CITY OF LODI
PUBLIC WORKS DEPARTMENT
COUNCIL COMMUNICA'
TO: City Council Project Data
Approved in F.Y.get: 1982/83
FROM: City Manager Fund: Transportation Development Act
DATE: May 25, 1983 Amount Budgeted: $50,000
Total Project Estimate: $75,000
SUBJECT: Turner Road Overlay Bid Opening Date: May 25, 1983
200' W/Stockton St. to 630' E/Mintum Drive
RECOMMENDED ACTION: That the City Council award the contract for the above project
to Granite Constr7clion Co. in the amount of $64,954 and appropriate an additional
$25,000 from the Transportation Development Act Fund to complete the project.
BACKGROUND INFORMATION: This project includes repairing and reconstructing the
su grade and installing an asphalt concrete overlay over the entire street.
Additional funds are needed for the project as the amount of subgrade reconstruc-
tion and repair is much higher than included in the original estimate.
Plans and specifications for this project were approved on May 4, 1983. The
City has received the following 4 bids for this project:
BIDDER LOCATION BID
Granite Construction Co. Watsonville $649954.00
Claude C. Wood Co. Lodi 69,492.00
Frank Ferreira Paving Inc. Sacramento 80,503.28
is!rthent Construction Co. Stockton 81,769.40
Engineer's Estimate 62,396.00
A tabulati of the bids is attached.
U
Jac I Ionsko
Pub1 c Works Director
chment
cc: Assistant Finance Director
JLR/RCP/eeh
APPROVED; FILE N0.
HENRY A. CLAVES, City Manager
TURNER ROAD OVERLAY
100' W/Stockton Street to
E/Wintum Drive
ITEM
APPROXIMATE
ESTIMATE
NO.
QUANTITY
DESCRIPTION
1.
624
CY
Roadway Excavation (F)
2.
12,050
SF
Compact Original Ground
3.
450
Ton
Aggregate Base
4.
1,500
Ton
Asphalt Concrete
5.
3,500
SF
Subgrade Repair
6.
2,240
LF
Pavement Grinding
7.
6
EA
Adjust Water Valve/
Monument Frame to Grade
8.
2
EA
Adjust Manhole Frame to
Grade
(F) Denotes final quantity
CLAUDE C. WOOD
TOTAL $69,492.00
of Bids
ENGINEER'S
COMPANY
ESTIMATE
ITEM
UNIT
TOTAL
N0.
PRICE
PRICE
1.
S 10.00
$ 6,240.00
2.
.24
2,892.00
3.
13.00
5,850.00
4.
27.00
40,500.00
5.
2.50
8,750.00
6.
1.50
3,360.00
7.
175.00
1,050.00
8.
425.00
850.00
TOTAL $69,492.00
of Bids
ENGINEER'S
TOTAL
ESTIMATE
UNIT
TOTAL
PRICE
PRICE
$ 5.00
S 3.120.00
.12
1.446..00
10.00
4,500;00
29.00
43,500-.00
1.30
4.550.00.
1.50
3.360.00
220.00
1,320.00
300.00
600.00
TOTAL
$62,396.00
FRANK FERREIRA PAVING
INC.
UNIT
TOTAL
PRICE
PRICE
$ 8.17
$ 5009.8.08 *
.39
4,699.50 *
11.87
5,341.50
36.81
55,215.00 *
1.42
4,970.00
1.33
2,979.20
250.00
1,500.00
350.00
700.00
$80,503.28
41 Corrected
Figure
GRANITE CONSTRUCTION
COMPANY
UNIT
TOTAL
PR'I'CE
PRICE
$ 6.00
$ 3,744.00
.20
2.410.00
11.00
4.950.00
2700
40,500.00
2.50
8,750.00
1.50
3.360.00
150.00 900.00
170.00 340.00
$64,954.00
TEICHERT
CONSTRUCT ION..COMPANY
UNIT
TOTAL
PRICE
PRICE
$ 15.20
5 9,484.80
.50
6,025.00
1-5.00
6,150.00
28.40
42,600.00
3.40
11.900.00
1.54
3,449.60
160.00
960.00..
300.00
600.00`;:
5819769.40'
i t -M
I
2