HomeMy WebLinkAboutAgenda Report - August 4, 1982 (36)PLANS AND SPECS Council approved the plans and specifications for "Salas
FOR SALAS PARK Park Control and Pump Structure" and authorized the City
CONTROL AND PUMP Clerk to advertise for bids thereon.
STRUCTURE APPROVED
In general, the work consists of constructing a reinforced
concrete pump and control structure with two 14 hp sub-
mersible wastewater pumps, slide and drainage gates and
a weir.; a reinforced concrete outlet structure; furnishing
and installing a motor control center, bubbler system and :
telemetry system; and installing miscellaneous underground
stoma drains, foundations, conduit and other appurtenances.
The total cost of the project is estimated at $185,000.
y S>
T
n
_ s a
r
_ J
S l
S ff
A�
�t 1
. < "--rid l"•
.. ,t✓ v.
fir. `'.:/, x. "
fAl
.• Y -. cg t r .r» J l�'.
it
77
i '•'t
\
}
4 Y t
♦
r� r
t �M:
2:Lr"s�'�rF �,f tit
� t •„ t.
1
+sjy
�y1 r
rt s
����1
Y��iik""��j,
�$ it f ,. J
i�' •� rEt�yl
�
e
COUNCIL COMMUNICATION
SUBJECT: Plans and Specifications for Salas Park Control b Pump Structure
RECOMMENDED ACTION: That the City Council approve the plans and specifications
or 'Salas Park Control 6 Pump Structure," and authorize the City Clerk to ad-
vertise for bids to be received Wednesday. August 25, 1982.
BACKGROUND INFORMATION: The construction of the Salas Park (D Basin) Control
and Pump Structure was approved in the 1981-82 Capital Improvement Budget with
an estimated expenditure of $237,000 -
In general, the work consists of constructing a reinforced concrete pump and
control structure with two 14 hp submersible wastewater pumps, slide and
drainage gates and a weir; a reinforced concrete outlet structure; furnishing
and
and installing a motor control center, bubbler system and telemetry system;
and installing miscellaneous underground storm drains, foundations, conduit
and other appurtenances.
The totaXc o the project is estimated at $185,000;.
Ja L. Ronsko
Pub is Works Director
eeh
APPROVED:
HENRY A. GLAVES. City Manager
FILE. NO.
CITY OF LODI
PUBLIC WORKS DEPARTMENT
TO
City Council
FROM:
City Manager
DATE:
July 29, 1982
COUNCIL COMMUNICATION
SUBJECT: Plans and Specifications for Salas Park Control b Pump Structure
RECOMMENDED ACTION: That the City Council approve the plans and specifications
or 'Salas Park Control 6 Pump Structure," and authorize the City Clerk to ad-
vertise for bids to be received Wednesday. August 25, 1982.
BACKGROUND INFORMATION: The construction of the Salas Park (D Basin) Control
and Pump Structure was approved in the 1981-82 Capital Improvement Budget with
an estimated expenditure of $237,000 -
In general, the work consists of constructing a reinforced concrete pump and
control structure with two 14 hp submersible wastewater pumps, slide and
drainage gates and a weir; a reinforced concrete outlet structure; furnishing
and
and installing a motor control center, bubbler system and telemetry system;
and installing miscellaneous underground storm drains, foundations, conduit
and other appurtenances.
The totaXc o the project is estimated at $185,000;.
Ja L. Ronsko
Pub is Works Director
eeh
APPROVED:
HENRY A. GLAVES. City Manager