Loading...
HomeMy WebLinkAboutAgenda Report - July 15, 1981 (37)�. ) 1 ` 1� � J '.� � �KV .4 : sy5 8 C � ^t �rk5 � ��; _ d. S i � - it �7�t � t i '- f4 r4'. CITY OF LODI PUBLIC WORKS DEPARTMENT TO: City Council FROM: City Manager DATE- July 9, 1981 SUBJECT: Church Street Improvements COUNCIL COMMUNICATION RECOMMENDED ACTION: That the City Council award the bid for CHURCH STREET IMPROVEMENTS, Lockeford Street to Turner Road to Teichert Construction Co., Inc., the low bidder, in the amount of $277.373.60 (Alt. 8). BACKGROUND INFORMATION: Plans and specifications for this project were ap- proved by t e City Count11 on June 17, )981. Bids were opened on Wednesday, July 8, 1981, and the following three bids were received: The Alternates were for different types of pavement construction; ''A'' - Standard construction asphalt concrete and aggregate base over compacted subgrade; "B" - Full depth asphalt concrete over compacted subgrade; "C" - Asphalt concrete over cement treated soil. Alternates ''B" and ''C" do not require as deep an excavation as "A" and were requested due to existing shallow utilities. A tabulation of the bids has also been attached. c L. Ronsko P is Works Director Attachment JLR/eeh APPROVED: . GLAVES, City Manager FILE NO. Bid Bid Bid Bidder Location Alt. A (At t. B Ai t. C Teichert Const. Co. Inc. Stockton $282,685.60 $277.373.60 $279.358.50 C.C. Wood Co. Inc. Lodi $284,220.85 $296.04-8.35 $303,850.25 Granite Const. Co. Inc. Stockton $311.100.00 $303,042.00 $310,697.50 Engineer's Estimate $324.955.00 $344,336.00 5-334.139.00 The Alternates were for different types of pavement construction; ''A'' - Standard construction asphalt concrete and aggregate base over compacted subgrade; "B" - Full depth asphalt concrete over compacted subgrade; "C" - Asphalt concrete over cement treated soil. Alternates ''B" and ''C" do not require as deep an excavation as "A" and were requested due to existing shallow utilities. A tabulation of the bids has also been attached. c L. Ronsko P is Works Director Attachment JLR/eeh APPROVED: . GLAVES, City Manager FILE NO. CHURCH STREET IMPROVEMENTS Lockeford Street to Turner Road Tabulation of bids received July 8, 1981 BASE SID ENGINEER'S ESTIMATE ITEM APPROXIMATE Unit Total NO. UA�r.r, :T.Y...,. DESCRIPTION Price Price 1. LS Clearing and Grubbing $ 13,200.00 2. 29,050 SF Concrete Subgrade Compaction $ 0.30 8,715.00 3• 3►628 LF Vertical Curb & Gutter 9.50 34,466.00 4. 17►545 SF Sidewalk & Residential Driveway 2.25 39,476.25 5. 298 LF Commercial Curb & Gutter 10.75 3,203.50 6. 1,690 SF Commercial Driveway 3.00 5,070.00 7. 8 EA Street Sign Post 140.00 1,12,0.00 8. 8. 22 EA Adjust Manhole Frame & Cover 250.00 5,500.00 9. 34 EA Adjust Water Valve Frame & Cover 150.00 5,100.00 10. 74 LF 18" Storm Drain 45.00 3,330.00 11. 28 LF 15" Storm Drain 43.00 1,204.00 12. 560 LF 12" Storm Drain 40.00 22,400.00 13. 2 EA 48" Manhole 1000.00 2,000.00 14. 17 EA Side Inlet Catch Basin 650.00 sli,050.00 15. LS Street Light System 7000-.00 7,000.00 16. LS Excavation Safety 2000.00 2,000.00 BASE B I D TOTAL $164,834-75 PAVING ALTERNATE A PAVING ALTERNATE B ITEM APPROXIMATE Unit Total ITEM APPROXIMATE Unit Total 140. QUANTITY DESCRIPTION Price Price NO. QUANTITY DESCRIPTION Price Price 1. 5,060 CY Roadway $ 5.00 $ 25,300.00 1. 2,250 CY Roadway $4.75 $ 10,687.50 Excavation Excavation(F) 2. 123,320 SF Compact Origi- 0.15 18,498.00 2. 123,320 SF Compact Orig- 0.20 24,664.00 nal Ground @ 90% inal Ground 3- 2,890 T Aggregate Base 9.75 28,177.50 95% 4. 2,890 T Asphalt Concrete 30.50 88,145.00 3. 4,805 T Asphalt Con- 30.00 144,150.00 ALTERNATE A SUBTOTAL 160,120.50 crete ALTERNATE B SUBTOTAL $179►501.50 PAVING ALTERNATE C 1. 1,310 CY Roadway Ex- $ 4.75 $ 6,222.50 cavation (F) a TOTAL BASE BID & ALTERNATE A $324,955.25 2. 129,750 SF Cement Treated 0.25 32,437.50 11 TOTAL BASE BID & ALTERNATE 8 $344,336.25 Subgrade 3. 283 T Portland Cement 120.00 33,960.00 Ili TOTAL BASE BID & ALTERNATE C $334►139.75 4. 3,170 T Asphalt Concrete 30.50 26,685.00 ALTERNATE C SUBTOTAL $169,305-00 (F) denotes Final Pay Quantity TEICHERT CONSTRUCTION GRANITE CONSTRUCTION.CO. CLAUDE C. WOOD CO.BASE ' 91D ALTERNATE B BASE BID 7.50 $ 16,875.00 BASE BID $ 3.00 Item Unit Total Item Unit. Total Item Unit Total N0. Price Price No. Price Price No. Price Price 1. $23,000.00 $ 23,000.00 1. $25,293.00 $ 25,293.00 1. $24,000.00` $ 24,000.00 2. 0.22 6,391.00 2. 0.25 7,262.50 2. 0.25 7,262:50 3. 7.50 27,210.00 3. 8.50 30,83`8.00 3. 8.00 29,024.00 4. 1.50 26,317:5.0 4. 1.50 26,317.50 4. 1.85 32,458.25 5. 7.50 2,235.00 5. 8.00 2,384.00 5. 9.00 2,682.00 6. 2.30 3,887.00 6. 2.00 3,380.00 6. 2.25 3.802.50 7. 140.00 1,120.00 7. 50.00 640.00 7. 100.00 800.00 8. 350.00 7,700.00 8. 350.00 7,700.00 8. 370.00 8,140.00 9. 175.00 5,950.00 9. 250.00 8,500.00 9. 185.00 6,290 00 10. 26.00 1,924.00 10. 24.00 1,776.00 10. 28.00 2,07:)0 11. 25.00 700.00 11. 20.00 560.00 H. 28.00 784:00 12. 23.00 12,880.00 12. 16.00 8,9.60.00 12. 24.00 13,440.00 13. 1,500.00 3,000.00 13. 900.00 1,800.00 13. 1,000.00 2,000.00 14. 420.00 7,140.00 14. 500.00 8,500.00 14. 450.00 7,650.00 15. 7,000.00 7,000.00 15. 6,564.00 6,564.00 15. 7,000.00 7,000.00 16. 300.00 300.00 16. 2,500.00 ��2►500,00 16. 500.00 500.00 BASE BID TOTAL $136,754.50 BASE BID TOTAL 5142,975.00 BASE BID TOTAL $ +7,905.25 PAVING ALTERNATE A 1. $ 7.50 $ 37,950.00 2. 0.08 9,865.60 3. 9.75 28,177.50 4. 24.20 69,938-00 ALT. A SUBTOTAL $145,931-10` PAVING ALTERNATE A 1 .10 S 38,962.00 2. 0.15 18,498.00 3. 10.50 30,345.00 4. 28.00 8�0_1920�.00 ALT. A SUBTOTAL $16d,725-00 25.00 PAVING ALTERNATE A I. S 5.00 2. 0.08 3• 9.50 4. 25.50 ALT. A SUBTOTAL $ 25,300.00 9,865.60 27,455.00 73,695.00 $136 315.60- PAVING ALTERNATE B PAVING ALTERNATE B PAVING ALTERNATE B . 7.50 $ 16,875.00 1. $ 3.00 S 18,000.00 1. $ 7.00 S 15,7 00 2. 0.08 9,865.60 2. 0.10 12,332.00 2. 0.08 9,8.Y'S0 3. 23.70 113,878.50 3. 27.00 129,735-00 3. 25.50 122 527.50 ALT. B SUBTOTAL $140,619.10 ALT. B SUBTOTAL $160,067-00 ALT. B SUBTOTAL $148',143.-10 PAVING ALTERNATE C PAVING ALTERNATE C PAVING ALTERNATE C .00 $ 10,480.00 1. $ 5.60 11,790.00 1. $ .00 $ 10,480.00 2. 0.24 31,140.00 2. - 0.29 37,627.50 2. 0.28 36,330-00 11 3. 88.00 24,go4.00 3. 110.00 31,130.00 3. 100.00 28,300.001 4. 24.00 76.,088.0..0000 4. 27.50 87,175-00 1 4, 25.50 80,835.00 ALT. C SUBTOTAL $142,604..00 ALT. C SUBTOTAL 7,722.50 ALT. C SUBTOTAL $155,945.001 1 TOTAL BASE BID S ALT A $282,685.60 1 TOTAL BASE BID & ALT A $311,700.00 I TOTAL BASE BID S ALT A $284,220.85 11 TOTAL BASE BID S ALT B $277,373.60 it TOTAL BASE BID S ALT B $303,042.00 tl TOTAL BASE BID S ALT B 5296,048.351 111 TOTAL BASE BID 8 ALT C 5279,358.50 III TOTAL BASE d10 S ALT C $310,697.50 III TOTAL BASE BID S ALT C $303,850.251 RESOLUTION NO. 81-90 AWARD - CONTRACT FOR CHURCH STREET IMPROVEMENTS? LOCKEFORD STREET TO TURNER ROAD, LODI WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened by the City Clerk of this City on July 8, 1981 at 11:00 a.m. for the Contract for Church Street Improvements, Lockeford Street to Turner Road, as described in the specifications therefor approved by the City Council June 17, 1981; and WHEREAS, said bids have been compared, checked, and tabulated and a report thereof filed with the City Manager as follows: BIDDER Teichert Construction Co., Inc. C.C. Wood Co., Inc. Granite Construction Co.,Inc. Bid did Bid (Alt. A) (Alt. B) (Alt. C) $282,685.60 $277,373.60 $279,358.50 $284,220.85 $296,048.35 $303,850.25 $311,700.00 $303,042.00 $310,697.50 WHEREAS, the City Manager recommends that award be mads to the low bidder, Teichert Construction Co., Inc. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lodi that award of contract for Church Street Improvements, Lockeford Street to Turner Road be and the same is hereby made to Teichert Construction Co., Inc., the low bidder, in the amount of $277,373.60 (Alt. B). Dated: July 15, 1981 I hereby certify that Resolution No. 81-90 was passed and adopted by the City Council of the City of Lodi in a regular meeting held July 15, 1981 by the follow- ing vote: Ayes: Councilmen - Murphy, Hughes, Pinkerton, Katnich and McCarty Noes: Councilmen - None Absent: Councilmen None ALICE M. REI CHE City Clerk 81-90