Loading...
HomeMy WebLinkAboutAgenda Report - April 17, 2013 C-12AGENDA ITEM Cv 10L CITY OF LODI COUNCIL COMMUNICATION TM AGENDA TITLE: Adopt Resolution Awarding Contract for Fire Station No. 2 Site Improvement Project to Stat -X General Engineering, of Salida ($28,290) and Appropriating Funds ($9,000) MEETING DATE: April 17, 2013 PREPARED BY: Public Works Director RECOMMENDED ACTION: Adopt resolution awarding contract for Fire Station No. 2 Site Improvement Project to Stat -X General Engineering, of Salida, in the amount of $28,290 and appropriating funds in the amount of $9,000. BACKGROUND INFORMATION: On March 6, 2013, Council authorized a two-year lease agreement of temporary quarters to provide living and working space during the design and construction of the new fire station and approved plans and specifications and authorized bids for the site improvements required to serve the temporary quarters. The site improvement project consists of installing a wastewater service, water service, concrete walk and other incidental and related work to serve the temporary quarters. Planning and design for the new fire station facility are underway, and it is anticipated it will be operational by April 2015. During construction, crews will reside in and operate the fire station from these temporary quarters. The City received the following five bids for this project on April 3, 2013. Bidder Location Bid Engineer's Estimate $ 25,000.00 Stat -X General Engineering Salida $ 28,290.00 Arrow Construction Sacramento $ 35,412.00 A. M. Stephens Construction Lodi $ 35,798.00 Soracco & Sons, Inc. Sutter Creek $ 37,402.08 A -Vet Construction, Inc. Woodbridge $ 43,518.72 Staff recommends awarding a contract to Stat -X General Engineering, of Salida, for the Fire Station No. 2 Site Improvement Project in the amount of $28,290 and appropriate funds in the amount of $9,000. FISCAL IMPACT: The City will incur additional costs to operate the temporary quarters that may be partially offset by vacating part of the fire station. APPROVED: onradt Bartlam, City Manager K:\WP\PROJECTS\MISC\FireSta2\Fire Station #2 Site Improvement Project\CAward.doc 4/9/2013 Adopt Resolution Awarding Contract for Fire Station No. 2 Site Improvement Project to Stat -X General Engineering, of Salida ($28,290) and Appropriating Funds ($9,000) April 17, 2013 Page 2 FUNDING AVAILABLE: Requested Appropriation: General Fund Capital (1211) $9,000 Jordan Ayers Deputy City Manager/Internal Se ices Director F. Wally Sa delin Public Works Director Prepared by Charles E. Swimley, Jr., City Engineer/Deputy Public Works Director FWS/CES/pmf cc: Larry Rooney, Fire Chief Ron Penix, Battalion Chief Chris Boyer, Assistant Engineer Charlie Swimley, City Engineer/Deputy Public Works Director K:\WP\PROJECTS\MISC\FireSta2\Fire Station #2 Site Improvement Project\CAward.doc 4/8/2013 FIRE STATION NO. 2 SITE IMPROVEMENT PROJECT 705 East Lodi Avenue CONTRACT CITY OF LODI, CALIFORNIA THIS CONTRACT made by and between the CITY OF LODI, State of California, herein referred to as the "City," and STAT -X GENERAL ENGINEERING, herein referred to as the "Contractor." WITNESSETH: That the parties hereto have mutually covenanted and agreed, and by these presents do covenant and agree with each other, as follows: The complete Contract consists of the following documents which are incorporated herein by this reference, to -wit: Notice Inviting Bids Information to Bidders General Provisions Special Provisions Bid Proposal Contract Contract Bonds Plans The July 2006 Edition, Standard Specifications, State of California, Business and Transportation Agency, Department of Transportation All of the above documents, sometimes hereinafter referred to as the "Contract Documents," are intended to cooperate so that any work called for in one and not mentioned in the other is to be executed the same as if mentioned in all said documents. ARTICLE I - That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the City and under the condition expressed in the two bonds bearing even date with these presents and hereunto annexed, the Contractor agrees with the City, at Contractor's cost and expense, to do all the work and furnish all the materials except such as are mentioned in the specifications to be furnished by the City, necessary to construct and complete in a good workmanlike and substantial manner and to the satisfaction of the City the proposed improvements as shown and described in the Contract Documents which are hereby made a part of the Contract. ARTICLE II - The City hereby promises and agrees with the Contractor to employ, and does hereby employ, the Contractor to provide all materials and services not supplied by the City and to do the work according to the terms and conditions for the price herein, and hereby contracts to pay the same as set forth in Section 5.600,, Acceptance and Payment, "of easuremenf of the " General Provisions, in the manner and upon the conditions above set forth; and the said parties for themselves, their heirs, executors, administrators, successors and assigns, do hereby agree to the full performance of the covenants herein contained. ARTICLE III - The Contractor agrees to conform to the provisions of Chapter 1, Part 7, Division 2 of the Labor Code. The Contractor and any Subcontractor will pay the general prevailing wage rate and other employer payments for health and welfare, pension, vacation, travel time, and subsistence pay, apprenticeship or other training programs. The responsibility for compliance with these Labor Code requirements is on the prime contractor. Fire Station #2 Improv.3.doc I 04/03/13 ARTICLE IV - And the Contractor agrees to receive and accept the following prices as full compensation for furnishing all materials and for doing all the work contemplated and embraced in this agreement; also for all loss or damage arising out of the nature of the work aforesaid or from the action of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until its acceptance by the City, and for all risks of every description connected with the work; also for all expenses incurred by or in consequence of the suspension or discontinuance of work and for well and faithfully completing the work, and the whole thereof, in the manner and according to the Plans and Contract Documents and the requirements of the Engineer under them, to -wit: The work consists of installing a modular building in the parking/training area on the north side of the existing Fire Station No. 2 building, installation of approximately 256 lineal feet of wastewater service pipeline, 56 lineal feet of water service pipeline, and 320 square feet of concrete walk and other incidental and related work, all as shown on the plans and specifications for the above project "Fire Station #2 Site Improvement Project, 705 East Lodi Avenue". ARTICLE V - By my signature hereunder, as Contractor, I certify that I am aware of the provisions of Section 3700 of the Labor Code, which requires every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. Fire Station #2 Improv.3.doc 2 04/03/13 CONTRACT ITEMS ITEM EST'D. NO. DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE 1. Mobilization LS 1 $ 450.00 $ 450.00 2. Clearing and Grubbing EA 1 $ 1,200.00 $ 1,200.00 3. Water Pollution Control LS 1 $ 300.00 $ 300.00 4. 4 -Inch Sanitary Sewer Pipe (PVC) LF 256 $ 58.00 $14,848.00 5. Sanitary Sewer Cleanout EA 2 $ 430.00 $ 860.00 6. 1-'/2 Inch Water Pipe (PVC) LF 56 $ 87.00 $ 4,872.00 7. 4 -Foot Sidewalk SF 320 $ 18.00 $ 5,760.00 TOTAL $28,290.00 ARTICLE V - By my signature hereunder, as Contractor, I certify that I am aware of the provisions of Section 3700 of the Labor Code, which requires every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. Fire Station #2 Improv.3.doc 2 04/03/13 ARTICLE VI - It is further expressly agreed by and between the parties hereto that, should there be any conflict between the terms of this instrument and the Bid Proposal of the Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith. ARTICLE VII - The City is to furnish the necessary rights-of-way and easements and to establish lines and grades for the work as specified under the Special Provisions. All labor or materials not mentioned specifically as being done by the City will be supplied by the Contractor to accomplish the work as outlined in the specifications. ARTICLE VIII - The Contractor agrees to commence work pursuant to this contract within 15 calendar days after the City Manager has executed the contract and to diligently prosecute to completion within 40 CALENDAR DAYS. WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE TIME OF COMPLETION FOR THIS CONTRACT IS REASONABLE AND THE CONTRACTOR AGREES TO PAY THE CITY LIQUIDATED DAMAGES AS SET FORTH IN SECTION 6-04.03 OF THE SPECIAL PROVISIONS. CONTRACTOR AGREES THAT THIS AMOUNT MAY BE DEDUCTED FROM THE AMOUNT DUE THE CONTRACTOR UNDER THE CONTRACT. IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the year and date written below. CONTRACTOR: CITY OF LODI By: Title By: Konradt Bartlam City Manager Date: Attest City Clerk (CORPORATE SEAL) Approved As To Form D. Stephen Sc au City Attorney Fire Station #2 Improv.3.doc 3 04/03/13 1. AA# 2. JV# Submit completed form to the Budget Division with any required documentation. Final approval will be provided in electronic copy format. FUND # BUS. UNIT # ACCOUNT # ACCOUNT TITLE AMOUNT ,A. SOURCE OF FINANCING 1211 3205 Fund Balance 9,000.00 B. USE OF FINANCING 1211 1211045 1825.2250 Fire Station Two $ 9,000.00 Submit completed form to the Budget Division with any required documentation. Final approval will be provided in electronic copy format. RESOLUTION NO. 2013-55 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING AND AUTHORIZING THE CITY MANAGER TO EXECUTE CONTRACT FOR FIRE STATION NO. 2 SITE IMPROVEMENT PROJECT AND FURTHER APPROPRIATING FUNDS WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on April 3, 2013, at 11:00 a.m., for the Fire Station No. 2 Site Improvement Project described in the plans and specifications therefore approved by the City Council on March 6, 2013; and WHEREAS, said bids have been checked and tabulated and a report thereof filed with the City Manager as follows: Bidder Bid Stat -X General Engineering $ 28,290.00 Arrow Construction $ 35,412.00 A. M. Stephens Construction $ 35,798.00 Soracco & Sons, Inc. $ 37,402.08 A -Vet Construction, Inc. $ 43,518.72 WHEREAS, staff recommends awarding the contract for the Fire Station No. 2 Site Improvement Project to the low bidder, Stat -X General Engineering, of Salida, California, in the amount of $28,290. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby award the contract for the Fire Station No. 2 Site Improvement Project to the low bidder, Stat -X General Engineering, of Salida, California, in the amount of $28,290; and BE IT FURTHER RESOLVED that the City Manager is hereby authorized to execute the contract; and BE IT FURTHER RESOLVED that funds in the amount of $9,000 be appropriated from the General Fund Capital account for this project. Dated: April 17, 2013 I hereby certify that Resolution No. 2013-55 was passed and adopted by the City Council of the City of Lodi in a regular meeting held April 17, 2013, by the following vote: AYES: COUNCIL MEMBERS — Hansen, Johnson, and Katzakian NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — Mounce and Mayor Katzakian ABSTAIN: COUNCIL MEMBERS — None LJOHL City Clerk 2013-55