Loading...
HomeMy WebLinkAboutAgenda Report - August 7, 2013 C-05AGENDA ITEM C**0 &% CITY OF LODI COUNCIL COMMUNICATION • TM AGENDA TITLE: Adopt Resolution Awarding Contract for Ham Lane Overlay Project, Lodi Avenue to Turner Road, to Teichert Construction, of Stockton ($1,028,646) MEETING DATE: August 7, 2013 PREPARED BY: Public Works Director RECOMMENDED ACTION: Adopt resolution awarding contract for Ham Lane Overlay Project, Lodi Avenue to Turner Road, to Teichert Construction, of Stockton, in the amount of $1,028,646. BACKGROUND INFORMATION: This project consists of installing an asphalt concrete overlay on Ham Lane from Lodi Avenue to Turner Road. The work includes installing approximately 4,650 tons of asphalt concrete overlay with pavement fabric, performing approximately 16,600 square feet of pavement dig -out, reconstructing 6,000 square feet of asphalt concrete pavement, and other incidental and related work. This project also includes relocating a crosswalk which requires public noticing per California Vehicle Code 21950.5. The locations of the street improvements are shown on Exhibit A. Plans and specifications for this project were approved on June 19, 2013. seven bids for this project on July 17, 2013. The lowest responsive bidder, signed the required Local Hire forms and will conform to the requirements. Bidder Engineer's Estimate Teichert Construction George Reed, Inc. Martin Brothers Construction Knife River Construction Biondi Paving & Engineering Chester Bross Construction B & M Builders, Inc. Location Stockton Modesto Sacramento Stockton Sacramento Valley Springs Rancho Cordova The City received the following Teichert Construction, has Bid $ 1,028,203.00 $ 1, 028, 646.00 $ 1, 077, 645.00 $ 1, 080, 895.00 $ 1,113, 584.35 $ 1,116, 387.00 $ 1,184, 208.00 $ 1,319,257.45 This project is budgeted for $1,200,000 in FY 2013/14. That amount covers the contract, engineering, inspection and project contingencies. FISCAL IMPACT: The project will reduce maintenance costs in the project area. Bartlam, City Manager KAM PROJECTS\STREETS\Ham Lane Overlay\CAward.doc 7/18/2013 Adopt Resolution Awarding Contract for Ham Lane Overlay Project, Lodi Avenue to Turner Road to Teichert Construction, of Stockton ($1,028,646) August 7, 2013 Page 2 FUNDING AVAILABLE: This project will be funded by: Measure K (325073): $468,000 Gas Tax (322024): $732,000 Jordan Ayers Deputy City Manager/Internal Services Director 'A a 1�j J'9'. W, F. Wally Sandelin Public Works Director Prepared by Sean Nathan, Associate Civil Engineer FWS/SN/pmf Attachment cc: Associate Civil Engineer Nathan Deputy Public Works Director — Utilities City Engineer/Deputy Public Works Director K:\WP\PROJECTS\STREETS\Ham Lane Overlay\CAward.doc 7/18/2013 EXHIBITA Ham Lane Overlay Lodi Ave - Turner Rd F _J Lakewood School EE Turner Rd._ I I TF -1 E H11111 [EffH1 - 1 11 IT M iPa I I I IJ PT Tk" I , -IT, 117 1 MI ro J Pnrn�p Wn--,hintnn i� -.hn Lodi High School F) --- CB C:J ftftL�3 �- M-LLI L�A M HTF��I " qMT-T i F 11> �F��FTMAILip,T7, p 1 -UT T-T-Tn FM i peri orLCc 4 iriar EM PWQQ-1, iF Pine -S Pine'St ,71 Mid-17,1LIZ hFS F---- - F' NHL1tC ins Street Squlalrl 1 ' 7'- �Lil t I —IT Fr7 - — St-Apes,.Acad6Ty P F=IT i. —:J Cer"ty--H­iglhL-S'(�-h�6961 L --- V L ALJ Fill ILI El LEGEND: Project Location HAM LANE OVERLAY Lodi Avenue to Turner Road CONTRACT CITY OF LODI, CALIFORNIA THIS CONTRACT made by and between the CITY OF LODI, State of California, herein referred to as the "City," and TEICHERT CONSTRUCTION, herein referred to as the "Contractor." WITNESSETH: That the parties hereto have mutually covenanted and agreed, and by these presents do covenant and agree with each other, as follows: The complete Contract consists of the following documents which are incorporated herein by this reference, to -wit: Notice Inviting Bids Information to Bidders General Provisions Special Provisions Bid Proposal Contract Contract Bonds Plans The July 1992 Edition, Standard Specifications, State of California, Business and Transportation Agency, Department of Transportation All of the above documents, sometimes hereinafter referred to as the "Contract Documents," are intended to cooperate so that any work called for in one and not mentioned in the other is to be executed the same as if mentioned in all said documents. ARTICLE I - That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the City and under the condition expressed in the two bonds bearing even date with these presents and hereunto annexed, the Contractor agrees with the City, at Contractor's cost and expense, to do all the work and furnish all the materials except such as are mentioned in the specifications to be furnished by the City, necessary to construct and complete in a good workmanlike and substantial manner and to the satisfaction of the City the proposed improvements as shown and described in the Contract Documents which are hereby made a part of the Contract. ARTICLE II - The City hereby promises and agrees with the Contractor to employ, and does hereby employ, the Contractor to provide all materials and services not supplied by the City and to do the work according to the terms and conditions for the price herein, and hereby contracts to pay the same as set forth in Section 5.600, "Measurement, Acceptance and Payment," of the General Provisions, in the manner and upon the conditions above set forth; and the said parties for themselves, their heirs, executors, administrators, successors and assigns, do hereby agree to the full performance of the covenants herein contained. ARTICLE III - The Contractor agrees to conform to the provisions of Chapter 1, Part 7, Division 2 of the Labor Code, The Contractor and any Subcontractor will pay the general prevailing wage rate and other employer payments for health and welfare, pension, vacation, travel time, and subsistence pay, apprenticeship or other training programs. The responsibility for compliance with these Labor Code requirements is on the prime contractor. Contract.doc 1 07/17/13 ARTICLE IV - And the Contractor agrees to receive and accept the following prices as full compensation for furnishing all materials and for doing all the work contemplated and embraced in this agreement; also for all loss or damage arising out of the nature of the work aforesaid or from the action of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until its acceptance by the City, and for all risks of every description connected with the work; also for all expenses incurred by or in consequence of the suspension or discontinuance of work and for well and faithfully completing the work, and the whole thereof, in the manner and according to the Plans and Contract Documents and the requirements of the Engineer under them, to -wit: The work consists of installing approximately 4,650 tons of asphalt concrete overlay with pavement fabric, performing 16,600 square feet of pavement dig -out, reconstructing 6,000 square feet of asphalt concrete pavement, reconstructing 6,700 square feet of concrete sidewalk, ramps and driveways, and other incidental and related work, all as shown on the plans and specifications for "Ham Lane Overlay". CONTRACT ITEMS Item No. Description Unit Estimated Quantity Unit Price Total Price 1 Traffic Control LS 1 $ 40,500.00 $ 40,500.00 2 Construction Notification LS 1 $ 2,500.00 $ 2,500.00 3 Water Pollution Control LS 1 $ 2,000.00 $ 2,000.00 4 Clearing and Grubbing LS 1 $ 36,500.00 $ 36,500.00 5 Miscellaneous Concrete Compaction SF 10,682 $ 1.00 $ 10,682.00 6 Pavement Repair (Digout) SF 17,108 $ 9.00 $ 153,972.00 7 Pavement Reconstruction (with Re redin SF 6,012 $ 1.25 $ 7,515.00 8 Pavement Crack Seal POUND 2,500 $ 4.00 $ 10,000.00 9 Pavement Skin Patch SF 200 $ 10.00 $ 2,000.00 10 Pavement Grinding (6) LF 11,032 $ 1.00 $ 11,032.00 11 Pavement Grinding (12') LF 793 $ 5.50 $ 4,361.50 12 Pavement Fabric SY 34,900 $ 1.25 $ 43,625.00 13 Asphalt Concrete Overlay TON 4,650 $ 78.00 $ 362,700.00 14 Sidewalk, Ramp, or Residential Driveway SF 6,857 $ 6.50 $ 44,570.50 15 Concrete Curb and Gutter: Square Type LF 484 $ 31.00 $ 15,004.00 16 Concrete Curb and Gutter: Vertical Type LF 619 $ 36.00 $ 22,284.00 17 Concrete Curb and Gutter: Driveway LF 348 $ 31.00 $ 10,788.00 18 Commercial Gutter and Driveway SF 923 $ 14.00 $ 12,922.00 19 Truncated Dome Panels SF 312 $ 40.00 $ 12,480.00 20 Adjust Survey Monument Box to Grade EA 1 j $ 450.00 j $ 450.00 21 Adjust Storm Drain Manhole to Grade EA 18 $ 550.00 1 $ 9,900.00 Contract.doc 2 07/17/13 Item No. Description Unit Estimated Quantity Unit Price Total Price 22 Adjust Wastewater Manhole to Grade EA 26 $ 550.00 $ 14,300.00 23 Replace Water Valve Frame, Cover and Concrete Rin EA 37 $ 450.00 $ 16,650.00 24 Side Inlet Catch Basin EA 5 $ 1,400.00 $ 7,000.00 25 12 -inch Storm Drain Pipe LF 255 $ 110.00 $ 28,050.00 26 Storm Drain Manhole EA 1 $ 2,300.00 $ 2,300.00 27 Abandon Storm Drain Facilities LS 1 $ 8,000.00 $ 8,000.00 28 Traffic Loop Replacement EA 81 $ 1,000.00 $ 81,000.00 29 Traffic Signage and Striping LS 1 $ 45,000.00 $ 45,000.00 30 Construct 2' Concrete Median LF 96 $ 110.00 $ 10,560.00 Total: $ 1.028.646.00 ARTICLE V - By my signature hereunder, as Contractor, I certify that I am aware of the provisions of Section 3700 of the Labor Code, which requires every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. ARTICLE VI - It is further expressly agreed by and between the parties hereto that, should there be any conflict between the terms of this instrument and the Bid Proposal of the Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith. ARTICLE VII - The City is to furnish the necessary rights-of-way and easements and to establish lines and grades for the work as specified under the Special Provisions. All labor or materials not mentioned specifically as being done by the City will be supplied by the Contractor to accomplish the work as outlined in the specifications. ARTICLE Vlll - The Contractor agrees to commence work pursuant to this contract within 15 calendar days after the City Manager has executed the contract and to diligently prosecute to completion within 50 CALENDAR DAYS. WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE TIME OF COMPLETION FOR THIS CONTRACT IS REASONABLE AND THE CONTRACTOR AGREES TO PAY THE CITY LIQUIDATED DAMAGES AS SET FORTH IN SECTION 6-04.03 OF THE SPECIAL PROVISIONS. CONTRACTOR AGREES THAT THIS AMOUNT MAY BE DEDUCTED FROM THE AMOUNT DUE THE CONTRACTOR UNDER THE CONTRACT. Contract.doc 3 07/17/13 IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the year and date written below. CONTRACTOR: CITY OF LODI By: Konradt Bartiam City Manager By: Date: Title Attest City Clerk (CORPORATE SEAL) Approved As To Form D. Stephen Schwabauer City Attorney us Contractdoc 4 07/17/13 RESOLUTION NO. 2013-140 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING AND AUTHORIZING THE CITY MANAGER TO EXECUTE CONTRACT FOR THE HAM LANE OVERLAY PROJECT, LODI AVENUE TO TURNER ROAD ------------------------------------------------------------------------ ------------------------------------------------------------------------ WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on July 17, 2013, at 11:00 a.m., for the Ham Lane Overlay Project, Lodi Avenue to Turner Road, described in the plans and specifications therefore approved by the City Council on June 19, 2013; and WHEREAS, said bids have been checked and tabulated and a report thereof filed with the City Manager as follows: Bidder Bid Teichert Construction $1,028,646.00 George Reed, Inc. $1,077,645.00 Martin Brothers Construction $1,080,895.00 Knife River Construction $1,113,584.35 Biondi Paving & Engineering $1,116,387.00 Chester Bross Construction $1,184,208.00 B & M Builders, Inc. $1,319,257.45 WHEREAS, staff recommends awarding the contract for the Ham Lane Overlay Project, Lodi Avenue to Turner Road, to the low bidder, Teichert Construction, of Stockton, California, in the amount of $1,028,646; and WHEREAS, the lowest responsive bidder, Teichert Construction, has signed the required Local Hire forms and will conform to the requirements. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby award the contract for the Ham Lane Overlay Project, Lodi Avenue to Turner Road, to the low bidder, Teichert Construction, of Stockton, California, in the amount of $1,028,646; and BE IT FURTHER RESOLVED that the City Manager is hereby authorized to execute the contract. Dated: August 7, 2013 ------------------------------------------------------------------------ ------------------------------------------------------------------------ I hereby certify that Resolution No. 2013-140 was passed and adopted by the City Council of the City of Lodi in a regular meeting held August 7, 2013, by the following vote: AYES: COUNCIL MEMBERS — Hansen, Johnson, Katzakian, Mounce, and Mayor Nakanishi NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None 2013-140 &OHL-OLSON City Clerk