HomeMy WebLinkAboutAgenda Report - May 15, 1985 (84)ws - f I TYC MA RMSM APPROPRIATIONS FOR CAPITAL IMPROVEMENT PPrS ORD. No. 1355 INDUCED Following introduction of the matter by Staff and Council discussion, Council, on motion of Council Member Snider, 1 d introduced Ordinance No 1355 O anerdin son sewn - g Ordinance No. 1344 as to various appropriations for the following Capital Improvement Projects: MASTER STORM DRAIN SYSTEM (123 Fund) Project Present Recnded (Development) Appropriation Appropriation Pine St. $225,000 $155,000 S.D. EJCluff (DA.RT) Industrial Way none $ 30,000 S.D. E. Cluff (MCP Investment Co.) Turner Rd. S.D. none $ 40,000 W. Rutledge (Woodlake Subdivision) Total $225,000 $225,000 STREET SYSTEM Hutchins St. Overlay $ 59,000 Gas Tax $ 21,000 Gas Tax Harney to Kettleman (33.Fund) $291,000 FAU $129,000 FAU (126 Fund) Ham Lane Overlay $100,000 Gas Tax $ 86,000 FAU Lockeford to Turner (33 fund) $ 14,000 Gas Tax Turner Rd. Overlay $130,000 Gas Tax $ 95,000 FAU Ham to Mills (33 Fund)" $ 15,000 Gas Tax Turner ••. Re- none $152,000 construction Lower Sacramento Rd. (S) to $ 31,000 Lower Sacramento Rd. (N) Developer (Woodlake Subdivision) TOTAL $289,000 Gas Tax $202,000 Gas Tax $291,000 ori FAU $580,000. :The motion carried by unanimous vote of present. FROM: City Manager DATE: May 7, 1985 SUBJECT: Revised Appropriations for Capital Improvement Projects RECOMMENDED ACTION: That the City Council revise/appropriate funds for the follow- ing Capital Improvement Projects: MASTER STORM DRAIN SYSTEM (123 Fund) Project Present Recommended (Development) Appropriation Appropriation Pine St. S.D. E/Cluff ( DART) Industrial Way S.D. E/Cluff "MCP Investment Co.) Turner Rd. S.D. W/Rutledge (Woodlake Subdivision) Total STREET SYSTEM Hutchins St. Overlay Harney to Kettleman Nam Lane Overlay Lockeford to Turner Turner Road Overlay Ham to Mills Turner Road Reconstruction Lower Sacramento Rd. (S) to Lower Sacramento Rd. (N) (Woodlake Subdivision) TOTAL $225,000 $155,000 none $ 30;000 none $ 40,000 $225,000 $225,000 $ 59,000 Gas Tax (33 Fund) $21,000 Gas Tax $291,000 FAU (126 Fund) $129,000 FAU $100,000 Gas Tax (33 Fund) $ 86,000 FAU $ 14,000 Gas Tax $130,000 Gas Tax (33 Fund) $ 95,000 FAU $ 15,000 Gas Tax none $152,000 Gas Tax 1 $ 31,000 Developer. Contributil $289,000 Gas Tax $202,GOO i Gas Tax $291,000 FAU $310000 FAU $580,000 $512,000 i APPROVED: LAE—TE THOMAS RSON, Gity Manager FILE N 0 . ; �„ Storm System: The Master Storm Drain budgeted to coincide with DART project on E. Pine Street, included more main in Pine Street than was necessary to accomm^date the final plans prepared by DART. Thus excessive funds are appropriated for the project. Two additional projects needing Master Drain lines are ready for con- struction and funds are requested for those Projects as shown above. No additional Master Drain Funds are needed to make these changes. Street System: During the design process for the Hutchins Street Overlay, it was determined that no work need be done on the southbound lanes at: this time. This resulted in excess FAU funds in the project. In order to help reduce the backlog of Federal Aid Urban (FAU) funds and keep the number of FAU projects to a minimum, it is recommended that ma additional overlays (Ham Lane and Turner Road) be added to the FAU project. This frees less restrictive Gas Tax Funds for other projects. The Turner Road Reconstruction project will provide a new street fronting the Woodlake Subdivision. The developer will contribute funds for his share of the work (from the existing edge of pavement to the new gutter on the north). The installation of the City's Master Storm Drain will require nearly complete re- placement of the street and the existing south side consists of patched, oil treated subgrade which is the City's responsibility to replace. Due to the size of the project, it is recommended that the City go to bid on the entire project rather than having the developer do the work for the City. ,U,, Jac L. Ronsko Publ c Works Director �1 JLR/ RCP/eeh