' r JUNE 25, 1983
VARIOUS PLANS AND Council approved the following Plans and Specifications and
SPECIFICATIONS authorized the City Clerk to advertise for bids thereon:
APPROVED
a) Lodi Lake Park Picnic Shelter
b) Turner Road Widening West of Cluff Avenue
c) Washington Street Curb, Gutter, Sidewalk and Storm Drain
d) Hutchins Street Improvements Project, Vine Street to
Tokay Street
--- - -- --
res aY '."4 n35V
fc � ` -,h��� , .fix rx' ��, ,r�•��x t
8
5i.'atac+g,'tv�t✓�-�,rs
a v L5cRM
.,t.
'' ` e
s§ 44
a4:
CITY OF LODI
PUBLIC WORKS DEPARTMENT
a
COUNCIL COMMUNICATION
TO: City Council Project Data
FROM: City Manager Approved in F.Y. Budget: 1982/83
Fund: Federal Revenue Sharing
DATE: June 10, 1983 Amount Budgeted: $30,000
Total Project Estimate: $30,000
SUBJECT: Lodi Lake Park Picnic Shelter Bid Opening Date: July 13, 1983
RECOMMENDED ACTION: That the City Council approve the plans and specifications
or the above project and authorize advertisement for bids thereon.
BACKGROUND INFORMATION This project consists of the construction of a steel
tame, concrete tile roof shelter (approximately 1000 SO with a concrete slab.
The shelter will be located at the north point of the Lodi Lake Park.
The original budget estimate included the purchase of a prefabricated steel
frame and installation with an asphalt shingle roof. However, discussions with
a local contractor indicated that the pre -fab structure could be built locally
at nearly half the cost. To do this, we engaged.a local structural engineer
to design the structure. In addition, we were able to have the structure en-
gineered to su rt a concrete tile roof which would result in lower maintenance.
Ja Ronsko
P 1 i Works Di rector
cc: ssi=Stant Finance Director
Parks & Recreation Director
JLR/RCP/eeh
APPROVED: ! FILE 40.
ty nanaoer
CITY 4F LODI
PUBLIC WORKS DEPARTMENT
COUNCIL COMMUNICATION
TO: City Council Project Data
Approved in F.Y. Budget: 1982/83
FROM: City Manager Fund: Transportation Development Act
DATE:
June 10, 1983 Amount Budgeted: $53,000
Total Project Estimate: $59,000
SUBJECT: Turner Road Widening Bid Opening Date: June 29, 1983
West of Chuff Avenue
RECOMMENDED ACTION: That the City Council approve the plans and specifications
ror the above project and authorize advertisement for bids thereon.
BACKGROUND INFORMATION: This project consists of widening Turner Road west of
Cluff Avenue by constructing additional pavement at the Jerome, Snell and
Anagnos properties. Curb, gutter and sidewalk is being constrvaed at the
Jerome and Snell properties under the terms of the Right -of -Way acquisition
agreements.
The total project estimate for this phase of the project is higher than the
budget estimate. However, the cost of the Right-of-Way.acquisition phase was
sufficiently ow the estimate to cover the construction overrun.
Ja L. R�nsko
P I Works Director
cc'Assistant Finance Director
JLR/ RCP/eeh
APPROVED:
r
FILE NO.
(Q CITY OF LODI
PUBUC WORKS DEPARTMENT
COUNCIL COMMUNICATION
TO: City Council Project Data
FROM: City Manager Total Project Estimate: $20,000
DATE: June 10, 1983 Bid Opening Date: July 20, 1983
SUBJECT: Washington Street Curb,
Gutter, Sidewalk b Storm Drain
RECOMMENDED ACTION: That the City Council approve the plans and specifications
for t above project and authorize advertisement for bids.
BACKGROUND INFORMATION: This project was approved by the City Council at the
request of the Amer can Legion and is for the purpose of solving the drainage
problem on Washington Street in front of the American Legion Building and
Installing a handicap ramp in conjunction with handicap work the Legion is
doing.
A special allocation covering the cost will be prepared when the bids are
received.
a L. Ronsko
ub i c Works Director
cc: Assistant Finance Director
J L. n'J GE R/eeh
APPROVED: I FILE NO.
f
CITY OF LODICOUNCIL COMMUNICA N
PUBLIC WORKS DEPARTMENT
FDATE:
City Council Project Data
City Manager Approved in F.Y. Budget: 1982/83
Fund: Transportation Development Act
June 10, 1983 Amount Budgeted: $200,000
Total Project Estimate: $130,000
: Hutchins Street improvement Bid Opening Date: June 29, 1983
Project, Vine St. to Tokay St.
RECOMMENDED ACTION: That the City Council approve the plans and specifications
or the above project and authorize advertisement for bids thereon and defer
minor widening at Vine and Tokay until needed.
BACKGROUND INFORMATION: This project includes the reconstruction of the pave-
ment, replacement o an existing 81' storm drain with a 12" line and spot patch-
ing of only severely deteriorated driveway type gutter on the east side.
The estimated project cost is substantially lower than the budgeted amount
because the project approved by the Council last year included minor widening
at Vine Street and Tokay Street. The widening will not be needed until some
future date when four lanes and a turn pocket are required at the intersections.
Doing this now would require replacement of a substantial amount of good curb,
gutter and sidewalk and the acquisition of right-of-way. It is recommended that
this widening/bf deterred until traffic volumes warrant the additional lanes.
kcL. RonskoWorks Director
istant Finance Director
JLR/RCP/eeh
FILE NO.