Loading...
HomeMy WebLinkAboutAgenda Report - July 6, 1983 (55)PROPOSED Agenda item K-5 - "Proposed improvements to Stadium Parking IMPROVFMEN'S TO Lot" was introduced by City Manager Glaves. Public Works STADIUM PAR R)G Director Ronsko then apprised the Council that it is LOT recommended that if the City undertakes this project, that the paving be done at this time. Fan estimate for the stadium parking lot indicates ultimate improvements including paving will cost approximately $150,000. Based on Grape and Wine Festival providing $20,000 for these improvements, $130,000 will have to be appropriated by the City Council. If this work is to be completed this summer, the monies must be approved at the Council meeting of July 6, 1983. If the funds are allocated this department will immediately obtain a consulting engineering firm to do the design in order that the plans anu specifications can be brought to the Council for approval on August 3, 1983. Following discussion, Council, on motion of Mayer Pro 'Dore Snider, Pinkerton second, approved funding ;or the preparation of plans and specifications for Stadium Parking Lot Inprovements. I i t^ CITY OF LODI PUBLIC WORKS DEPARTMENT COUNCIL COMMUNICATION I TO:. City Council FROM: City Manager DATE: July 1, 1953 SUBJECT: Salas Part: Improvements Stadium Parking Lot Improvements These two projects were discussed at the last Council shirtsleeve session. Assuming that these projects are going to be constructed this summer, the attached construction schedule would have to be followed. CITY OF LODI PUBLIC WORKS DEPARTMENT COUNCIL COMMUNICATION I TO:. City Council FROM: City Manager DATE: July 1, 1953 SUBJECT: Salas Part: Improvements Stadium Parking Lot Improvements These two projects were discussed at the last Council shirtsleeve session. Assuming that these projects are going to be constructed this summer, the attached construction schedule would have to be followed. PKo.7�95L L:) coAls? -rv- �4 C.A5 PAek 5TAV ILY-1 m,,, pltltc, PAO'.* sloocs FXkelAI& L 07" SA LAS PAe,< ZM'PvgOVe"IEW S I AUGUS S M T W 1 2 co~'/off rro✓t PAS'W 'd . AtG s �& OCTOBER S-TISD 1uM PAP-g►,NC, LO�t' -i' PROtl�MEN_ 'CS �l�ws � SPt tS AUGUST F S S RA T W F S 4 5 6 7 9 1 1 -14 15 16 EYtcL,4Q Cor.Ie*4 f • Vac Doo.+. '4 f -sit,/ o r+ 1 Cv,--"c </_4.aA Ilwc( OCTOBER SX19 S 1 2. 8 9 15 16 22 23�29 .31 . ESTIMATE STADIUM PARKING LOT IMPROVEMENT Misc. Data ° Parking Lot area - 4 acres ° Storm drainage tied into existing 24" line in school property Cuts S fills36" Mow strip under fencing on N R. Lighting to be placed on existing poles Oiled Paved Surface Surface Drainage Facilities S 18,000 $ 18,000 Grading b Compacting 17,000 17,000 Fencing (Northside) 7,000 7,000 (Eastside) 2,000 2,000 Lighting 2,000 2,000 Oiled Surface 8,000 Paving 65,000 Parking Stall Striping 1,000 Conc. Curbing 10,000 Sprinklers 8,000 Sub -total $ 54,000 $ 130,000 Engineering 5,000 7,000 Contingencies 102 5,000 13,000 TOTAL $ 64,000 $ 1.50,000 Misc. Data ° Parking Lot area - 4 acres ° Storm drainage tied into existing 24" line in school property Cuts S fills36" Mow strip under fencing on N R. Lighting to be placed on existing poles ;4 i r t i �I 1� r