HomeMy WebLinkAboutAgenda Report - August 5, 1981 (35)E'r8:sc�i CITY OF LODI PUBLIC WJRKS DEPARTMENT TO: City Council FROM: City Manager DATE: July 27, 1981 COUNCIL COMMUNICATION SUBJECT: Contract for Central Avenue Improvements RECOMMENDED ACTION: That the City Council award the bid for "Central Avenue Improvements, Tokay Street to Lodi Avenue and Eden Street, Central Avenue to Garfield Street," to Teichert Construction, the low bidder, in the amount of $149,132.30 for Alternate B and appropriate an additional $18,000 of Trans- portation Development Act funds to the Miscellaneous Curb b Gutter Projects account. BACKGROUND INFORMATION: Plans and specifications for this project were ap- proved by the City Council on July 1, 1981. Bids were opened on Wednesday, July 22, 1981, and the following three bids were received: A tabulation of the bids has also been attached. Alternate bids were requested for two hydraulically equivalent combinations of storm drain pipe to serve Central Avenue. Alternate A included 15", 18", 21" and 24" precast pipe. Alternate B included 15" and 18" precast pipe and 30" cast -in-place pipe. The cast -in-place pipe will be installed in Eden Street from Central Avenue to Garfield Street. We wish to point out to the Council that while Alt. B is recommended due to a cost savings of approximately $4,000, it has some disadvantages. Cast -in-place pipe cannot be backfilled for seven days after installation, thus the trench will be open at least a week longer than normal. The plans and specifications require that steel, plates to support traffic be used at the intersections and that the remainder of the trench be completely barricaded and roped. However, there will be more than normal inconvenience to residents and there Is an increased liability exposure due to the additbnal time. APPROVED: I FILE NO. HENRY A. CLAVES. City Manager Base Bid b Base Bid S Bidder Location Alt. A Alt. -B Teichert Construction Stockton $152,672.50 $149,132.30 Granite Construction Co. Watsonville $158,263.00 $159,581.00 Claude C. Wood Co. Lodi $163,167,00 no bid Engineer's Estimate $138,485 $139,144.00 A tabulation of the bids has also been attached. Alternate bids were requested for two hydraulically equivalent combinations of storm drain pipe to serve Central Avenue. Alternate A included 15", 18", 21" and 24" precast pipe. Alternate B included 15" and 18" precast pipe and 30" cast -in-place pipe. The cast -in-place pipe will be installed in Eden Street from Central Avenue to Garfield Street. We wish to point out to the Council that while Alt. B is recommended due to a cost savings of approximately $4,000, it has some disadvantages. Cast -in-place pipe cannot be backfilled for seven days after installation, thus the trench will be open at least a week longer than normal. The plans and specifications require that steel, plates to support traffic be used at the intersections and that the remainder of the trench be completely barricaded and roped. However, there will be more than normal inconvenience to residents and there Is an increased liability exposure due to the additbnal time. APPROVED: I FILE NO. HENRY A. CLAVES. City Manager City Council July 27, 1981 Page 2 Case -in-place pipe has typically not been used in existing streets because of these problems. However, as funding becomes more difficult, we felt the cost savings should be weighed against these disadvantages, particularly in low volume streets. As indicated in the memo requesting approval of the plans and specifications on July 1, 1981, additional funds are needed to award the entire project. The storm drain main line is being funded with Revenue Sharing funds. Catch basins, laterals and curb returns at all the intersections and curb and gutter in Central Avenue from Lodi Avenue to the alley south of Hilbo rn Street is being replaced under the Miscellaneous Curb and Gutter Projects account funded by Transportation Development Act Funds. An additional $18,000 is needed for the TDA account to complete the project. Unused funds from.the Church Street project are available. if Att. A is selected-, an additional $4,000 will be needed to fund the storm drain, either in the TDA account or the Revenue Sharing account. Jack . Ronsko Pubi Works Director Attachment JLR/eeh . ... wwu•.a 'eta.G.lfi13i n?gtKK.t. s.4 •: r.,[ ;: -rJ. r , I ^H. -r CENTRAL AVENUE STREET IMPROVEMENTS EDEN STREET IMPROVEMENTS Tokay Street to Lodi Avenue Central Avenue to Garfield Street Tabulation of bids recelvedJuly 22 1981 BASE B I D 361 ENGINEER'S ---------- 27.00 ESTI MATE, '. ITEM APPROXIMATE 641 Unit Total NO. QUANTITY DESCRIPTION Price Price 1. 100% LS Clearing and Grubbing LS $ 7,258.00 2. 7,480 SF Miscellaneous Concrete $ 1.00 7,480.00 Subgrade Compaction 3• 361 LF 15" Storm Drain 27.00 10,108.00 4. 641 LF 12" Storm Drain 25.00 16,666.00 5. 15 EA Side Inlet Catch Basin 550.00 8,250.00 6. 5 EA Storm Drain Manhole 1,000.00 5,000.00 7. 1,208 LF Square -type Curb E Gutter 9.00 10,872.00 8. 154 LF Commercial Gutter 9.50 1,463.00 9. 4,180 SF Residential Sidewalk b 2.00 8,360.00 Driveway 10. 915 SF Concrete Alley Approach 3.00 2,745.00 11. 100% LS Excavation SAfety LS 1,000.00 12. 10,400 SF Pavement Replacement 2.00 20,800.00 BASE BID TOTAL $ 99,000.00 ALTERNATE A r"1. X660 LF 21+" Storm Drain Pipe $ 30.00 $ 19,800.00 2. 352 LF 21" Storm Drain Pipe 29.00 10,208.00 3. 351 LF 15" Storm Drain Pipe 27.00 9,828.00 SUBTOTAL "A" $ 39,485.00 ALTERNATE B ��-660 LF 30" Cast -in -Place Concrete $ 31.00 $ 20,460.00 Pipe 2. 703 LF 18" Storm Drain Pipe 28.00 19,684.00 $ 40,144.00 TOTAL BASE BID b ALTERNATE "A10 $ 138,485.00 TOTAL BASE t BID S ALTERNATE "B" $ 139,144.00 TOTAL BASE BID 6 A $152,672.50 TOTAL BASE BID S A $158,263.00 TOTAL BASE BID b A $163,167.00 TOTAL BASE BID & B $14g,132.30 TOTAL BASE BID E B $159,581.00 TOTAL BASE BID & B No bid TEICNERT CONSTRUCTION GRANITE CONSTRUCTION CLAUDE C. WOOD COMPANY BASE BID BASE BID BASE BID Item Unit Total Item Unit Total. Item Unit Total No, Price Price No. Price Price No. Price Price 1. $9,600.00 $ 9,600.00 1. LS $ 18,300.00 1. $7,000.00 $ 7,000.00 2. 0.25 1,810.00. 2. $ 0.70 5,236.00 2. 0,90 6,732.00 3. 36.00 12,996.00 3. 28.00 10,108.00 3. 37.00 13,357.00 4. 39.00 24,999.00 4. 25.00 16,025.00 4. 35.00 22,435.00 5. 620.00 9,300.00 5. 600.00 9,000.00 5. 560.00 8,400.00 6. 1,000.00 5,000.00 6. 1,300.00 6,500.00 6. 1,500.00 7,500.00 7. 9.50 11,476.00 7. 9.00 10,872.00 7. 9.00 10,872.00 8. 10.50 1,617.00 8. 12.50 1,925.00 8. 10.00 1,540.00 9. 1.90 '7,942.00 9. 2.00 8,360.00 9. 1.90 7,942.00 10. 3.90 3,568.50 10. 7.00 6,405.00 10. 2.00 1,830.00 .,, 11. 200.00 200..00 H. 1,680.00 1,680.00 11. 1,700.00 1,700.00 12. 1,20 12,480.00 12. 1.70 17,680.00 12. 1.80 18,720.00 BASE BID TOTAL 5101,048.50 BASE BID TOTAL $112,091.00 BASE BID TOTAL $108,028.00 ALTERNATE A ALTERNATE A ALTERNATE A 1. $ 42.00 $ 27,720.00 1. $ 38.00 $ 25,080.00 1. $ 42.00 $ 27,720.00 2. 36.00 12,672.00 2. 32.00 11,264.00 2. 41.00 14,432.00 3. 32.00 x1,232.00 3. 28.00 9,82.8.00 3. 37.00 12,987.00 ALT. A SUBTOTAL $ 51,624.00 ALT. A SUBTOTAL $ 46,1`72.00 ALT. A SUBTOTAL $ 55,139.00 ALTERNATE B ALTERNATE B ALTERNATE B 1. $ 36.00 $ 23,760.00 1. $ 40.00 $ 26,400.00 No bid 2. 34.60 24,323.80 2. 30.00 21,090.00 ALT. B SUBTOTAL $ 48,083.80 ALT. B SUBTOTAL $ 47,490.00 TOTAL BASE BID 6 A $152,672.50 TOTAL BASE BID S A $158,263.00 TOTAL BASE BID b A $163,167.00 TOTAL BASE BID & B $14g,132.30 TOTAL BASE BID E B $159,581.00 TOTAL BASE BID & B No bid RESOLUTION NO. 81-103 AWARD - CONTRACT FOR CENTRAL AVENUE IMPROVEMENTS WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened by the City Clerk of this City on July 22, 1981 at 11:00 a.m. for the contract for Central Avenue Improvements as described in the specifications therefor approved by the City Council July 1, 1981; and WHEREAS,.said bids have been compared, checked, and tabulated and a report thereof filed with the City Manager as follows: BASE BID & BIDDER ALT. A Teichert Construction $152,672.50 Granite Construction Co. $158,263.00 Claude C. Wood Co. $163,167.00 BASE BID & ALT. B $149,132.30 $159,581.0 0 no bid WHEREAS, the City Manager recommends that award be made to the low bidder, Teichert Construction; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lodi that award of contract for Central Avenue Improvements be and the same is hereby made to Teichert Construction, the low bidder, in the amount of $149,132.30, Alternate B. NOW, ;HEREFORE, BE IT FURTHER RESOLVED that the City Council of the City of Loei does hereby appropriate an addi- tional $18,000.00 of Transportation Development Act Funis to the Miscellaneous Curb and Gutter Projects account. Dated: August 5, 1981 I hereby certify that Resolution No. 81-103 was passed and adopted by the City Council of the City of Lodi in a regular meeting held August 5, 1981 by the follow- ing vote: Ayes: Councilmen - Murphy, Hughes, Pinkerton and McCarty Noes: Councilmen - None Absent: Councilmen Katnich ALICE M. RE CHE City Clerk 81-103