HomeMy WebLinkAboutAgenda Report - April 15, 1981 (44)EVA A t e .
T :S 1 ! 1. t x.:.71 Yf t� S • .. , 7 .. r -.{
♦ cY `�' I F 1}�72 iY F T eke t.J
+ + a tf,
.4 ° a.`rY �.z. w .. rs 35 a•r�:F i �-L 3 s ,y *
Y s{ �? 3 <i y`L ..s C ..
• t.0 m ^mak t •y 3 +� NT �� X` '� 9 4 T zaa �� ! C
r-�t 1-0 PlAwit
x df a r s �k
u r
R r:� 1 Y +f r♦zt f C� +S3+ti i��C uF r.S"S" Tr�S'r, a,h �l� *} � � .� , � is
e
k si' 41 rsg n S v. , ♦y Y ti h a t can
-
'-
' t
11,Sr,
4 ( 'C• 4i+ 3 K ��'x�"�'y�p��'MM�V y M�(x ! If �l�t l� l � T7 32.1 •Y { L+ S ; Yj
r, � ♦ `4`�t •:A',F,t'��y°ltA 7T.7Ny TrY��N;117��'i' {\ e ♦� ♦L "� f b ♦ ! x- L - '.
.. ..,_., _,. _. _. ... • •. .k ., .{,.. T: .f.✓x:ilsX3t `?4 `C tT�w Sin,..L. ,..ti�%a.�_ Gv',._ ,i L\{':7. .. _, _ 'l`._ ..._,. .., ... .__. ._...
! i r
Nottttern Colftmict ftwar Agency
770 K" Boulevard . Santa Clara. California 95051. (408) 248.3422
ROBERT E. GRtMSHAVM
Gentgl maanor
April 2, 1981
TO: Hembers ' of the NCPA Comm ss i on
FRO14: Robert E; Grimshaw,
0 NN
SUBJECT: NCPA Servi-ce Schedule, PG&E-NCPA Interruptible Transmission
Service Contract
Enclosed is a copy of the service schedule adopted at the Commission's last
meeting in -Ukiah. The Agency has received a signed copy of the Interruptible-
Transmission Service Contract from Pacific Gas and Electric. For the Agency
to act on behalf of your city. under this agreement, it is necessary for the:
Agency to have a contract with your city. Therefore,. please take whatever
actionisnecessary to -have the. enclosed service schedule approved as- soon
as possible and return same to the Agency.
woul-d Tike to stress, -under the terms- of the service schedule and lhterr-upti
b a Transmission Contract, there is no obligation or liability to your c1t
S Y y
unless you specifically request delivery of energy under this service schedult.
Yours truly,
ROBERT E. GRIMSNAN <j<
General Manager
Enc.
NCPA SERVICE SCHEDULE,
PG&E - NCPA INTERRUPTIBLE TRANSMISSION'
SERVICE CONTRACT
This Agreement, herein "Service Schedule", by and
between NORTHERN CALIFORNIA POWER AGENCY, a joint powers
agency of the State of California created and functioning
under Government Code section 6500, herein "NCPA" and its
undersigned member or members, hereinafter referred to
individually as the "Participating Member", witnesseth:
WHER27AS, NCPA has entered into an."Interruptible
Transmission Service Contract", herein "Transmission
--ntract" with Pacific Gas and Electric Company, herein -
a ter PG&E, under date of '1981, wherein
PG&E will provide transmiss on sereice under certain condi-
tions for interruptible energy purchased by NCPA and its
members from a utility or publ-ic agency in the Pacific
Northwest, herein "Interruptible Supplier "L
and
WHEREAS, the Participating Member desires NCPA to
request PG&E to transmit such interruptible energy which
such member, or NCPA for;such member's account, has
arranged to purchase, herein called "Northwest Energy", a
copy of which purchase arrangement is attached hereto as
Exhibit "A"j now therefore the parties hereto agree as
follows:
Section 1. The Participating Member may from time to
time request NCPA or its agent by telephone or otherwise to
obtain transmission service for its Northwest Energy pur-
suant to the Transmission Contract, and NCPA or its agent
will give notice thereof to PG&E. Any such request shall
be in such detail as NCPA or its agent may 'reasonably
require, and shall be confirmed in writing to NCPA or its
agent at the earliest practicable date, but no failure to
confirm shall affect the rights of NCPA or its agent under
this Service Schedule.
Section 2. All such requests shall be subject to all
provisions of the Transmission Contract. NCPA and its
agent shall not be liable for any failure of PG&E to
transmit the Northwest Energy as requested, or at all. By
making a request pursuant to this agreement the Partici-
pating Member warrants that it has entered into its own
4r.rangements with its regular power supplier to receive
credit for the Northwest Energy Obtained by it.
Section 3. The Participating Member shall pay to NCPA
or its agent within 10 days after billing therefor all sums
which NCPA has incurred a liability to pay, or has paid to
its agent, PG&E and/or the Interruptible Supplier on
account of any request made by the Participating Member to
NCPA under this Service Schedule. The Participating Member
shall..a so pay to NCPA under its proportionate share of al I
costs incurred by NCPA in carrying out its duties under the
Transmission Contract, upon billing therefor.
Section 4. This Service Schedule -may be terminated by
eithsr NCPA or the Participating Member=at any time, but
such termination shall not affect the liabi-lity of the
Participating Member for moneys due for services requested
by it prior to termination.
Dated:
NORIMERN CALIFORNIA . POWER AGENCY
Ry
General Manager
-2-
Part c pat ng Member
April 17, 1981
Robert E Grimshaw
General Manager
Northern California
Power Agency
770 Kirly Boulevard
Santa Clara, CA 95051
Re: NCPA Service Schedule, PG&E -NCPA Inter-
ruptible Transmission Service Contract
Dear Mr. Grimshaw:
Enclosed herewith please find a certified
copy of Resolution No. 81-43, "Resolution
Approving NCPA Service Schedule, PG&E -
NCPA'Interruptible Transmission Service
Contract", which was adopted by the Lodi
City Council at a regular meeting held
April 15, 1981.
Should you have any questions regarding
the Council's actions in this matter,
please feel free to call this office.
Very truly yours,
au) 'A - &a -i
Alice M. Re the
City Clerk
AR: d9
Enc.
RESOLUTION APPROVING NCPA SERVICE SCHEDULE,
PG&E - NCPA INTERRUPTIBLE TRANSMISSION
SERVICE CONTRACT
RESOLVEDI, that the City Council of the City of. Lodi
-does-hereby- approve "NCPA Service Schedule, PG&E -WCPA
Interruptible Transmission Service Contract", a copy of which
is attached hereto identified a Exhibit "A" and thereby made
a part hereof.
Dated: April 15, 1981
I hereby certify that Resolution No. 81-43 was passed
and adopted by the City Council of the City of Lodi
in a regular meeting held April 15, 1981 by the follow-
ing vote:
Ayes: Councilmen - Murphy, Hughes -0 Pinkerton, Kat.n1ch-
and McCarty
Woes: Councilmen - None
Absent: Councilmen - None
a
W
81-43
EXHIBIT "A"
NCPA SERVICE SCHEDULE,
PG&E - NCPA INTERRUPTIBLE TRANSMISSION
SERVICE CONTRACT
This Agreement, herein "Service Schedule", by and
between NORTHERN CALIFORNIA POWER AGENCY, a joint powers
agency of the State of California created and functioning
under Government Code section 6500, herein "NCPA" and its
undersigned member or members, hereinafter referred to
-individually as the "Participating Member", witnesseth:
WHEREAS, NCPA has entered into an "Interruptible
Transmission Service Contract% herein "Transmission
Contract" with Pacific Gas and Electric Company, herein-
after PG&E, under date of , 1981, wherein
PG&E will provide transmiss on service under certain condi-
tions for interruptible energy purchased by NCPA and its
members from a utility or public agency in the Pacific
Northwest, herein "Interruptible Supplier"; and
WHEREAS-, the Participating Member desires NCPA to
request PG&E to transmit such interruptible energy which.
-such member, or NCPA for such member's account, has
arranged to purchase, herein called "Northwest Energy"". a
copy of which purchase arrangeme t is attached hereto as
Exhibit "A"; now therefore the parties hereto agree as
follows:
Section 1. The Participating Member may from time to
time request NCPA or its agent by telephone or otherwise to
obtain transmission service for its Northwest Energy pur-
suant to the Transmission Contract, and NCPA or its agent
will give notice thereof to PG&E. Any such request shall
be in such detail as NCPA or its agent may reasonably
require, and shall be confirmed in writing to NCPA or its
agent at the earliest practicable date, but no failure to
confirm shall affect the rights of NCPA or its agentti under
this Service Schedule.
Section 2. All such requests shall be subject to all
provisions of the Transmission Contract. NCPA and its
agent shall not be liable for any failure of PG&E to
transmit the Northwest Energy as requested, or at all. By.
making a request pursuant to this agreement the Partici-
pating Member warrants that it has entered into its own
arrangements with its regular power supplier to receive
credit for•the Northwest Energy obtained by it.
- Section 3. .The Participating Member shall pay to NCIV,
}
orits -agent within 10 days after:,billing therefor, all sums
which NCPA has incurred a liability to pay, or has.paid•to
.its agent, PG&E and/or the Interruptible Supplier on
account of any request made by the Participating Member to
NCPA under this Service Schedule. The Participating Member
shall. also pay to NCPA under its proportionate share of all
costs incurred by NCPA in carrying out its duties under the
Transmission Contract, upon billing therefor.
Section 4. This Service Schedule may be terminated by
either NCPA or the Participating Member at any time, but
such termination sha11 not affect the liability of the
Participating Member for moneys due for services requested
by it prior to termination:
Dated:
NORTHERN CA AFORNIA ,POWER AGENCY .
Participating Men►ber
By By
General'Managex
1 '
-2-.
1 4
1
x'r
r:
Y yt
t
roo
.�
is Jy
1
Y� �
t
lr
1 4
1
x'r
r:
Y yt
t
roo
.�
is Jy
1
Y� �
N
Northern California Power Agency
770 Kiely Boulevard • Santa Clara. California 95051. (408)248-3422
ROBERT L GRIMSHAW
General Manager
April 2, 1981
TO: Members of the NCPA Commission
FROM: Robert E. Grimshaw
SUBJECT: NCPA Service Schedule, PG&E-NCPA Interruptibfie Transmission
Service Contract
Enclosed is a copy of the service schedule adopted at the Commission's last
meeting in Ukiah. The Agency has received a signed copy of the Interruptible
Transmission Service Contract from Pacific Gas and Electric. For the Agency
to act on behalf of your city under this agreement, it is necessary for the
Agency to have a contract with your city. Therefore, please take whatever
action is necessary to have the enclosed service schedule approved as -soon
as possible and return same to the Agency.
I, would like to stress, under the terms of the service. schedule and InterruRti-
ble Transmission Contract, there is no obligation or liability to your city
unless you specifically request delivery of energy under this service schedule.
Yours truly,
r
ROBERT E. GRIMSNAW
General Manager
Enc.
i f
Northam fatifomio Power A9oncY
770 Kiely Boulevard . Santa Clara. California 95051. (409) 2483422
ROBERT L GRIUSHM
General Manager
April 2, 1`981
TO: Members of the NCPA Commission
FROM: Robert E. Grimshaw
SUBJECT: NCPA Service Schedule, PG&E-NCPA Interruptible Transmission
Service Contract
Enclosed is a copy of the service schedule -adopted at the Commission's last
meeting in Ukiah. The Agency has received a signed copy of the Interruptible
Transmission Service Contract from Pacific Gas and Electric. For the Agency
to act on behalf of your city under this agreement, it is necessary for the
Agency to have a contract w#th your city. Therefore, please take whatever
action is necessary to have the enclosed service schedule approved as -soon
as possible and return same to the Agency.
I: would like to stress, under the terms of the service schedule and Interrupti-
ble Transmission Contract, there is no obligation or liability to your city
unless you specifically request delivery of energy under this service schedule.
Yours truly,
ROBERT E. GRIMSMAW
General Manager
Enc. 01�-
APR -
A-ZI-N,
k- v
0
I 17.,. -Section 2. All such requests shall be subject to all
provisions of the Transmission Contract. NCPA and its
agent shall not be liable for any failure of PG&E to
transmit the Northwest Energy as requested, or at all. By
making a request pursuant to this agreement the Partici-
pating Member warrants that it has entered into its own
&
r
- . : .1 --.'-
NCPA SERVICE SCHEDULE,
PG&E NCPA INTERRUPTIBLE TRANSMISSION
SERVICE CONTRACT
This Agreement, herein "Service Schedule", by and
between NORTHERN CALIFORNIA POWER AGENCY, a joint powers
agency --of the State of California created and functioning
under Government Code section 6500, herein."NCPA" and its
--undersigned member -or members, hereinafter referred to Aq
'individually as the "Participating Member", witnesseth:
K
-iNCPA has entered Into an "Interruptibler
-;rrammission Service Contract" herein "Transmission
erei
rac -Pacific -Gas and Electric Company, herein-
Cont t" -with n
Y,
4 1
z-
41 ter PG&E, under date of 1981, wherein
will. provide tranamisaTon sere ce under certain condi-
t ions.-. for -7 1 nterru tible energy purchased by NCPA and its
'.*embers from a utility or public agency in the Pacific
-.
N.orthweet,*.herein ."Interruptable Supplier'; and
WHEREAS, the Participating Member desires NCPA to
request PG&E to transmit such interruptible energy- which
such member, or NCPA for such member's account,,has
-arranged to.purchase, herein called "Northwest Energy", a
COPY of which purchase arrangement is attached -hereto as
Exhibit "A"; now therefore the parties hereto agree as
follows:
Section I. The Participating Member may Irom time to
time request NCPA or its agent by telephone'or otherwise to
obtain transmission service for its Northwest Energy pur-
suant to the Transmission Contract, and NCPA or its agent
will give notice thereof to PG&E. Any such request shall
be in such detail as NCPA or its agent may reasonably
require, and shall be confirmed in writing to NCPA or its
agent at the earliest practicable date, but no failure to
confirm shall affect the rights of NCPA or its agent. under
this Service Schedule.
I 17.,. -Section 2. All such requests shall be subject to all
provisions of the Transmission Contract. NCPA and its
agent shall not be liable for any failure of PG&E to
transmit the Northwest Energy as requested, or at all. By
making a request pursuant to this agreement the Partici-
pating Member warrants that it has entered into its own
&
r
- . : .1 --.'-
ate:
k..
4 v
arrangenents with its regular power supplier to receive
1. credit for 'the Northwest Energy obtained by it.
Section 3. The -.Participating Member shall pay to NCP'
or its agent within lO days after billing therefor all ,sums
which NCPA has' in mired_ a liability to pay, or has paid to
Its agent, PG&E and/or the Interruptible Supplier on
account:: of _-any,reque'st made by the Participating Member to
NCPA under 'this,_Service Schedule. The Participating Member
shall .al o :pay to VCPA under its proportionate share of all
costs A-ncurred by NCPA in carrying out its duties under thtie
Transa#ssion_Contract, upon billing therefor.
Section 4. This Service Schedule may be terminated by
either NCPA or_the Participating Member at any time, but
such termination shall not affect the liability of the
Participating Member for moneys due for services requested -
by it'prior to termination.
Dated:
NORMERN CALIFORNIA .POWER AGENCY
Partic pat ncl-Member
€ By
General Manager
A