPDATED COST
PROJECT 003T 19_82_Cost Year 19— Cost 19 Cost 19 cost 19 Cost
ENR_X3,7_ Needed ENR 3732 ENR ENR ENR
Land Acquisition:
R/W
Easements
grg/Arch:
EIR
Preliminary
Final
a. $ 500 82-83 $ 500
b. $ 500 83-84
C . $ 500 84-85
Constructlon:
a. $ 5,000 82-83 $ 5.000
C. $ 6,000 84-85
Cher:
Sub Total $ 5,500
15 % Cont. 800
tal Project $ A . 3J0
osis S
.Estimated O i M
Costs (U8e back S
,Af sheet)
' _•
roJ'elt P R0J ECT Y S A R COST ($Ov
STORM (NAGE { most
PROJECT DESCRIPTION
82-8
1982-8
1983-84
1984-85 1985-86
1986-8-P,
1,00
1.08
1.17
1.27
1.38
COLLECTION SYSTEM IMPROVEMENTS
' Elm Street Storm Drain
43
43
Main to Washington
' Westdale Subdivision Drainage Improvement
86
° Maple and Central Storm Drains
118
118
Stockton to Central
Alley S/Maple to Maple
'
Roper, Palm b Grant Storm Drains
96
•112'
Eureka to Turner
Roper to Grant
Eureka to Palm
° Acacia Street Storm Drain
82
104
Sto.'cton to Centrad
' Olive Court Storm Drain
52
72
Pleasant to School
' Central Avenue Storm Drain
66
71
Oak to Elm
' Forrest Avenue Storm Drain
31
Church to School
' Main Street Storm Drain
67
Walnut to Pine
° Lockeford Street Storm Drair.
114
'
Washington to Cherokee
' Other Collection Improvements
485
MISCELLANEOUS IMPROVEMENTS
' Miscellaneous Storm Drains
10/yr
10
H
12
13
14
' Catch Basin Replacement Prc,•ram
20/yr
20
22
23
25
28
' Outfall Structure Cont+tel Program
10/yr
'10.
11
12
13
14
TOTAL
207
128
167
155
128•