Loading...
HomeMy WebLinkAboutAgenda Report - June 15, 1983 (34)pi,.��K"T; >v fi�tt,, +i '�„��' x •� t^ 1.•t 7 `"i .}2 -�. 't .., td`", �`•frrtkr ' r JUNE 25, 1983 VARIOUS PLANS AND Council approved the following Plans and Specifications and SPECIFICATIONS authorized the City Clerk to advertise for bids thereon: APPROVED a) Lodi Lake Park Picnic Shelter b) Turner Road Widening West of Cluff Avenue c) Washington Street Curb, Gutter, Sidewalk and Storm Drain d) Hutchins Street Improvements Project, Vine Street to Tokay Street --- - -- -- res aY '."4 n35V fc � ` -,h��� , .fix rx' ��, ,r�•��x t 8 5i.'atac+g,'tv�t✓�-�,rs a v L5cRM .,t. '' ` e s§ 44 a4: CITY OF LODI PUBLIC WORKS DEPARTMENT a COUNCIL COMMUNICATION TO: City Council Project Data FROM: City Manager Approved in F.Y. Budget: 1982/83 Fund: Federal Revenue Sharing DATE: June 10, 1983 Amount Budgeted: $30,000 Total Project Estimate: $30,000 SUBJECT: Lodi Lake Park Picnic Shelter Bid Opening Date: July 13, 1983 RECOMMENDED ACTION: That the City Council approve the plans and specifications or the above project and authorize advertisement for bids thereon. BACKGROUND INFORMATION This project consists of the construction of a steel tame, concrete tile roof shelter (approximately 1000 SO with a concrete slab. The shelter will be located at the north point of the Lodi Lake Park. The original budget estimate included the purchase of a prefabricated steel frame and installation with an asphalt shingle roof. However, discussions with a local contractor indicated that the pre -fab structure could be built locally at nearly half the cost. To do this, we engaged.a local structural engineer to design the structure. In addition, we were able to have the structure en- gineered to su rt a concrete tile roof which would result in lower maintenance. Ja Ronsko P 1 i Works Di rector cc: ssi=Stant Finance Director Parks & Recreation Director JLR/RCP/eeh APPROVED: ! FILE 40. ty nanaoer CITY 4F LODI PUBLIC WORKS DEPARTMENT COUNCIL COMMUNICATION TO: City Council Project Data Approved in F.Y. Budget: 1982/83 FROM: City Manager Fund: Transportation Development Act DATE: June 10, 1983 Amount Budgeted: $53,000 Total Project Estimate: $59,000 SUBJECT: Turner Road Widening Bid Opening Date: June 29, 1983 West of Chuff Avenue RECOMMENDED ACTION: That the City Council approve the plans and specifications ror the above project and authorize advertisement for bids thereon. BACKGROUND INFORMATION: This project consists of widening Turner Road west of Cluff Avenue by constructing additional pavement at the Jerome, Snell and Anagnos properties. Curb, gutter and sidewalk is being constrvaed at the Jerome and Snell properties under the terms of the Right -of -Way acquisition agreements. The total project estimate for this phase of the project is higher than the budget estimate. However, the cost of the Right-of-Way.acquisition phase was sufficiently ow the estimate to cover the construction overrun. Ja L. R�nsko P I Works Director cc'Assistant Finance Director JLR/ RCP/eeh APPROVED: r FILE NO. (Q CITY OF LODI PUBUC WORKS DEPARTMENT COUNCIL COMMUNICATION TO: City Council Project Data FROM: City Manager Total Project Estimate: $20,000 DATE: June 10, 1983 Bid Opening Date: July 20, 1983 SUBJECT: Washington Street Curb, Gutter, Sidewalk b Storm Drain RECOMMENDED ACTION: That the City Council approve the plans and specifications for t above project and authorize advertisement for bids. BACKGROUND INFORMATION: This project was approved by the City Council at the request of the Amer can Legion and is for the purpose of solving the drainage problem on Washington Street in front of the American Legion Building and Installing a handicap ramp in conjunction with handicap work the Legion is doing. A special allocation covering the cost will be prepared when the bids are received. a L. Ronsko ub i c Works Director cc: Assistant Finance Director J L. n'J GE R/eeh APPROVED: I FILE NO. f CITY OF LODICOUNCIL COMMUNICA N PUBLIC WORKS DEPARTMENT FDATE: City Council Project Data City Manager Approved in F.Y. Budget: 1982/83 Fund: Transportation Development Act June 10, 1983 Amount Budgeted: $200,000 Total Project Estimate: $130,000 : Hutchins Street improvement Bid Opening Date: June 29, 1983 Project, Vine St. to Tokay St. RECOMMENDED ACTION: That the City Council approve the plans and specifications or the above project and authorize advertisement for bids thereon and defer minor widening at Vine and Tokay until needed. BACKGROUND INFORMATION: This project includes the reconstruction of the pave- ment, replacement o an existing 81' storm drain with a 12" line and spot patch- ing of only severely deteriorated driveway type gutter on the east side. The estimated project cost is substantially lower than the budgeted amount because the project approved by the Council last year included minor widening at Vine Street and Tokay Street. The widening will not be needed until some future date when four lanes and a turn pocket are required at the intersections. Doing this now would require replacement of a substantial amount of good curb, gutter and sidewalk and the acquisition of right-of-way. It is recommended that this widening/bf deterred until traffic volumes warrant the additional lanes. kcL. RonskoWorks Director istant Finance Director JLR/RCP/eeh FILE NO.