APPROVAL OF CITY Council was informed that it is Staff's recom-`'
PROJECTS TO BE mendation that the following projects be constructed
CONSTRUCTED IN at this time in order that they be done in ,
CONJUNCTION WITH conjunction with the Cluff Avu:•ie and Turner
TURNER-CLUFF Road Assessment J)istrict No. 1. It is felt that
ASSESSMENT the City will obtain better prices for the work a
DISTRICT NO. 1 and the finished product will be better if the
work is done at one time by the same contractor.�x
-
''A's._�
-
;> Paving S/CL of Fund (Mise. ;
Lockeford St. to Widening)
Victor Rd.
3. Cluff Ave. $64,000 Master Drain
x Storm Drain Fund
Lockeford St.
to S/Side
Victor Rd. r
4. Northeast $25,000 Sewer Capital
_ Area Sanitary Reserve Fund
Sewer Extension
Y - _
BACRGNMD INFORMATION: The above projects are
recommended for construction at this time in
order that they be done in conjunction with the
Cluff Ave. and Turner Rd. Assessment District No.
1. It is felt that the City will obtain better
prices for the work and the finished product
will be better if the work is done at one time by::
the same contractor. -L
The Turner Rd. paving is proposed in the 1981/82
C.I.P. The work includes the installation
of pavement in front of the Casa de Lodi Mobile`':
Home Park. The street is presently oiled and is L `;_
a high maintenance street. y �=
r
The Lockeford St. and Cluff Ave. paving includes
regrading the south half of the intersection to
reduce the "hump" on Cluff caused by the S.P.R.R._�
and installation of catch basins to improve �:``
drainage. The north half of the intersection will
be done by the District. .
The Cluff Ave. storm drain includes the jacked
crossing of Hwy. 12 and the S.P.R.R This
work is recommended at this time in order that
the grade of the storm drain north of Lockeford ' f
Street can be adjusted to match that of the ja!ked
pipe. This will also complete the installation
of utilities in Cluff Ave. north of Victor- Rd. x
The Northeast Sanitary Sewer extension is the ? =
installation of a 15" sewer main east from the r =
s._ lift station on Cluff Avenue. The owner of the "•
property plans to develop when the District is
completed and the sewer would have to go in
then anyway. This sewer will ultimately serve
i Myrtle Ave. It is recommended that the cost of o I
this line be reimbursed to the City by the Yi
Myrtle Ave. properties as they develop. The
C�zY City has already funded the oversizing of the,
�.: Northeast Area Lift Station on this basis. cc
-r
Following discussion, on motion of Mayor Pro
Tempore Murphy, Hughes second, Council approved n -
the plans and specifications and appropriated
funds for the projects heretofore listed to be
constructed in conjunction with the C-1 Avenue
and Turner Roa' Assessment District No.
P
CITY OF LI COUNCIL COMMUNICATION
PUBLIC WORKS DEPARTMENT
TO: City Council
FROM: City Manager
DATE: July 29, 1981
SUBJECT: Approval of City Projects to be Constructed in
Conjunction with Turner-Cluff Assessment District
RECOMMENDED ACTION: That .the City Council approve plans and specifications
and appropriate unds for the following projects to be constructed in con-
junction with the Cluff Avenue and Turner Road Assessment District No., 1:
Project Total cost
1. Turner Rd. Subdivision $50,000
Paving - Beckman Rd.
to 550' E/Beckman Rd.
2. Lockeford St. 6 Chuff Ave. $20,000
Paving S/� of Lockeford
St. to Victor Rd.
3. Cluff Ave. Storm Drain $64,000
Lockeford St. to
S/Side Victor Rd.
4. Northeast Area Sanitary $25,000
Sewer Extension
Funding Source
Gas Tax Fund
Transportation Development
Act Fund (Miscellaneous
Widening)
Master Drain Fund
Sewer Capital Reserve Fund
BACKGROUND INFORMATION: The above projects are recommended for construction
at this time in order that they be done in conjunction with the Cluff Ave.
and Turner Rd. Assessment District No. 1. It is felt that the City will
obtain better prices for the work and the finished product will be better
if the work is done at one time by the same contractor.
The Turner Rd. paving is proposed in the 19$1/82 C.I.P. The work includes
the installation of pavement in front of the Casa de Lodi Mobile Home Park.
The street is presently oiled and is a high maintenance street.
The Lockeford St. and Cluff Ave. paving includes regrading the south half of
the intersection to reduce the "hump" on Cluff caused by the S.P.R.R. and
installation of catch basins to improve drainage. The north half of the
intersection will be done by the District.
The Cluff Ave. storm drain includes the jacked crossing of Hwy. 12 and the
S.P.R.R. This work is recommended at this time in order that the grade
APPROVED:
HENRY A. GLAVES, City Manager
FILE NO.
e
City Council
July 290 1981
Page 2
f—
tl
of the storm drain north of Lockeford St. can be adjusted to match that of
the jacked pipe. This will also complete the installation of utilities in
Cluff Ave. north of Victor Rd.
The Northeast Sanitary Sewer extension is the installation of a 15" sewer main
east from the lift station on Cluff Avenue. The owner of the property plans
to develop when the District is completed and the sewer would have to go in
then anyway. This sewer will ultimately serve Myrtle Ave. It is recommended
that the cost of this line be reimbursed to the City by the Myrtle Ave.
properties as they develop. The City has already funded the oversizing of
the Northeast Area Lift Station on this basis.
Jac L. Ronsko
Publ c Works Director
J eh