HomeMy WebLinkAboutAgenda Report - August 17, 1983 (59)01"emury - century Salas Park Parka - - - n8 f Lot": BIMER BID Granite Construction $252,259.10 Frsnk Ferrira Paving $255,726.79 Claude C. Wood Co. $261,865.80 Teichert Construction $278,506.60 The breakdown of the project costs is as follows Parking Lot Construction (incl. Cont±agencies) $ 96,000 Plans (Consultant) 3,000 Inspection and engineering (City) 4,000 $ 103,000 Off-site %brk Construction (incl. contingencies) $ 169,000 Street a storm Drain $ 122,000•• Vkter* $ 24,000 Sewer* $ 23,000 Electrical System $ 10,000 Pians (consultant) 4,000 Inspection and engineering (City) 8,000 * eligible for reimbursement agreement (50$)$ 191,000 •• $18,000 is for street work on the east side of Stockton Street SALAS PARK Following recommendation of the City Manager, Council PARKIN$ U)r adopted Resolution No. 83-87 awarding the contract for the 02?nVLT AWARDED heretofore listed project to Granite Construction Ooqpwjy in the amount of $252,259.10 and appropriated the required` RBS. ND. 93-87 funds for the total project. (� CITY OF LODI l TO: - City Council FROM: City Manager DATE: August 11, 1983 SUBJECT: STOCKTON STREET IMPROVEMENTS 1000' S/Century - Century SALAS PARK PARKING LOT COUNCIL COMMUNICATION Project Data Approved in F.Y. Budget: -- Fund: -- Amount Budgeted: -- Total Proj�:ct Estimate: $ 294,000 Bid Opening Date: Aug. 10, 1983 RECOMMENDED ACTION: That the City Council award the contract for the above project to Granite Construction Company in the amount of $252,259.10 and appropriate the required funds for the total project. BACKGROUND INFORMATION: Plans and specifications for this project were approve on July 7,7983. The City has received the following 4 bids for this project: BIDDER LOCATION BID Granite Constructf'on Company Stockton $ 252,259.1`0 Frank Ferrara Paving Sacramento $ 255,j726. 9 Claude C. wood Company Lodi $ 261,865. Telchert Construction Stockton $ 278,506.60 The breakdown of the project costs is as follows: Parking Lot Construction (Incl. contingencies) $ 96,000 Plans (consultant) 3,000 Inspection and engineering (City) 4,000 S 103,000 Off-site Work Construction (incl. contingencies) $ 169,000 Street b Storm Drain $ 122,000** Water* $ 24,000 Sewer* $ 23,000 Electrical System $ 10,000 Plans (consultant) 4,000 Inspection and engineering (City) 8,000 * eligible for reimbursement agreement (50%) $ 191,000 ** $18,000 is for street work on the east side of Stockton Street i APPROVED: FILE 40. N A.� E C tY Hager q�" ff'/ D. City Council , August 11, 1983 Page Z The offsite and-electrical-work on Stockton Street �s.g,Ms$ter`Orain Fund expense (treating the City as a developer). However„ t`he street work on thW'eatt-slde of Stockton Street will be charged to one of the street funds. The .total project wi11«..be,funded using:COR or Revenue Sharing Funds for the -Parking-Lot and Ma`ster•Drain,and Street Funds for `Zhe offsICe.work. A tabulation 94 the bids is. attached.: Jack; L. Ronsko Pub)'ic Works Dtrector Attachment JLR:RCP:dmw E STOCKTON STREET IMPROVEMENTS .1000' S/Century boulevard to Century boulevard SALAS PARK PARKING LOT Tabulation of bids received August 10, 1982 ENGINEER'S SCHEDULE A ESTIMATE ITEM APPROXIMATE unit Total 00. QL"TITV DESCRIPTION Price Price 1. 2,530 CY Roadway Excavation (F) $ 3.00 s 7,590.00 2. 43.530 SF 3. 2.580 SF 4. 645 SF S. 7.320 SF 6. 625 LF 7• 562 LF 8. 100 LF 9. 10. 11. 12. 13. 14. 15. 16. 17- 18. 19. • 20. 21. 22. 23. 24. 25. 26. 27. LS 2 EA 2 EA 51 LF 1.067 LF i EA I EA 1 EA 1 EA 155 LF 989 LF 4 EA 2 EA 2 EA 40 LF 15 LF 483 LF 471 LF 1 EA Compact Original Ground Aggregate base Cl. 11 (.800.) Asphalt Concrete Type b (.201) Concrete Subgrade Compaction Vertical Curb. Gutter t Sidewalk Curb t Gutter Commercial Type Curb, Gutter t Driveway Joint Trench Street Lights (Single Mast) Street Lights (Double Mast) 6" water 12" Vater 6" Valve 12" Valve blowoff Fire Hydrant (Rich Ranger /960) 12" Storm brain 15" Storm Drain Side inlet Catch basin Drop Inlet Catch basin 48" Manhole 6" Sanitary Sewer 8" Sanitary Sewer 12" Sanitary Sewer 1516 Sanitary Sewer Sanitary Sewer Manhole (F) denotes final pay gwntity TOTAL SCHEDULE A SCHEDULE b 1. 3.200 CV Excavation (F) 2. 63,480 SF Ce poct Original Ground 3. 16553 T Aggregate base C1 1i (.331) 4. 800 T Asphalt Concrete Type b (.171) S. 825 SF i*, Vide Sidewelk 6. 2.066 LF 611 Concrete Curb 7• 7 EA Parking Lot Lights ( Post Top Luminaires) 8. $10 LF 121' Storm brain S. 4 EA Drop Inlet Catch basins 10. 159 LF 6" Sanitary Sewer 11. 1 EA Clean-out 12. Lump Sum L.b►dscape Sprinkler System TOTAL SCHEDULE b TOTAL BASE bio (SCHEDULES A t b) (F) denotes final pay quantity .08 11.00 31.00 .O5 14.50 7.00 . 16.00 1.800.00 1,000.00 1.300.00 7.30 22.00 245.00 900.00 250.00 1.350.00 10.50 15.00 S70.00 400.00 1,000.00 7.50 12.00 16.00 18.50 1,000.00 3;08 11.00 31.00 2.00 2.00 1.000.00 10.50 400.00 7.50 100.00 2,200.00 3.482.40 28.380.00 19.995.00 366.00 9.062.50 3:914:0o 1.600.00 1.800.00 2.000.00 2.600.00 372.30 23.474.00 245.00 900.00 250.00 1.350.00 1.627.50 14.825.00 2.260.00 800.00 2,000.00 300.00 180.00 7.728.00 8.713.50 1.000.00 146,865.20 9.600.00 5.078.40 17.072.00 24.900.00 1,640.00 4,132.00 7.000.00 5.355.00 1,600.00 1,192.50 100.00 2.200.00 $ 79.769.90 $226.635.10 _�L GMHITE CONSTP K T10N COMPANY SCHEDULE A 21.600.00 Itee unit Total Ho. Price Price 1. S 4.60 S 11,635:00 . :.. .12 5.223.60 3. 11.00 28.330.00 4. 29.00 18.70S.Oo 5. .20 1.464.00 6. 12.00 7.500.00 7. 9.00 S.Os3.00 1. 24.00 2,400.00 9. 3.000.00 3,000.00 10. 1.250.00 2.s0D.0o 11. 1.450.00 2.900.00 12. 161.00 714.00 13. 16.00 19.206.00 14. 400.00 400.00 Is. 700.00 700.00 16. 200.00 200.00 17. I.S00.00 1.500.00 is. 11:00 1.705.00 19. 19.25 19.035.25 20. 800.00 3.200.00 21. 650.00 13.000.00 22. 1.500.00 3.000.00 23. II.50 460.00 24. 11.00 210.00 25• 18.00 8.694.00 26. 23.25 10.950.75 27. 1.300.00 1.300.00 TOTAL SCHEDULE A $161.,346.60 SCHEDULE 8 t. S 2.23 S 7.200.00 2 DO S. 078.40 1t o0 1 7 , 0 n 00 3- 4. 27400 21.600.00 S. 1.70 1,394.00 6. 4.10 16.734.00 7. 1.000.00 7.000.00 t. IS.50 7.905.00 9. 600. DO 2.400.00 10. 11.50 1.420.50 11. 200.00 200.00 12. 2.500.00 2.500.00 TOTAL SCHEDULE 3 $90.912.50 FERR1 M PAYING, INC. SCHEDULE A 6.976.00 Its" Unit Total NO. Price Price 1. S 3.79 S 9.583.70 2. .12 5.523.60 is I0.S2 27.141.60 7. 34.50 22.252..0 S. .35 2.562.00 6. 18.92 11.825.00 7. 11.10 6.233.20 S. 22.00 2.200.00 S. 3.100.00 3.100.00 10. 1.771.84 3.543.63 if. 2.121.23 4.242.56 12. 10.08 S14.08 13. 19.04 20.315.68 14. 336.00 336.00 is. 723.00 729.00 16. 420.00 420.00 17. 1.568.00 i.S63.00 i1. ISM 2.4)0.40 19. 19.04 18.830.56 20. 721.00 2.912.00 21. 672.00 1.344.00 22. 1.120.00 2.240.00 23• 12.32 492 so 24. 14.56 213.40 2S. 17.92 1.65.5.36 26. 21.28 10.022.33 21. 1,120.00 1,120.00 TOTAL SCHEDULE A $170.366.00 SCHEDULE 8 1. S 2.18 $ 6.976.00 2. .06 3.803.80 3. 10:52 16.327.04 4. 34.35 27.480.00 S. 2.01 1,648.20 6. 3.04 6.230.64 7. 1.3S1.84 91.462.88 8. 12.32 6,283.20 9. 673.00 I'm .00 lo. 10.03 1.102.72 t • 234.00 224,.06 12• 2.S73.31 2.579.31 TOTAL SCHEDULE 8 115.)60.79 CLAUDE C. ►1000 MANY SCHEDULE A Item Unit Total lb. Price Price 1. S 4.00 S 10.120.00 2. .10 4.353.00 3. 9.00 23.220.00 4. 27.00 17.415.00 S. .30 2.196.00 6. 17.00 10.62S.00 7. 9.50 S.339.00 8. 22.00 - 2.200.00 9. 4.400.00 4.400.00 10. 1.300.00 2.600.00 11. 1.500.00 3.000.00 12. $.Do 403.00 13. 22.00 23.474.00 14. 400.00 400.00 15. 700.00 700.00 16. 625.00 625.00 17. 1.125.00 1.12S.00 Is. 28.00 4.340.00 19. 25.00 24.725.00 20. $50.00 2.200.03 21. 560.00 1.120.00 22. 1.200.00 2.400.00 23. 21.00 840.00 24. 22.00 330.03 25. 27.00 13.041.00 26. )0•00 14,130.03 27. 1,)00.00 1.300-00 TOTAL SCHEDULE A $176.626.00 SCHEDULE 1. S 2.00 S 6,400.00 :. .11 6.932.80 1. 11.00 17.07=.00 i. 28.00 22.400.00 3. 1.75 /.435.00 is 4.00 4,2".00 7. 1.2SO.00 8,)90.00 8. 12.00 6,120.00 9. 42j,00 1.700.00 10. 24.00 3,416.00 11. .300.00 300.00 12. 2,000,00 2.000.00 TOTAL SCHEDULE 8 !35.239.80 TEICHERT CONSTRVCTION SCHEDULE A stew Unit Total NO. Price ►rice 1. 5 2.00 IS 5.060.00 2. .20 8.7".00 3. 10.00 25.800.00 4, 29.00 18.705_00 S. .26 1.903.20 6. 1$.00 9.37S.00 7. 11.00 6.182.00 t. 15.00 1.500.00 9. 1.400.00 5.400.00 10. I.SOo.00 3,000.00 If. 1.700.00 3.400.00 12. 11.00 561.00 13. 21.00 22.407.00 14. 230.00 230.00 15. 500,00 500.00 16. 400.00 400.00 17. 1.300.00 1.300.00 18. 16.00 2.480:00 19. 25.00 24.72S.00 20 600.00 2.400.00 21. 520.00 1.040.00 22. 1.300.00 2.600.00 23. 40.00 1.600.00 24, u.Do 660:00 23. 26.00 12.558.00 26. 31.00 14.601.00 27. 1.400.00 1.400.00 TOTAL SCHEOULE A $176,493.20 SCHEDULE 8 1. S 4.10 $13,120.00 2. .19 12.061.20 3. 10.00 15.52040 4. 30.00 24.000.00 S• 2.00 1.640.00 6. 3.70 7.644.20 7• 1.200.00 8.400.00 8. 12.00 61120.00 f. 520.00 2.080.00 10. 32.00 $1088.00 11. 540.00 140.00 12. 31800.00 3.400.00 TOTAL SCHE011LE 5 SIO0.013.40 TOTAL MSE 919 (SCHEOMtS A 6 4) TOTAL USE 810 (SCHEOMES A c t) TOTAL BASE 110 (SCREDULES A 6 8) TOTAL MSE 810 (SCHEDULES A E 8) 1252.259.10 S255.726.79 5261."S.80 6278.506.60