RMSM APPROPRIATIONS
FOR CAPITAL IMPROVEMENT
PPrS
ORD. No. 1355
INDUCED
Following introduction of the matter by Staff and Council
discussion, Council, on motion of Council Member Snider,
1 d introduced Ordinance No 1355 O anerdin
son sewn - g
Ordinance No. 1344 as to various appropriations for the
following Capital Improvement Projects:
MASTER STORM DRAIN SYSTEM (123 Fund)
Project Present Recnded
(Development) Appropriation Appropriation
Pine St. $225,000 $155,000
S.D. EJCluff
(DA.RT)
Industrial Way none $ 30,000
S.D. E. Cluff
(MCP Investment Co.)
Turner Rd. S.D.
none
$
40,000
W. Rutledge
(Woodlake Subdivision)
Total
$225,000
$225,000
STREET SYSTEM
Hutchins St. Overlay
$ 59,000 Gas Tax
$
21,000 Gas Tax
Harney to Kettleman (33.Fund)
$291,000 FAU
$129,000
FAU
(126 Fund)
Ham Lane Overlay
$100,000 Gas Tax
$
86,000 FAU
Lockeford to Turner
(33 fund)
$
14,000 Gas Tax
Turner Rd. Overlay
$130,000 Gas Tax
$
95,000 FAU
Ham to Mills
(33 Fund)"
$
15,000 Gas Tax
Turner ••. Re- none $152,000
construction
Lower Sacramento Rd. (S) to $ 31,000
Lower Sacramento Rd. (N) Developer
(Woodlake Subdivision)
TOTAL $289,000 Gas Tax $202,000 Gas Tax
$291,000 ori FAU
$580,000.
:The motion carried by unanimous vote of
present.
FROM: City Manager
DATE: May 7, 1985
SUBJECT: Revised Appropriations for Capital Improvement Projects
RECOMMENDED ACTION: That the City Council revise/appropriate funds for the follow-
ing Capital Improvement Projects:
MASTER STORM DRAIN SYSTEM (123 Fund)
Project Present Recommended
(Development) Appropriation Appropriation
Pine St. S.D. E/Cluff
( DART)
Industrial Way S.D. E/Cluff
"MCP Investment Co.)
Turner Rd. S.D. W/Rutledge
(Woodlake Subdivision)
Total
STREET SYSTEM
Hutchins St. Overlay
Harney to Kettleman
Nam Lane Overlay
Lockeford to Turner
Turner Road Overlay
Ham to Mills
Turner Road Reconstruction
Lower Sacramento Rd. (S) to
Lower Sacramento Rd. (N)
(Woodlake Subdivision)
TOTAL
$225,000 $155,000
none $ 30;000
none $ 40,000
$225,000 $225,000
$ 59,000 Gas Tax (33 Fund) $21,000 Gas Tax
$291,000 FAU (126 Fund) $129,000 FAU
$100,000 Gas Tax (33 Fund) $ 86,000 FAU
$ 14,000 Gas Tax
$130,000 Gas Tax (33 Fund) $ 95,000 FAU
$ 15,000 Gas Tax
none
$152,000
Gas Tax 1
$ 31,000
Developer.
Contributil
$289,000 Gas Tax
$202,GOO
i
Gas Tax
$291,000 FAU
$310000
FAU
$580,000
$512,000
i
APPROVED: LAE—TE THOMAS RSON, Gity Manager
FILE N 0 . ; �„
Storm System: The Master Storm Drain budgeted to coincide with DART project on
E. Pine Street, included more main in Pine Street than was necessary to accomm^date
the final plans prepared by DART. Thus excessive funds are appropriated for the
project. Two additional projects needing Master Drain lines are ready for con-
struction and funds are requested for those Projects as shown above. No additional
Master Drain Funds are needed to make these changes.
Street System: During the design process for the Hutchins Street Overlay, it
was determined that no work need be done on the southbound lanes at: this time.
This resulted in excess FAU funds in the project. In order to help reduce the
backlog of Federal Aid Urban (FAU) funds and keep the number of FAU projects
to a minimum, it is recommended that ma additional overlays (Ham Lane and Turner
Road) be added to the FAU project. This frees less restrictive Gas Tax Funds for
other projects.
The Turner Road Reconstruction project will provide a new street fronting the
Woodlake Subdivision. The developer will contribute funds for his share of the
work (from the existing edge of pavement to the new gutter on the north). The
installation of the City's Master Storm Drain will require nearly complete re-
placement of the street and the existing south side consists of patched, oil
treated subgrade which is the City's responsibility to replace. Due to the size
of the project, it is recommended that the City go to bid on the entire project
rather than having the developer do the work for the City.
,U,,
Jac L. Ronsko
Publ c Works Director