Loading...
HomeMy WebLinkAboutAgenda Report - August 4, 1982 (36)PLANS AND SPECS Council approved the plans and specifications for "Salas FOR SALAS PARK Park Control and Pump Structure" and authorized the City CONTROL AND PUMP Clerk to advertise for bids thereon. STRUCTURE APPROVED In general, the work consists of constructing a reinforced concrete pump and control structure with two 14 hp sub- mersible wastewater pumps, slide and drainage gates and a weir.; a reinforced concrete outlet structure; furnishing and installing a motor control center, bubbler system and : telemetry system; and installing miscellaneous underground stoma drains, foundations, conduit and other appurtenances. The total cost of the project is estimated at $185,000. y S> T n _ s a r _ J S l S ff A� �t 1 . < "--rid l"• .. ,t✓ v. fir. `'.:/, x. " fAl .• Y -. cg t r .r» J l�'. it 77 i '•'t \ } 4 Y t ♦ r� r t �M: 2:Lr"s�'�rF �,f tit � t •„ t. 1 +sjy �y1 r rt s ����1 Y��iik""��j, �$ it f ,. J i�' •� rEt�yl � e COUNCIL COMMUNICATION SUBJECT: Plans and Specifications for Salas Park Control b Pump Structure RECOMMENDED ACTION: That the City Council approve the plans and specifications or 'Salas Park Control 6 Pump Structure," and authorize the City Clerk to ad- vertise for bids to be received Wednesday. August 25, 1982. BACKGROUND INFORMATION: The construction of the Salas Park (D Basin) Control and Pump Structure was approved in the 1981-82 Capital Improvement Budget with an estimated expenditure of $237,000 - In general, the work consists of constructing a reinforced concrete pump and control structure with two 14 hp submersible wastewater pumps, slide and drainage gates and a weir; a reinforced concrete outlet structure; furnishing and and installing a motor control center, bubbler system and telemetry system; and installing miscellaneous underground storm drains, foundations, conduit and other appurtenances. The totaXc o the project is estimated at $185,000;. Ja L. Ronsko Pub is Works Director eeh APPROVED: HENRY A. GLAVES. City Manager FILE. NO. CITY OF LODI PUBLIC WORKS DEPARTMENT TO City Council FROM: City Manager DATE: July 29, 1982 COUNCIL COMMUNICATION SUBJECT: Plans and Specifications for Salas Park Control b Pump Structure RECOMMENDED ACTION: That the City Council approve the plans and specifications or 'Salas Park Control 6 Pump Structure," and authorize the City Clerk to ad- vertise for bids to be received Wednesday. August 25, 1982. BACKGROUND INFORMATION: The construction of the Salas Park (D Basin) Control and Pump Structure was approved in the 1981-82 Capital Improvement Budget with an estimated expenditure of $237,000 - In general, the work consists of constructing a reinforced concrete pump and control structure with two 14 hp submersible wastewater pumps, slide and drainage gates and a weir; a reinforced concrete outlet structure; furnishing and and installing a motor control center, bubbler system and telemetry system; and installing miscellaneous underground storm drains, foundations, conduit and other appurtenances. The totaXc o the project is estimated at $185,000;. Ja L. Ronsko Pub is Works Director eeh APPROVED: HENRY A. GLAVES. City Manager FILE. NO.