Loading...
HomeMy WebLinkAboutAgenda Report - June 19, 1985 (88)&I Me I •!• • • • 1021010 Council was reminded that the City of Lodi's 1985-86 Ccm vanity Block Grant projects are as follows: PROJFC.'T AWUNI' Blakely Park Swrimning Pools $ 180,000 Garfield Street Storm Drain $ 25,000 SalasPark Shade Structure $ 25,000 Providing Handicap Access to City Hall and Carnegie Library building $ 167,000 Because of the extreme difficulties in using Block Grant Funds for engineering or architectural services, we are reccrmerding that General Fund dollars be used for the design of the Blakiey Park and Garfield Street Projects. This action would be similar to the engineering allocation made for the 1984-85 storm drain Block Grant projects. Staff indicated that it is their intention to use the existing design of the Lodi Lake Shade Structure for the Salas Park project and acccrcglish any additional engineering in house. The architectural services required for modifications to City Hall and the Carnegie Library will be done by the architect who is currently retained and funded out of Revenue Sharing Funds. The engineering and architectural funds needed are as follows: PRWBCT OR MSCRIPTION ARCHITBCTURAL SERVICES Blakely Park Swimming Pools $ 15,000 Garfield Street Storm Drain $ 2,500 TCTAL $ 17,500 The Lodi City Council allocated $17,500 for engineering and architectural services for the design of the Blakely Park Swimming Pool and Garfield Street Stone Dr ^-----.-,,- ....._..,,,ain Prod M u LN-M. -�i TO: City Council FROM: City Manager DATE: June 13, 1985 COUNCIL C0111MUNICATION SUBJECT: Allocation of Engineering and Architectural Funds for Block Grant Projects RECOMMENDED ACTION: That the City Council allocate $17,500 for engineering and architectural services for the design of the Blakely Park Swimming Pool and Garfield Street Storm Drain Projects. BACKGROUND INFORMATION: The City of Lodi's '85-86 Community Block Grant projects are as follows: Project Amount Blakely Park Swimming Pools $ 180,000 Garfield S}.reet Storm Drain $ 25,000 Salas Park Shade Structure $ 25,000 Providing Handicap Access to City Hall and Carnegie Library building $ 167,000 Because of the extreme difficulties in using Block Grant Funds for engineering or architectural services, we are recommending that General Fund dollars be used for the design of the Blakely Park and Garfield Street projects. This action would be similar to the engineering allocation made for the '84 -85 storm drain Block Grant projects. It is our intent to use the existing design of the Lod: Lake Shade Structure for the Salas Park project and accomplish any addition engineering in-house. The architectural services required for modifications to City Hall and the Carnegie Library will be done by the architect who is currently retained and funded out of Revenue Sharing Funds. The engineering and architectural funds needed are shown below: Project Engineering or — Architectural Services Blakely Park Swimming Pools $ 15,000 arf'eld Street Storm Drain $ 2,500 TOTAL $ 17,500 /Jack . Ronsko Public Works Director AWffhILE N0. THOMAS A. PETERSON, City Manager