HomeMy WebLinkAboutAgenda Report - March 20, 2013 C-19 PHAGENDA ITEM -019
CITY OF LODI
COUNCIL COMMUNICATION
TM
AGENDA TITLE: Set Public Hearing for May 15, 2013, to Consider Adopting Resolution Setting
Pre -Approved Engineering News Record Adjustment Index for Wastewater Rates
for Residential, Commercial and Industrial Customers
MEETING DATE: March 20, 2013
PREPARED BY: Public Works Director
RECOMMENDED ACTION: Set public hearing for May 15, 2013, to consider adopting resolution
setting pre -approved Engineering News Record Adjustment Index
for wastewater rates for residential, commercial and industrial
customers.
BACKGROUND INFORMATION: City Council approved wastewater rate increases of 25 percent
effective July 16, 2009; 20 percent effective July 1, 2010; 10 percent
effective July 1, 2011; and 5 percent effective July 1, 2012. Also,
the City Council approved an Engineering News Record — 20 Cities Average (ENR) based indexing of
wastewater rates beginning with FY 2012/13. A Proposition 218 procedure was conducted that validated
these actions.
Staff has regularly updated the Wastewater Utility Financial Plan and a copy of the current Financial Plan
is attached as Exhibit A. The recommended rate adjustments in the Financial Plan are 2.5 percent
beginning July 1, 2013. The rates for this next year, attached as Exhibit B, reflect an increase of
2.5 percent, which is lower than the ENR -based index of 2.8. The rate increase for this past year was
3 percent, lower than the 5 -percent increase anticipated in 2009.
FISCAL IMPACT: Increased revenues to the wastewater utility are required to keep up with
cost of service increases and new mandated costs.
FUNDING AVAILABLE: Not applicable.
Aa�_ -
F. Wally sgnaeTin
Public Works Director
FWS/pmf
Attachments
cc: Information Systems Manager
Deputy Public Works Director — Utilities
APPROVED: 2j "'- --'
e
Konradt Bartlam, City Manager
K:\WP\UTILITY RATES\W WW\2013 W WW Rate Increase\CCSetPH—WWRates.doc
3/4/2013
City of Lodi -- Wastewater Utility
Financial Plan Summary
Beginning Balance
Revenues
Wastewater Sales
Interest Earnings
Other Revenues
Transfer In for Debt Service (172)
Transfer In for Debt Service (173)
Transfer From/(To) Rate Stabilization Fund (174)
Total Revenues
Expenditures
Transfer Out to Gen'I Fund (Cost of Services)
Transfer Out to WW Capital Outlay (171)
Transfer Out To WW Cap. Rsrv. (172)
Administration & Other
Plant Maintenance
Sanitary System Maintenance
Storm Drainage Maintenance
Industrial System Maintenance
2003 Wastewater COP Debt Service
2004 Wastewater COP Debt Service
2007 Wastewater COP Debt Service
2012 Wastewater Refinancing
Total Expenditures
Ending Balance
Operating Reserve (25%)
Available Balance
Debt Service Coverage (min. = 1.20)
without COST
Beginning Balance
Revenues
Transfer In (from 170)
Transfer In (from 170-Deprec.)
Other Revenue
Investment Earnings
Total Revenues
Expenditures
Financial System Replacement
FY 12-13 1 FY 13-14 1 FY 14-15 FY 15-16 1 FY 16-17 1 FY 17-18 1 FY 18-19 1 FY 19-20
3% 2.5% 3% 3% 3% 3% 3% 3%
2,892,538
5,461,860
4,362,182
4,244,104
4,293,626
5,833,748
7,069,470
8,805,792
13,705,000
14,075,000
14, 525,000
14, 990,000
15,470,000
15,965,000
16,476,000
17,003,000
34,000
60,000
49,000
166,000
168,000
222,000
265,000
326,000
196,000
202,300
208,600
214,900
221,200
227,500
233,800
241,200
31,000
31,000
31,000
110,000
110,000
110,000
110,000
110,000
1,433,000
7,000
83,000
97,000
113,000
129,000
299,000
415,000
15,399,000
14, 375,300
14,896,600
15, 577,900
16,082, 200
16,653, 500
17, 383,800
18,095, 200
1,451,478
1,451,478
1,451,478
1,451,478
1,451,478
1,451,478
1,451,478
1,451,478
500,000
500,000
3,000,000
3,250,000
2,000,000
2,575,000
2,500,000
3,500,000
1,075,980
1,116,500
1,159,200
1,202,900
1,247,600
1,294,300
1,343,000
1,392,700
4,016,000
4,174,000
4,339,000
4,510,000
4,689,000
4,876,000
5,069,000
5,271,000
702,090
728,000
755,000
783,000
812,000
842,000
873,000
906,000
556,560
579,000
602,000
627,000
652,000
678,000
706,000
735,000
34,570
36,000
37,000
38,000
39,000
40,000
41,000
42,000
381,000
3,266,000
-
-
-
-
-
-
2,138,000
98,000
98,000
98,000
98,000
98,000
98,000
98,000
1,599,000
1,604,000
1,603,000
1,607,000
1,606,000
1,614,000
1,617,000
1,609,000
375,000
1,922,000
1,970,000
1,961,000
1,947,000
1,949,000
1,949,000
1,951,000
12,829,678
15,474,978
15,014,678
15,528,378
14,542,078
15,417,778
15,647,478
16,956,178
5,461,860
4,362,182
4,244,104
4,293,626
5,833,748
7,069,470
8,805,792
9,944,814
2,989,000
3,263,000
2,511,000
2,579,000
2,649,000
2,723,000
2,800,000
2,876,000 25%
2,472,860
1,099,182
1,733,104
1,714,626
3,184,748
4,346,470
6,005,792
7,068,814
1.54
0.96
1.86
1.97
2.04
2.11
2.19
2.27
1.86
2.23
2.25
2.37
2.44
2.51
2.58
2.67
7,394,480 5,483,810
2,839,810
1,413,810
348,810
1,439,810
328,810
2,261,810
- -
2,500,000
2,750,000
1,500,000
2,075,000
2,000,000
3,000,000
500,000 500,000
500,000
500,000
500,000
500,000
500,000
500,000
500,000 500,000
3,000,000
3,250,000
2,000,000
2,575,000
2,500,000
3,500,000
- 250,000
250,000
-
-
-
-
City of Lodi -- Wastewater Utility
Financial Plan Summary
FY 12-13
FY 13-14
FY 14-15
FY 15-16
FY 16-17
FY 17-18
FY 18-19
FY 19-20
Financial Planning
22,670
-
-
-
-
-
-
-
Misc. System Relocations
35,000
35,000
36,000
38,000
39,000
41,000
43,000
44,000
Misc. Wastewater Taps
40,000
40,000
42,000
43,000
45,000
47,000
49,000
51,000
Collect. System Capac. Enhanc. Projects
20,000
200,000
21,000
216,000
22,000
234,000
24,000
253,000
Wastewater Main Replac./Lining Proj.
609,000
2,000,000
104,000
2,163,000
112,000
2,340,000
122,000
2,531,000
Storm Drain Trash Handling System
400,000
30,000
312,000
1,622,000
-
-
-
-
Lift Sta. Remote Term. Unit Replac.
20,000
-
-
-
Utility Frame & Cover Replacement
110,000
-
Lift Station Generator Replacements
100,000
-
260,000
-
-
-
-
-
Vehicles /Equipment
150,000
75,000
62,000
70,000
79,000
877,000
182,000
190,000
White Slough Compliance Studies & Rpts
-
-
-
-
-
-
-
-
Plant Maint. & Land Applic. Area Improv.
75,000
-
Influent Screening Replacement
2,000,000
UV Disinfection Upgrade
300,000
-
Aeration Diffuser Replacement
-
-
-
500,000
-
Cloth Filter Media Replacement
30,000
30,000
-
30,000
Digested Sludge Line to Presses
30,000
-
-
-
Electrical Upgrades
-
50,000
Admin/Ops Building Improvements
-
750,000
Rotary Press Maintenance Crane
25,000
-
Pond Gates
35,000
Shop Rollup Door
7,500
Emergency Generator Maintenance
20,000
Road to Outfall Repair
10,000
Secondary Scum Trough Drives
11,500
Misc Paving
10,000
-
SCADA Upgrades/PLC Replacement
-
75,000
Primary Chain & Flights
75,000
80,000
40,000
Boiler Retube
-
-
20,000
Chain Hoist
35,000
-
Gas compressor (WSWPCF)
14,000
Dissolved Air Floatation Tank Rebuild
225,000
Tailwater Pump (WSWPCF)
25,000
UV Bypass System Improvements
100,000
-
-
-
Fence Repairs/Upgrades
-
25,000
25,000
25,000
Anaerobic Digester Painting
130,000
-
-
-
Digester Cleaning & Gas Scrubber Relining
125,000
-
Plant Security Enhancements
-
130,000
-
-
-
-
-
-
Miscellaneous Future Projects
100,000
100,000
104,000
108,000
112,000
117,000
122,000
127,000
Total Expenditures
2,410,670
3,144,000
4,426,000
4,315,000
909,000
3,686,000
567,000
3,196,000
Ending Balance
5,483,810
2,839,810
1,413,810
348,810
1,439,810
328,810
2,261,810
2,565,810
City of Lodi -- Wastewater Utility
Financial Plan Summary
Beginning Balance
Revenues
Transfer In from 170
Interest Earnings
Total Revenues
Expenditures
White Slough Solids Handling Facility
White Slough Sludge Thickening
Transfer Out to 170 (for Debt Service)
Total Expenditures
Ending Balance
Restricted Debt Service Reserve
2007 COP Proceeds (w/ fiscal agent)
Cash Deficit (amt. owed for past DS)
Beginning Balance
Revenues
Wastewater IMF
Wastewater IMF from PCE/TCE & WTP
Interest Earnings
Total Revenues
Expenditures
Transfer Out (to 170 for Debt Service)
Transfer Out (refund PCE/TCE)
City -Wide IMF Program Update
Total Expenditures
Ending Balance
Owed to Fund 170 for Debt Service
FY 12-13 1 FY 13-14 1 FY 14-15 1 FY 15-16 1 FY 16-17 1 FY 17-18 1 FY 18-19 1 FY 19-20
3,135,539 3,135,539 3,135,539 3,135,539 3,135,539 3,135,539 3,135,539 3,135,539
31,000 31,000 31,000 110,000 110,000 110,000 110,000 110,000
31,000 31,000 31,000 110,000 110,000 110,000 110,000 110,000
31,000 31,000 31,000 110,000 110,000 110,000 110,000 110,000
31,000 31,000 31,000 110,000 110,000 110,000 110,000 110,000
3,135,539
3,135,539
3,135,539
3,135,539
3,135,539
3,135,539
3,135,539
3,135,539
2,379,536
2,379,536
2,379,536
2,379,536
2,379,536
2,379,536
2,379,536
2,379,536
756,003
756,003
756,003
756,003
756,003
756,003
756,003
756,003
662,952 6,952 82,952 96,952 112,952 128,952 298,569 414,569
770,000
333,000
346,000
360,000
375,000
390,000
405,000
421,000
7,000
-
1,000
3,000
4,000
5,000
10,000
15,000
777,000
333,000
347,000
363,000
379,000
395,000
415,000
436,000
1,433,000
7,000
83,000
97,000
113,000
129,000
299,000
415,000
-
250,000
250,000
250,000
250,000
96,383
-
-
1,433,000
257,000
333,000
347,000
363,000
225,383
299,000
415,000
6,952 82,952 96,952 112,952 128,952 298,569 414,569 435,569
116,000 1,919,000 2,796,000 3,662,000 4,511,000 5,349,000 6,019,000 6,568,000
City of Lodi -- Wastewater Utility
Financial Plan Summary
Beginning Balance
Revenues
Transfer In from 170
Total Revenues
Expenditures
Transfer Out to 170
Total Expenditures
Ending Balance
FY 12-13 I
FY 13-14 I
FY 14-15 I
FY 15-16 I
FY 16-17 I
FY 17-18 I
FY 18-19 I
FY 19-20
16,582,000
Operating Reserve (25%)
2,989,000
3,263,000
2,511,000
2,579,000
2,649,000
2,723,000
500,000
500,000
500,000
500,000
500,000
500,000
500,000
500,000
500,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000
Aggregate End -of -Year Balance
14,588,000
10,920,000
9,390,000
8,391,000
11,038,000
11,332,000
15,118,000
16,582,000
Operating Reserve (25%)
2,989,000
3,263,000
2,511,000
2,579,000
2,649,000
2,723,000
2,800,000
2,876,000
Restricted DS Reserve
2,379,536
2,379,536
2,379,536
2,379,536
2,379,536
2,379,536
2,379,536
2,379,536
2007 COP Proceeds
756,003
756,003
756,003
756,003
756,003
756,003
756,003
756,003
Rate Stabilization Fund
500,000
500,000
500,000
500,000
500,000
500,000
500,000
500,000
Net Available for Capital Projects
7,963,461
4,021,461
3,243,461
2,176,461
4,753,461
4,973,461
8,682,461
10,070,461
Exhibit B
City of Lodi -- Wastewater Utility
current ana Proposes wastewater nates
Notes:
(1) Winter water usage determined as average monthly usage from December through February.
Current
July 2013
Residential
Percent Increase
2.5
Flat Rates ($/month)
1 Bedroom
$
25.20
$
25.83
2 Bedroom
$
33.60
$
34.44
3 Bedroom
$
42.00
$
43.05
4 Bedroom
$
50.40
$
51.66
5 Bedroom
$
58.80
$
60.27
6 Bedroom
$
67.20
$
68.88
7 Bedroom
$
75.60
$
77.49
Usage -Based Rates
Service Charge ($/month)
$
22.95
$
23.52
Usage Charge ($/CCF) (1)
$
2.61
$
2.68
Non -Residential ($/month)
Moderate Strength (per SSU)
$
33.60
$
34.44
High Strength
Flow (per MG, annual basis)
$
3,402.35
$
3,487.41
BOD (per 1,000 lbs, annual basis)
$
561.47
$
575.51
SS (per 1,000 lbs, annual basis)
$
351.07
$
359.85
Grease Interceptor & Septic Holding Tank
Waste within City Limits (per 1,000 gal.)
$
297.29
$
304.72
Septic (only) Holding Tank Waste
Outside City Limits (per 1,000 gal.)
$
631.11
$
646.89
Disposal to Storm Drain System (per MG)
$
312.28
$
320.09
Notes:
(1) Winter water usage determined as average monthly usage from December through February.
Please immediately confirm receipt
of this fax by calling 333-6702
CITY OF LODI
P. O. BOX 3006
LODI, CALIFORNIA 95241-1910
ADVERTISING INSTRUCTIONS
SUBJECT: PUBLIC HEARING TO CONSIDER RESOLUTION SETTING PRE -
APPROVED ENGINEERING NEWS RECORD ADJUSTMENT
INDEX FOR WASTEWATER RATES FOR RESIDENTIAL,
COMMERCIAL, AND INDUSTRIAL CUSTOMERS
PUBLISH DATE: SATURDAY, MARCH 23, 2013
TEAR SHEETS WANTED: One (1) please
SEND AFFIDAVIT AND BILL TO
LNS ACCT. #0510052
DATED: THURSDAY, MARCH 21, 2013
ORDERED BY: RANDI JOHL
CITY CLERK
J NIFER ROBISON, CMC
ASSISTANT CITY CLERK
RANDI JOHL, CITY CLERK
City of Lodi
P.O. Box 3006
Lodi, CA 95241-1910
MARIA BECERRA
ADMINISTRATIVE CLERK
Verify Appearance of this Legal in the Newspaper — Copy to File
forms\advins.doc
DECLARATION OF POSTING
PUBLIC HEARING TO CONSIDER RESOLUTION SETTING PRE -APPROVED
ENGINEERING NEWS RECORD ADJUSTMENT INDEX FOR WASTEWATER RATES
FOR RESIDENTIAL, COMMERCIAL, AND INDUSTRIAL CUSTOMERS
On Thursday, March 21, 2013, in the City of Lodi, San Joaquin County, California, a
Notice of Public Hearing to consider resolution setting pre -approved Engineering News
Record adjustment index for wastewater rates for residential, commercial, and industrial
customers (attached and marked as Exhibit A) was posted at the following locations:
Lodi Public Library
Lodi City Clerk's Office
Lodi City Hall Lobby
Lodi Carnegie Forum
I declare under penalty of perjury that the foregoing is true and correct.
Executed on March 21, 2013, at Lodi, California.
Q"A Ag o'10—D A
(INN-11FE101M. ROBISON, CMC
ASSISTANT CITY CLERK
N:\Administration\CLERK\Forms\DECPOSTPW.DOC
ORDERED BY:
RANDI JOHL
CITY CLERK
MARIA BECERRA
ADMINISTRATIVE CLERK
• CITY OF LODI
Carnegie Forum
305 West Pine Street, Lodi
NOTICE OF PUBLIC HEARING
Date: May 15, 2013
Time: 7:00 p.m.
For information regarding this notice please contact:
Randi Johl
City Clerk
Telephone: (209) 333-6702
NOTICE OF PUBLIC HEARING
NOTICE IS HEREBY GIVEN that on Wednesday, May 15, 2013, at the hour of
7:00 p.m., or as soon thereafter as the matter may be heard, the City Council will
conduct a public hearing at the Carnegie Forum, 305 West Pine Street, Lodi, to
consider the following matter:
a) Resolution setting pre -approved Engineering News Record
adjustment index for wastewater rates for residential, commercial,
and industrial customers (as identified on the attached Exhibit A).
Information regarding this item may be obtained in the Public Works
Department, 221 West Pine Street, Lodi, (209) 333-6706. All interested persons
are invited to present their views and comments on this matter. Written
statements may be filed with the City Clerk, City Hall, 221 W. Pine Street, 2nd
Floor, Lodi, 95240, at any time prior to the hearing scheduled herein, and oral
statements may be made at said hearing.
If you challenge the subject matter in court, you may be limited to raising only
those issues you or someone else raised at the public hearing described in this
notice or in written correspondence delivered to the City Clerk at, or prior to, the
public hearing.
B rder of the Lodi City Council:
a I
City Clerk
Dated: March 20, 2013
Approved as to form:
__:E�
D. StephenSchwabau r
City Attorney
J:\CITYCLRK\FORMS\PH NOTICE publication WWRates.doc 3/20/13
- .� 1 sEXHijI
City of Lodi -- Wastewater Utility
Current and Proposea wastewater Kates
Current
July 2013
Residential
Percent Increase
2.5
Flat Rates ($/month)
1 Bedroom
$
25.20
$
25.83
2 Bedroom
$
33.60
$
34.44
3 Bedroom
$
42.00
$
43.05
4 Bedroom
$
50.40
$
51.66
5 Bedroom
$
58.80
$
60.27
6 Bedroom
$
67.20
$
68.88
7 Bedroom
$
75.60
$
77.49
Usage -Based Rates
Service Charge ($/month)
$
22.95
$
23.52
Usage Charge ($/CCF) (1)
$
2.61
$
2.68
Non -Residential ($/month)
Moderate Strength (per SSU)
$
33.60
$
34.44
High Strength
Flow (per MG, annual basis)
$
3,402.35
$
3,487.41
BOD (per 1,000 lbs, annual basis)
$
561.47
$
575.51
SS (per 1,000 lbs, annual basis)
$
351.07
$
359.85
Grease Interceptor & Septic Holding Tank
Waste within City Limits (per 1,000 gal.)
$
297.29
$
304.72
Septic (only) Holding Tank Waste
Outside City Limits (per 1,000 gal.)
$
631.11
$
646.89
Disposal to Storm Drain System (per MG)
$
312.28
$
320.09
Notes:
(1) Winter water usage determined as average monthly usage from December through February.