CITY OF LODI
COUNCIL COMMUNICATION
TM
AGENDA TITLE: Adopt Resolution Awarding Contract for Katzakian Park Restroom Repair Project
to Poser Construction, of Lodi ($14,000)
MEETING DATE: May 1, 2013
PREPARED BY: Public Works Director
RECOMMENDED ACTION: Adopt resolution awarding contract for Katzakian Park Restroom
Repair Project to Poser Construction, of Lodi, in the amount of
$14,000.
BACKGROUND INFORMATION: This project provides for the necessary repairs at the restroom
facilities at Katzakian Park. In 2012, a fire was started in a trash
can adjacent to the park restroom. A portion of the restroom
building caught on fire and sustained damages from both the fire and emergency responders. The
majority of the damage was in the men's restroom, which has been closed since the time of the fire.
The improvements consist of replacing a variety of structural and finishing components to improve
aesthetics, security, and safety. The improvements will also allow the City to once again provide
separate men's and women's facilities rather than the temporary unisex restroom that has been provided
since the time of the fire. The Bridgetowne Homeowners Association, which represents adjacent
property owners, has pledged $5,000 toward construction costs.
Plans and specifications for this project were approved on April 3, 2013. The City received the following
two bids for this project on April 24, 2013.
Bidder
Engineer's Estimate
Poser Construction
Diede Construction, Inc.
FISCAL IMPACT:
Location
Bid
Lodi $ 14,000
Woodbridge $ 47,000
The project will not have an impact to the maintenance costs of the facility
but will reduce the City's liability associated with a damaged structure.
FUNDING AVAILABLE: Parks Maintenance (347312)
Jordan Ayers
Deputy City Manager/Internal Services Director
P r 01�h---'C
,Vw F. Wally Sandelin
Public Works Director
Prepared by Sean Nathan, Associate Engineer
FWS/SN/pmf
cc: Park Superintendent
APPROVED:
`Konradt Bartlam, City Manager
K:\WP\PROJECTS\PARKS\KatzakianPrk\RestroomRepair\CAward.doc
4/24/2013
KATZAKIAN PARK RESTROOM REPAIR PROJECT
2735 West Turner Road CONTRACT
CITY OF LODI, CALIFORNIA
THIS CONTRACT made by and between the CITY OF LODI, State of California, herein
referred to as the "City," and POSER CONSTRUCTION, herein referred to as the "Contractor."
WITNESSETH:
That the parties hereto have mutually covenanted and agreed, and by these presents do
covenant and agree with each other, as follows:
The complete Contract consists of the following documents which are incorporated herein by
this reference, to -wit:
Notice Inviting Bids
Information to Bidders
General Provisions
Special Provisions
Bid Proposal
Contract
Contract Bonds
Plans
The July 1992 Edition,
Standard Specifications,
State of California,
Business and Transportation Agency,
Department of Transportation
All of the above documents, sometimes hereinafter referred to as the "Contract Documents,"
are intended to cooperate so that any work called for in one and not mentioned in the other is to
be executed the same as if mentioned in all said documents.
ARTICLE I - That for and in consideration of the payments and agreements hereinafter
mentioned, to be made and performed by the City and under the condition expressed in the two
bonds bearing even date with these presents and hereunto annexed, the Contractor agrees
with the City, at Contractor's cost and expense, to do all the work and furnish all the materials
except such as are mentioned in the specifications to be furnished by the City, necessary to
construct and complete in a good workmanlike and substantial manner and to the satisfaction
of the City the proposed improvements as shown and described in the Contract Documents
which are hereby made a part of the Contract.
ARTICLE II - The City hereby promises and agrees with the Contractor to employ, and does
hereby employ, the Contractor to provide all materials and services not supplied by the City and
to do the work according to the terms and conditions for the price herein, and hereby contracts
to pay the same as set forth in Section 5.600, "Measurement, Acceptance and Payment," of the
General Provisions, in the manner and upon the conditions above set forth; and the said parties
for themselves, their heirs, executors, administrators, successors and assigns, do hereby agree
to the full performance of the covenants herein contained.
ARTICLE III - The Contractor agrees to conform to the provisions of Chapter 1, Part 7, Division
2 of the Labor Code. The Contractor and any Subcontractor will pay the general prevailing
wage rate and other employer payments for health and welfare, pension, vacation, travel time,
and subsistence pay, apprenticeship or other training programs. The responsibility for
compliance with these Labor Code requirements is on the prime contractor.
1 04/7.4/13
ARTICLE IV - And the Contractor agrees to receive and accept the following prices as full
compensation for furnishing all materials and for doing all the work contemplated and embraced
in this agreement; also for all loss or damage arising out of the nature of the work aforesaid or
from the action of the elements, or from any unforeseen difficulties or obstructions which may
arise or be encountered in the prosecution of the work until its acceptance by the City, and for
all risks of every description connected with the work; also for all expenses incurred by or in
consequence of the suspension or discontinuance of work and for well and faithfully completing
the work, and the whole thereof, in the manner and according to the Plans and Contract
Documents and the requirements of the Engineer under them, to -wit:
The work consists of removing and replacing various structural and finishing components of the
park's restroom facility. The facility sustained damages from a fire and emergency responders'
forced entrance. All repairs and/or replacements will be done in kind and includes other
incidental and related work, all as shown on the plans and specifications for the
"Katzakian Park Restroom Repair Project, 2735 West Turner Road".
See Section 6-07 "Description of Bid Items" of the Special Provisions for additional information.
CONTRACT ITEMS
ITEM EST'D.
NO. DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE
1. Provide Complete Restroom
Repair LS 1 $ 13,250.00 $13,250.00
2. Repaint Exterior LS 1 $ 750.00 $ 750.00
TOTAL $14,000.00
ARTICLE V - By my signature hereunder, as Contractor, I certify that I am aware of the
provisions of Section 3700 of the Labor Code, which requires every employer to be insured
against liability for workers' compensation or to undertake self-insurance in accordance with the
provisions of that code, and I will comply with such provisions before commencing the
performance of the work of this contract.
ARTICLE VI - It is further expressly agreed by and between the parties hereto that, should
there be any conflict between the terms of this instrument and the Bid Proposal of the
Contractor, then this instrument shall control and nothing herein shall be considered as an
acceptance of the said terms of said proposal conflicting herewith.
ARTICLE VII - The City is to furnish the necessary rights-of-way and easements and to
establish lines and grades for the work as specified under the Special Provisions. All labor or
materials not mentioned specifically as being done by the City will be supplied by the Contractor
to accomplish the work as outlined in the specifications.
ARTICLE VIII - The Contractor agrees to commence work pursuant to this contract within 15
calendar days after the City Manager has executed the contract and to diligently prosecute to
completion within 20 CALENDAR DAYS.
f.nntrart Mr. 2 04/24/13
WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE TIME OF
COMPLETION FOR THIS CONTRACT IS REASONABLE AND THE CONTRACTOR AGREES
TO PAY THE CITY LIQUIDATED DAMAGES AS SET FORTH IN SECTION 6 OF THE
SPECIAL PROVISIONS. CONTRACTOR AGREES THAT THIS AMOUNT MAY BE
DEDUCTED FROM THE AMOUNT DUE THE CONTRACTOR UNDER THE CONTRACT.
IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the year
and date written below.
CONTRACTOR:
0
Title
(CORPORATE SEAL)
CITY OF LODI
0
Konradt Bartlam
City Manager
Date:
Attest
City Clerk
Approved As To Form
D. Stephen Schwabauer
City Attorney=--
.
Contract.doc 3 04/24/13
RESOLUTION NO. 2013-68
A RESOLUTION OF THE LODI CITY COUNCIL
AWARDING AND AUTHORIZING THE
CITY MANAGER TO EXECUTE CONTRACT FOR
KATZAKIAN PARK RESTROOM REPAIR PROJECT
WHEREAS, in answer to notice duly published in accordance with law and the order of
this City Council, sealed bids were received and publicly opened on April 24, 2013, at
11:00 a.m., for the Katzakian Park Restroom Repair Project described in the plans and
specifications therefore approved by the City Council on April 3, 2013; and
WHEREAS, said bids have been checked and tabulated and a report thereof filed with
the City Manager as follows:
Bidder Bid
Engineer's Estimate $ 15,000
Poser Construction $ 14,000
Diede Construction, Inc. $ 47,000
WHEREAS, staff recommends awarding the contract for the Katzakian Park Restroom
Repair Project to the low bidder, Poser Construction, of Lodi, California, in the amount of
$14,000.
NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby award
the contract for Katzakian Park Restroom Repair Project to the low bidder, Poser Construction,
of Lodi, California, in the amount of $14,000; and
BE IT FURTHER RESOLVED that the City Manager is hereby authorized to execute the
contract.
Dated: May 1, 2013
I hereby certify that Resolution No. 2013-68 was passed and adopted by the City
Council of the City of Lodi in a regular meeting held May 1, 2013, by the following vote:
AYES: COUNCIL MEMBERS — Hansen, Johnson, Katzakian, Mounce, and
Mayor Nakanishi
NOES: COUNCIL MEMBERS — None
ABSENT: COUNCIL MEMBERS — None
ABSTAIN: COUNCIL MEMBERS — None
&JOHL
City Clerk
2013-68