HomeMy WebLinkAboutAgenda Report - May 1, 1985 (46)The above exhibits show these street projects with the
deficient curb and gutter and sidewalk noted. As a part of
these above projects, the City will be installing the
deficient curb and gutter with one exception. Some of the
deficient sidewalk will be installed by the City because it
is our responsibility. In some cases, the City has
agreements with property owners for the installation of the
sidewalk, however, there are some sidewalk deficiencies on
developed parcels where we need direction from the City
Council. Sidewalk installation is a property owner's
responsibility. The City can require the property owners to
provide the sidewalk that is missing where we have the
right-of-way and more than 50% of the block has inprovements.
Ham Lane
The Ham Lane project includes street reconstruction with
widening on the west side.
There are presently only four parcels which have no sidewalk.
The City has a verbal agreement with the property owners of
the 4-plex, Iocated on the S.W. corner at Walnut Street, for
the installation of sidewalk on Ham Lane. It is recommended
that the City call for this sidewalk installation at this
t ini .
A portion of the Zion Reformed Church (fronting the parking
lots on the north and south side of the church) has no
sidewalk. The City is acquiring right-of-way from the Zion
Reformed Church and it is recomwnded that the City ask that
they put in their sidewalk at this time. The cost of the
sidewalk installation is approximately $3,000 which is about
10% of what they will receive from the right-of-way
A
- E
` c
i
REVIEW SIDEt1'ALK
Agenda Item K-3 - "_Review sidewalk deficiencies on City's
DEFICIZCIES CN
major street projects" was introduced by Public Works
QTY'S P%,IAJCR
Director Ronsko who gave the following- report concerning the
STREET PlDJECTS
subject:
In 1985 we will be reconstructing and/or widening the
following streets:
I. Ham Lane - Lodi to Elm
2. Hutchins Street - Rimbv to Vine
3. Lockeford Street - Mills to Cross
4. California Street - Lockeford to Turner Road
5, Stockton Street - Kettleman Lane to Vine
The above exhibits show these street projects with the
deficient curb and gutter and sidewalk noted. As a part of
these above projects, the City will be installing the
deficient curb and gutter with one exception. Some of the
deficient sidewalk will be installed by the City because it
is our responsibility. In some cases, the City has
agreements with property owners for the installation of the
sidewalk, however, there are some sidewalk deficiencies on
developed parcels where we need direction from the City
Council. Sidewalk installation is a property owner's
responsibility. The City can require the property owners to
provide the sidewalk that is missing where we have the
right-of-way and more than 50% of the block has inprovements.
Ham Lane
The Ham Lane project includes street reconstruction with
widening on the west side.
There are presently only four parcels which have no sidewalk.
The City has a verbal agreement with the property owners of
the 4-plex, Iocated on the S.W. corner at Walnut Street, for
the installation of sidewalk on Ham Lane. It is recommended
that the City call for this sidewalk installation at this
t ini .
A portion of the Zion Reformed Church (fronting the parking
lots on the north and south side of the church) has no
sidewalk. The City is acquiring right-of-way from the Zion
Reformed Church and it is recomwnded that the City ask that
they put in their sidewalk at this time. The cost of the
sidewalk installation is approximately $3,000 which is about
10% of what they will receive from the right-of-way
A
- E
On the east side of the street between Ribier and Cardinal,
there is one undeveloi.3d parcel where there is no curb and
gutter or sidewalk, In order to get a good finished product,
the City is proposing to remove the two Iarge cottonwood
trees which are in the right-of-way at the edge of pavement
and install curb and gutter through the frontage of this
parcel. It is not proposed that the sidewalk be installed
until the parcel is developed.
Also on the east side between York and Windsor, there is a
developed residential parcel with no sidewalk. The City h, --Ls
the right-of-way in this area and it is reccxmended that the
Citta require this property owner to install sidewalk at this
t Ime.
Lockeford Street
This project includes the reconstruction of the existing
pavement between the existing curbs. There are two parcels
having no sidewalk. It is recoamended that the City require
this sidewalk be installed at this time.
California Street
This project includes street reconstruction between the
existing curbs.
The City will be installing curb, gutter, and sidewalk
4
..•'.�
to ttze app roacn
µA'� semi 1
ar
through theYk r'ai troad crossiri lit Lane at the
in rovetnents that were recentlyrailroad on
protection
Southern Pacific crossing. unction with
will be installed by Southern Pacific in conjunction
this project.
The only other area that is deficient in
and eHut Hutchins walk is the
(Ilolly
side of the block between center and coffee shop.
Drive) fronting the small shoppingcenter
this area and it is
The City has the right-of-��ah ro erty owner to: install
recotmiended the City require the property
Street between
sidewalk on the east side of e block surrounded
and Hutchins (Holly Drive)- also has deficient
by Hutchins, Lockeford, and California,
sidewalk on the Hutchins Street frontage- `n City Council
being
may want to require all of this sidewalk g installed at
this time.
Stockton Street
This project includes the reconstruction e City providing curb
pavement, widening in scxne areas, an in
and gutter in the areas where the parcelserall finished reproject.e Pe Thi s
order to get a beWider construction and the work is being
project is currently
done by the Claude C. IVoods Co•
Industry' the City is not 1>rovi<litig curb and
Fronting Valley y u 1,� r�;c undev(! 1 <ipc>cl prohc r ty
gutter because the parcel is tiic installilt ion Of ti
'11ie rit•ccl stn the nortlw �t
where future to z• cl and lO� Ic�va 11� 1 i t eclutne
curb, €,
tit thc> LitrK� c,f its (1,
vi!1c)lJtit(?nt ,
corner Of I<cttic�V►n Lane allot Steel:ton Scree>,l hay no curs riru
gLittel• or sidewttllc, howevc r.
W
t ltrid not yet hc.i Cr detc�tmiiie(i, _
the City took
the clot 1'itt'�+ to c<svE,t• tiii� woit•k since
S t oelc t oti Street ti l i Enztlx
771 =-� � h
Therefore, the City is putting in curb, gutter and sidewalk
on this parcel under this project.
On the east side, there are sit remaining parcels which do
not have sidewalk. It is recommended that the City require
these parcels to install sidewalk along their 'frontage. It
is our understanding from C. C. lVoods Company that they
already have a contract with two of these property owners to
install their sidewalks.
On the west side, in addition to the large undeveloped Valley
industnj's parcel, there are five smaller parcels which do
not have sidewalk. This sidewalk could be required now or
delaved until the Valley Industry parcel develops and then
require sidewalk fronting all of the west side of Stockton
Street from Kettleman Lane to Vine Street.
Numerous exhibits and diagrams were presented for Council's
perusal.
A very lengthy discussion followed with questions being
directed to Staff.
By motion action, Council determined that the property owners
provide sidewalk that is missing where the City has the
right-of-way and more than 50% of the block has improvements
as recommended by Staff in the following areas:
a) On motion of Council Metrber Reid, Olson second - Ham Lane
- Lodi Avenue to Elm Street. The motion was adopted by
unanimous vote.
b) On motion of Council Marber Olson, Re, -1 second - Hutchins
Street - between York and Windsor, except for undeveloped
parcel in subject area. The motion carried by unanimous
vote.
c) On motion of Mayor Pro Tempore Hinchman, Olson second,
Lockeford Street - Mills to Cross. The motion carried by
unanimous vote.
d) On motion of Mayor Pro Tempore Hinchman, Olson second -
California Street - Lockeford to Turner Road (including
block surrounded by Hutchins, Lockeford, and California)
The motion carried by the following vote:
Ayes: Council Mlembers - Hinchman, Olson, Pinkerton,
and Snider
Noes: Council Members - Reid
2
e) On motion of Council Aimber Reid, Hinchman second -
Stockton Street - Kettleman Lane to Vine Street
(excepting parcels on the west side which will be
improved when Valley Industry develops).
-Alim:s M N
jw