HomeMy WebLinkAboutAgenda Report - April 16, 1986 (68)CITY COUNCIL MEETING
APRIL 16, 1986
I 100W
LANDSCAPE ARCHITECIVRAL
AGREEMENT FOR G BASIN
(CENTURY AND LOWER
SACRANERM ROAD) Agenda item e -1-E - "Approve Landscape Architectural
Agreement for G Basin was discussed with Mayor Reid making
CC -27(c) a motion that Staff proceed with the Master Plan for
$9,000. The motion died for lack of a second. Council
Member Hirschman then made a motion that the Agreement be
returned to Staff for a feasability study, the motion was
seconded by Council Member Snider and carried by unanimous
vote
CITY OF LORI
PUBLIC WORKS DEPARTMENT
T0: City Council
FROM: City Manager
DATE: April 9, 1986
COUNCIL COMMUNICATION
SUBJECT: Landscape Architectural Agreement for G Basin
(Century and Lower Sacramento)
RECOMMENDED ACTION: That the City Council authorize the Mayor and the City Clerk
to execute the Landscape Architectural Agreement covering the golf concept Master
Plan and Grading Plan for the G Basin.
BACKGROUND INFORMATION: In the 1986 Capital Improvement Program there was
$14,000 allocated for -the planning and design of a possible golf course -drainage
basin combination to be located at the southeast corner of Century Blvd. and
Lower Sacramento Road.
The concept of combining a nine -hole golf course and the drainage basin was ap-
proved by the Park b Recreation Commission and City Council. This agreement
covers the development of a Master Plan, cost estimates, and a Grading Plan
together with storage capacity calculations. Included in the preliminary work
for the Master Plan development, will be preliminary layouts (2 or 3) for the
nine -hole concept together with the location and amowit of additional acreage
that would have to be acquired. We presently have 27-112 acres and will need
a minimum of an additional 8 acres to provide solely for the drainage require-
ments. for the total G area. It appears from our discussions with the consultant,
that in order to provide the nine -hole golf concept, an additional 10-15 acres
may be necessary. we will also be asking the consultant to prepare a preliminary
layout for an additional nine holes (18 holes total).
Due to the development that .is currently taking place in the G area (Lobaugh
property and Sunwest area), it is to the City's advantage to have a final
Grading Pian developed as soon as possible.
Attached is the proposal for the development of the Master Plan and construction
documents. A breakdown of fees is as follows:
PHASE I - MASTER PLAN
(A) Preliminary - $5,000
(B) Design Development - $4,000
PHASE 11 - CONSTRUCTION DOCUMENTS - $8,000 - $16,000*
*Depends on size of golf course to be constructed.
APPROVED: f --.-- FILE NO.
THOMAS A. PETERSON, City Manager
City Council
April 9, 1986
Page 2
It is recommended that the City Council authorize the Mayor and City Clerk to
execute the agreement for the work under Phase I (Master Plan Development)
of the agreement. Phase t (B) Design Development will not be authorized until
the final preliminary Master Plan Is reviewed and approved by the Part. S
Recreation Commission and City Council.
A'
Z'10-1
Jac L. Ronsko
Publ c Works Director
cc: Park b Recreation Director
Attachment
JLR/ech
Golf Inc.
PROPOSAL FOR GOLF COURSE ARCHITECTURAL SERVICES
AT
LODI, CALIFORNIA
We are pleased to submit our proposal for golf course architec-
tural work in connection with the proposed nine (9) hole aolf
course. Our proposal is divided into three phases as follows:
PHASE I - MASTER PLAN, including the following works
(A) Preliminary
(1) Meeting with client to review problems, set the scope
of work, and establish design criteria.
(2) On-site review of course with eye toward possible
solutions.
(3) Submittal of Preliminary Plan (s) and review.
(4) Submittal of Final Preliminary for approval.
(B) Design Development
(1) Prepare preliminary grading plans to insure flood
storage capacity and refine to final.
(2) Prepare color rendering of final Master Plan.
(3) Prepare preliminary cost estimates.
PHASE II - CONSTRUCTION DOCUMENTS
Preparation of all documents necessary for construction of a golf
course, includings clearing plan, grading and drainage plan,
green details, irrigation, grassing plan, construction details,
specifications, quantity take -offs, cost estimates, and bid
documents.
Golf Course Consulting Professionals
4349 Vegas Drive • Las Vegas, Nevada 89108 - (702) 646-2084