HomeMy WebLinkAboutAgenda Report - April 17, 2013 C-15AGENDA ITEM (:*15
t1j% CITY OF LODI
,. COUNCIL COMMUNICATION
TM
AGENDA TITLE: Adopt Resolution Awarding Contract for ADA Improvement Project — Phase 2, Lodi
Softball Complex and Salas Park, to A. M. Stephens Construction Company, Inc.,
of Lodi ($84,312.60)
MEETING DATE: April 17, 2013
PREPARED BY: Public Works Director
RECOMMENDED ACTION: Adopt resolution awarding contract for ADA Improvement Project —
Phase 2, Lodi Softball Complex and Salas Park, to A. M. Stephens
Construction Company, Inc., of Lodi, in the amount of $84,312.60.
BACKGROUND INFORMATION: This project consists of installing 12 concrete ADA -compliant
parking stalls and other incidental and related work, all as shown on
the plans and specifications for the project. The improvements are
shown in Exhibit A.
The improvements at these two parks are part of the City -Wide ADA Transition Plan (February 2011).
The improvements will improve ADA access to the park.
Plans and specifications for this project were approved on March 6, 2013. The City received the
following five bids for this project on March 27, 2013.
Bidder Location Bid
Engineer's Estimate $ 85,119.00
A. M. Stephens Construction Company Lodi $ 84,312.60
Sierra National Construction Carmichael $ 86,526.20
Abide Builders, Inc. Vacaville $ 92,104.00
A -Vet Construction Woodbridge $ 101,755.59
Cazadores Construction EI Dorado Hills $127,122.00
The budget amount includes the cost of engineering, construction, contract administration and project
contingencies.
FISCAL IMPACT: Not applicable.
FUNDING AVAILABLE: Community De lopment Block Grant Fund (4591202) - $105,000
Jordan Ayers
Deputy City Manager/Intern IS rvices Director
F. Wally ndelin
Public Works Director
Prepared by Sean Nathan, Associate Engineer
FWS/SN/pmf
Attachment
cc: Neighborhood Services Manager
Senior Civil Engineer Chang
APPROVED:
Konradt Bartlam, City Manager
K:\WP\PROJECTS\PARKS\Lodi Softball Complex—Salas Park\CAward.doc
3/28/2013
II _
II T.s � II
II cc. wx,reuNE"r� II � 5C
II II I sf Hes
II n. wNxEuxE '® � s II
ure II II 1
II II 1
Oxu`OII� w. wnlre,wE PAVEMENT REPAIR II
u II II 1
II II 1
c x °io"d�l yi� II I
oNwxo II " � 'ar II I
PAVEDPARKING AREA
�� ,# afl"10 _
' c. 'e�°'fl'66 "c REBrnIPEV PARRINGSTALLB I
IBM u IHO, ELEV43.%
Ii I 1
n
IL,:v II I
XPaNTERIsarvD
we,xw.vC
WITHIN REMOVAL MAT oc ^oex xuu.0 "c ��°s
wuvwnG DOME PANELS ON w.MP 'FPIIBO` EX PurvTER lswrvo 11 M RyP,^x.�N urzII PosT(m) laO9
B WIDE CURB P, ALLOGAPAReNGBIG 11�`EI �,I;�Ex G AP 311., XADARAMP ---- -S, ERBro„T
Pa
I yMllll IIII h'$
TR
4°1STR PE,e IEx PurvTeR survG lePn rvr on Ex PnminEnT .` ,�•, TRUNCATE
(Bx EPANTOry Il ,.re •, 11 ) II DOME PANELS P)
xc ,ag U
w.,Nw"v1 0�. v° ® Eayeoc . a«llv" a�c°c' —s lu 0
SAWCUT EX c°"c µ�'� rIHETALLADAV NDA G � p"R9 'i --_ RPx, INSTALLGRIND EX C/JNCRETE
w°iu,wsr 1h "w" —
CONCRETE o. ,.T
EP EP SMOOTH
—rI
GN LIGHTP STaz.a "c ��' DE c Yie
3 ,"r Z TO PROVITHANBII ON
z"i� «.�31 IejY
v� II e
^' II 1 it
�x PAVED PARKING AREA
I I UU ^" II I�1 I II I
REMOVE I DIS
ED,1 AVENE-ENE
Ex sIDEW I. (T, O 1 5�-I s.5. 1, = PROPOSED CONCRETE PAD CRAG CONI �xc1 11
1Bre5x 1 ISI( oC XX- PROPOSED TOP OF CURS GRADE II 11
.,...I �P �® w P _ 11
x0�"&Tot Ewsnrvc TOPo wr0 arvo E�Ev. 111
t o 1T
� I •F
I I
aric ,s�4 as*° s
TREES TO BE REMOVED BY CITY
�S
epc
PPRgNG sc nnIII M 1 CONCRETEADA SAWCUTAC
I�II� o `®
PARKING PPO
ac
P AR
ARKIN
1
xre. so a ® SAwcuTLNE DST COMPACTED NATIVE ®ax%RC U
I I
BEGIN RAN
INSTALLTRUNCATED DOME PANE, -SON RAMP ucE Ex sloEw 1
xc 1 ox�N x r BE ALK IN KIND”`
., w �alloii REruCEC RC00RB PAVEMENT REPAIR DETAIL
1 RESTRIPE1.=KINGBTA�L. NTS 1 F
.m re�11O z
Is
1 a N v
,Ir — — a. wxx��xE M
— 1 -BI
DIMENSOPLAN G PARKING STALL z,—,
6- CURS AP-7EPRE AST GNGWHEE BTDP
5.
SEE ABOVE DETAIL
II % LEX
rvoTEs tl
THE GOITICTOR=LSLH rvGrvANDETG,^a1e1BTEENTINDEBGrvBANDPOBT.ATTHE --- a. ,x. ,,,,,_ n PAVEMENT
SEAND 1.17
INSTALLATION DETAIL. IRADE D RT TO 1. THE R AND INSTALL 16) IFO.T PRECAST CONCRETE WHEE,.STOP 11 M BoscAPlrvc OW NATrv��P o%PC B' ,
BUM PERSPANTEDB�UE REPERTDTHIBBHEETP R G ATIDNB r — — c.,wxxE,xEAc
AB EC ES
HO
B. REFER TO SHEET cx FOR ADDITIONAL ADA DETAIL. II PRIOR TOOFFPAVEMENT MAN FACE
NO
wx
.. ALL ASPHAUTCONCRETE AND CONCRETE REMOVAL LIMIT SHALL BEBAW u. SECTIONA-ANTS C2
0
[_T�2D013-C2
K:\CADD\PROJECTS\2012\012D013\012D013-C2.dwg, C2 - SALAS PARK, 02/12/2013 10:33:16 AM
O)c R�AtL)
4- CONCRETE POST
8' CHAIN LINK FENCE - FRONT ELEVATION
--------------------------
\ ALK
�— — — SHAILL BE PAID AS CONCRETENST Ew
INSTALLADAPARKING SIGN
INSTALL ADA NPPRIaNG SIGNS
ON RAMP ITVP
S„
zo
— --- — -- ---s — —a .o�
14e e
IEP
N.1PAR
NG¢F61I
nE n p+ P
_ w L9c
• ATE
OYP4
12' DOUBLE CHAIN LINK GATE
.g
BB
STEEL CAP(TVP)
ES
1.
I II
PROTECT REE (TYP) "—
REMOVE
E-- -----
"
�AIcurl) ^�N JLPROTECT EX FENCE INPucE( )
ill LLADA —_ REMOVE EX TURF AND RBNG
INSTALL
srgLL uK mP)
� � �o IN sDL,.
IV¢ SEE NOTES wx° _x° k a' °
NO E i na
i c�uuo � I ' I l y s "' °x°xxo
µ J i -P49.62-
— --- ---- ----- - ---- --
GA E
B 19,.7— r— r i �� 7— r— --
` Eo o IEPa
SAWCUT EX NC
aO E
cREMpVEEXS,RFING
H
® NpaG h I 1
�x B B 6
A ps
Q9� o B B66�
—T LINE (rvP)
PXX,XX PROPOSED
5pv as CONCRETE
nc PROPOSED TOP IFURB GRADE
=
EXISTING TOM INFO AND ELEV.
EX PAVED PARKING AREA
8' CHAIN LINK FENCE - SIDE ELEVATION
STOCKTON ST
NBIDEDwvONE,W E OF STOCKTON AT
^^ BM 6SEILEVGAI
C1 CURB
K:\CADD\PROJECTS\2012\012D013\012D013.dwg, C1 - SOFTBALL, 02/12/2013 10:35:34 AM
--
III
=J
I I I
I
I
NOTES.
1. RE
FENCE.AC,ETCwITAINTHE�NCREMGMIN
E AND E
ERKUMB.TABLE, SIGN URGs,CHMNUNK
=
III3.
wIISAACUTU
LL
THE BOLTS
THE
BF RION ESPDNSIe�OJECT EOR IRRIGATION DAMAGE OUTSIDE Os DEMDUT`I LIMITS. PoNTagc oR
NNT ACNGATEANDDROPEgANDTCHIOCK ()1 FOOTDOUBLESwINGGATEwITNCANE
REFER I TNIFSHEET FOR AH9Ga
4--
CONCRETEBwK
—+—SII
III
III
ili
I�-4
—
—+ —I
—
—
THE
GA-VA
SHALLPROVIDE AND IOTNIBAP BNEEIFOROEgl .CE,
CONTRACTOR LF NEW SOOT cS
AN NK FENCE. REFER
ALLP STEENTRANCE SIGNS AND POSTS ATTHE
; .
III
(I
o
INSTALLATION
BTHE UM_'TGAINTEDBLUE.
T. REFER
B. ALL
DETAILS. NONBHEE G,. WEER TO SHEET GZFOR SIGN VERBIAGE AND
REEERTAND SSTALLTA)1ECOTPRECASTCONCRETE wHEELSTOP
RLI. NS
TO SHEET GZFOR ADDITIONAL ADA DETgILB.
ASPHALT CONCRETE AND CONCRETE REMOVAL LIMIT SH,LLBEGAwLCUT.
8' CHAIN LINK FENCE - SIDE ELEVATION
STOCKTON ST
NBIDEDwvONE,W E OF STOCKTON AT
^^ BM 6SEILEVGAI
C1 CURB
K:\CADD\PROJECTS\2012\012D013\012D013.dwg, C1 - SOFTBALL, 02/12/2013 10:35:34 AM
ADA IMPROVEMENT PROJECT PHASE 2
LODI SOFTBALL COMPLEX AND SALAS PARK CONTRACT
(401 North Stockton Street) (2001 South Stockton Street)
CITY OF LODI, CALIFORNIA
THIS CONTRACT made by and between the CITY OF LODI, State of California, herein
referred to as the "City," and A. M. STEPHENS CONSTRUCTION COMPANY, INC., herein
referred to as the "Contractor."
WITNESSETH:
That the parties hereto have mutually covenanted and agreed, and by these presents do
covenant and agree with each other, as follows:
The complete Contract consists of the following documents which are incorporated herein by
this reference, to -wit:
Notice Inviting Bids
Information to Bidders
General Provisions
Special Provisions
Bid Proposal
Contract
Contract Bonds
Plans
The July 1992 Edition,
Standard Specifications,
State of California,
Business and Transportation Agency,
Department of Transportation
All of the above documents, sometimes hereinafter referred to as the "Contract Documents,"
are intended to cooperate so that any work called for in one and not mentioned in the other is to
be executed the same as if mentioned in all said documents.
ARTICLE I - That for and in consideration of the payments and agreements hereinafter
mentioned, to be made and performed by the City and under the condition expressed in the two
bonds bearing even date with these presents and hereunto annexed, the Contractor agrees
with the City, at Contractor's cost and expense, to do all the work and furnish all the materials
except such as are mentioned in the specifications to be furnished by the City, necessary to
construct and complete in a good workmanlike and substantial manner and to the satisfaction
of the City the proposed improvements as shown and described in the Contract Documents
which are hereby made a part of the Contract.
ARTICLE II - The City hereby promises and agrees with the Contractor to employ, and does
hereby employ, the Contractor to provide all materials and services not supplied by the City and
to do the work according to the terms and conditions for the price herein, and hereby contracts
to pay the same as set forth in Section 5.600, "Measurement, Acceptance and Payment," of the
General Provisions, in the manner and upon the conditions above set forth; and the said parties
for themselves, their heirs, executors, administrators, successors and assigns, do hereby agree
to the full performance of the covenants herein contained.
ARTICLE III - The Contractor agrees to conform to the provisions of Chapter 1, Part 7, Division
2 of the Labor Code. The Contractor and any Subcontractor will pay the general prevailing
wage rate and other employer payments for health and welfare, pension, vacation, travel time,
and subsistence pay, apprenticeship or other training programs. The responsibility for
compliance with these Labor Code requirements is on the prime contractor.
Contract. doc 1 03/28/13
ARTICLE IV - And the Contractor agrees to receive and accept the following prices as full
compensation for furnishing all materials and for doing all the work contemplated and embraced
in this agreement; also for all loss or damage arising out of the nature of the work aforesaid or
from the action of the elements, or from any unforeseen difficulties or obstructions which may
arise or be encountered in the prosecution of the work until its acceptance by the City, and for
all risks of every description connected with the work; also for all expenses incurred by or in
consequence of the suspension or discontinuance of work and for well and faithfully completing
the work, and the whole thereof, in the manner and according to the Plans and Contract
Documents and the requirements of the Engineer under them, to -wit:
Perform the work necessary to install 12 concrete ADA compliant parking stalls and other
incidental and related work, all as shown on the plans and specifications for the project "ADA
Improvement Project Phase 2, Lodi Softball Complex and Salas Park (401 North Stockton
Street and 2001 South Stockton Street)".
:0I01L%119 :L�>i�>i�►►�l;'
ITEM
Pavement Repair
SF
EST'D.
$
23.50
NO.
DESCRIPTION
UNIT
QTY
UNIT PRICE
TOTAL PRICE
1.
Clearing and Grubbing
LS
1
$ 8,300.00
$ 8,300.00
2.
Storm Water Erosion Control
LS
1
$ 6,700.00
$ 6,700.00
3.
Walkway Abandonment
SF
325
$ 4.00
$ 1,300.00
4. Concrete Sidewalk Grinding
5. Miscellaneous Concrete
Subgrade Compaction
SF 10 $ 25.00 $ 250.00
SF 5,440 $ 1.00 $ 5,440.00
6.
Pavement Repair
SF
216
$
23.50
$ 5,076.00
7.
Concrete Sidewalk/Wheelchair
Ramp
SF
2,008
$
5.60
$11,244.80
8.
Concrete ADA Parking Pad
SF
3,224
$
6.70
$21,600.80
9.
Concrete Curb
LF
416
$
22.00
$ 9,152.00
10.
Furnish and Install ADA Signs
LS
1
$
3,150.00
$ 3,150.00
Contract.doc 2 03/28/13
ITEM
$
4,509.00
EST'D.
NO.
DESCRIPTION
UNIT
QTY
11.
Install ADA Truncated Dome
$
1,950.00
Panel
SF
167
12.
Install Concrete Bumper
EA
12
13.
Chain Link Fence and Gate
LS
1
14.
Parking Lot Striping
LS
1
UNIT PRICE TOTAL PRICE
$ 27.00
$
4,509.00
$ 45.00
$
540.00
$ 5,100.00
$
5,100.00
$ 1,950.00
$
1,950.00
TOTAL $84,312.60
ARTICLE V - By my signature hereunder, as Contractor, I certify that I am aware of the
provisions of Section 3700 of the Labor Code, which requires every employer to be insured
against liability for workers' compensation or to undertake self-insurance in accordance with the
provisions of that code, and I will comply with such provisions before commencing the
performance of the work of this contract.
ARTICLE VI - It is further expressly agreed by and between the parties hereto that, should
there be any conflict between the terms of this instrument and the Bid Proposal of the
Contractor, then this instrument shall control and nothing herein shall be considered as an
acceptance of the said terms of said proposal conflicting herewith.
ARTICLE VII - The City is to furnish the necessary rights-of-way and easements and to
establish lines and grades for the work as specified under the Special Provisions. All labor or
materials not mentioned specifically as being done by the City will be supplied by the Contractor
to accomplish the work as outlined in the specifications.
ARTICLE VIII - The Contractor agrees to commence work pursuant to this contract within 15
calendar days after the City Manager has executed the contract and to diligently prosecute to
completion within 50 CALENDAR DAYS.
WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE TIME OF
COMPLETION FOR THIS CONTRACT IS REASONABLE AND THE CONTRACTOR AGREES
TO PAY THE CITY LIQUIDATED DAMAGES AS SET FORTH IN SECTION 6-04.03 OF THE
SPECIAL PROVISIONS. CONTRACTOR AGREES THAT THIS AMOUNT MAY BE
DEDUCTED FROM THE AMOUNT DUE THE CONTRACTOR UNDER THE CONTRACT.
Contract. doc 3 03/28/13
IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the year
and date written below.
CONTRACTOR: CITY OF LODI
By:
Konradt Bartlam
City Manager
By: Date:
Title
Attest
City Clerk
(CORPORATE SEAL) Approved As To Form
D. Stephen Schwabauer
City Attorney rk '
Contract.doc 4 03/28/13
RESOLUTION NO. 2013-57
A RESOLUTION OF THE LODI CITY COUNCIL AWARDING
AND AUTHORIZING THE CITY MANAGER TO EXECUTE
CONTRACT FOR AMERICANS WITH DISABILITIES ACT
IMPROVEMENT PROJECT — PHASE 2, LODI SOFTBALL
COMPLEX AND SALAS PARK
WHEREAS, in answer to notice duly published in accordance with law and the order of
this City Council, sealed bids were received and publicly opened on March 27, 2013, at
11:00 a.m., for the Americans with Disabilities Act (ADA) Improvement Project — Phase 2, Lodi
Softball Complex and Salas Park described in the plans and specifications therefore approved
by the City Council on March 6, 2013; and
WHEREAS, said bids have been checked and tabulated and a report thereof filed with
the City Manager as follows:
Bidder Bid
Engineer's Estimate $ 85,119.00
A. M. Stephens Construction Company $ 84,312.60
Sierra National Construction $ 86,526.20
Abide Builders, Inc. $ 92,104.00
A -Vet Construction $ 101,755.59
Cazadores Construction $ 127,122.00
WHEREAS, staff recommends awarding the contract for the ADA Improvement Project —
Phase 2, Lodi Softball Complex and Salas Park to the low bidder, A. M. Stephens Construction
Company, Inc., of Lodi, California, in the amount of $84,312.60.
NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby award.
the contract for the Americans with Disabilities Act (ADA) Improvement Project — Phase 2, Lodi
Softball Complex and Salas Park to the low bidder, A. M. Stephens Construction Company, Inc.,
of Lodi, California, in the amount of $84,312.60; and
BE IT FURTHER RESOLVED that the City Manager is hereby authorized to execute the
contract.
Dated: April 17, 2013
I hereby certify that Resolution No. 2013-57 was passed and adopted by the City
Council of the City of Lodi in a regular meeting held April 17, 2013, by the following vote:
AYES: COUNCIL MEMBERS — Hansen, Johnson, and Katzakian
NOES: COUNCIL MEMBERS — None
ABSENT: COUNCIL MEMBERS — Mounce and Mayor Nakanishi
ABSTAIN: COUNCIL MEMBERS — None
t:�JOHL
City Clerk
2013-57