Loading...
HomeMy WebLinkAboutAgenda Report - March 19, 1986 (98)-- --- •- �G�i,,uiy -le services or Black and Veatch, Consulting OC -6 Engineers, for the preparation of the c- t1C-51 (a) Sewex' Master Plan Update and Study of the Eastside Area at a total cost of $53,000. ie , J., t -x t r I i y Y 5 �- 3 � i- 4 1 { - T0: City Council`: Proj11 ect` Data FROM: C1ty Manager Originally Budgeted: -1985 & 1984 Budgeted Fund: 17.1 Sewer.Fund DATE:. March 12, 1986 Amount Budgeted: $41,300'. - Over-Run_Fund: 17.1 Sewer Fund_ SUBJECT: Approve Agreement with . Sewer. Master Plan Consultant RECOMMENDED ACTION: 'That the City Council engage the services of Black &Veatch,_- "Consulting Engineers,' for the 'preparation of.the`Sewer MasterPlan `Update. and ` Study of the Eastside Area`for a total cost of $53,000._ A breakdown of `costs and `what has been budgeted -is as follows: Study Area Consultant Cost Budgeted Amount Citywide Sewer MasterPlan $ 39,600 $ 35,000: 1. Eastside Moratorium Area 9,700 r� Eastside::Sewer.Investigation 3,700 6,300 ' f. z (1984 Block Grant Project} ;, $ 53,000 $ it1,300 (. 3: The firm of Black & Veatch is currently working with the City crews on -the.` televideo'analysis of'the existing' sewers,on'.'the east side. This work ,includes recommending replacementA ines and line upgrading in the Eastside Area. Members of this: f ir,ml were,,also involved with the•City's original` Sewer Master Flan and; treatment; plantconstruction and:expansion'at White Slough The amount budgeted.for_the"Sewer Master Plan was only a City staff est c. Based on reviewing.the attached proposal and our knowledge of the _firm's past.::__ s• '- performance,-th6,department can strongly recommend this firm be retained:to do'.this work. In addition'`to Ma.ster.Plan document, the.,City wiil'obtain• he . . software -backs a "SEWER" and will receive trainin on th use'of this ro ram. g , 9 p . 9`; . . If there `a re any questions about our recommendation,or the project in general, �.. please cont t me.-- k ack L. Ronsko v b c, Works Director t Attachment JLR/eeh 6 'Y +g APPROVED: Fl LE NO. THOMAS'A •PETERSON, City Manager r: .b,. NOV owl x LL— n is d gr— cram ., PROPOSAL -.. TO s = CITY OF LODI, FOR SEWER MASTER'PLAN Y - PURPOSE The rima ose for the preparation of this sewer master" plan is P rY PurP P P P to. provide for the orderly addition to the existing wastewater collection � . aad transport system to provide adequate service.for existing and,future populations within the City of Lodi planning area. The.secondary purposes areto provide engineering `support _regarding the. collection _. system to the EIR consultant for the Moratorium Study Area and to 'evaluate ; the physical condition of the collection system in the Eastside Sewer Study Area. F SCOPE OF WORK . t To execute the purpose of this study, the following scope of work will be :completed. i Task 100,— Sewer Master Plan To prepare an overall Sewer; Master Plan `or the City of Lodi .seryiceq: area, the following specific'tasks will be undertaken. >101 Using_the existing and future population �land and zoning _use, 3 provided by the City,'develop unit wastewater contribution by use , `,. type that reflects the actual measured flow at the White Slough T j. wastewater- treatment facility. ,Also develop,minimum, peak, and } wet wyather flow= ratios and -project future system flows �. 102 Develop a hydraulic model:of the existing collection system using i the Black :&.Veatch "SEWER" program 'The model will include the ` i; basic main and submain;'system but '.not.'collection'sewers. J' The .l = network will be reviewed and approved by the City. _ 103 Run the model to calibrate it with plant influent records. ;$ Perform subarea calibrations for flow data at nine ,key locations in the City. Flowmeters will be provided by Black &.,Veatch but A installed and removed by city staff under the direction of the engineer. _ 104 ,Develop standard sewer system design criteria to guide city staff g{ in the review 'of development plans. 105 Using future .flows, run the "SEWER" model to identify system deficiencies as the .City grows. Also, summarize the overall . i conditions of .the existing syste<as based upon interview with City .. staff. 106 Develop recommendations for system improvements including size, routing,and cost to accommodate future growth. Plans shall be based upon design standards and natural contours as defined by 14 _ USGS_mapping. ,. 107 For three large undeveloped areas identified by city staff, develop specific recommendations for providing collection sewers._ 108 Develop a recommended sewer maintenance plan. 109 .Provide a:draft'report for. City review. 110 Incorporate City comments into a final draft for City review.. Ill Incorporate, City comments regarding the final draft and prepare 'the, final report for printing.'.: 'lave" the number of final' copies• ` required,,by the City printed and delivered. Actual printing will be`billed.separately. I12 A user program manual, data files, and user subroutine will be a developed and'provided.the City, to, allow city staff :to run'the. SEWER" model_by telephone"modum access to the Black & Veatch ,. computer. ' 113 Provide the City staff- with training, hardware computer analysis, and start—up assistance to get the model operational from City i offices. -` 114 Provide �'four,;review meetings with city, staff as follows:- a.`'' Interviews with maintenance personnel. b. ' Review of flow :projections',design standards, and analysis of existing system. P48m2-2:­ C. Review of draft report: - d. Review of final report. Task 200 - Apartment Moratorium Study Area F-; To provide engineering support to the City's EIR consultant for the Apartment Moratorium Study Area, the following specific tasks will be undertaken. 201 Evaluate the capacity and adequacy of the existing collection sewers in the Study Area for two zoning conditions identified by the EIR consultant:: Identify the cost.of improvements required, _= for the two conditions. 202 Provide planning level analysis ofall alternative development i w, schemes identified by the EIR consultant to determine the cost a_ impact of each. P 203 Provide analysis and cost for two alternatives selected for _ detailed analysis from the.screening in Task 202. 204 IR Respond to questions, regarding the sewer system during the EIR- process. process. F:`. 205 Detail an implementation plan for the selected best alternative. Incorporate a summary;,of theprocess and. implementation plan,as r' an appendix to the Sewer Master Plan.f: 206 Provide for three coordination meetings and/or publicmeeting ''with the EIR consultant and -City. F $. Task 300 - East Side Sewer Analysis S To provide as assessment of the study area, the following tasks will be undertaken: E 301: Evaluate the capacity and adequacy of the existing collection_ -- sewers in the study area for exist=c:.ing and proposed zoning. 302` Summarize the results of smoke and TV testing performed by ,city r staff and correlate this information with the theoretical capacity of the `system to provide as overall assessment of the system adequacy. $ 3.03. Meet : with city --staff : to" discuss results and to develop a recommended impr ` ' .. ovement plan.. P48m3 -3- Report Outline` a Therreport prepared to present the analysis and results of the study effort will have the following outline. t_AChapter l Introduction - Authorization, purpose, and scope of study.`: t Chapter 2 Summary of Recommendations - Summarize the recommendations Y of the study as 'supported by the text. E T Chapter 3 Study Area Characteristics_- Summarize existing and future s - a land use zoning and population data provided by city stafff. �y Develop unit wastewater flow characteristics for existing , population that, when applied to'the land use information, J reflects the actual measured flow at the White Slough:' €y wastewater 'treatment .facility. Also develop minimum, :w peak, and wet weather flow characteristics. -_ y, Chapter 4 Existing Wastewater System - Provide.a description of thelk Y '> existing wastewater collection system', to include basic main and submains and pumping facilities: Summarize �n _'. maintenance problems in the system. Model`the.existing system to identify current system 'deficiencies. Wt _ Chapter.5 Basis of Design - Summarize design criteria to be applied v to the physical facilities (i.e., minimum slopes, design .; j water depth, minimum pipe depth, etc.) Develop future r= a wastewater flows based upon the population and densities.:, ; Chapter 6 Collection System Plan - Summarize the analysis of the distribution system and present a proposed development plan for the collection system. Appendix A Apartment Moratorium Study Area Appendix B Eastside Sewer Analysis a Study Assumptions'. mak. This scope of work is based upon the following assumptions: o Work will;be concurrent with the EIR water system and traffic_- s consultants for.the Apartment Moratorium Study. o Population, growth, land use,, and zoning to be incorporated into, n the :master. plan Will be prepared: by. others. o Existing sewer. maps are up-to-date and accurate. Any required field verifications will be performed by the City. P48m4 -4- x s o The industrial collection system will not be addressed in the �r study. o Work will not include detailed inspection/evaluation of each pump ` i station.' ' o Final report printing will be paid by the City at cost. SCHEDULE Tasks 101, 102, 103, 104, and 108 can be completed in 8 weeks of notice to proceed. The schedule then becomes dependent upon the EIR consultant and the completion of Task 200. Once Task 200 is completed, a draft sewer master plan can be completed in an additional 6 weeks. Without the delay for Task 200, a draft of the sewer master pian would be complete u is in 16 weeks. ,r �� FEE BASIS _ } - Wiz•. Summarized in attached Table 1 is the manpower estimate and cost of the project tasks. The basic.Sewer, Master Plan cost is $39,631 with an+ additional $9,676 for the Apartment Moratorium Study Area and an additional t_ $3,686 for the Eastside Study:Area. These amounts are the estimated not to exceed costs. 'The consultant ' will make every effort to complete the work within the not to exceed price.:..• . A " PROJECT PERSONNEL Mr. David A. Requa will serve as project manager and will have overall4. ' project"accountability. He will also participate in any public. or City.f- Council meeting that may be required. Mr. Frank Appelfeller will be " i AIV f? project engineer and will coordinatethe day—to—day activities and prepare 15 the engineering rep ort.' Mr.' Greg Baatrup, Mr. Gary Meyer, and As. Sheila_ Boyington will provide staff engineering analysis on an as—needed and` as -available. basis."' P48m5 —5— .� f .` f _ - t ?. TABLE 1 CITY OF LODI SEWER MASTER PLAN'` ENGINEERING ESTIMATE MAN-HOURS • TASK Proj Proj Staff Expns Total <- Mgr Eng Eng D r€ t Cler. 100 SEWER MASTER PIAN 101 :. 6 16 18 8 0, 0 2541 102: 8 20 48 0 0 500 4548 y '103 4 :16 48 -0 0 500 4009 •= 104 4 16 16 0 4 0 2123 105 ' 2 '' 6 16 0 0 100 106 8 8 24 8 4 0 2596 107 2- 8 8 16. 0 _ 0 1579 ,. 108` 4 10 16 0 4 0 1760 109 8. 36 40 48 16 100 6898 _. { 110 4 16 8 16 4 100 2421 111. 2 8 0 8 2 100 1074 7 _` 112 2 16 0 0 4 50 1277AA _. 113 4 16 48 0 4 0 3619 =: ,mss , 114 32 24 0 0 0 .0 3828 Sub -total Master Plan 90 216. 290. 104 42 .1450 39631 200 APARTMENT" STUDY AREA',� 201:' 2 6. 12 6 0 50 1337 x;. r 202. 2 8 8 0 4 0 1117 203 2 8 12 12 4 0 1733 204 ; 2 :80 0 4 0 743: 205: 2 12 20 16 8 50 2652__ 206 18 6 0 8 4 0 2096__' 9. Sub -total Apartment Area 28 48 52 42 24 _.'_100 9676 300.EAST SIDE AREA. `301 2 4 12 12 4 100 1591 L =: 302 +' 4 4 I6 6 2 0 1557 i .. . 303': 4 4 0 0 0 0 ," 539" x _ Sub -total East Side 10 12 28 18 6 100 3686 =;. TOTAL PROJECT" 128 276 370 164 72 1650 52993 Z -, hK L -