HomeMy WebLinkAboutAgenda Report - June 17, 1981 (46)S AND The Plans and Specifications for "Church Street,
SPECIFICATIONS Lockeford Street to Turner Road" were presented
FOR CHURCH for Council's approval. Council was apprised that,
STREET in general, the work consists of reconstructing
IMPROVEMENTS approximately 2800 lineal feet of street, includ-
r. APPROVED ing replacement of curb, gutter and sidewalk,
catch basins, storm drain laterals, street lights
and miscellaneous and incidental work.
COUNCIL APPROVED THE PLANS AND SPECIFICATIONS
FOR "CHURCH STREET IMPROVEMENTS, LOCKEFORD STREET
TO TURNER ROAD" AND AUTHORIZED THE CITY CLERK
TO ADVERTISE FOR BIDS THEREON.
......... _..--- -•--
- s:c
mac.
. t+
r err •......II/3 �,f.-Aj'~is.� �ii��', n
Y
S AND The Plans and Specifications for "Church Street,
SPECIFICATIONS Lockeford Street to Turner Road" were presented
FOR CHURCH for Council's approval. Council was apprised that,
STREET in general, the work consists of reconstructing
IMPROVEMENTS approximately 2800 lineal feet of street, includ-
r. APPROVED ing replacement of curb, gutter and sidewalk,
catch basins, storm drain laterals, street lights
and miscellaneous and incidental work.
COUNCIL APPROVED THE PLANS AND SPECIFICATIONS
FOR "CHURCH STREET IMPROVEMENTS, LOCKEFORD STREET
TO TURNER ROAD" AND AUTHORIZED THE CITY CLERK
TO ADVERTISE FOR BIDS THEREON.
......... _..--- -•--
- s:c
mac.
. t+
CiTY OF LODI
PUBLIC WORKS DEPARTMENT
TO: City Council
FROM: City Manager
COUNCIL COMMUNICATION
DATE: June 11, 1981
SUBJECT: Plans and Specifications for Church Street ImprovemenEs
RECOMMENDED ACTION: That the City Council approve the plans and specifications
or "ChrucE Street Improvements, Lockeford Street to Turner Road," and authotlze
the City Clerk to advertise for bids to be received Wednesday, July 8, 1981.
BACKGROUND INFORMATION: The reconstruction of Church Street between Lockeford
and Turner was approved in the 80-81 Capital improvement Budget with an estimated
expenditure of $555,000.00. Planters on both sides of the street will be eliminated
to provide a street width of 48 feet as approved by the City Council on May 6, 1981.
In general, the work consists of reconstructing approximately 2800 lineal teet of
street including replacement of curb, gutter and sidewalk, catch basins, storm drain
laterals, street lights and miscellaneous Pad incidental work.
The total cost of the project is estimated at $43-,000.
Ja k L. Ronsko
Pub is Works Director
JR:kw
APPROVED:
HENRY A. CLAVES. C tv Manager