HomeMy WebLinkAboutAgenda Report - April 17, 2013 C-13AGENDA ITEM Cf 6
CITY OF LODI
COUNCIL COMMUNICATION
TM
AGENDA TITLE: Adopt Resolution Awarding Contract for Hale Park Sports Court Resurfacing
Project, 209 East Locust Street, to First Serve Productions, Inc., of Danville
($32,788.91)
MEETING DATE: April 17, 2013
PREPARED BY: Public Works Director
RECOMMENDED ACTION: Adopt resolution awarding contract for Hale Park Sports Court
Resurfacing Project, 209 East Locust Street, to First Serve
Productions, Inc., of Danville, in the amount of $32,788.91.
BACKGROUND INFORMATION: Acrylic court surfaces have a useful life of approximately 10 years
under normal conditions. The Hale Park sports courts were last
resurfaced in 2002 and are again in need of resurfacing. -
This project includes resurfacing two sports courts at Hale Park (Exhibit A). The project consists of
surface preparation and resurfacing of approximately 17,900 square feet of basketball and handball court
surface, re -striping the game lines, and modifying portions of the existing chain-link fencing around the
perimeter of the court area.
Plans and specifications for this project were approved on March 6, 2013. The City received the
following bid for this project on March 27, 2013.
Bidder Location Bid
Engineer's Estimate $ 40,085.65
First Service Productions, Inc. Danville $ 32,788.91*
*Corrected Total
FISCAL IMPACT: Aside from the Capital expenditure, the fiscal impact will be negligible.
FUNDING AVAILABLE: Community Development Block Grant Funds (4591203)
Jordan Ayers
Deputy City Manager/Internal Services Director
A,011., J_a4e_,�
F. Wally Sa elin
Public Works Director
Prepared by Charles E. Swimley, Jr., City Engineer/Deputy Public Works Director
FWS/CES/pmf
Attachment
cc: Neighborhood Services Manager
Parks, Recreation & Cultural Services Director
APPROVED:
Konradt Bartlam, City Manager
K:\WP\PROJECTS\PARKS\Hale Park\Hale Park Court Resurfacing\CAward.doc 3/28/2013
(E)
PMNING IAT
f.(ii:uiYaClifilct
(� TOT I I Tj
PUYCROVNp I
I
I
(E) REG
�rL
7f
4 E
n.-.a.'.as - �.�-......ra��ti_�.�I�.I. I:'IRF.L•�I'Si. .--.. —
Hale Park -Pro ieet Location
*ji, r0w
3
JIWY fi,.k'COti't,LkY,Rh1CN6,�f.11(cY NRYYI�
THIS PROJECT CONSISTS OF (2) PROJECT LOCATIONS WITHIN THE IXISTING -
SITE.
f�y'.A11U.Y I1. T11NLaBWT :J_vI IUUI:xF:uUNC
0. 1NE CONTRIRDR SN1M1 PR M AND INSTIIJ. APPRO%1NATE1 13,359
SOIM FEET OF NEW ACRYLIC SPORTS COURT SURFACING AND NEW G E
UNE S AS WO OUT PER THE PEWS AND SPEOFICATIONS. THE DIVING
COURT IS A 4 INCH THI CONCRETE STAB WITH EXPANSION JOINTS. THIS
LOCATION SHALL RECENE (1) 50'x94' FOL. IBASKETBNL COURT IND (1)
361x45' 41' BASKETBALL CWRT WITH PERIMETER APRONS.
B THE CONTRACTOR SW PROVIDE AND 6VSTNL IPPRO%WATELY 4,
SOMME FEET OF NEW ACRriIC SPORTS COURT SURFACNO AND NEW GAME
UNES AS WD OUT PER THE PEWS ANO SPECIFICATIONS. THE DIVING
COURT IS A 2 INCH THICK COMPACTED ASPHALT SUB WITHOUT JOINTS. N15
LOCATION SHALL RECEIVE (1) 42'x74' NGOIHED FULL BLSIETBUL COURT
WITH PERIMETER APRONS
raaere(a�suvtrWo�unrnronfw.vanw3al►ro�an toe)LrrT�
Eft6TING B45KETBALL COURL CHIN LNN FENCING ANO CALIFS SHALL REIJAN
IDC ING BASK 0T STANDARDS STWE REMAW,
]. E""n G SPORTS UGMING STANMRDS SHALL REWIN
4, EXISTING CMU WBONRY WNL TO REMAN,
-]Ai AT.IE I':\It1: HENCIN(I PROIL•CI' M t'11IS
THIS PROJECT CONSISTS OF (2) PROJECT LOCATIONS WITHIN THE DIMING PARK
SIE
Cr
.~i. C , THE CONTRACTOR SHALL RII AND ULSPOSE OF APPRO%INATELY 410
UNEN FEET OF DIVING BOTTOM TENSION WIRE AND INSTALL
APPRO%IUATELY 410 LINEAL FEET OF NEW 146' O.D. SS -40 BOT"ON RML
PIPE WITH APPRWRNTE NARUWME WHICH WO111O INCLUDE BRACE "D$.RAR ENDS. BOLTS. NUTS MD NEW TIE WIRE TO SECURE THE DIVING
_ CNNN UNR FABRIC TO NEW BOTTOM RNI-
D
NLD THE CONTRACTOR SHALL REMOVE AND DISPOSE OF APPROXIMATELY 136
UNEAL FEET OF IX6TING BOTTOM TENAON WIRE MD INSTALL
APPROXWATELY 1]6 LNEWL FEET OF NEW 1.66' O.D. SS -40 BOTTOM RAIL
PIPE WITH APPROPRWTE NA IWME WHICH WOULD INCLUDE BRAAE BMDS,
RAIL ENDS, BOLTS. NUTS AND NEW TIE INRE TD SECURE THE I.N.IX
CI WN LINK FABRIC TO NEW BOTTOM ML
(E) PRM
Chain Link Fence Retrofit Work (See Sheet C3)
SCALP. Ud=I.D'
PPE
ICTOR SHALL REMOVE THE EXJSNNG
TE AND HW RINGS MD Km E
.66" OJT. SS -40 PIPE BOMM RUL
PRTAW HARDWME. (BRACE BAMCS,
BOLTS, NUTS. TIRE WIRE ETC)
ii
rg
U C
z
N O �
lY-I CL. v
H V v
0 x Jj
V
N P,
C O
�W N .zn
HHTT�N V
HLH
HALE PARK SPORTS COURT RESURFACING
209 East Locust Street CONTRACT
CITY OF LODI, CALIFORNIA
THIS CONTRACT made by and between the CITY OF LODI, State of California, herein
referred to as the "City," and FIRST SERVE PRODUCTIONS, INC., herein referred to as the
"Contractor."
WITNESSETH:
That the parties hereto have mutually covenanted and agreed, and by these presents do
covenant and agree with each other, as follows:
The complete Contract consists of the following documents which are incorporated herein by
this reference, to -wit:
Notice Inviting Bids
Information to Bidders
General Provisions
Special Provisions
Bid Proposal
Contract
Contract Bonds
Plans
The July 1992 Edition,
Standard Specifications,
State of California,
Business and Transportation Agency,
Department of Transportation
All of the above documents, sometimes hereinafter referred to as the "Contract Documents,"
are intended to cooperate so that any work called for in one and not mentioned in the other is to
be executed the same as if mentioned in all said documents.
ARTICLE I - That for and in consideration of the payments and agreements hereinafter
mentioned, to be made and performed by the City and under the condition expressed in the two
bonds bearing even date with these presents and hereunto annexed, the Contractor agrees
with the City, at Contractor's cost and expense, to do all the work and furnish all the materials
except such as are mentioned in the specifications to be furnished by the City, necessary to
construct and complete in a good workmanlike and substantial manner and to the satisfaction
of the City the proposed improvements as shown and described in the Contract Documents
which are hereby made a part of the Contract.
ARTICLE II - The City hereby promises and agrees with the Contractor to employ, and does
hereby employ, the Contractor to provide all materials and services not supplied by the City and
to do the work according to the terms and conditions for the price herein, and hereby contracts
to pay the same as set forth in Section 5.600, "Measurement, Acceptance and Payment," of the
General Provisions, in the manner and upon the conditions above set forth; and the said parties
for themselves, their heirs, executors, administrators, successors and assigns, do hereby agree
to the full performance of the covenants herein contained.
ARTICLE III - The Contractor agrees to conform to the provisions of Chapter 1, Part 7, Division
2 of the Labor Code. The Contractor and any Subcontractor will pay the general prevailing
wage rate and other employer payments for health and welfare, pension, vacation, travel time,
and subsistence pay, apprenticeship or other training programs. The responsibility for
compliance with these Labor Code requirements is on the prime contractor.
rnntrnnt rine. 1 03/27/13
ARTICLE IV - And the Contractor agrees to receive and accept the following prices as full
compensation for furnishing all materials and for doing all the work contemplated and embraced
in this agreement; also for all loss or damage arising out of the nature of the work aforesaid or
from the action of the elements, or from any unforeseen difficulties or obstructions which may
arise or be encountered in the prosecution of the work until its acceptance by the City, and for
all risks of every description connected with the work; also for all expenses incurred by or in
consequence of the suspension or discontinuance of work and for well and faithfully completing
the work, and the whole thereof, in the manner and according to the Plans and Contract
Documents and the requirements of the Engineer under them, to -wit:
Perform the work necessary to resurface approximately 13,399 square feet of concrete slab
sports court surface and approximately 4,480 square feet of asphalt slab sports court surface
and modify the existing chain link fencing. The work shall include cleaning, washing and
priming the existing surfaces; applying new acrylic sports court surface material; restriping; and
other incidential and related work, all as shown on the plans and specifications for "Hale Park
Sports Court Resurfacing, 209 East Locust Street".
CONTRACT ITEMS
ITEM EST'D.
NO. DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE
1. Furnish and Install 6 Foot
Portable Temporary Fencing LF 100 $ 11.16 $ 1,116.00
2. Furnish and Install Project Sign
and Posts (Per Exhibit A) EA 1 $ 1,016.00 $ 1,016.00
3. Furnish all Labor, Materials and
Equipment to Resurface Existing
Concrete Slab Acrylic Colored
Sports Court SF 13,399 $ 1.09 $14,604.91
4. Furnish all Labor, Materials and
Equipment to Resurface Existing
Asphalt Slab Acrylic Colored
Sports Court SF
4,480
$
0.7625
$ 3,416.00
5. Furnish all Labor, Materials and
Equipment to Apply New Game
Lines LS
1
$
2,116.00
$ 2,116.00
6. Furnish All Labor, Materials and
Equipment to Modify Existing
Chain Link Fencing LS
1
$
10,116.00
$10,116.00
7. Sandblast and/or Acid Etch
Court Surface SF
5,000
$
0.0808
$ 404.00
TOTAL $32,788.91
r.nntrnnt rinn.. 2 03/28/13
ARTICLE V - By my signature hereunder, as Contractor, I certify that I am aware of the
provisions of Section 3700 of the Labor Code, which requires every employer to be insured
against liability for workers' compensation or to undertake self-insurance in accordance with the
provisions of that code, and I will comply with such provisions before commencing the
performance of the work of this contract.
ARTICLE VI - It is further expressly agreed by and between the parties hereto that, should
there be any conflict between the terms of this instrument and the Bid Proposal of the
Contractor, then this instrument shall control and nothing herein shall be considered as an
acceptance of the said terms of said proposal conflicting herewith.
ARTICLE VII - The City is to furnish the necessary rights-of-way and easements and to
establish lines and grades for the work as specified under the Special Provisions. All labor or
materials not mentioned specifically as being done by the City will be supplied by the Contractor
to accomplish the work as outlined in the specifications.
ARTICLE VIII - The Contractor agrees to commence work pursuant to this contract within 15
calendar days after the City Manager has executed the contract and to diligently prosecute to
completion within 30 CALENDAR DAYS.
WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE TIME OF
COMPLETION FOR THIS CONTRACT IS REASONABLE AND THE CONTRACTOR AGREES
TO PAY THE CITY LIQUIDATED DAMAGES AS SET FORTH IN SECTION 6-04.03 OF THE
SPECIAL PROVISIONS. CONTRACTOR AGREES THAT THIS AMOUNT MAY BE
DEDUCTED FROM THE AMOUNT DUE THE CONTRACTOR UNDER THE CONTRACT.
IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the year
and date written below.
IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the year
and date written below.
CONTRACTOR: CITY OF LODI
By:
By:
Konradt Bartlam
City Manager
Date:
Attest:
Title
City Clerk
(CORPORATE SEAL) Approved As To Form
D. Stephen SqPwa
0auer
City Attorney
I m/97113
RESOLUTION NO. 2013-56
A RESOLUTION OF THE LODI CITY COUNCIL AWARDING
AND AUTHORIZING THE CITY MANAGER TO EXECUTE
CONTRACT FOR HALE PARK SPORTS COURT
RESURFACING, 209 EAST LOCUST STREET
WHEREAS, in answer to notice duly published in accordance with law and the order of
this City Council, sealed bids were received and publicly opened on March 27, 2013, at
11:00 a.m., for the Hale Park Sports Court Resurfacing, 209 East Locust Street, described in
the plans and specifications therefore approved by the City Council on March 6, 2013; and
WHEREAS, said bids have been checked and tabulated and a report thereof filed with
the City Manager as follows:
Bidder Bid
First Serve Productions, Inc. $32,788.91*
`Corrected Total
WHEREAS, staff recommends awarding the contract for the Hale Park Sports Court
Resurfacing, 209 East Locust Street, to the sole bidder, First Serve Productions, Inc., of
Danville, California, in the amount of $32,788.91.
NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby award
the contract for the Hale Park Sports Court Resurfacing, 209 East Locust Street, to the sole
bidder, First Serve Productions, Inc., of Danville, California, in the amount of $32,788.91; and
BE IT FURTHER RESOLVED that the City Manager is hereby authorized to execute the
contract.
Dated: April 17, 2013
I hereby certify that Resolution No. 2013-56 was passed and adopted by the City
Council of the City of Lodi in a regular meeting held April 17, 2013, by the following vote:
AYES: COUNCIL MEMBERS — Hansen, Johnson, and Katzakian
NOES: COUNCIL MEMBERS — None
ABSENT: COUNCIL MEMBERS — Mounce and Mayor Nakanishi
ABSTAIN: COUNCIL MEMBERS — Non:&JOHL
City Clerk
2013-56