HomeMy WebLinkAboutAgenda Report - April 15, 1981 (36)O CITY OF LODI
COUNCIL COMMUNICATION
TO: City Council
FROM: City Manager
DATE: Apri 1 1, 1981
SUBJECT: Contract for Well 19 Site Improvements
RECOMMENDED ACTION: Tt. .3t the City award the bid for "Well 19 Site Improve—
ment" to Case Construct on Company, the low bidder, in the amount of $20,070.
BACKGROUND INFORMATION: Plans and specifications for this project were
approved by the City Council on February 11, 1981. Bids were opened Wednesday,
April 1, 1981, and the following 2 bids were received:
BIDDER LOCATION BID (Alt. A Total)
Case Construction Co. Lodi $20,070
Neth Construction Co. Stockton $21,285
Engineer's Estimate $16,080
A tabulation of the bids has also been attached.
Original bids were received on March 11, 1981, but were rejected because of a
bid error and then re -advertised for opening on April 1, 1981. Alternate bids
(Items 1b) were solicited for precast fence around a portion of the site. Due to
the small size of the job, none were submitted. The bids shown are for hand -
laid block. The slumpstone block alternate is recommended because of cost and
compatibility with the surrounding area. The brick inky in the driveway is also
recommended as it will match the brick relief in the wall, and was included in
our SPAR Cp 1, where a varianco for the 8' wall was approved.
Jo L. Ronsko
Publ c Works Director
Attach.
APPROVED:
. L, t.^ V C31 %.1ry manager
FILE NO.
WELL #19 SITE IMPROVEMENTS Tabulation of bids received April 1, 1981.
Item No. Descriptionr Engineer's Est. Case Constr. Neth Constr.
Ia. Fumish and install approximately LS $13,000 $15,600 $16,670
200 LF of block wall, footings,
foundations, conduit, yard lights,
steel door, mowstrip and other
Incidental and related work, all
as shown on the plans and speci-
fications.
y.
Furnish and install approximately $2.50/SF - $1,500 $3.80/SF - $2,280
600 SF of commercial driveway
with brick inlay.
3a. Furnish and install approximately LS $1,580 $2,190
25LF 18", and 12 LF of 12"
storm drain with drop inlet catch TOTAL $16,080 $20,070
basin and riser.
lb. Construct approximately 150 LF LS $11,465 No Bid
of concrete slot fence, balance
of slumpstone block wall (south
wall), footings, foundations,
conduit, yard Lights, steel door,
moyvstrip and other incidental
and related work, all as shown
on plans and specifications.
lc. Construct approximately 150 LF of LS $13,900 $17,800
split face block (hand laid or pre -
cost) fence, balance of block wall
(south wall), footings, Foundations,
conduit, yard lights, steel door, mow -
strip and other incidental and related
work, all as shown in the plans and
specifications.
$3.97/5F - $2,380
$2,235
$21,285
No Bid
No Bid
WELL #19 SITE IMPROVEMENTS. Cont'd.
Item No. Description Engineer's Est.Case Constr. Neth Constc.
2b. Furnish and install approximately $1.75/SF - $1,050 $2.90/SF - $1,740 $3.23/SF - $1,940
600 SF of commercial driveway
without brick inlay.
0
0
i
RESOLUTION NO. 81-41
s
AWARD - CONTRACT, WELL #19 SITE IMPROVEMENTS
WHEREAS, in answer to notice duly published in accordance
with law and the order of this City Council, sealed bids were
received and publicly opened by the City Clerk of this City
on April 1, 1981 at 11:00 a.m. for the contract for Well #19
Site Improvements as described in the specifications therefor
approved by the City Council February 18, 1981; and
WHEREAS, said bids have been compared, checked, and
tabulated and a report thereof filed with the City Manager as
shown on Exhibit "A" attached hereto and thereby made a part
hereof.
WHEREAS, the City Manager recommends that award be made
to the low bidder, Case Construction Co.
NOW, THEREFORE, BE IT RESOLVED by the City Council of
the City of Lodi that award of contract for Well #19 Site Im-
provements be and the same is hereby made to Case Construction
Co., the low bidder, in the amount of $20,070.00.
Dated: April 1.5, 1981
I hereby certify that Resolution No. 81-41 was passed
and adopted by the City Council of the City of Lodi in
a regular meeting held April 15, 1981 by the following
vote:
Ayes: Councilmen - Murphy, Hughes, Katnich, Pinkerton,
and McCarty
Noes: Councilmen - None
Absent: Councilmen None
A � - &4_
ALICE M. REIMCHE
City Clerk
81-41
► /
ELL 19 SITE IMPROVEMENTS
Tabulation of bids received•A ril 1, 1981•. ,
- -
em No.
rrrrrrr�\-
Description
i��rr�
Engineer's Est..
Case Constr.
Neth Constr. '
�.
� A
Furnish and install approximately .
LS 513,000
$15,600
5161'670
�
200 LF of block wall, footings,
foundations, conduit, yard lights,
'
steel door, mowstrip and other
incidental and related work, all
{
as shown on the plans and speci-
fications.
Furnish and install approximately
$2.50/SF - $1,500
$3-.80/SF - $2,280 ',
53.97/5F - $2y38Q
600 SF of commercial driveway
with brick inlay.
:
Cl.
Furnish and install approximately
IS $14580-
$2190
$2p2._
25L.F 18", and 12 LF of 12"
storm drain with drop inlet catch TOTAL
$16,080
$20,070
$21,285
basin and riser.
b.
Construct approximately 180 LF
LS $11,465
No Bid
No Bid
of concrete slat fence, balance
of slumpstone block wall (south
wall), Footings, foundations,
conduit, yard lights, steel door,
mowstrip and other Incidental
and related work, all as shown
on plans and specifications.
a.
Construct approximately 150 LF of
LS $13,900
517,800.
No Std
split face block (hand laid or pro -
cast) fence, balance of block wall
(south wall), footings, foundations,
conduit, yard lights, steel door, Mow -
strip and other incidental and related
..work,,' all as shown in the plans and
sper1crcations.
\
r,
'ELL 119 SITE IMPROVEMENTS, Cont'd.
em NO, Descjri ttiio,.n
�. Furnish and install approximately
600 SF of commercial driveway
• without brick inlay.
Engineer's Est*°
$1.75/SF - $1,050
w
''Case Constr. Neth Consh.
i
$2.90/SF - $1,740 $3.23/SF $1,440