HomeMy WebLinkAboutAgenda Report - June 19, 2013 C-11AGENDA ITEMC &J'
CITY OF LODI
COUNCIL COMMUNICATION
• TM
AGENDA TITLE: Adopt Resolution Awarding Contract for 2013-2015 Tree Maintenance to
West Coast Arborists, Inc., of Anaheim ($178,000) and Authorizing Public Works
Director to Execute Extensions
MEETING DATE: June 19, 2013
PREPARED BY: Public Works Director
RECOMMENDED ACTION: Adopt resolution awarding contract for 2013-2015 Tree Maintenance to
West Coast Arborists, Inc., of Anaheim, in the amount of $178,000 and
authorizing Public Works Director to execute extensions.
BACKGROUND INFORMATION: This project provides for the structural pruning, maintenance
trimming, stump grinding, emergency calls, removal of City trees,
pest control and tree planting at various locations throughout the
City for Fiscal Years 2013/14 and 2014/15. An objective of this contract is to improve the health of our
urban forest and reduce costs associated with this effort.
In previous years, a majority of the annual tree trimming budget was spent on tree pruning, tree
removals, and emergency responses due to storm -related damage. The contract provides for individual
tree pruning, which is more effective than grid pruning, as used in the past. The contract will be for two
years with optional extensions, if mutually agreeable.
Specifications for this project were approved on April 17, 2013. The City received the following bid for
this project on May 15, 2013.
Bidder Location Bid
Engineer's Estimate $213,000
West Coast Arborists, Inc. Anaheim $178,000
The contract contains an option to extend if mutually agreeable to the City and the contractor. Staff
recommends authorizing the Public Works Director to execute up to two two-year extensions to the
contract when it is in the best interest of the City to do so.
FISCAL IMPACT: Selective tree maintenance improves tree health, which will reduce the
number of emergency calls.
FUNDING AVAILABLE: This project will be funded by Streets Operating account (3215036).
Jordan Ayers
Deputy City Manag r/Internal Se ices Director
F. Wally SarWelin
Public Works Director
Prepared by Sean Nathan, Associate Civil Engineer
FWS/SN/pmf
cc: Associate Civil Engineer Nathan Deputy Public Works Director — Utilities
City Engineer/Deputy Public Works Director
nradt Bartlam, City Manager
K:\WP\PROJECTS\STREETS\2013 Tree Maintenance\CAward.doc 6/11/2013
2013-2015 TREE MAINTENANCE CONTRACT
CITY OF LODI, CALIFORNIA
THIS CONTRACT made by and between the CITY OF LODI, State of California, herein
referred to as the "City," and WEST COAST ARBORISTS, INC., herein referred to as the
"Contractor."
WITNESSETH:
That the parties hereto have mutually covenanted and agreed, and by these presents do
covenant and agree with each other, as follows:
The complete Contract consists of the following documents which are incorporated herein by
this reference, to -wit:
Notice Inviting Bids
Information to Bidders
General Provisions
Special Provisions
Bid Proposal
Contract
Contract Bonds
Plans
The July 1992 Edition,
Standard Specifications,
State of California,
Business and Transportation Agency,
Department of Transportation
All of the above documents, sometimes hereinafter referred to as the "Contract Documents,"
are intended to cooperate so that any work called for in one and not mentioned in the other is to
be executed the same as if mentioned in all said documents.
ARTICLE I - That for and in consideration of the payments and agreements hereinafter
mentioned, to be made and performed by the City and under the condition expressed in the two
bonds bearing even date with these presents and hereunto annexed, the Contractor agrees
with the City, at Contractor's cost and expense, to do all the work and furnish all the materials
except such as are mentioned in the specifications to be furnished by the City, necessary to
construct and complete in a good workmanlike and substantial manner and to the satisfaction
of the City the proposed improvements as shown and described in the Contract Documents
which are hereby made a part of the Contract.
ARTICLE II - The City hereby promises and agrees with the Contractor to employ, and does
hereby employ, the Contractor to provide all materials and services not supplied by the City and
to do the work according to the terms and conditions for the price herein, and hereby contracts
to pay the same as set forth in Section 5.600, "Measurement, Acceptance and Payment," of the
General Provisions, in the manner and upon the conditions above set forth; and the said parties
for themselves, their heirs, executors, administrators, successors and assigns, do hereby agree
to the full performance of the covenants herein contained.
ARTICLE III - The Contractor agrees to conform to the provisions of Chapter 1, Part 7, Division
2 of the Labor Code. The Contractor and any Subcontractor will pay the general prevailing
wage rate and other employer payments for health and welfare, pension, vacation, travel time,
and subsistence pay, apprenticeship or other training programs. The responsibility for
compliance with these Labor Code requirements is on the prime contractor.
Contract.doc 1 05/21/13
ARTICLE IV - And the Contractor agrees to receive and accept the following prices as full
compensation for furnishing all materials and for doing all the work contemplated and embraced
in this agreement; also for all loss or damage arising out of the nature of the work aforesaid or
from the action of the elements, or from any unforeseen difficulties or obstructions which may
arise or be encountered in the prosecution of the work until its acceptance by the City, and for
all risks of every description connected with the work; also for all expenses incurred by or in
consequence of the suspension or discontinuance of work and for well and faithfully completing
the work, and the whole thereof, in the manner and according to the Plans and Contract
Documents and the requirements of the Engineer under them, to -wit:
The work may include, but is not limited to, maintenance pruning (structural and clearance) and
crown reductions, tree removals, stump grinding, mistletoe removal, tree pest control, palm tree
pruning, and emergency call outs as specified in the bid summary. All work shall be completed
in accordance with the standards set forth by the International Society of Arboriculture Pruning
Standards (Best Management Practices) and the ANSI A300 Standards. Successful bidder
shall have a Certified Arborist on staff, who will supervise all tree care operations. Special
projects that are difficult to access require the need for specialty equipment (i.e., crane), service
request pruning, or pruning to reduce and/or pruning to restore would fall under Crew Rental.
All work shall be done as described in the Specifications for the above project.
See Section 6-07 "Description of Bid Items" for additional information.
Contractdoc 2 05/21/13
CONTRACT ITEMS:
Bid
Item
No.
Description
Unit
Estimated
Quantity
Unit Price
Total
1
Clearance Pruning
EA
200
$ 35.00
$ 7,000.00
2
Service Request Pruning 0"-6" DSH
EA
100
$ 35.00
$ 3,500.00
3
Service Request Pruning 7"-12" DSH
EA
150
$ 75.00
$ 11,250.00
4
Service Request Pruning 13"-18" DSH
EA
100
$ 75.00
$ 7,500.00
5
Service Request Pruning 19"-24" DSH
EA
100
$ 150.00
$ 15,000.00
6
Service Request Pruning 25"-30" DSH
EA
100
$ 150.00
$ 15,000.00
7
Service Request Pruning > 30" DSH
EA
75
$ 150.00
$ 11,250.00
8
Tree & Stump Removal < 6" DSH
EA
30
$ 50.00
$ 1,500.00
9
Tree & Stump Removal 6"-12" DSH
EA
30
$ 150.00
$ 4,500.00
10
Tree & Stump Removal 13"-18" DSH
EA
20
$ 300.00
$ 6,000.00
11
Tree & Stump Removal 19"-24" DSH
EA
20
$ 500.00
$ 10,000.00
12
Tree & Stump Removal 25"-30" DSH
EA
20
$ 800.00
$ 16,000.00
13
Tree & Stump Removal > 30" DSH
EA
30
$ 800.00
$ 24,000.00
14
Stump Removal < 6" DSH
EA
5
$ 50.00
$ 250.00
15
Stump Removal 6"-12" DSH
EA
5
$ 100.00
$ 500.00
16
Stump Removal 13"-18" DSH
EA
5
$ 200.00
$ 1,000.00
17
Stump Removal 19"-24" DSH
EA
5
$ 200.00
$ 1,000.00
18
Stump Removal 25"-30" DSH
EA
5
$ 300.00
$ 1,500.00
19
Stump Removal > 30" DSH
EA
5
$ 300.00
$ 1,500.00
20
Date Palm Tree Trimming
EA
50
$ 150.00
$ 7,500.00
21
Fan Palm Tree Trimming
EA
50
$ 75.00
$ 3,750.00
22
Crew Rental - 3 Man
HR
50
$ 150.00
$ 7,500.00
23
Emergency Crew Rental
HR
50
$ 210.00
$ 10,500.00
24
Tree Pest Control up to 30" DBH
EA
100
$ 35.00
$ 3,500.00
25
Tree Pest Control > 30" DBH
EA
10
$ 70.00
$ 700.00
26
Consulting Arborist Services
HR
20
$ 65.00
$ 1,300.00
27
Tree Planting Allowance (only with City
Authorization
I -S
1
$ 5,000.00
$ $5,000.00
TOTAL: $178.000.00
Contractdoc 3 05/21/13
ARTICLE V - By my signature hereunder, as Contractor, I certify that I am aware of the
provisions of Section 3700 of the Labor Code, which requires every employer to be insured
against liability for workers' compensation or to undertake self-insurance in accordance with the
provisions of that code, and I will comply with such provisions before commencing the
performance of the work of this contract.
ARTICLE VI - It is further expressly agreed by and between the parties hereto that, should
there be any conflict between the terms of this instrument and the Bid Proposal of the
Contractor, then this instrument shall control and nothing herein shall be considered as an
acceptance of the said terms of said proposal conflicting herewith.
ARTICLE VII - The City is to furnish the necessary rights-of-way and easements and to
establish lines and grades for the work as specified under the Special Provisions. All labor or
materials not mentioned specifically as being done by the City will be supplied by the Contractor
to accomplish the work as outlined in the specifications.
ARTICLE VIII - The length of the contract will be twenty-four (24) months, starting July 1, 2013
and ending June 30, 2015. The contract may be extended if agreed upon by the Contractor
and the City.
WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE TIME OF
COMPLETION FOR THIS CONTRACT IS REASONABLE AND THE CONTRACTOR AGREES
TO PAY THE CITY LIQUIDATED DAMAGES AS SET FORTH IN SECTION 6-04.03 OF THE
SPECIAL PROVISIONS. CONTRACTOR AGREES THAT THIS AMOUNT MAY BE
DEDUCTED FROM THE AMOUNT DUE THE CONTRACTOR UNDER THE CONTRACT.
IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the year
and date written below.
CONTRACTOR: CITY OF LODI
By:
Konradt Bartlam
City Manager
By: Date:
Title
Attest
City Clerk
(CORPORATE SEAL) Approved As To Form
D. Stephen Sch abauer
City Attorney
Contract.doc 4 05121/13
RESOLUTION NO. 2013-123
A RESOLUTION OF THE LODI CITY COUNCIL AWARDING
AND AUTHORIZING THE CITY MANAGER TO EXECUTE
CONTRACT FOR 2013-2015 TREE MAINTENANCE AND
FURTHER AUTHORIZING THE PUBLIC WORKS DIRECTOR
TO EXECUTE EXTENSIONS
WHEREAS, in answer to notice duly published in accordance with law and the order of
this City Council, sealed bids were received and publicly opened on May 15, 2013, at
11:00 a.m., for 2013-2015 Tree Maintenance, described in the specifications therefore approved
by the City Council on April 17, 2013; and
WHEREAS, said bids have been checked and tabulated and a report thereof filed with
the City Manager as follows:
Bidder Bid
West Coast Arborists, Inc. $ 178,000
WHEREAS, staff recommends awarding the contract for 2013-2015 Tree Maintenance
to the sole bidder, West Coast Arborists, Inc., of Anaheim, California, in the amount of
$178,000.
NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby award
the contract for 2013-2015 Tree Maintenance to the sole bidder, West Coast Arborists, Inc., of
Anaheim, California, in the amount of $178,000; and
BE IT FURTHER RESOLVED that the City Manager is hereby authorized to execute the
contract; and
BE IT FURTHER RESOLVED that the Public Works Director is hereby authorized to
execute two 2 -year extensions if in the best interests of the City.
Dated: June 19, 2013
------------------------------------------------------------------------
I hereby certify that Resolution No. 2013-123 was passed and adopted by the City
Council of the City of Lodi in a regular meeting held June 19, 2013, by the following vote:
AYES: COUNCIL MEMBERS — Hansen, Johnson, Katzakian, and
Mayor Nakanishi
NOES: COUNCIL MEMBERS — None
ABSENT: COUNCIL MEMBERS — Mounce
ABSTAIN: COUNCIL MEMBERS — None
RA JOHL
City Clerk
2013-123