HomeMy WebLinkAboutAgenda Report - March 19, 19864-1-5 ,<: .' a � C IT F LODICOUNCIL Y: COMMUNICATION' =:- • • PUBLIC WORKS DEPARTMENT s TO: City Council Project Data Originally Budgeted: 1985 t FROM: City Manager Budgeted Fund: 18.1 Water Fund ;1 a Budgeted Amount:- $10,000.00 3 DATE: March 12, 1986 Over -run Fund: 18.1 Water Fund SUBJECT: Approve Agreement with Consultant for Eastside Moratorium Water Study J a RECOMMENDED ACTION: . That the City Council engage the services of Psomas s � Associates, Engineering Consultants, for the preparation of the Eastside Y _ Moratorium Water Study for the total cost of $141,000. Harold Welborn, with Psomas & Associates, is presently designing the City's 1 water tank re replacement and was the p project engineer for the City's past z Water ,System Master Plan _ } The work to be performed is shown on.the attached Scope of Work. This study of the City's domestic and fire protection systems on the east side will be included in the Eastside Moratorium E1R`being prepared by the firm of Jones b x Stokes. Mr. Jack Ronsko, Director } CITY OF LOD) � =' Dept. of Public Works PU:LIC MAKS 4 221 W. Pine Street _Lodi, CA 95246 s i RE: EAST SIDE MORATORIUM AREA - WATER STUDY 1 Dear Mr. Ronsko : - t-- I have prepared a Scope of Work and budget for studying the. existing and future water facility needs of the` "East "Side -" Moratorium Area". The Study involves' -an in-depth look at t: E the water system in the Study Area and the analysis of future system needs depending on the. planned development within the area. ..: This study is to be 'accomplished in concert with other - {f utility studies and an`EIR.- It is my understanding that the City,..either directly or, through the Environmental Consultant :will `supply all neces- i. sary.base maps _on",which the facilityl information, will be e.. E--:: delineated. The City _will"provide maps showing. -all existing and; proposed Study Area land'uses: ,and required fire..hydrant locations for:All development' scenarios to be investigated." A: bound formal document will not be part of this 'Scope of x Work. t. A :summary of our proposed Scope_ of ,Work and theassociated Task &'-Man.`Hour breakdown is provided -for your review._,..The f, total estimated `cost =%for .:`the; Scope of -Work:' proposed is ` $14,000.' Please review the Scope Work and then we can get .together r` "of to .discuss ,the details. I ,look--forward>.to'working,with`the ' City on this project. `. Sincerely, ;.._ `= Psomas &`Associates of Sacramento Harold,L: Welborn Affiliate Offices HLW/law 8 14 _ ...wned..w.c 7:.ut, 'x w ., r,^r .. .�__ .� � � .z.. .... ... .. ,nW ewe ..,.1.�.. ... .,.., ,,. ,_ ._,.. ww ,..:. t.._+., LODI-EAST SIDE MORATORIUM AREA WATER FACILITIES STUDY SCOPE OF WORK A �- 1. Project administration and coordination with EIR Con=.: sultant. ($650) 2. Collect data on existing facilities in Study Area (City, B&V) ($1,400) E 3. Review and document results of computer hydraulic net- work analyses as they apply to the Study Area. Use -s results from 1977 Master Plan & 1979 Well Control & Elevated Tank Study and the 1985 Elevated Tank Siting Study. ($1,226) f . 4. Develop water use rates for each class of user and each level of residential density.' ($350) 5. Establish maximum supply capability curves for each line size, at each length for both domestic & fire demands. ($740) 6. Develop cost estimate tables for facilities required to: ). upgrade water system in the Study Area.($490) } 7. Establish and delineate subareas within StudyArea to be f coordinated with other consultants, if necessary. ($380) ; 8. Summarize existing facilities. '- y;g Location (street`, sidewalk, alley, etc.) ; i" Size ',,,Age Material -' Use (fire, domestic, both) ($570) ` .. Sin 9. Identify minimum facilities required regardless of, plan alternatives. ($700) . 10. Establish facility needs for minimum density scenaric and summarize by subarea. ($2,_300) % . 11. Establish facility needs `for 'maximum density scenario ( s,j and summarize by subarea. ($2,360) 55}