AGENDA TITLE: Adopt Resolution Authorizing City Manager to Execute Change Orders No. 2
Through 7 to Contract with Knife River Construction, of Stockton, for Water Meter
Program Phase 3 ($771,215) and Appropriating Funds ($764,811)
MEETING DATE:
PREPARED BY:
August 7, 2013
Public Works Director
RECOMMENDED ACTION: Adopt resolution authorizing City Manager to execute Change
Orders No. 2 through 7 to contract with Knife River Construction, of
Stockton, for Water Meter Program Phase 3, in the amount of
$771,215, and appropriating funds in the amount of $764,811.
BACKGROUND INFORMATION: On March 20, 2013, City Council awarded the contract for
construction of the Water Meter Program Phase 3 to Knife River
Construction in the amount of $2,898,200. As with the other
construction phases of the Water Meter Program, numerous change orders are anticipated, and staff
wants to inform the City Council of the status of approved, in -process and anticipated contract changes
over the duration of the Phase 3 project.
The following information is submitted to the Council for its information and action as noted.
Change Order No. 1: Perform emergency repair of 36 -inch and 42 -inch storm drain lines in
Auto Center Drive and Guild Avenue ($4,606). Add new service line from meter box to home at
640 Roper Avenue, 641 EI Capitan Drive, and 654 Rutledge Drive ($6,356). Perform additional pot
holing on Lake Street and Loma Drive ($1,740.50). Replace 143 meter box lids at $40 each ($5,720).
Perform other miscellaneous time and material work from May 9 through May 16 ($2,167.50). Total
change order cost is $20,590. This change order has been executed.
Change Order No. 2: Perform remainder of water main and water service abandonments from Phase 2
that were eliminated from the Teichert Construction contract to accelerate closure of that contract and
acceptance of the project. Total change order cost is $147,000.
Change Order No. 3: Replace the existing 14 -inch 60 -year old asbestos concrete pipe with new plastic
water main in Ham Lane between Holly Drive and Lockeford Street. This work was originally scheduled
to be performed in Phase 5 of the meter program but is being advanced so the Ham Lane Overlay
Project can be completed this year. Total change order cost is $225,565.
Change Order No. 4: Remove and replace 225 feet of existing 14 -inch 67 -year old asbestos concrete
pipe with new 10 -inch plastic water main in Loma Drive between Turner Road and Holly Drive. Total
change order cost is $41,625.
APPROVED:'-`�=-ti
Ko radt Bartlam, City Manager
K:\WP\PROJECTS\WATER\Meters\Water Meter Program Phase 3\CKnifeRiverCCO2 7.doc
7/29/2013
Adopt Resolution Authorizing City Manager to Execute Change Orders No. 2 Through 7 to Contract with
Knife River Construction, of Stockton, for Water Meter Program Phase 3 ($771,215) and Appropriating
Funds ($764,811)
August 7, 2013
Page 2
Chance Order No. 5: Replace the existing 3 -inch water main in Westwood Avenue with 1,740 feet of
new 6 -inch plastic pipe between Holly Drive and Lockeford Street. This replacement was overlooked
during the design phase in part because of contradictions in City records regarding the size of the
pipeline. This would have been a standard replacement based upon the 3 -inch size of the water main.
The total cost of the change order is $158,065.
Change Order No. 6: Work performed under this change order includes the emergency addition of a new
water and wastewater services at 401 South Washington Street to resolve the dispute of two property
owners formerly using shared services ($7,450.75). The wastewater lateral construction cost of $2,583
will be billed to the property owner based upon the City standard service charge schedule. The water
service installation will be covered under the Water Meter Program. In addition, cement subgrade
treatment was performed on Lakehome Drive between Park Avenue and Laurel Avenue ($29,833). The
contractor performed other miscellaneous time and material work from May 22 through June 22
($37,421.88). The total cost of the change order is $74,705.63.
Change Order No. 7:This change order is for repairing and repaving the entrance road at White Slough
Water Pollution Control Facility that was damaged during the construction of the Lodi Energy Center
Project (LEC). A payment of $75,000 will be provided by the LEC project and the remainder of the costs
will be paid from wastewater operating funds. The total cost of the change order is $103,664.30.
The total cost of the above -listed change orders is $771,214.93 or approximately 27 percent of the
original contract value. An appropriation of $764,811 is requested to cover the costs of these change
orders. The storm drain repair will be funded by the storm drain operating fund ($4,606) and the
wastewater service installation ($2,583) will be funded by the wastewater operating fund.
The Phase Three contract is a unit -price -based contract. We have become aware that, in particular, two
items of work (replacement of asphalt concrete pavement and import fill material) will have increased
quantities over the contract amount resulting in an estimated $700,000 increase in the contract value.
Appropriation of funds for this extra unit -price -based work will be submitted for approval at the time
Council accepts the project.
FISCAL IMPACT: The improvements will reduce overall annual maintenance costs.
FUNDING AVAILABLE: Requested Appropriation:
Wastewater Capital (171493) $29,000
Water Capital (181466) $735,811
Total $764,811
n
Jordan ers
Deputy City Manager/Internal Services Director
'&', "
F. Wally Sa delin
Public Works Director
FWS/pmf
K:\WP\PROJECTS\WATER\Meters\Water Meter Program Phase 3\CKnifeRiverCCO2_7.doc 7/23/2013
1. AA#
2. J\/#
""Cl WY`0 NLODES'.
N. ,
V
kvikIX I'ONA
FUND #
QQ-T;k
J gA
ACCOUNT TITLE
TO: lInternal services Dept, - Budget Division
AMOUNT
3. FROM: ]Rebecca Areida-yadav 15. DATE:
7/23/2013
14. DEPARTMENT/DIVISION: Public Works
Fund Balance
0., R,%U%
T
, �0 N — -08f "T
VSTMJIENT�o PR A 4
-, JOf WL A
FUND #
BUS. UNIT# ACCOLINT#
ACCOUNT TITLE
AMOUNT
A.
SOURCE OF
FINANCING
171
3205
Fund Balance
$
29,000.00
181 3205 Fund Balance $
735,811.00
B.
USE OF
FINANCING
171
171493 1825.2250
Plant Maint. Improvements
$
29,000.00
181 181466 1825.2150 Water Meter Program Phase 3 $
735,811.00
AQF
Please provide a description of the project, the total cost of the project, as well as justification for the
requested adjustment. If you need more space, use an additional sheet and attach to this form.
Change orders no, 2-7 with Knife River Construction for Water Meter Program Phase 3
If Council has authorized the appropriation adjustment, complete the following:
Meeting Date: es No: I Attach copy of resolution to this form.
Department Head Signature*
Submit completed form to the Budget Division with any required documentation.
Final approval will be provided in electronic copy format.
77-77- tt1r. I
Deputy City Manager/internal Services Manager
Date
Submit completed form to the Budget Division with any required documentation.
Final approval will be provided in electronic copy format.
RESOLUTION NO. 2013-
A RESOLUTION OF THE LODI CITY COUNCIL AUTHORIZING .fes
THE CITY MANAGER TO EXECUTE CHANGE ORDERS NO. 2
THROUGH 7 TO CONTRACT WITH KNIFE RIVER
CONSTRUCTION, OF STOCKTON, FOR WATER METER
PROGRAM PHASE 3 AND FURTHER APPROPRIATING FUNDS
WHEREAS, on March 20, 2013, City Council awarded the contract for construction of
the Water Meter Program Phase 3 to Knife River Construction in the amount of $2,898,200; and
WHEREAS, as with the other construction phases of the Water Meter Program,
numerous change orders are anticipated over the duration of the Phase 3 project; and
WHEREAS, Change Orders No. 2 through 7 include water main and water service
abandonments from Phase 2; replacement of water main in Ham Lane between Holly Drive and
Lockeford Street, in Loma Drive between Turner Road and Holly Drive, and in
Westwood Avenue between Holly Drive and Lockeford Street; installation of two new water and
wastewater services at 401 South Washington Street; cement subgrade treatment on
Lakehome Drive between Park Avenue and Laurel Avenue; and repair of the White Slough
Water Pollution Control Facility entrance road; and
WHEREAS, the total cost of the above -listed change orders is $771,214.93 or
approximately 27 percent of the original contract value.
NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby
authorize the City Manager to execute Change Orders No. 2 through 7 to contract with
Knife River Construction, of Stockton, California, for Water Meter Program Phase 3, in the
amount of $771,214.93; and
BE IT FURTHER RESOLVED that funds in the amount of $764,811 be appropriated for
the project from the Wastewater Capital and Water Capital accounts.
Dated: August 7, 2013
------------------------------------------------------------------------
------------------------------------------------------------------------
I hereby certify that Resolution No. 2013- was passed and adopted by the City
Council of the City of Lodi in a regular meeting held August 7, 2013, by the following vote: