HomeMy WebLinkAboutAgenda Report - March 19, 1986 (98)-- --- •- �G�i,,uiy -le services or Black and
Veatch, Consulting
OC -6
Engineers,
for the preparation of the
c-
t1C-51 (a)
Sewex' Master Plan Update and
Study of the Eastside Area
at a total cost of $53,000.
ie
,
J.,
t
-x t
r I
i
y
Y
5 �-
3 �
i-
4
1 { -
T0: City Council`:
Proj11 ect` Data
FROM: C1ty Manager Originally Budgeted: -1985 & 1984
Budgeted Fund: 17.1 Sewer.Fund
DATE:. March 12, 1986 Amount Budgeted: $41,300'.
- Over-Run_Fund: 17.1 Sewer Fund_
SUBJECT: Approve Agreement with .
Sewer. Master Plan Consultant
RECOMMENDED ACTION: 'That the City Council engage the services of Black &Veatch,_-
"Consulting Engineers,' for the 'preparation of.the`Sewer MasterPlan `Update. and
`
Study of the Eastside Area`for a total cost of $53,000._
A breakdown of `costs and `what has been budgeted -is as follows:
Study Area Consultant Cost Budgeted Amount
Citywide Sewer MasterPlan $ 39,600 $ 35,000:
1.
Eastside Moratorium Area 9,700
r�
Eastside::Sewer.Investigation 3,700 6,300 '
f.
z
(1984 Block Grant Project} ;, $ 53,000 $ it1,300
(.
3:
The firm of Black & Veatch is currently working with the City crews on -the.`
televideo'analysis of'the existing' sewers,on'.'the east side. This work
,includes
recommending replacementA ines and line upgrading in the Eastside Area. Members
of this: f ir,ml were,,also involved with the•City's original` Sewer Master Flan and;
treatment; plantconstruction and:expansion'at White Slough
The amount budgeted.for_the"Sewer Master Plan was only a City staff est c.
Based on reviewing.the attached proposal and our knowledge of the _firm's past.::__
s•
'- performance,-th6,department can strongly recommend this firm be retained:to
do'.this work. In addition'`to Ma.ster.Plan document, the.,City wiil'obtain• he
. .
software -backs a "SEWER" and will receive trainin on th use'of this ro ram.
g , 9 p . 9`;
. .
If there `a re any questions about our recommendation,or the project in general,
�..
please cont t me.--
k
ack L. Ronsko
v
b c, Works Director
t
Attachment
JLR/eeh
6
'Y
+g
APPROVED:
Fl LE NO.
THOMAS'A •PETERSON, City Manager
r:
.b,.
NOV owl x LL— n is d gr— cram
.,
PROPOSAL
-..
TO
s =
CITY OF LODI,
FOR
SEWER MASTER'PLAN
Y -
PURPOSE
The rima ose for the preparation of this sewer master" plan is
P rY PurP P P P
to. provide for the orderly addition to the existing wastewater collection
� .
aad transport system to provide adequate service.for existing and,future
populations within the City of Lodi planning area. The.secondary purposes
areto provide engineering `support _regarding the. collection
_.
system to the EIR consultant for the Moratorium Study Area and to 'evaluate
;
the physical condition of the collection system in the Eastside Sewer Study
Area.
F
SCOPE OF WORK .
t
To execute the purpose of this study, the following scope of work will
be :completed.
i
Task 100,— Sewer Master Plan
To prepare an overall Sewer; Master Plan `or the City of Lodi .seryiceq:
area, the following specific'tasks will be undertaken.
>101 Using_the existing and future population �land and zoning
_use,
3
provided by the City,'develop unit wastewater contribution by use
,
`,.
type that reflects the actual measured flow at the White Slough
T
j.
wastewater- treatment facility. ,Also develop,minimum, peak, and
}
wet wyather flow= ratios and -project future system flows
�.
102 Develop a hydraulic model:of the existing collection system using
i
the Black :&.Veatch "SEWER" program 'The model will include the
`
i;
basic main and submain;'system but '.not.'collection'sewers. J' The .l
=
network will be reviewed and approved by the City.
_
103
Run the model to calibrate it with plant influent records.
;$
Perform subarea calibrations for flow data at nine ,key locations
in the City. Flowmeters will be provided by Black &.,Veatch but
A
installed and removed by city staff under the direction of the
engineer. _
104
,Develop standard sewer system design criteria to guide city staff
g{
in the review 'of development plans.
105
Using future .flows, run the "SEWER" model to identify system
deficiencies as the .City grows. Also, summarize the overall
.
i
conditions of .the existing syste<as based upon interview with City
..
staff.
106
Develop recommendations for system improvements including size,
routing,and cost to accommodate future growth. Plans shall be
based upon design standards and natural contours as defined by
14
_
USGS_mapping. ,.
107
For three large undeveloped areas identified by city staff,
develop specific recommendations for providing collection sewers._
108
Develop a recommended sewer maintenance plan.
109
.Provide a:draft'report for. City review.
110
Incorporate City comments into a final draft for City review..
Ill
Incorporate, City comments regarding the final draft and prepare
'the, final report for printing.'.: 'lave" the number of final' copies•
`
required,,by the City printed and delivered. Actual printing will
be`billed.separately.
I12
A user program manual, data files, and user subroutine will be
a
developed and'provided.the City, to, allow city staff :to run'the.
SEWER" model_by telephone"modum access to the Black & Veatch
,.
computer.
'
113
Provide the City staff- with training, hardware computer analysis,
and start—up assistance to get the model operational from City
i
offices.
-`
114
Provide �'four,;review meetings with city, staff as follows:-
a.`'' Interviews with maintenance personnel.
b. ' Review of flow :projections',design standards, and analysis
of existing system.
P48m2-2:
C. Review of draft report:
-
d. Review of final report.
Task 200
- Apartment Moratorium Study Area
F-;
To
provide engineering support to the City's EIR consultant for the
Apartment
Moratorium Study Area, the following specific tasks will be
undertaken.
201
Evaluate the capacity and adequacy of the existing collection
sewers in the Study Area for two zoning conditions identified by
the EIR consultant:: Identify the cost.of improvements required,
_=
for the two conditions.
202
Provide planning level analysis ofall alternative development
i w,
schemes identified by the EIR consultant to determine the cost
a_
impact of each.
P
203
Provide analysis and cost for two alternatives selected for
_
detailed analysis from the.screening in Task 202.
204
IR
Respond to questions, regarding the sewer system during the EIR-
process.
process.
F:`.
205
Detail an implementation plan for the selected best alternative.
Incorporate a summary;,of theprocess and. implementation plan,as
r'
an appendix to the Sewer Master Plan.f:
206
Provide for three coordination meetings and/or publicmeeting
''with the EIR consultant and -City.
F $.
Task 300
- East Side Sewer Analysis
S To
provide as assessment of the study area, the following tasks will
be undertaken:
E 301:
Evaluate the capacity and adequacy of the existing collection_
--
sewers in the study area for exist=c:.ing and proposed zoning.
302`
Summarize the results of smoke and TV testing performed by ,city
r
staff and correlate this information with the theoretical
capacity of the `system to provide as overall assessment of the
system adequacy.
$
3.03.
Meet : with city --staff : to" discuss results and to develop a
recommended impr ` ' ..
ovement plan..
P48m3
-3-
Report Outline`
a
Therreport prepared to present the analysis and results of the study
effort will have the following outline.
t_AChapter
l Introduction - Authorization, purpose, and scope of study.`:
t
Chapter 2 Summary of Recommendations - Summarize the recommendations
Y
of the study as 'supported by the text.
E
T
Chapter 3 Study Area Characteristics_- Summarize existing and future
s
-
a
land use zoning and population data provided by city stafff.
�y
Develop unit wastewater flow characteristics for existing
,
population that, when applied to'the land use information,
J
reflects the actual measured flow at the White Slough:'
€y
wastewater 'treatment .facility. Also develop minimum,
:w
peak, and wet weather flow characteristics.
-_
y,
Chapter 4 Existing Wastewater System - Provide.a description of thelk
Y
'>
existing wastewater collection system', to include basic
main and submains and pumping facilities: Summarize
�n
_'.
maintenance problems in the system. Model`the.existing
system to identify current system 'deficiencies.
Wt
_
Chapter.5 Basis of Design - Summarize design criteria to be applied
v
to the physical facilities (i.e., minimum slopes, design
.;
j
water depth, minimum pipe depth, etc.) Develop future
r=
a
wastewater flows based upon the population and densities.:,
;
Chapter 6 Collection System Plan - Summarize the analysis of the
distribution system and present a proposed development plan
for the collection system.
Appendix A Apartment Moratorium Study Area
Appendix B Eastside Sewer Analysis
a
Study Assumptions'.
mak.
This scope of work is based upon the following assumptions:
o Work will;be concurrent with the EIR water system and traffic_-
s
consultants for.the Apartment Moratorium Study.
o Population, growth, land use,, and zoning to be incorporated into,
n
the :master. plan Will be prepared: by. others.
o Existing sewer. maps are up-to-date and accurate. Any required
field verifications will be performed by the City.
P48m4 -4-
x
s
o The industrial collection system will not be addressed in the
�r
study.
o Work will not include detailed inspection/evaluation of each pump
`
i
station.'
'
o Final report printing will be paid by the City at cost.
SCHEDULE
Tasks 101, 102, 103, 104, and 108 can be completed in 8 weeks of
notice to proceed. The schedule then becomes dependent upon the EIR
consultant and the completion of Task 200. Once Task 200 is completed, a
draft sewer master plan can be completed in an additional 6 weeks. Without
the delay for Task 200, a draft of the sewer master pian would be complete
u is
in 16 weeks.
,r
��
FEE BASIS _
}
- Wiz•.
Summarized in attached Table 1 is the manpower estimate and cost of
the project tasks. The basic.Sewer, Master Plan cost is $39,631 with an+
additional $9,676 for the Apartment Moratorium Study Area and an additional
t_
$3,686 for the Eastside Study:Area.
These amounts are the estimated not to exceed costs. 'The consultant
'
will make every effort to complete the work within the not to exceed price.:..•
.
A
"
PROJECT PERSONNEL
Mr. David A. Requa will serve as project manager and will have overall4.
'
project"accountability. He will also participate in any public. or City.f-
Council meeting that may be required. Mr. Frank Appelfeller will be "
i
AIV
f?
project engineer and will coordinatethe day—to—day activities and prepare
15
the engineering rep ort.' Mr.' Greg Baatrup, Mr. Gary Meyer, and As. Sheila_
Boyington will provide staff engineering analysis on an as—needed and`
as -available. basis."'
P48m5 —5—
.� f
.`
f
_
-
t
?.
TABLE 1
CITY OF LODI
SEWER MASTER PLAN'`
ENGINEERING ESTIMATE
MAN-HOURS
•
TASK
Proj
Proj Staff
Expns
Total
<-
Mgr
Eng Eng D r€ t
Cler.
100 SEWER MASTER PIAN
101 :.
6
16 18
8
0,
0
2541
102:
8
20 48
0
0
500
4548
y '103
4
:16 48
-0
0
500
4009
•=
104
4
16 16
0
4
0
2123
105 '
2
'' 6 16
0
0
100
106
8
8 24
8
4
0
2596
107
2-
8 8
16.
0 _
0
1579
,.
108`
4
10 16
0
4
0
1760
109
8.
36 40
48
16
100
6898
_.
{
110
4
16 8
16
4
100
2421
111.
2
8 0
8
2
100
1074
7 _`
112
2
16 0
0
4
50
1277AA
_.
113
4
16 48
0
4
0
3619
=:
,mss ,
114
32
24 0
0
0
.0
3828
Sub -total Master Plan
90
216. 290.
104
42
.1450
39631
200 APARTMENT" STUDY AREA',�
201:'
2
6. 12
6
0
50
1337
x;.
r
202.
2
8 8
0
4
0
1117
203
2
8 12
12
4
0
1733
204 ;
2
:80
0
4
0
743:
205:
2
12 20
16
8
50
2652__
206
18
6 0
8
4
0
2096__'
9.
Sub -total Apartment Area
28
48 52
42
24
_.'_100
9676
300.EAST SIDE AREA.
`301
2
4 12
12
4
100
1591
L =:
302 +'
4
4 I6
6
2
0
1557
i .. .
303':
4
4 0
0
0
0
," 539"
x
_
Sub -total East Side
10
12 28
18
6
100
3686
=;.
TOTAL PROJECT"
128
276 370
164
72
1650
52993
Z
-,