Loading...
HomeMy WebLinkAboutAgenda Report - August 5, 1981 (37)_.._ ._ a - Yom` z*s �'• .<_- ' APPROVAL OF CITY Council was informed that it is Staff's recom-`' PROJECTS TO BE mendation that the following projects be constructed CONSTRUCTED IN at this time in order that they be done in , CONJUNCTION WITH conjunction with the Cluff Avu:•ie and Turner TURNER-CLUFF Road Assessment J)istrict No. 1. It is felt that ASSESSMENT the City will obtain better prices for the work a DISTRICT NO. 1 and the finished product will be better if the work is done at one time by the same contractor.�x - ''A's._� - ;> Paving S/CL of Fund (Mise. ; Lockeford St. to Widening) Victor Rd. 3. Cluff Ave. $64,000 Master Drain x Storm Drain Fund Lockeford St. to S/Side Victor Rd. r 4. Northeast $25,000 Sewer Capital _ Area Sanitary Reserve Fund Sewer Extension Y - _ BACRGNMD INFORMATION: The above projects are recommended for construction at this time in order that they be done in conjunction with the Cluff Ave. and Turner Rd. Assessment District No. 1. It is felt that the City will obtain better prices for the work and the finished product will be better if the work is done at one time by:: the same contractor. -L The Turner Rd. paving is proposed in the 1981/82 C.I.P. The work includes the installation of pavement in front of the Casa de Lodi Mobile`': Home Park. The street is presently oiled and is L `;_ a high maintenance street. y �= r The Lockeford St. and Cluff Ave. paving includes regrading the south half of the intersection to reduce the "hump" on Cluff caused by the S.P.R.R._� and installation of catch basins to improve �:`` drainage. The north half of the intersection will be done by the District. . The Cluff Ave. storm drain includes the jacked crossing of Hwy. 12 and the S.P.R.R This work is recommended at this time in order that the grade of the storm drain north of Lockeford ' f Street can be adjusted to match that of the ja!ked pipe. This will also complete the installation of utilities in Cluff Ave. north of Victor- Rd. x The Northeast Sanitary Sewer extension is the ? = installation of a 15" sewer main east from the r = s._ lift station on Cluff Avenue. The owner of the "• property plans to develop when the District is completed and the sewer would have to go in then anyway. This sewer will ultimately serve i Myrtle Ave. It is recommended that the cost of o I this line be reimbursed to the City by the Yi Myrtle Ave. properties as they develop. The C�zY City has already funded the oversizing of the, �.: Northeast Area Lift Station on this basis. cc -r Following discussion, on motion of Mayor Pro Tempore Murphy, Hughes second, Council approved n - the plans and specifications and appropriated funds for the projects heretofore listed to be constructed in conjunction with the C-1 Avenue and Turner Roa' Assessment District No. P CITY OF LI COUNCIL COMMUNICATION PUBLIC WORKS DEPARTMENT TO: City Council FROM: City Manager DATE: July 29, 1981 SUBJECT: Approval of City Projects to be Constructed in Conjunction with Turner-Cluff Assessment District RECOMMENDED ACTION: That .the City Council approve plans and specifications and appropriate unds for the following projects to be constructed in con- junction with the Cluff Avenue and Turner Road Assessment District No., 1: Project Total cost 1. Turner Rd. Subdivision $50,000 Paving - Beckman Rd. to 550' E/Beckman Rd. 2. Lockeford St. 6 Chuff Ave. $20,000 Paving S/� of Lockeford St. to Victor Rd. 3. Cluff Ave. Storm Drain $64,000 Lockeford St. to S/Side Victor Rd. 4. Northeast Area Sanitary $25,000 Sewer Extension Funding Source Gas Tax Fund Transportation Development Act Fund (Miscellaneous Widening) Master Drain Fund Sewer Capital Reserve Fund BACKGROUND INFORMATION: The above projects are recommended for construction at this time in order that they be done in conjunction with the Cluff Ave. and Turner Rd. Assessment District No. 1. It is felt that the City will obtain better prices for the work and the finished product will be better if the work is done at one time by the same contractor. The Turner Rd. paving is proposed in the 19$1/82 C.I.P. The work includes the installation of pavement in front of the Casa de Lodi Mobile Home Park. The street is presently oiled and is a high maintenance street. The Lockeford St. and Cluff Ave. paving includes regrading the south half of the intersection to reduce the "hump" on Cluff caused by the S.P.R.R. and installation of catch basins to improve drainage. The north half of the intersection will be done by the District. The Cluff Ave. storm drain includes the jacked crossing of Hwy. 12 and the S.P.R.R. This work is recommended at this time in order that the grade APPROVED: HENRY A. GLAVES, City Manager FILE NO. e City Council July 290 1981 Page 2 f— tl of the storm drain north of Lockeford St. can be adjusted to match that of the jacked pipe. This will also complete the installation of utilities in Cluff Ave. north of Victor Rd. The Northeast Sanitary Sewer extension is the installation of a 15" sewer main east from the lift station on Cluff Avenue. The owner of the property plans to develop when the District is completed and the sewer would have to go in then anyway. This sewer will ultimately serve Myrtle Ave. It is recommended that the cost of this line be reimbursed to the City by the Myrtle Ave. properties as they develop. The City has already funded the oversizing of the Northeast Area Lift Station on this basis. Jac L. Ronsko Publ c Works Director J eh