HomeMy WebLinkAboutAgenda Report - July 6, 1983 (55)PROPOSED Agenda item K-5 - "Proposed improvements to Stadium Parking
IMPROVFMEN'S TO Lot" was introduced by City Manager Glaves. Public Works
STADIUM PAR R)G Director Ronsko then apprised the Council that it is
LOT recommended that if the City undertakes this project, that
the paving be done at this time. Fan estimate for the
stadium parking lot indicates ultimate improvements
including paving will cost approximately $150,000. Based on
Grape and Wine Festival providing $20,000 for these
improvements, $130,000 will have to be appropriated by the
City Council. If this work is to be completed this summer,
the monies must be approved at the Council meeting of July
6, 1983. If the funds are allocated this department will
immediately obtain a consulting engineering firm to do the
design in order that the plans anu specifications can be
brought to the Council for approval on August 3, 1983.
Following discussion, Council, on motion of Mayer Pro
'Dore Snider, Pinkerton second, approved funding ;or the
preparation of plans and specifications for Stadium Parking
Lot Inprovements.
I
i t^
CITY OF LODI
PUBLIC WORKS DEPARTMENT
COUNCIL COMMUNICATION I
TO:. City Council
FROM: City Manager
DATE: July 1, 1953
SUBJECT: Salas Part: Improvements
Stadium Parking Lot Improvements
These two projects were discussed at the last Council shirtsleeve session.
Assuming that these projects are going to be constructed this summer, the
attached construction schedule would have to be followed.
CITY OF LODI
PUBLIC WORKS DEPARTMENT
COUNCIL COMMUNICATION I
TO:. City Council
FROM: City Manager
DATE: July 1, 1953
SUBJECT: Salas Part: Improvements
Stadium Parking Lot Improvements
These two projects were discussed at the last Council shirtsleeve session.
Assuming that these projects are going to be constructed this summer, the
attached construction schedule would have to be followed.
PKo.7�95L L:) coAls?
-rv-
�4 C.A5 PAek 5TAV ILY-1
m,,, pltltc,
PAO'.* sloocs
FXkelAI& L 07"
SA LAS PAe,< ZM'PvgOVe"IEW S
I AUGUS
S M T W
1 2
co~'/off rro✓t
PAS'W 'd . AtG s
�& OCTOBER
S-TISD 1uM PAP-g►,NC, LO�t' -i' PROtl�MEN_ 'CS
�l�ws � SPt tS
AUGUST
F S S RA T W F S
4 5 6
7 9 1 1
-14 15 16
EYtcL,4Q Cor.Ie*4 f •
Vac Doo.+. '4 f -sit,/
o r+ 1
Cv,--"c </_4.aA Ilwc(
OCTOBER
SX19
S
1
2. 8
9 15
16 22
23�29
.31 .
ESTIMATE
STADIUM PARKING LOT IMPROVEMENT
Misc. Data
° Parking Lot area - 4 acres
° Storm drainage tied into existing 24" line in school property
Cuts S fills36"
Mow strip under fencing on N R.
Lighting to be placed on existing poles
Oiled
Paved
Surface
Surface
Drainage Facilities
S 18,000
$ 18,000
Grading b Compacting
17,000
17,000
Fencing (Northside)
7,000
7,000
(Eastside)
2,000
2,000
Lighting
2,000
2,000
Oiled Surface
8,000
Paving
65,000
Parking Stall Striping
1,000
Conc. Curbing
10,000
Sprinklers
8,000
Sub -total
$ 54,000
$ 130,000
Engineering
5,000
7,000
Contingencies 102
5,000
13,000
TOTAL
$ 64,000
$ 1.50,000
Misc. Data
° Parking Lot area - 4 acres
° Storm drainage tied into existing 24" line in school property
Cuts S fills36"
Mow strip under fencing on N R.
Lighting to be placed on existing poles
;4
i
r
t
i
�I
1�
r