h.`
PLANS AND SPECS Plans and specifications for "Catch Basin Replacement
FOR CATCH BASIN 80,'81 "were presented for Council's approval. In
REPLACEMENT 80/81 general. the work consists of removing G" and 8"
APPROVED catch basin laterals and drop i -islet catch basins and
installing 12" laterals with side inlet catch basins. The
work also includes some curb anti gutter replacement
and installation of wheelchair ramps.
Council approved the pians and specifications for "Catch
Basin replacement 80/81 at the intersection of Chestnut
and Lee. Daisy and Pleasant. Pleasant and Forrest and
Daisy and Lincoln", and authorized the City Clerk to
advertise for bids thereon.
A
.. CITY OF LODI
PUBLIC WORKS DEPARTMENT
TO: City Council
FROM: City Manager
DATE: April 16, 1982
COUICOUNCIL
NCIL COMMUNICATION
SUBJECT: Plans and Specifications for Catch Basin Replacement 80/81
RECOMMENDED ACTION; That the City Council approve the plans and specifications
for "Catch Basin Replacement 86/81 at the intersections, of Chestnut & Lee,
Daisy & Pleasant. Pleasant & Forres-t -and Daisy & Lintotn," and authorize the
City Clerk to advertise for bids to be received Wednesday, May 12, 1982.
BACKGROUND INFORMATION: The replacement of catch basins at the above inter-
sect ons was approved 1n the 1980/BlCap:ttal Improvement Budget with an estimated
expenditure of $20,900. This project is part of an ongoing program to reduce
maintenance problems during storms caused by inadequate catch basins and
laterals.
in general, the work consists of removing 611 and 8" catch basin la'terals
and drop inlet catch basins and, Installtng 1211 laterals with side inlet catch
basins. The work also includes some curb and gutter repl-acemen-t and instal-
lation of wheelchair ramprs.
The total cost, of the project is estimated at $3.5,000. A recommendation or
funding the project or revising it will be made after the actual bid's are
opened.