Loading...
HomeMy WebLinkAboutAgenda Report - April 17, 1985 (53)APPFDPRIATICU OF Council was reminded that in 1984 a portion of the City of FC\IDS FCH Lodi's Community Development Block Grant finds was used on ENGINEERING the east side to upgrade two major storm deficiencies; REIQUIRED FCR replacing a well and performing a Televideo Analysis of the EASMIDE TELE- Eastside Sewer System. The Televideo Analysis is the only VIDDO SEWER. Block Grant project not yet completed. This Televideo work ANALYSIS is to be done with our personnel and TV equipment. The additional City personnel were just recently hired for this 1 project. This work includes the cleaning and TV'ing of up to 9 miles of existing sewer mains. The firm of Black and Veatch is familiar with analyzing large scale sewer systems similar to what we will be doing under this Block Grant program. Black and Veatch will first be setting up an effective and systematic way of analyzing the system so that we will only be using our manpower and equipment for that work that is actually needed. They will also be structuring an inventory system of the results so that we can ultimately computerize the maintenance information for this area and, in the future, for our entire system. They will also be training our personnel in smoke testing procedures to help us determine the amount of broken house lateral lines and illegal connections to the sewer system. Based on the existing zoning, they will be analyzing the adequacy (capacity) of our existing systems and will be making recommendations for size and location for any new lines needed based on the capacity analysis and the conditions of the existing trunk facilities. The City presently has $6,000 budgeted for a Sewer Cutfall Corrosion Study. This work will b, done by Black and Veatch. The firm has indicated to us that if both of these ` similar type projects can be done together, it will save approximately $1,000 on the outfall study. 5, \\ COUNCIL -ITPROPRIATED $7,800 CUT OF THE SENM UTILITY CAPITAL: QJMt Lv FIND FOR THE HIRING OF THE FIRM OF BLACK AND Zai TO ASSIST THE CITY OF LCDI IN CMIPLETING THEIR EAMIDE TELEVIDEO SEWER ANALYSIS BLOCK GRANT PI n CT. COMMUNICATIONCITY OF LODCOUNCIL PUBLIC WORKS TO: City Council FROM: City Manager DATE: April 11, 1985 SUBJECT: Appropriation of Funds for Engineering Consultant to Help in Analysis of Eastside Taievideo Sewer Project RECOMMENDED ACTION: That the City Council appropriate $7,800 out of the Sewer Utility Capital Outlay Fund for hiring the firm of Black & Veatch to assist the City of Lodi in completing their Eastside Televideo Sewer Analysis Block Grant Project. BACKGROUND INFORMATION: In 1984 a portion of the City of Lodi's Community Development Block Grant funds was used on the east side to upgrade two major storm deficiencies; replacing a well and performing a Televideo Analysis of the Eastside Sewer System. The Televideo Analysis is the only Block Grant project not yet completed. This Televideo work is to be done with our person- nel and TV equipment. The additional City personnel were just recently hired for this project. This work includes the cleaning and TV'ing of up to 9 miles of existing sewer mains. The firm of Black & Veatch is familiar with analyzing large scale sewer systems similar to what we will be doing under this Block Grant program. Black & Veatch will. first be setting up an effective and systematic way of analyzing the system so that we will only be using our manpower and equipment for that work that is actually needed. They will also be structuring an inventory system of the results so that we can ultimately computerize the maintenance information for this area and, in the future, for our entire system. They will also be training our personnel in smoke testing procedures to help us determine the amount of broken house lateral lines and illegal connections to the sewer system. Based on the existing zoning, they will be analyzing the adequacy (capacity)of our existing systems and will be making recommendations for size and location for any new lines needed based on the capacity analysis and the conditions of the existing trunk facilities. The City presently has $6,000 budgeted for a Sewer Outfall Corrosion Study. This work will be done by Black & Veatch. The firm has indicated to us that if both of these similar type projects can be done together, we will save approximately $1,000 on the outfall study. The firm of Black & Veatch is very familiar wiCh our overall system and problems and we would, therefore, recommend that the City allocate the $7,800 to retain � t APPROVED: __ rf "/ Ill (` �.- ---.- . FILE N0. MAS A. PETERSON, City Manager City Council April .11,<1985 Page 2' them to help us with this Block Grant project. This work was not included under the Block Grant submittal due to the complications and submittal re- quirements needed to retain an engineering firm with federal funds. cr1r� e Ronsko orks Director JLR1 eeh