HomeMy WebLinkAboutAgenda Report - April 15, 1981 (36)O CITY OF LODI COUNCIL COMMUNICATION TO: City Council FROM: City Manager DATE: Apri 1 1, 1981 SUBJECT: Contract for Well 19 Site Improvements RECOMMENDED ACTION: Tt. .3t the City award the bid for "Well 19 Site Improve— ment" to Case Construct on Company, the low bidder, in the amount of $20,070. BACKGROUND INFORMATION: Plans and specifications for this project were approved by the City Council on February 11, 1981. Bids were opened Wednesday, April 1, 1981, and the following 2 bids were received: BIDDER LOCATION BID (Alt. A Total) Case Construction Co. Lodi $20,070 Neth Construction Co. Stockton $21,285 Engineer's Estimate $16,080 A tabulation of the bids has also been attached. Original bids were received on March 11, 1981, but were rejected because of a bid error and then re -advertised for opening on April 1, 1981. Alternate bids (Items 1b) were solicited for precast fence around a portion of the site. Due to the small size of the job, none were submitted. The bids shown are for hand - laid block. The slumpstone block alternate is recommended because of cost and compatibility with the surrounding area. The brick inky in the driveway is also recommended as it will match the brick relief in the wall, and was included in our SPAR Cp 1, where a varianco for the 8' wall was approved. Jo L. Ronsko Publ c Works Director Attach. APPROVED: . L, t.^ V C31 %.1ry manager FILE NO. WELL #19 SITE IMPROVEMENTS Tabulation of bids received April 1, 1981. Item No. Descriptionr Engineer's Est. Case Constr. Neth Constr. Ia. Fumish and install approximately LS $13,000 $15,600 $16,670 200 LF of block wall, footings, foundations, conduit, yard lights, steel door, mowstrip and other Incidental and related work, all as shown on the plans and speci- fications. y. Furnish and install approximately $2.50/SF - $1,500 $3.80/SF - $2,280 600 SF of commercial driveway with brick inlay. 3a. Furnish and install approximately LS $1,580 $2,190 25LF 18", and 12 LF of 12" storm drain with drop inlet catch TOTAL $16,080 $20,070 basin and riser. lb. Construct approximately 150 LF LS $11,465 No Bid of concrete slot fence, balance of slumpstone block wall (south wall), footings, foundations, conduit, yard Lights, steel door, moyvstrip and other incidental and related work, all as shown on plans and specifications. lc. Construct approximately 150 LF of LS $13,900 $17,800 split face block (hand laid or pre - cost) fence, balance of block wall (south wall), footings, Foundations, conduit, yard lights, steel door, mow - strip and other incidental and related work, all as shown in the plans and specifications. $3.97/5F - $2,380 $2,235 $21,285 No Bid No Bid WELL #19 SITE IMPROVEMENTS. Cont'd. Item No. Description Engineer's Est.Case Constr. Neth Constc. 2b. Furnish and install approximately $1.75/SF - $1,050 $2.90/SF - $1,740 $3.23/SF - $1,940 600 SF of commercial driveway without brick inlay. 0 0 i RESOLUTION NO. 81-41 s AWARD - CONTRACT, WELL #19 SITE IMPROVEMENTS WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened by the City Clerk of this City on April 1, 1981 at 11:00 a.m. for the contract for Well #19 Site Improvements as described in the specifications therefor approved by the City Council February 18, 1981; and WHEREAS, said bids have been compared, checked, and tabulated and a report thereof filed with the City Manager as shown on Exhibit "A" attached hereto and thereby made a part hereof. WHEREAS, the City Manager recommends that award be made to the low bidder, Case Construction Co. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lodi that award of contract for Well #19 Site Im- provements be and the same is hereby made to Case Construction Co., the low bidder, in the amount of $20,070.00. Dated: April 1.5, 1981 I hereby certify that Resolution No. 81-41 was passed and adopted by the City Council of the City of Lodi in a regular meeting held April 15, 1981 by the following vote: Ayes: Councilmen - Murphy, Hughes, Katnich, Pinkerton, and McCarty Noes: Councilmen - None Absent: Councilmen None A � - &4_ ALICE M. REIMCHE City Clerk 81-41 ► / ELL 19 SITE IMPROVEMENTS Tabulation of bids received•A ril 1, 1981•. , - - em No. rrrrrrr�\- Description i��rr� Engineer's Est.. Case Constr. Neth Constr. ' �. � A Furnish and install approximately . LS 513,000 $15,600 5161'670 � 200 LF of block wall, footings, foundations, conduit, yard lights, ' steel door, mowstrip and other incidental and related work, all { as shown on the plans and speci- fications. Furnish and install approximately $2.50/SF - $1,500 $3-.80/SF - $2,280 ', 53.97/5F - $2y38Q 600 SF of commercial driveway with brick inlay. : Cl. Furnish and install approximately IS $14580- $2190 $2p2._ 25L.F 18", and 12 LF of 12" storm drain with drop inlet catch TOTAL $16,080 $20,070 $21,285 basin and riser. b. Construct approximately 180 LF LS $11,465 No Bid No Bid of concrete slat fence, balance of slumpstone block wall (south wall), Footings, foundations, conduit, yard lights, steel door, mowstrip and other Incidental and related work, all as shown on plans and specifications. a. Construct approximately 150 LF of LS $13,900 517,800. No Std split face block (hand laid or pro - cast) fence, balance of block wall (south wall), footings, foundations, conduit, yard lights, steel door, Mow - strip and other incidental and related ..work,,' all as shown in the plans and sper1crcations. \ r, 'ELL 119 SITE IMPROVEMENTS, Cont'd. em NO, Descjri ttiio,.n �. Furnish and install approximately 600 SF of commercial driveway • without brick inlay. Engineer's Est*° $1.75/SF - $1,050 w ''Case Constr. Neth Consh. i $2.90/SF - $1,740 $3.23/SF $1,440