Loading...
HomeMy WebLinkAboutAgenda Report - May 20, 1981 (60)PUC -% APPLICATION a ep one sea e Hearings stating that -quested authorization Utilities Commission $252 million per year. City Clerk Reimche presented a Notice re Pacific T 1 h Off t R t Increase Application and Pacific Telephone has re— from the California Public to increase its rates by O NOTICE OF PACIFIC InLEPHONE OFFSET RATE INCREASE APP I "I N AND HEARINGS Pacific Telephone has requested authorization from the California Public Utilities Commission (CPUC) to increase its rates by $252 million per year reflecting and passing through to customers the additional increased costs resulting from the Federal Communications Commission (FCC- decision in Docket No. 79=105 in.which the FCC ordered changes for telephone utilities which require that certain station connection costs be treated: as an expense item rather than'as a capital expenditure. Pacific has also requested that the application be consolidated for hearing with a related investigation ordered by the CPUC known as 0.I.1. No. 84, which deals with the same basic -subject matter The Commission has scheduled hearings in O.I.I. No. 84 for Monday, May 18, 1981 at 10:00 a.m. and May 19-22 at 9:30-a.m.; and Monday, July 13, 1981 at 10:00 a.m. and July 14-17 at 9:30 a..= -.-in- the, Co =ission Courtroom, State Building, 107 S. Broadw ey, Los A-ngiel-es, Cal i fora ia. Shown below are the estimated increases in rates for various classes of service as proposed by Pacific: -1- Note: There will be coincidental changes in other line and trunk rates such as foreign exchange based upon present rate relationships. SURCHARGE (To be applied to line and trunk rates) Residence - 10% Business - 15% The CPUC may take acticn, after hearings are held, which could increase.ur decrease.the tqtal amount requested or which may result in`'rate changes in different classes or categories of service and/or increases of a greater or lesser amount for the categories shown above. A copy of the rate increase application may be examined at Pacific's principal public offices or at the CPUC"offices set out below. Company representatives are also available in San Francisco (415-542-1762) or Los Angeles (213-488-6707) to answer questions. -2- k� Increases In Present Rates Proposed By Pacific Telephone Dollar Increase Increase Over Present Over Present Rates Rates MULTI -ELEMENT CHARGES Business Installation Charges: Premises wiring $8 100% Station Handling 2 25% Residence Installation Charges: tentra1 Office Connection $1 lit Station Handling $4 50% COMPLEX SERVICE CONN7CTION CHARGES ` Lines -and Trunks $8= 13% Stations $8 221 SASIC RATES Residence - Flat Rate $1 178 Business Measured Line $2 29% Flat Line $2 14% Measured Trunk $'2 57% Flat Trunk $3 !4% Semipublic Service $2 29% Note: There will be coincidental changes in other line and trunk rates such as foreign exchange based upon present rate relationships. SURCHARGE (To be applied to line and trunk rates) Residence - 10% Business - 15% The CPUC may take acticn, after hearings are held, which could increase.ur decrease.the tqtal amount requested or which may result in`'rate changes in different classes or categories of service and/or increases of a greater or lesser amount for the categories shown above. A copy of the rate increase application may be examined at Pacific's principal public offices or at the CPUC"offices set out below. Company representatives are also available in San Francisco (415-542-1762) or Los Angeles (213-488-6707) to answer questions. -2- Further information may be obtained from the CPUC offices at: 350 McAllister Strejet 107 South Broadway San Francisco, CA 94102 Los Angeles, CA 90012 A copy_of the application and exhibits will be furnished upon written request which should be addressed to: J. E . Dennis Assistp:st Vice President The Pscific Telephone and Telegraph Company 3.4:0 New Montgomery Street San Francisco, CA 94105